SlideShare a Scribd company logo
1 of 1
NAME:                                               DATE:                         AGE:

                                     RISK ASSESMENT
                                     Media Production


Environmental risks:
The outdoor and indoor environment can provide many dangerous situations that can be
hazardous to the actors, film crew and filming equipment e.g.
      Weather hazards such as rain, snow and ice.
      Slippery conditions that may cause individuals to fall or slip.
      Weather that may induce hypothermia and holds a possibility of freezing to death.
      Extreme weather, which could induce heat related problems such as sunburn, sun stroke
      and dehydration.


Human risks and factors:
Human error may take place during production and filming in undesirable and hazardous ways e.g.
     Camera may run out of battery during a filming session so it must be mad sure that the camera
     is fully charged.
     The crew and cast must make sure all equipment (camera, tripod etc.) is treated with respect
     and is looked after to avoid damage, which could threaten the possibility of future use.
     Individuals from outside parties (not from the HSFC media department, tutor or student) may
     try to take equipment or bring danger or harm to the members of the cast and crew.
     With the transportation of the equipment, measures must be taken to avoid damage (accidental
     damage) such as keep camera’s and tripods in protective casings and only have them exposed
     during usage.


Personal injury risks:
During the production of the video the possibilities are rather large that personal injury can occur.
In the most recent ‘Travers White productions’ production was shot several health risks such as:
       A knife was use and it needed fake blood to be rubbed upon its blade, this could have
       caused serious injury.
       The part of the production which was filmed in the wilderness location we had the
       possibility of injury as steep hills had to be climbed and old railway bridges which could be
       possibly structurally unstable.
       The area in which we shot is a remote location with no help by land available for minimum
       two miles.



Please sign in the boxes below to show that you have read and understand the recorded risk
possibilities and to show that we had your consent to take part in the newest ‘ Travers White
Productions’ project with full understanding of the possible dangers that occurred with the activity.



    Participant Sign:                                    Print:

   Witness Sign:                                         Print:

More Related Content

Viewers also liked

Viewers also liked (7)

Metodologia de la seguridad industrial
Metodologia de la seguridad industrialMetodologia de la seguridad industrial
Metodologia de la seguridad industrial
 
Ispa sheets jvd m 20120406 basic
Ispa sheets jvd m 20120406 basicIspa sheets jvd m 20120406 basic
Ispa sheets jvd m 20120406 basic
 
An Integrated Probabilistic Risk Assessment for Turkey
An Integrated Probabilistic Risk Assessment for TurkeyAn Integrated Probabilistic Risk Assessment for Turkey
An Integrated Probabilistic Risk Assessment for Turkey
 
Risk Assessment of Food Packaging Materials_2012
Risk Assessment of Food Packaging Materials_2012Risk Assessment of Food Packaging Materials_2012
Risk Assessment of Food Packaging Materials_2012
 
Probabilistic Risk Assessment
Probabilistic Risk AssessmentProbabilistic Risk Assessment
Probabilistic Risk Assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentation
 

Similar to Risk assesment.

Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment Sam Benzie
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_wolllfie
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_danielharrison12
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_LewisDunn
 
Film Production Risk Assessment
Film Production Risk AssessmentFilm Production Risk Assessment
Film Production Risk Assessmentdanhops888
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_ryansharman
 
Street of risk assessment
Street of risk assessmentStreet of risk assessment
Street of risk assessmentErica Da Silva
 
Street of risk assessment
Street of risk assessmentStreet of risk assessment
Street of risk assessmentBruna Martins
 
Production Risk Asessment Form
Production Risk Asessment FormProduction Risk Asessment Form
Production Risk Asessment Formceliapeplow
 
Risk Assessment Outdoor filming
Risk Assessment Outdoor filmingRisk Assessment Outdoor filming
Risk Assessment Outdoor filmingSophieg8
 
Riskassessmenttemplate 200124132817
Riskassessmenttemplate 200124132817Riskassessmenttemplate 200124132817
Riskassessmenttemplate 200124132817mollyallen19
 
Risk assessment template. copy
Risk assessment template. copyRisk assessment template. copy
Risk assessment template. copymollyallen19
 
Video production risk assessment; sixth form
Video production risk assessment; sixth formVideo production risk assessment; sixth form
Video production risk assessment; sixth formkurthillson
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessmentjosh mk
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentconner3326
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessmentjosh mk
 

Similar to Risk assesment. (20)

Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film Production Risk Assessment
Film Production Risk AssessmentFilm Production Risk Assessment
Film Production Risk Assessment
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Street of risk assessment
Street of risk assessmentStreet of risk assessment
Street of risk assessment
 
Street of risk assessment
Street of risk assessmentStreet of risk assessment
Street of risk assessment
 
Production Risk Asessment Form
Production Risk Asessment FormProduction Risk Asessment Form
Production Risk Asessment Form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment Outdoor filming
Risk Assessment Outdoor filmingRisk Assessment Outdoor filming
Risk Assessment Outdoor filming
 
Risk 2021
Risk 2021Risk 2021
Risk 2021
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Riskassessmenttemplate 200124132817
Riskassessmenttemplate 200124132817Riskassessmenttemplate 200124132817
Riskassessmenttemplate 200124132817
 
Risk assessment template. copy
Risk assessment template. copyRisk assessment template. copy
Risk assessment template. copy
 
Video production risk assessment; sixth form
Video production risk assessment; sixth formVideo production risk assessment; sixth form
Video production risk assessment; sixth form
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 

More from benwhite16

Question 5 complete
Question 5 completeQuestion 5 complete
Question 5 completebenwhite16
 
Evaluation question 6 finished
Evaluation question 6 finishedEvaluation question 6 finished
Evaluation question 6 finishedbenwhite16
 
Secondary audience research
Secondary audience researchSecondary audience research
Secondary audience researchbenwhite16
 
Secondary audience research
Secondary audience researchSecondary audience research
Secondary audience researchbenwhite16
 
Analysis of catch me if you can.
Analysis of catch me if you can.Analysis of catch me if you can.
Analysis of catch me if you can.benwhite16
 
Se7en timeline
Se7en timelineSe7en timeline
Se7en timelinebenwhite16
 

More from benwhite16 (10)

Call sheets
Call sheetsCall sheets
Call sheets
 
Question4
Question4Question4
Question4
 
Question 5 complete
Question 5 completeQuestion 5 complete
Question 5 complete
 
Evaluation question 6 finished
Evaluation question 6 finishedEvaluation question 6 finished
Evaluation question 6 finished
 
Secondary audience research
Secondary audience researchSecondary audience research
Secondary audience research
 
Secondary audience research
Secondary audience researchSecondary audience research
Secondary audience research
 
Analysis of catch me if you can.
Analysis of catch me if you can.Analysis of catch me if you can.
Analysis of catch me if you can.
 
9 slide wotw
9 slide wotw9 slide wotw
9 slide wotw
 
9 slide wotw
9 slide wotw9 slide wotw
9 slide wotw
 
Se7en timeline
Se7en timelineSe7en timeline
Se7en timeline
 

Risk assesment.

  • 1. NAME: DATE: AGE: RISK ASSESMENT Media Production Environmental risks: The outdoor and indoor environment can provide many dangerous situations that can be hazardous to the actors, film crew and filming equipment e.g. Weather hazards such as rain, snow and ice. Slippery conditions that may cause individuals to fall or slip. Weather that may induce hypothermia and holds a possibility of freezing to death. Extreme weather, which could induce heat related problems such as sunburn, sun stroke and dehydration. Human risks and factors: Human error may take place during production and filming in undesirable and hazardous ways e.g. Camera may run out of battery during a filming session so it must be mad sure that the camera is fully charged. The crew and cast must make sure all equipment (camera, tripod etc.) is treated with respect and is looked after to avoid damage, which could threaten the possibility of future use. Individuals from outside parties (not from the HSFC media department, tutor or student) may try to take equipment or bring danger or harm to the members of the cast and crew. With the transportation of the equipment, measures must be taken to avoid damage (accidental damage) such as keep camera’s and tripods in protective casings and only have them exposed during usage. Personal injury risks: During the production of the video the possibilities are rather large that personal injury can occur. In the most recent ‘Travers White productions’ production was shot several health risks such as: A knife was use and it needed fake blood to be rubbed upon its blade, this could have caused serious injury. The part of the production which was filmed in the wilderness location we had the possibility of injury as steep hills had to be climbed and old railway bridges which could be possibly structurally unstable. The area in which we shot is a remote location with no help by land available for minimum two miles. Please sign in the boxes below to show that you have read and understand the recorded risk possibilities and to show that we had your consent to take part in the newest ‘ Travers White Productions’ project with full understanding of the possible dangers that occurred with the activity. Participant Sign: Print: Witness Sign: Print: