KEGIATAN : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG KECAMATAN BENGKALIS Minggu ke
PEKERJAAN : PEMBANGUNAN PARIT BETON JALAN ROZALI WONOSARI 350 M' Dari Tanggal
LOKASI : KEC. BENGKALIS Sampai Tanggal :
4 5 6 7 = 5 + 6
DIVISI 1. UMUM
Mobilisasi 1.00 Ls 0.84 0.5 0.50 1
DIVISI 3. PEKERJAAN TANAH
Galian Struktur Kedalaman 0-2 M 138.34 M3 1.48 138.34 - 138.34
Urugan Pasir 16.28 M3 1.92 16.28 - 16.28
DIVISI 6. PERKERASAN ASPAL
DIVISI 7. STRUKTUR
BETON K125 (Lantai Kerja) 32.55 M3 14.91 32.55 - 32.55
Pas. Bata 1/2 Bata 245.00 M2 16.21 175 70.00 245.00
Pas. Bata 1 Bata 245.00 M2 35.70 175 70.00 245.00
Plesteran 1;2 619.50 M2 9.92 443 176.99 619.50
Plastik Alas 395.50 M2 1.37 395.50 - 395.50
Besi Stek (besi polos Dia 10 mm) 454.05 Kg 3.14 454.05 - 454.05
Cerucuk dia 6 - 8 cm Pjg 6m 3,503 Btg 13.60 3,503 - 3,503.00
Pipa PVC Dia 1" 275.00 M1 0.92 196 78.57 275.00
100
KEMAJUAN PEKERJAAN SAMPAI MINGGU INI 100 %
Di Buat Oleh:
Di Periksa Oleh: KONSULTAN PENGAW
PEJABAT PELAKSANA TEKNIS KEGIATAN CV. LINGKAR BUANA KON
(PPTK)
FIRDAUS, Sst SUHAIMI, Amd
Nip. 420011593 Supervision Engineer
No. Mata
Pembayaran
U R A I A N
Skh.7663
3.1 (4)
Skh 3.2 (4)
7.1 (8)
LAPORAN KEMAJUAN PEKERJAAN
a b
1.2
KONTRAK AWAL REALISASI FISIK
3
MINGGUAN
VOLUME KONTRAK BOBOT
%
MINGGU LALU MINGGU INI
SAMPAI DENGAN
MINGGU INI
: VII (Tujuh)
: 07 Agustus 2008
: 13 Agustus 2008
8 = 7/ 3 X 100 9 = 8 /100 X 4
100.00 0.84
100.00 1.48
100.00 1.92
100.00 14.91
100.00 16.21
100.00 35.70
100.00 9.92
100.00 1.37
100.00 3.14
100.00 13.6
100.00 0.92
100
WAS
NSULTAN
ring
PROSENTASE
THD BAGIAN
PEKERJAAN
THD BAGIAN
KESELURUHAN

More Related Content

Viewers also liked

제주펜션예약 방콕골프여행
제주펜션예약 방콕골프여행제주펜션예약 방콕골프여행
제주펜션예약 방콕골프여행
hydkfuig
 
강원도팬션 중국대련골프투어
강원도팬션 중국대련골프투어강원도팬션 중국대련골프투어
강원도팬션 중국대련골프투어
gsdgrhr
 
Financial scheme FHC E'UNITED STATES"E
Financial scheme FHC E'UNITED STATES"EFinancial scheme FHC E'UNITED STATES"E
Financial scheme FHC E'UNITED STATES"E
Fabrice CLAMAGIRAND
 
mt펜션『BU797』.『COM』신혼여행싸게가기
mt펜션『BU797』.『COM』신혼여행싸게가기mt펜션『BU797』.『COM』신혼여행싸게가기
mt펜션『BU797』.『COM』신혼여행싸게가기
hydkfuig
 
Projected budgeting 2015 FHC K'CANADA'K
Projected budgeting 2015 FHC K'CANADA'KProjected budgeting 2015 FHC K'CANADA'K
Projected budgeting 2015 FHC K'CANADA'K
Fabrice CLAMAGIRAND
 
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
hydkfuig
 
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
gsdgrhr
 
Husky Reference Letter
Husky Reference LetterHusky Reference Letter
Husky Reference LetterDeepak_tailevu
 
Gran jean day ecologico 1
Gran jean day ecologico 1Gran jean day ecologico 1
Gran jean day ecologico 1Paula Castro
 
Progress report
Progress reportProgress report
Progress report3HEz
 
Plantea
PlanteaPlantea

Viewers also liked (15)

제주펜션예약 방콕골프여행
제주펜션예약 방콕골프여행제주펜션예약 방콕골프여행
제주펜션예약 방콕골프여행
 
강원도팬션 중국대련골프투어
강원도팬션 중국대련골프투어강원도팬션 중국대련골프투어
강원도팬션 중국대련골프투어
 
lettre_felicitations_raganet
lettre_felicitations_raganetlettre_felicitations_raganet
lettre_felicitations_raganet
 
Financial scheme FHC E'UNITED STATES"E
Financial scheme FHC E'UNITED STATES"EFinancial scheme FHC E'UNITED STATES"E
Financial scheme FHC E'UNITED STATES"E
 
mt펜션『BU797』.『COM』신혼여행싸게가기
mt펜션『BU797』.『COM』신혼여행싸게가기mt펜션『BU797』.『COM』신혼여행싸게가기
mt펜션『BU797』.『COM』신혼여행싸게가기
 
Projected budgeting 2015 FHC K'CANADA'K
Projected budgeting 2015 FHC K'CANADA'KProjected budgeting 2015 FHC K'CANADA'K
Projected budgeting 2015 FHC K'CANADA'K
 
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
외국계은행대출\【 FUN88。CO。KR】\저축은행대출상품 아름다운팬션
 
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
안면도가는길\【 FUN88。CO。KR】\꽃지해수욕장펜션
 
Husky Reference Letter
Husky Reference LetterHusky Reference Letter
Husky Reference Letter
 
as119
as119as119
as119
 
51
5151
51
 
Gran jean day ecologico 1
Gran jean day ecologico 1Gran jean day ecologico 1
Gran jean day ecologico 1
 
Progress report
Progress reportProgress report
Progress report
 
Plantea
PlanteaPlantea
Plantea
 
Futbol1
Futbol1Futbol1
Futbol1
 

More from kurniawan yusril

Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
kurniawan yusril
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
kurniawan yusril
 
Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
kurniawan yusril
 
Bobot
BobotBobot

More from kurniawan yusril (9)

Labul
LabulLabul
Labul
 
Hj salamah
Hj salamahHj salamah
Hj salamah
 
Gg melati
Gg melatiGg melati
Gg melati
 
Dsn timur ok
Dsn timur okDsn timur ok
Dsn timur ok
 
Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
 
Bobot
BobotBobot
Bobot
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 
Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
 
Bobot
BobotBobot
Bobot
 

Recently uploaded

NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 

Recently uploaded (20)

NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 

Rojali

  • 1. KEGIATAN : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG KECAMATAN BENGKALIS Minggu ke PEKERJAAN : PEMBANGUNAN PARIT BETON JALAN ROZALI WONOSARI 350 M' Dari Tanggal LOKASI : KEC. BENGKALIS Sampai Tanggal : 4 5 6 7 = 5 + 6 DIVISI 1. UMUM Mobilisasi 1.00 Ls 0.84 0.5 0.50 1 DIVISI 3. PEKERJAAN TANAH Galian Struktur Kedalaman 0-2 M 138.34 M3 1.48 138.34 - 138.34 Urugan Pasir 16.28 M3 1.92 16.28 - 16.28 DIVISI 6. PERKERASAN ASPAL DIVISI 7. STRUKTUR BETON K125 (Lantai Kerja) 32.55 M3 14.91 32.55 - 32.55 Pas. Bata 1/2 Bata 245.00 M2 16.21 175 70.00 245.00 Pas. Bata 1 Bata 245.00 M2 35.70 175 70.00 245.00 Plesteran 1;2 619.50 M2 9.92 443 176.99 619.50 Plastik Alas 395.50 M2 1.37 395.50 - 395.50 Besi Stek (besi polos Dia 10 mm) 454.05 Kg 3.14 454.05 - 454.05 Cerucuk dia 6 - 8 cm Pjg 6m 3,503 Btg 13.60 3,503 - 3,503.00 Pipa PVC Dia 1" 275.00 M1 0.92 196 78.57 275.00 100 KEMAJUAN PEKERJAAN SAMPAI MINGGU INI 100 % Di Buat Oleh: Di Periksa Oleh: KONSULTAN PENGAW PEJABAT PELAKSANA TEKNIS KEGIATAN CV. LINGKAR BUANA KON (PPTK) FIRDAUS, Sst SUHAIMI, Amd Nip. 420011593 Supervision Engineer No. Mata Pembayaran U R A I A N Skh.7663 3.1 (4) Skh 3.2 (4) 7.1 (8) LAPORAN KEMAJUAN PEKERJAAN a b 1.2 KONTRAK AWAL REALISASI FISIK 3 MINGGUAN VOLUME KONTRAK BOBOT % MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI
  • 2. : VII (Tujuh) : 07 Agustus 2008 : 13 Agustus 2008 8 = 7/ 3 X 100 9 = 8 /100 X 4 100.00 0.84 100.00 1.48 100.00 1.92 100.00 14.91 100.00 16.21 100.00 35.70 100.00 9.92 100.00 1.37 100.00 3.14 100.00 13.6 100.00 0.92 100 WAS NSULTAN ring PROSENTASE THD BAGIAN PEKERJAAN THD BAGIAN KESELURUHAN