Risk Assessment NOTE:   This Risk Assessment did not take into account laws/acts such as RA10121, RA7279, RA7160, and letter/s ( http://www.goldstardailynews.com/northern-mindanao-%7C%7C-x/7353-denr-warned-jaraula-emano.html ) from DENR to LGU. The Author Arnel Escobido Aguinot Registered Civil Engineer (PRC - Philippines) Professional Engineer (Institute of Engineers Australia) BS in Civil Engineering Master of Engineering Former resident of NHA – Lourdesville Homes, Balulang, Cagayan de Oro City, Philippines
Probability or Likelihood Classification Descriptor Description Probability of Single Event Almost Certain Common or frequent occurrence, likely to occur often during the life of an individual item or system, or very often in an operation of a large number of similar items >25% Likely Is known to occur or it has happened.  Likely to occur several times in the life of an individual item or system or often in operation of a large number of similar items 10% - 25% Possible Could occur or “I’ve heard of it happening”.  Likely to occur sometime in the life of an individual item or system, or will occur several times in the life of a large number of similar components 1% - 10% Unlikely Unlikely to occur, but possible to occur sometime in the life of an individual item or system, or can reasonably be expected to occur in the life of a large number of similar components 0.1% - 1% Rare Practically impossible, so unlikely to occur in the life of an individual item or system that it may be assumed not to be experienced, or it may be possible, but unlikely to occur in the life of a large number of similar components <0.1% Maximum Reasonable Consequence Classifications Descriptor Health & Safety Environment Damage or Cost impact Catastrophic Fatality or permanent disability Impact with potential for severe of long term harm, or impact on area of significance >Php 80M Major Lost day injury, or illness Events causing harm which cannot be immediately recovered Php20M - Php80M Serious Restricted duties injury or illness Impact with localised harm Php4M - Php20M Medium Medical treatment injury or illness Events with potential to cause local harm Php400k - Php 4M Minor First aid injury or illness not requiring treatment single event causing negligible harm <Php400k RISK MATRIX CONSEQUENCES 1-Minor 2-Medium 3-Serious 4-Major 5-Catastrophic LIKELIHOOD Risk Rating A-Almost Certain Moderate High Critical Critical Critical B-Likely Moderate High High Critical Critical C-Possible Low Moderate High Critical Critical D-Unlikely Low Low Moderate High Critical E-Rare Low Low Moderate High High
 
 
 
 
 
All inherent Risks are   Critical   with Consequences to be  Catastrophic  and  Major . After putting in controls, majority of the items remain  Critical  although its likelihood are now  reduced . Regarding Control (refer to control column), consideration must be given to the appropriate application of the hierarchy of control as follows:   1. Elimination   2. Substitution   3. Isolation   4. Engineering   5. Administration   6. Personal Protective Equipment (PPE) or Signage This template, as its title connotes, is a high level Risk Assessment. It is recommended that a Barangay level Risk Assessment must also be developed. Notes on the Risk Assessment Matrix: Generally, Risk remains the same or reduces a level (e.g. from major to serious) after the installation of control measure/s. If the control measure cannot be implemented immediately there is a possibility that something can happen in the interim period – in this case  residual risk  score would be the same as  inherent risk  until control measures are in place. There are a number of Potential Causes under  Item No. 1  which can be considered as given or are already known and are ranked Critical in Inherent and Residual Risks.  Item No. 2  is considered enforceable while Item  No. 3  is generally referring to poor dissemination (2-way process) of information.  Item No. 4  is something that CDO can implement in the future.  Item No. 5  – after careful consideration of Items 1 to 4 it can be deduced that the loss of lives is forthcoming especially for communities in very close proximity to Cagayan River.  Item No. 6  (not in the matrix) – should be Rescue Operation.   
Disclaimer This was developed after Sendong made a landfall in Cagayan de Oro City. With very limited information and data to populate the Risk Assessment matrix it must be understood that this may not be the true picture of Pre-Sendong scenario, however, this may be used to simulate an approximate Pre-landfall (Sendong) Risk Assessment, hence this presentation. The information provided does not have regard to individual circumstances and does not purport to be exhaustive or complete.  The author does not warrant that the information are accurate, reasonable or complete, and to the maximum permitted by law, excludes all liability arising in relation to the information or its use. The information is not a substitute for professional advice, and before taking or omitting to take any action based on the information provided, professional advice (including from qualified Drainage and Civil Engineers, GIS Specialists, and Consultants) should be sought, and safety precautions should be assessed.  Moving forward, it is highly recommended that this template (Risk Assessment Matrix), or its equivalent, will form part of the CDO’s disaster management plan; however if such template is already in place, it must be reviewed periodically. Responsible party must be identified to ensure controls are implemented. This Risk Assessment must be reviewed upon receipt of information relating to Low Pressure Area (LPA) or Typhoon especially if the identified catchment area/s feeding Cagayan River is potentially within the LPA or Typhoon path; Lastly, this must be made available to all stakeholders (e.g. general public of CDO).

More Related Content

What's hot

One login enemy at the gates
One login enemy at the gatesOne login enemy at the gates
One login enemy at the gates
Eoin Keary
 
Risk assessment Presentation by Affygility Solutions
Risk assessment Presentation by Affygility SolutionsRisk assessment Presentation by Affygility Solutions
Risk assessment Presentation by Affygility Solutions
Dean Calhoun
 
Vulnerability Management Program
Vulnerability Management ProgramVulnerability Management Program
Vulnerability Management Program
Dennis Chaupis
 
INCIDENT RESPONSE NIST IMPLEMENTATION
INCIDENT RESPONSE NIST IMPLEMENTATIONINCIDENT RESPONSE NIST IMPLEMENTATION
INCIDENT RESPONSE NIST IMPLEMENTATION
Sylvain Martinez
 
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
Outpost24
 
Layer of protection analysis
Layer of protection analysisLayer of protection analysis
Layer of protection analysis
Sandip Sonawane
 
Ransomware attacks
Ransomware attacksRansomware attacks
Ransomware attacks
Texas Medical Liability Trust
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
Joe Hayes
 
Reduce the Attacker's ROI with Collaborative Threat Intelligence
Reduce the Attacker's ROI with Collaborative Threat IntelligenceReduce the Attacker's ROI with Collaborative Threat Intelligence
Reduce the Attacker's ROI with Collaborative Threat Intelligence
AlienVault
 
USPS CISO Academy - Vulnerability Management
USPS CISO Academy - Vulnerability ManagementUSPS CISO Academy - Vulnerability Management
USPS CISO Academy - Vulnerability Management
Jim Piechocki
 
INCIDENT RESPONSE OVERVIEW
INCIDENT RESPONSE OVERVIEWINCIDENT RESPONSE OVERVIEW
INCIDENT RESPONSE OVERVIEW
Sylvain Martinez
 
2018 09-13 it essentials disaster recovery vs. business continuity
2018 09-13 it essentials disaster recovery vs. business continuity2018 09-13 it essentials disaster recovery vs. business continuity
2018 09-13 it essentials disaster recovery vs. business continuity
Raffa Learning Community
 
State of Endpoint Security: The Buyers Mindset
State of Endpoint Security: The Buyers MindsetState of Endpoint Security: The Buyers Mindset
State of Endpoint Security: The Buyers Mindset
CrowdStrike
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
CallumWallace
 
Hands on Security, Disrupting the Kill Chain, SplunkLive! Austin
Hands on Security, Disrupting the Kill Chain, SplunkLive! AustinHands on Security, Disrupting the Kill Chain, SplunkLive! Austin
Hands on Security, Disrupting the Kill Chain, SplunkLive! Austin
Splunk
 
Risk bridges business and security
Risk bridges business and securityRisk bridges business and security
Risk bridges business and security
M. Isaiah McGowan
 
Vulnerability Management: What You Need to Know to Prioritize Risk
Vulnerability Management: What You Need to Know to Prioritize RiskVulnerability Management: What You Need to Know to Prioritize Risk
Vulnerability Management: What You Need to Know to Prioritize Risk
AlienVault
 
Ransomware 2020 Report
Ransomware 2020 ReportRansomware 2020 Report
Ransomware 2020 Report
Fortis
 
Security Incident Response Readiness Survey
Security Incident Response Readiness Survey  Security Incident Response Readiness Survey
Security Incident Response Readiness Survey
Rahul Neel Mani
 
Risk assessment as "The Art of Prevention"
Risk assessment as "The Art of Prevention"Risk assessment as "The Art of Prevention"
Risk assessment as "The Art of Prevention"
Gabriel (Gaby) Bar Giora
 

What's hot (20)

One login enemy at the gates
One login enemy at the gatesOne login enemy at the gates
One login enemy at the gates
 
Risk assessment Presentation by Affygility Solutions
Risk assessment Presentation by Affygility SolutionsRisk assessment Presentation by Affygility Solutions
Risk assessment Presentation by Affygility Solutions
 
Vulnerability Management Program
Vulnerability Management ProgramVulnerability Management Program
Vulnerability Management Program
 
INCIDENT RESPONSE NIST IMPLEMENTATION
INCIDENT RESPONSE NIST IMPLEMENTATIONINCIDENT RESPONSE NIST IMPLEMENTATION
INCIDENT RESPONSE NIST IMPLEMENTATION
 
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
Outpost24 webinar - Differentiating vulnerabilities from risks to reduce time...
 
Layer of protection analysis
Layer of protection analysisLayer of protection analysis
Layer of protection analysis
 
Ransomware attacks
Ransomware attacksRansomware attacks
Ransomware attacks
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Reduce the Attacker's ROI with Collaborative Threat Intelligence
Reduce the Attacker's ROI with Collaborative Threat IntelligenceReduce the Attacker's ROI with Collaborative Threat Intelligence
Reduce the Attacker's ROI with Collaborative Threat Intelligence
 
USPS CISO Academy - Vulnerability Management
USPS CISO Academy - Vulnerability ManagementUSPS CISO Academy - Vulnerability Management
USPS CISO Academy - Vulnerability Management
 
INCIDENT RESPONSE OVERVIEW
INCIDENT RESPONSE OVERVIEWINCIDENT RESPONSE OVERVIEW
INCIDENT RESPONSE OVERVIEW
 
2018 09-13 it essentials disaster recovery vs. business continuity
2018 09-13 it essentials disaster recovery vs. business continuity2018 09-13 it essentials disaster recovery vs. business continuity
2018 09-13 it essentials disaster recovery vs. business continuity
 
State of Endpoint Security: The Buyers Mindset
State of Endpoint Security: The Buyers MindsetState of Endpoint Security: The Buyers Mindset
State of Endpoint Security: The Buyers Mindset
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Hands on Security, Disrupting the Kill Chain, SplunkLive! Austin
Hands on Security, Disrupting the Kill Chain, SplunkLive! AustinHands on Security, Disrupting the Kill Chain, SplunkLive! Austin
Hands on Security, Disrupting the Kill Chain, SplunkLive! Austin
 
Risk bridges business and security
Risk bridges business and securityRisk bridges business and security
Risk bridges business and security
 
Vulnerability Management: What You Need to Know to Prioritize Risk
Vulnerability Management: What You Need to Know to Prioritize RiskVulnerability Management: What You Need to Know to Prioritize Risk
Vulnerability Management: What You Need to Know to Prioritize Risk
 
Ransomware 2020 Report
Ransomware 2020 ReportRansomware 2020 Report
Ransomware 2020 Report
 
Security Incident Response Readiness Survey
Security Incident Response Readiness Survey  Security Incident Response Readiness Survey
Security Incident Response Readiness Survey
 
Risk assessment as "The Art of Prevention"
Risk assessment as "The Art of Prevention"Risk assessment as "The Art of Prevention"
Risk assessment as "The Art of Prevention"
 

Viewers also liked

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
aeaguinot
 
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
esambale
 
Disaster management
Disaster managementDisaster management
Disaster management
Roselvie Frias
 
Lgu budgeting process
Lgu budgeting processLgu budgeting process
Lgu budgeting process
Gina Lee Santos
 
A Study on Risk Assessment in Construction Projects
A Study on Risk Assessment in Construction ProjectsA Study on Risk Assessment in Construction Projects
A Study on Risk Assessment in Construction Projects
IJMER
 
Performance Based Budgeting
Performance Based BudgetingPerformance Based Budgeting
Performance Based Budgeting
Anthony Rainey
 

Viewers also liked (6)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
Participatory mapping and LGU decision support tools for Disaster Risk Reduct...
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Lgu budgeting process
Lgu budgeting processLgu budgeting process
Lgu budgeting process
 
A Study on Risk Assessment in Construction Projects
A Study on Risk Assessment in Construction ProjectsA Study on Risk Assessment in Construction Projects
A Study on Risk Assessment in Construction Projects
 
Performance Based Budgeting
Performance Based BudgetingPerformance Based Budgeting
Performance Based Budgeting
 

Similar to Risk Assessment

Risk Analysis PowerPoint Presentation Slides
Risk Analysis PowerPoint Presentation Slides Risk Analysis PowerPoint Presentation Slides
Risk Analysis PowerPoint Presentation Slides
SlideTeam
 
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docxTask Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
ssuserf9c51d
 
Risk Assessment And Mitigation Plan PowerPoint Presentation Slides
Risk Assessment And Mitigation Plan PowerPoint Presentation SlidesRisk Assessment And Mitigation Plan PowerPoint Presentation Slides
Risk Assessment And Mitigation Plan PowerPoint Presentation Slides
SlideTeam
 
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docxSample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
anhlodge
 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
Ravithokal2
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation Slide
SlideTeam
 
OVER VIEW risk management 22016 NEW ASLI
OVER VIEW risk management 22016 NEW ASLIOVER VIEW risk management 22016 NEW ASLI
OVER VIEW risk management 22016 NEW ASLI
sssheid
 
Performing Risk Assessments1
Performing Risk Assessments1Performing Risk Assessments1
Performing Risk Assessments1
Mary Harris
 
Relating Risk to Vulnerability
Relating Risk to Vulnerability Relating Risk to Vulnerability
Relating Risk to Vulnerability
Resolver Inc.
 
Risk Mitigation Strategies PowerPoint Presentation Slides
Risk Mitigation Strategies PowerPoint Presentation SlidesRisk Mitigation Strategies PowerPoint Presentation Slides
Risk Mitigation Strategies PowerPoint Presentation Slides
SlideTeam
 
Unit-3 Professional Ethics in Engineering
Unit-3 Professional Ethics in EngineeringUnit-3 Professional Ethics in Engineering
Unit-3 Professional Ethics in Engineering
Nandakumar P
 
About Risks - WinValencia
About Risks - WinValenciaAbout Risks - WinValencia
About Risks - WinValencia
winvalencia
 
Managing risk
Managing riskManaging risk
Risk Criteria | Where the answer lies
Risk Criteria | Where the answer liesRisk Criteria | Where the answer lies
Risk Criteria | Where the answer lies
Advisian
 
Risk Analysis Boundaries2
Risk Analysis Boundaries2Risk Analysis Boundaries2
Risk Analysis Boundaries2
rrhimes
 
07 - Risk Assessment Creating a Risk Matrix.pdf
07 - Risk Assessment Creating a Risk Matrix.pdf07 - Risk Assessment Creating a Risk Matrix.pdf
07 - Risk Assessment Creating a Risk Matrix.pdf
ssusere173f1
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety Analysis
Gaurav Singh Rajput
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RA
Gaurav Singh Rajput
 
Effective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation SlidesEffective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation Slides
SlideTeam
 
Topic5
Topic5Topic5
Topic5
yousifmagdi
 

Similar to Risk Assessment (20)

Risk Analysis PowerPoint Presentation Slides
Risk Analysis PowerPoint Presentation Slides Risk Analysis PowerPoint Presentation Slides
Risk Analysis PowerPoint Presentation Slides
 
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docxTask Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
Task Risk AssessmentRisk Identification and Assessment WorksheetNa.docx
 
Risk Assessment And Mitigation Plan PowerPoint Presentation Slides
Risk Assessment And Mitigation Plan PowerPoint Presentation SlidesRisk Assessment And Mitigation Plan PowerPoint Presentation Slides
Risk Assessment And Mitigation Plan PowerPoint Presentation Slides
 
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docxSample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
Sample Hazard ProfileHazard Analysis WorksheetHazard _________.docx
 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
 
Risk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation SlideRisk Identification PowerPoint Presentation Slide
Risk Identification PowerPoint Presentation Slide
 
OVER VIEW risk management 22016 NEW ASLI
OVER VIEW risk management 22016 NEW ASLIOVER VIEW risk management 22016 NEW ASLI
OVER VIEW risk management 22016 NEW ASLI
 
Performing Risk Assessments1
Performing Risk Assessments1Performing Risk Assessments1
Performing Risk Assessments1
 
Relating Risk to Vulnerability
Relating Risk to Vulnerability Relating Risk to Vulnerability
Relating Risk to Vulnerability
 
Risk Mitigation Strategies PowerPoint Presentation Slides
Risk Mitigation Strategies PowerPoint Presentation SlidesRisk Mitigation Strategies PowerPoint Presentation Slides
Risk Mitigation Strategies PowerPoint Presentation Slides
 
Unit-3 Professional Ethics in Engineering
Unit-3 Professional Ethics in EngineeringUnit-3 Professional Ethics in Engineering
Unit-3 Professional Ethics in Engineering
 
About Risks - WinValencia
About Risks - WinValenciaAbout Risks - WinValencia
About Risks - WinValencia
 
Managing risk
Managing riskManaging risk
Managing risk
 
Risk Criteria | Where the answer lies
Risk Criteria | Where the answer liesRisk Criteria | Where the answer lies
Risk Criteria | Where the answer lies
 
Risk Analysis Boundaries2
Risk Analysis Boundaries2Risk Analysis Boundaries2
Risk Analysis Boundaries2
 
07 - Risk Assessment Creating a Risk Matrix.pdf
07 - Risk Assessment Creating a Risk Matrix.pdf07 - Risk Assessment Creating a Risk Matrix.pdf
07 - Risk Assessment Creating a Risk Matrix.pdf
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety Analysis
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RA
 
Effective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation SlidesEffective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation Slides
 
Topic5
Topic5Topic5
Topic5
 

Recently uploaded

Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 

Recently uploaded (20)

Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 

Risk Assessment

  • 1. Risk Assessment NOTE: This Risk Assessment did not take into account laws/acts such as RA10121, RA7279, RA7160, and letter/s ( http://www.goldstardailynews.com/northern-mindanao-%7C%7C-x/7353-denr-warned-jaraula-emano.html ) from DENR to LGU. The Author Arnel Escobido Aguinot Registered Civil Engineer (PRC - Philippines) Professional Engineer (Institute of Engineers Australia) BS in Civil Engineering Master of Engineering Former resident of NHA – Lourdesville Homes, Balulang, Cagayan de Oro City, Philippines
  • 2. Probability or Likelihood Classification Descriptor Description Probability of Single Event Almost Certain Common or frequent occurrence, likely to occur often during the life of an individual item or system, or very often in an operation of a large number of similar items >25% Likely Is known to occur or it has happened. Likely to occur several times in the life of an individual item or system or often in operation of a large number of similar items 10% - 25% Possible Could occur or “I’ve heard of it happening”. Likely to occur sometime in the life of an individual item or system, or will occur several times in the life of a large number of similar components 1% - 10% Unlikely Unlikely to occur, but possible to occur sometime in the life of an individual item or system, or can reasonably be expected to occur in the life of a large number of similar components 0.1% - 1% Rare Practically impossible, so unlikely to occur in the life of an individual item or system that it may be assumed not to be experienced, or it may be possible, but unlikely to occur in the life of a large number of similar components <0.1% Maximum Reasonable Consequence Classifications Descriptor Health & Safety Environment Damage or Cost impact Catastrophic Fatality or permanent disability Impact with potential for severe of long term harm, or impact on area of significance >Php 80M Major Lost day injury, or illness Events causing harm which cannot be immediately recovered Php20M - Php80M Serious Restricted duties injury or illness Impact with localised harm Php4M - Php20M Medium Medical treatment injury or illness Events with potential to cause local harm Php400k - Php 4M Minor First aid injury or illness not requiring treatment single event causing negligible harm <Php400k RISK MATRIX CONSEQUENCES 1-Minor 2-Medium 3-Serious 4-Major 5-Catastrophic LIKELIHOOD Risk Rating A-Almost Certain Moderate High Critical Critical Critical B-Likely Moderate High High Critical Critical C-Possible Low Moderate High Critical Critical D-Unlikely Low Low Moderate High Critical E-Rare Low Low Moderate High High
  • 3.  
  • 4.  
  • 5.  
  • 6.  
  • 7.  
  • 8. All inherent Risks are Critical with Consequences to be Catastrophic and Major . After putting in controls, majority of the items remain Critical although its likelihood are now reduced . Regarding Control (refer to control column), consideration must be given to the appropriate application of the hierarchy of control as follows: 1. Elimination 2. Substitution 3. Isolation 4. Engineering 5. Administration 6. Personal Protective Equipment (PPE) or Signage This template, as its title connotes, is a high level Risk Assessment. It is recommended that a Barangay level Risk Assessment must also be developed. Notes on the Risk Assessment Matrix: Generally, Risk remains the same or reduces a level (e.g. from major to serious) after the installation of control measure/s. If the control measure cannot be implemented immediately there is a possibility that something can happen in the interim period – in this case residual risk score would be the same as inherent risk until control measures are in place. There are a number of Potential Causes under Item No. 1 which can be considered as given or are already known and are ranked Critical in Inherent and Residual Risks. Item No. 2 is considered enforceable while Item No. 3 is generally referring to poor dissemination (2-way process) of information. Item No. 4 is something that CDO can implement in the future. Item No. 5 – after careful consideration of Items 1 to 4 it can be deduced that the loss of lives is forthcoming especially for communities in very close proximity to Cagayan River. Item No. 6 (not in the matrix) – should be Rescue Operation.  
  • 9. Disclaimer This was developed after Sendong made a landfall in Cagayan de Oro City. With very limited information and data to populate the Risk Assessment matrix it must be understood that this may not be the true picture of Pre-Sendong scenario, however, this may be used to simulate an approximate Pre-landfall (Sendong) Risk Assessment, hence this presentation. The information provided does not have regard to individual circumstances and does not purport to be exhaustive or complete.  The author does not warrant that the information are accurate, reasonable or complete, and to the maximum permitted by law, excludes all liability arising in relation to the information or its use. The information is not a substitute for professional advice, and before taking or omitting to take any action based on the information provided, professional advice (including from qualified Drainage and Civil Engineers, GIS Specialists, and Consultants) should be sought, and safety precautions should be assessed.  Moving forward, it is highly recommended that this template (Risk Assessment Matrix), or its equivalent, will form part of the CDO’s disaster management plan; however if such template is already in place, it must be reviewed periodically. Responsible party must be identified to ensure controls are implemented. This Risk Assessment must be reviewed upon receipt of information relating to Low Pressure Area (LPA) or Typhoon especially if the identified catchment area/s feeding Cagayan River is potentially within the LPA or Typhoon path; Lastly, this must be made available to all stakeholders (e.g. general public of CDO).