ROUND TABLE INDIA
Service through fellowship
Where We Are?
332+
Tables in India
ABOUT RTI
67+
Countries
138+
Cities in India
Numerous Healthcare
and Community Service
Activities
8655+
Classrooms Built
437+Cr.
Fund Deployment
What We Do? Who We Are?
Round Table India (RTI) is a volunteer-led,
non-political, and non-sectarian organization.
We promote service, fellowship, and goodwill
in national and international affairs. Our
dedicated young team prioritize the larger
needs of the community through sustainable
community building projects and service
initiatives.
02
WHY RT INDIA
Why Us?
Round Table India (RT India) is a trusted
partner for implementing welfare
schemes. Our flagship program,
Freedom Through Education (FTE),
has successfully Initiated/upgraded
schools nationwide with modern
infrastructure. We consistently receive
funds from our partners to support our
initiatives.
2022-23 54.19
Total funds received in last
5years
2018-19
2019-20
2020-21
2021-22 42.68
25.87
34.65
36.89
Classrooms allocated in last
5years
2018-19
2019-20
2020-21
2021-22 538
2022-23 717
364
519
422
Compliant with:
PAN MCA - CSR
80 G NGO Darpan
12AA MHA - FCRA
03
WHY RT INDIA
Project management Module
• A cutting edge project management tool
• Ensures Compliance at all stages
Project Online Module
• A convenient tracker of each project status
• All documentation is routed only through this module
04
An all encompassing tool to ensure transparency and enable easy monitoring of projects pan India
WHY choose RTI as your CSR implementation partner?
Ideal partner in the
field of Education,
HealthCare and
Community Service
Zero Over Head
Organization. 100% of
the donations are
utilized toward the
projects
Fully compliant with
Sec 135 requirements
for an implementing
agency
FCRA 80G and
12AA compliant
CSR Partner (IA)
to reputed Fortune
500 companies
Lucid and fast action
organization
Award Winning
community service
organization
Over 23 years of
track record in
delivering on CSR
eligible projects
Vast reach
across 130+
Cities and towns
in India
05
Companies Act 2013 (schedule VII)
CSR Admissible Activities
Promoting education, including special
education, employment-enhancing vocational
skills, and livelihood enhancement projects for
children, women, elderly individuals, and the
differently abled is an eligible CSR activity
under the Companies Act 2013, Schedule VII.
Spending CSR funds for COVID-19 and
related activities under items (i) and (xii) of
Schedule VII is eligible as per General Circular
no. 10/2020 issued by the Government of
India, Ministry of Corporate Affairs.
06
Our Expertise: Education
Built
3.07 M
Sq.Ft.
Impacting
9.53 M
Children
Outlay
437 Cr.
3616
Projects
8665
Class Rooms
Round Table India has
been building more than
One Classroom Every Day
for the last 12 years
07
Since 1996 Round Table India has been adopting
projects to provide quality school infrastructure to
underprivileged children. In 1998, this initiative was
formalized as the National Project of Round Table
India called "Freedom Through Education" (FTE).
FTE aims to educate underprivileged children and
break the cycle of poverty, degradation, and child
labour perpetuated by illiteracy. Round Table India
focuses on infrastructure-building to promote
education for future generations.
08
“Freedom through Education”
in pursuit of educatifig under privileged children.
About Project Heal
The Key focus areas of HEAL are:
Our Expertise: Healthcare
Mother
Care &
Child Care
Accessibility
(Infrastructure &
Equipment )
Eye-care
Trauma Care
& Ambulance
Service
1,339,364
BENEFICARIES
IMPACTED THIS YEAR
INR 57,324,823
PROJECT VALUE EXECUTED
09
Locations across India: cities and tables
Uttar Pradesh
City Table
Allahabad 1
Bareilly 2
Baroda 2
Bhadohi 1
Ghaziabad 2
Jhansi 1
Kanpur 3
Lucknow 3
Mathura 1
Meerut 1
Mirzapur 1
Moradabad 1
Muzzafarnagar 1
Noida 1
Pilibhit 1
Shahjahanpur 1
Saharanpur 1
Sitapur 1
Varanasi 3
Delhi
City Table
Agra 3
Delhi 11
Uttarakhand
City Table
Corbett 1
Dehradun 1
Haldwani 1
Haridwar 1
Roorkee 1
Rudrapur 1
Madhya Pradesh
City Table
Bhopal 3
Gwalior 1
Indore 4
Jabalpur 2
Ujjain 1
Madhya Pradesh
Bhubaneswar
Cuttack
Jharsuguda
Rourkela
Sambalpur
3
1
1
2
1
Odisha
Maharashtra
City Table
Aurangabad 1
Ichalkaranji 1
Kolhapur 1
Mumbai 9
Nagpur 4
Nasik 2
Pune 9
Sangli 1
Solapur 3
Karnataka
City Table
Bangalore 14
Belgaum 3
Bellary 2
Chikmagalur 1
Davangere 1
Dharwad 1
Hospet 1
Mangalore 2
Mysore 4
Sakleshpur 1
Shimoga 2
Tumkur 2
Hospet 1
Trivandrum
Wayanad
2
1
Kerala
Ajmer 1
Rajastan
Haryana
Tamil Nadu
City Table
Chennai 15
Hosur 1
Coimbatore 8
Coonoor 1
Erode 2
Karur 1
Madurai 2
Nagercoil 1
Ooty 1
Pollachi 1
Rajapalayam-Sivakasi 1
Salem 3
Tirupur 1
Trichy 2
Vellore 1
Gujarat
City Table
Ahmedabad 7
Ghandhidham 1
Jamnagar 1
Rajkot 1
Surat 3
Vadodara 1
Andhra Pradesh
City Table
Amaravati 1
Guntur 1
Nellore 2
Vijayawada 1
Vizag 4
Vizainagaram 1
Bihar
City
Patna
Table
1
Chhattisgarh
Punjab
Telangana
Goa
City
Bhopal
Gwalior
Indore
Jabalpur
Ujjain
10
Table
3
1
4
2
1
City Table
City Table
Asansol 1
Durgapur 1
Kolkata 16
Siliguri 4
City Table
City Table City Table City Table
Alleppey 1 Ambala 1 Bhilai 1
Calicut 2 Faridabad 1 Bilaspur 2
Cannanore 1 Gurgaon 2 Raipur 5
Cochin 3 Kaithal 1
Ernakulam 1 Karnal 1 Jharkhand
Kottayam 2 Panipat 2
Palakkad 1 Yamunanagar 1 City Table
Quilon (Kollam) 1 Dhanbad 1
Thodupuzha 1 Jamshedpur 2
Trichur 1 West Bengal Ranchi 3
City
Amritsar
Chandigarh
Rajpura
Table
1
3
1
City
Hyderabad
Secunderabad
Table
9
5
City Table
Bhilwara 2
Assam Margao 1
Bikaner 1 City Table Panjim 2
chittorgarh 1 Dibrugarh 1
Jaipur 7 Guwahati 7 Punjab
Jodhpur 2 Jorhat 2
Kota 3 Tezpur 1 City Table
Udaipur 4 Tinsukia 2 Ludhiana 3
Sikkim Meghalaya Puducherry
City Table City Table City Table
Gangtok 1 Shillong 1 Pondicherry 3
• Second Line Healthcare Centre,
Ernakulam
• New ICU Wing, Pune
• Renovation of Mother & Child Care
Ward, Ranchi
• Hospital Extension with ICU Unit,
Mirzapur
• Hospital Extension with ICU &
OT, Ahmedabad
• Renovation of 12 Bed Post Delivery Care
Ward, Jodhpur
• Renovation of 20 Bed Post ICU
Ward, Bikaner
• Renovation of Ward at Osmania Hospital
with Cognizant, Hyderabad
11
Some Projects Under
Project Heal:
Our Experties: Covid response
The COVID Times made us enter into COVID CSR, followed
by Hyderabad Flood Relief & Aamphan Relief Partnership with
Cognizant Outreach and Round Table India extended its
assistance to relief work extended to thousands of families
through 110+ selected requesting organizations in the capacity
of the Executing NGO Partner.
In phase 1 & phase 2, Round Table India has been able to
impact over 83,000 people across 8 cities of India (Kolkata,
Bengaluru, Hyderabad, Kochi, Coimbatore, Noida, Pune &
Mumbai) The partnership currently is valued at Rs. 900 Lacs &
Counting.
12
Our Experties: Covid response
From the Chief Minister’s kitchen in Ranchi
to the exceptional work done in Mumbai in
helping senior citizens and the needy with
daily essentials, cooked meals and rations.
These are just some of the examples of the
amazing work done by Round Table India
throughout the country during the pandemic
13
Meals served across
India (Food Packets &
Ration Meals)
ONE NATION ONE CAUSE
Impact
1st April-15th May 2020
55,15,387
Meals served across
India
20,81,807
Approx. Meals worth of
Ration
34,33,580
14
RTI undertakes a variety of community service initiatives. These are just a few landmark ones
Our Expertise: Community Service
15
The Event is one of its kind where
kids with Hearing impaired
participate in various kinds of
Sports and Cultural Activities. 800+
kids participate every year at the
event from all over the Nation.
Running for past 47 years
Silent Olympiad
TZP out the creativity of thousands
of under privileged children through
Sit & Draw, Music, Dance
competitions. A huge celebration for
Children being done done on a
PAN India basis in various schools
for past 13 years.
Tare Zameen Pe
Underprivileged children take this
experiential learning route to unlock
their potential for growth. It was a
life time experience for these
children. Event done for more than
10 years now
Flight of Fantasy
Round Table India is often amongst the first responders
Our Expertise: Disaster Relief
ROUND TABLE INDIA was
the only NGO entrusted by
Tamil Nadu Government to
work in Tsunami affected
areas for rebuilding of schools.
126 Schools were built at a
cost of Rs.25 Crores
Operation Tsunami
For Orissa Cyclone Relief in
1999-2000 – Construction of
10 Schools by the Tables in
Bhubaneswar and Cuttack.
Reconstruction of homes,
schools and distribution of food
and daily necessities was done
in Puri, Bhubaneswar &
Cuttack after the Cyclone Fani
in May 2019
Odhisa Cyclone
16
ROUND TABLE INDIA was
the first NGO to reach ground
after Kashmir Flood. We have
made a huge contribution at
the right Time to see that kids
don’t cry because of hunger,
women don’t plead for help
and men don’t run away from
duties and get engaged in anti-
social activities.
Kashmir Flood
Round Table was the first
organization to rebuild 20
Schools in Kutch &
Surendranagar (Bhuj) within 4
months. Azim Premji
Foundation contributed Rs.80
Lacs on a total outlay of
Rs.2.4 Crores
Gujrat Earthquake
Few of our Corporate Donors
Educating over 7 million underprivileged children
17
THANK YOU!
Let’s help build a brighter future.
Visit us at www.roundtableindia.org
Contact us on np@roundtableindia.org or csr@rti.in

Round Table India 2023-24 CSR proposal.pdf

  • 1.
    ROUND TABLE INDIA Servicethrough fellowship
  • 2.
    Where We Are? 332+ Tablesin India ABOUT RTI 67+ Countries 138+ Cities in India Numerous Healthcare and Community Service Activities 8655+ Classrooms Built 437+Cr. Fund Deployment What We Do? Who We Are? Round Table India (RTI) is a volunteer-led, non-political, and non-sectarian organization. We promote service, fellowship, and goodwill in national and international affairs. Our dedicated young team prioritize the larger needs of the community through sustainable community building projects and service initiatives. 02
  • 3.
    WHY RT INDIA WhyUs? Round Table India (RT India) is a trusted partner for implementing welfare schemes. Our flagship program, Freedom Through Education (FTE), has successfully Initiated/upgraded schools nationwide with modern infrastructure. We consistently receive funds from our partners to support our initiatives. 2022-23 54.19 Total funds received in last 5years 2018-19 2019-20 2020-21 2021-22 42.68 25.87 34.65 36.89 Classrooms allocated in last 5years 2018-19 2019-20 2020-21 2021-22 538 2022-23 717 364 519 422 Compliant with: PAN MCA - CSR 80 G NGO Darpan 12AA MHA - FCRA 03
  • 4.
    WHY RT INDIA Projectmanagement Module • A cutting edge project management tool • Ensures Compliance at all stages Project Online Module • A convenient tracker of each project status • All documentation is routed only through this module 04 An all encompassing tool to ensure transparency and enable easy monitoring of projects pan India
  • 5.
    WHY choose RTIas your CSR implementation partner? Ideal partner in the field of Education, HealthCare and Community Service Zero Over Head Organization. 100% of the donations are utilized toward the projects Fully compliant with Sec 135 requirements for an implementing agency FCRA 80G and 12AA compliant CSR Partner (IA) to reputed Fortune 500 companies Lucid and fast action organization Award Winning community service organization Over 23 years of track record in delivering on CSR eligible projects Vast reach across 130+ Cities and towns in India 05
  • 6.
    Companies Act 2013(schedule VII) CSR Admissible Activities Promoting education, including special education, employment-enhancing vocational skills, and livelihood enhancement projects for children, women, elderly individuals, and the differently abled is an eligible CSR activity under the Companies Act 2013, Schedule VII. Spending CSR funds for COVID-19 and related activities under items (i) and (xii) of Schedule VII is eligible as per General Circular no. 10/2020 issued by the Government of India, Ministry of Corporate Affairs. 06
  • 7.
    Our Expertise: Education Built 3.07M Sq.Ft. Impacting 9.53 M Children Outlay 437 Cr. 3616 Projects 8665 Class Rooms Round Table India has been building more than One Classroom Every Day for the last 12 years 07
  • 8.
    Since 1996 RoundTable India has been adopting projects to provide quality school infrastructure to underprivileged children. In 1998, this initiative was formalized as the National Project of Round Table India called "Freedom Through Education" (FTE). FTE aims to educate underprivileged children and break the cycle of poverty, degradation, and child labour perpetuated by illiteracy. Round Table India focuses on infrastructure-building to promote education for future generations. 08 “Freedom through Education” in pursuit of educatifig under privileged children.
  • 9.
    About Project Heal TheKey focus areas of HEAL are: Our Expertise: Healthcare Mother Care & Child Care Accessibility (Infrastructure & Equipment ) Eye-care Trauma Care & Ambulance Service 1,339,364 BENEFICARIES IMPACTED THIS YEAR INR 57,324,823 PROJECT VALUE EXECUTED 09
  • 10.
    Locations across India:cities and tables Uttar Pradesh City Table Allahabad 1 Bareilly 2 Baroda 2 Bhadohi 1 Ghaziabad 2 Jhansi 1 Kanpur 3 Lucknow 3 Mathura 1 Meerut 1 Mirzapur 1 Moradabad 1 Muzzafarnagar 1 Noida 1 Pilibhit 1 Shahjahanpur 1 Saharanpur 1 Sitapur 1 Varanasi 3 Delhi City Table Agra 3 Delhi 11 Uttarakhand City Table Corbett 1 Dehradun 1 Haldwani 1 Haridwar 1 Roorkee 1 Rudrapur 1 Madhya Pradesh City Table Bhopal 3 Gwalior 1 Indore 4 Jabalpur 2 Ujjain 1 Madhya Pradesh Bhubaneswar Cuttack Jharsuguda Rourkela Sambalpur 3 1 1 2 1 Odisha Maharashtra City Table Aurangabad 1 Ichalkaranji 1 Kolhapur 1 Mumbai 9 Nagpur 4 Nasik 2 Pune 9 Sangli 1 Solapur 3 Karnataka City Table Bangalore 14 Belgaum 3 Bellary 2 Chikmagalur 1 Davangere 1 Dharwad 1 Hospet 1 Mangalore 2 Mysore 4 Sakleshpur 1 Shimoga 2 Tumkur 2 Hospet 1 Trivandrum Wayanad 2 1 Kerala Ajmer 1 Rajastan Haryana Tamil Nadu City Table Chennai 15 Hosur 1 Coimbatore 8 Coonoor 1 Erode 2 Karur 1 Madurai 2 Nagercoil 1 Ooty 1 Pollachi 1 Rajapalayam-Sivakasi 1 Salem 3 Tirupur 1 Trichy 2 Vellore 1 Gujarat City Table Ahmedabad 7 Ghandhidham 1 Jamnagar 1 Rajkot 1 Surat 3 Vadodara 1 Andhra Pradesh City Table Amaravati 1 Guntur 1 Nellore 2 Vijayawada 1 Vizag 4 Vizainagaram 1 Bihar City Patna Table 1 Chhattisgarh Punjab Telangana Goa City Bhopal Gwalior Indore Jabalpur Ujjain 10 Table 3 1 4 2 1 City Table City Table Asansol 1 Durgapur 1 Kolkata 16 Siliguri 4 City Table City Table City Table City Table Alleppey 1 Ambala 1 Bhilai 1 Calicut 2 Faridabad 1 Bilaspur 2 Cannanore 1 Gurgaon 2 Raipur 5 Cochin 3 Kaithal 1 Ernakulam 1 Karnal 1 Jharkhand Kottayam 2 Panipat 2 Palakkad 1 Yamunanagar 1 City Table Quilon (Kollam) 1 Dhanbad 1 Thodupuzha 1 Jamshedpur 2 Trichur 1 West Bengal Ranchi 3 City Amritsar Chandigarh Rajpura Table 1 3 1 City Hyderabad Secunderabad Table 9 5 City Table Bhilwara 2 Assam Margao 1 Bikaner 1 City Table Panjim 2 chittorgarh 1 Dibrugarh 1 Jaipur 7 Guwahati 7 Punjab Jodhpur 2 Jorhat 2 Kota 3 Tezpur 1 City Table Udaipur 4 Tinsukia 2 Ludhiana 3 Sikkim Meghalaya Puducherry City Table City Table City Table Gangtok 1 Shillong 1 Pondicherry 3
  • 11.
    • Second LineHealthcare Centre, Ernakulam • New ICU Wing, Pune • Renovation of Mother & Child Care Ward, Ranchi • Hospital Extension with ICU Unit, Mirzapur • Hospital Extension with ICU & OT, Ahmedabad • Renovation of 12 Bed Post Delivery Care Ward, Jodhpur • Renovation of 20 Bed Post ICU Ward, Bikaner • Renovation of Ward at Osmania Hospital with Cognizant, Hyderabad 11 Some Projects Under Project Heal:
  • 12.
    Our Experties: Covidresponse The COVID Times made us enter into COVID CSR, followed by Hyderabad Flood Relief & Aamphan Relief Partnership with Cognizant Outreach and Round Table India extended its assistance to relief work extended to thousands of families through 110+ selected requesting organizations in the capacity of the Executing NGO Partner. In phase 1 & phase 2, Round Table India has been able to impact over 83,000 people across 8 cities of India (Kolkata, Bengaluru, Hyderabad, Kochi, Coimbatore, Noida, Pune & Mumbai) The partnership currently is valued at Rs. 900 Lacs & Counting. 12
  • 13.
    Our Experties: Covidresponse From the Chief Minister’s kitchen in Ranchi to the exceptional work done in Mumbai in helping senior citizens and the needy with daily essentials, cooked meals and rations. These are just some of the examples of the amazing work done by Round Table India throughout the country during the pandemic 13
  • 14.
    Meals served across India(Food Packets & Ration Meals) ONE NATION ONE CAUSE Impact 1st April-15th May 2020 55,15,387 Meals served across India 20,81,807 Approx. Meals worth of Ration 34,33,580 14
  • 15.
    RTI undertakes avariety of community service initiatives. These are just a few landmark ones Our Expertise: Community Service 15 The Event is one of its kind where kids with Hearing impaired participate in various kinds of Sports and Cultural Activities. 800+ kids participate every year at the event from all over the Nation. Running for past 47 years Silent Olympiad TZP out the creativity of thousands of under privileged children through Sit & Draw, Music, Dance competitions. A huge celebration for Children being done done on a PAN India basis in various schools for past 13 years. Tare Zameen Pe Underprivileged children take this experiential learning route to unlock their potential for growth. It was a life time experience for these children. Event done for more than 10 years now Flight of Fantasy
  • 16.
    Round Table Indiais often amongst the first responders Our Expertise: Disaster Relief ROUND TABLE INDIA was the only NGO entrusted by Tamil Nadu Government to work in Tsunami affected areas for rebuilding of schools. 126 Schools were built at a cost of Rs.25 Crores Operation Tsunami For Orissa Cyclone Relief in 1999-2000 – Construction of 10 Schools by the Tables in Bhubaneswar and Cuttack. Reconstruction of homes, schools and distribution of food and daily necessities was done in Puri, Bhubaneswar & Cuttack after the Cyclone Fani in May 2019 Odhisa Cyclone 16 ROUND TABLE INDIA was the first NGO to reach ground after Kashmir Flood. We have made a huge contribution at the right Time to see that kids don’t cry because of hunger, women don’t plead for help and men don’t run away from duties and get engaged in anti- social activities. Kashmir Flood Round Table was the first organization to rebuild 20 Schools in Kutch & Surendranagar (Bhuj) within 4 months. Azim Premji Foundation contributed Rs.80 Lacs on a total outlay of Rs.2.4 Crores Gujrat Earthquake
  • 17.
    Few of ourCorporate Donors Educating over 7 million underprivileged children 17
  • 18.
    THANK YOU! Let’s helpbuild a brighter future. Visit us at www.roundtableindia.org Contact us on np@roundtableindia.org or csr@rti.in