Sunil Faroz
E:sunil.faroz@gmail.com
M :9820435215
Objective:
To be resourceful to my organization by being highly analytical and technically sound, seeking career
growth in a challenging environment to implement cutting edge technologies.
Professional Summary:
• Overall 14+ years of experience in IT Application Development, Maintenance and Support
• 5+ years of experience in Data Architecture,Data Management and BI Solution
Development.
• 7+ year experience in ETL methodologies and Informatica PowerCenter 7.x/8.x/9.x
• Expertise in Data Modeling,Data Integration, Data Warehousing and abreast with latest Big
data technologies.
• Experience in Performance Tuning of Informatica components, SQL Queries, lookup
overrides and push down optimization techniques.
• Experience in configuring and manipulating various data modeling techniques (like Star and
Snow-flake)
• Experience in conducting Requirement analysis and Impact Analysis on existing Enterprise
Data warehouse, analyzing user requirements and providing estimates for best solution within
defined scope for design, build, testing and deployment phases considering complexity of
solution.
• Experience in all ETL development life cycle phases (requirement analysis, impact analysis,
design, development, testing, deployment and documentation).
• Good experience in data analysis, job monitoring, maintenance and troubleshooting ETL
issues.
• Proficient in Offshore-Onsite co-ordination, status reporting and inspiring self and others
towards establishing & achieving group goals by providing a clear vision, positive attitude
towards work & fostering a healthy team spirit.
• Proficient in complying with SLAs and on-time delivery maintaining high CSI.
• Working knowledge of Big Data technologies like HDFS,HIVE and MapReduce.
• Oracle Certified Associate ( OCA certified)
Skills Summary:
Project Management
• Effort estimation
• Planning and executing support and development projects
• Client Liaison
• Quality Assurance/initiatives
• Identify and mitigate risk
• Resource management
System Design & Development • Requirements Gathering and Analysis
• Data Analysis
• Functional Design.
• ETL Design
• Development and Testing
• UAT
• Implementation
Languages, Software and Tools
• Informatica Power Center 7.1.4 ,8.1.1,8.5,8.6, 9.1
• SQL, PL/SQL
• Business Objects 6.5
RDBMS
• Teradata 14.X
• Oracle 9i ,Oracle 10G
Operating Systems
• Windows 2000
• Unix/Linux
• HP-UX ,Solaris.
Business Areas
• Banking – Credit Risk
• Manufacturing
• Theatrical Distribution
• Home Entertainment.
Organizational Experience:
Organization Position From To Location
Tata Consultancy Services Associate
Consultant
Jul 2004 Till date Mumbai,India
Patni Computer Systems DBA Jan 2004 Jun 2004 Mumbai, India
Embee Software Services DBA Jul 2003 Dec 2003 Mumbai, India
Infoton System Services DBA Feb 2002 Jun 2003 Mumbai, India
Diotek Infotech DBA Feb 2001 Jan 2002 Mumbai, India
Education:
M.H.Saboo Siddik College Of Engg, Mumbai Univ 1999 1st Class
Diploma Industrial Electronics, Mumbai Univ 1994
1
st
Class
10
th
St.Anthonys Convent School, Mah(State board)
1991 Distinction
Projects:
Project AAA & CCAR project – Credit Risk Lending Business
Organization TCS
Client GE - Capital
Description
GE -Capital's Credit Risk capture for Lending Business
GE Capital is focusing on merging data from all its sub business into an
Enterprise wide data warehouse. Teradata proprietary Financial
Services Logical Data Model (FSLDM) is selected as the data model and
is customized to suit the needs for GEC.
For integrating the data from different source systems Informatica
and Teradata Utilities are used as data transformation modes.
Informatica is used for sourcing the data from the source systems
when is then stages into Teradata and BTEQ scripts are used to move
it to Core database.
AAA - Accuracy Availability Accessibility
CCAR - Comprehensive Capital Analysis & Review
Role Technical Architect & Offshore Project Lead.
Team Size 14 resources (3 DA + 4 Business Analyst + 7 ETL )
Operating System(s) Linux, Windows
Key Skills and
Technologies used
Informatica 9.0, Teradata 14.X,Teradata tools.
Responsibilities
My role as Offshore Project Lead & DA in this project are:
• Lead and responsible for delivery of bi-monthly releases to the
FSLDM based on ongoing Business Requirements.
• Coordinating with:
-Business Partners to understand scope of Requirement Document
and identifying gaps in the requirements
-Team and reporting progress of project on daily, weekly & monthly
basis using HP -ALM (Appl.Lifecycle mgmt) tool.
-Business Users, Project Managers, Data Architects & ETL developers
to foster good relationship throughout project lifecycle
• Generating mapping document between source & target tables
based on the results of data profiling and maintaining the results
of analysis into a standard template which is a base for ETL
development.
• Assigning tasks to Offshore Team based on client's requirements
Achievements :
• Driven initiatives for GE Capital to the tune of $50,000 for AAA
and CCAR projects.
.Start Date Oct 2013 till date
Project Enterprise Application Integration (EAI ) Support
Organization TCS
Client Paramount Pictures
Description
Enterprise Application Integration (EAI ) Production Support 24x7
Support.
Role Offshore Lead
Team Size 7 resources (6 core support + 1 QA lead)
Operating System(s) Linux, Windows
Key Skills and
Technologies used
Informatica 9.0, Oracle 10G ,SQL Server
Responsibilities
My role as Offshore Support Lead in this project are:
• Lead and responsible for the 24x7 Production Support program
from offshore
• Offshore ownership of Incident ,Change and Problem
management through ServiceNow.
• Drive Process Improvements(PI) and propose Design Strategies
with Client – 6 PI’s successfully completed.
• Client communication and coordination - daily and weekly
conference call with client to track the status of deliverables
• To make sure the bug fix and Change management goes smoothly
from Informatica- ETL perspective.
Mentoring team members – trouble shooting escalated issues,
guiding team for solution.
.Start Date Aug 2012 till Aug2013
Project SAP Integration
Organization TCS
Client Honeywell
Description SAP Integration of multiple Honeywell sites
Role Offshore Technical Lead
Team Size 5 (peak size 10)
Operating System(s) Unix, Windows
Key Skills and
Technologies used
Informatica, Oracle ,SQL Server
Responsibilities My role as Technical Lead in this project are:
• Lead and responsible for the program from offshore
• Develop and assist team members for Informatica mapping
development
• Analyze the requirements for development
• Client communication and coordination - daily and weekly
conference call with client to track the status of deliverables
• To make sure the Integration goes smoothly from Informatica
perspective
• Mentoring team members – trouble shooting escalated issues,
guiding team to for solution
Start Date Aug 2009
End Date Jul 2012
Project Theatrical Online Business Intelligence ( TOBI )
Organization Tata Consultancy Services
Client Warner Brothers
Description
TOBI is a Data warehousing Solution catering to Warner Bros
Theatrical distribution of prints all over the world. It tracks end to end
distribution of theatrical releases all over the world (currently 24
territories). The projects has ETL tools ( Informatica, PL/SQL ) and
Reporting tool as Business Objects (BO).It handles the Sales, Finance,
Marketing , Accounts Receivables functional areas of theatrical
distribution
Role Offshore Lead
Team Size 4
Key Skills and
Technologies used
Informatica, Oracle 9i
Responsibilities
My role as Offshore Lead in this project were to :
• Study and understand the existing application and contribute
enhancements of the application.
• Handled analysis of all the requirements from the domain experts
• Work on change requests/ enhancements and to ensure software
quality compliance
• Involved in Release management of Support issues and CR's
• Leading team for support activities. Assigning tasks and guiding
team in issue resolutions.
• Regularly monitoring the batch jobs esp the SLA based jobs.
• Create detailed documents
• Coordinate with client regularly to understand new requirements
• Responsible for setting up the offshore for TOBI in Mumbai in
2006
Start Date June-2006
End Date August- 2007
Onsite UK – Jun 2006 – Dec 2006 , US Jan 2009 Feb 2009
Project Central Database Management Systems ( CDBMS )
Organization Tata Consultancy Services
Client Reserve Bank of India
Description
Reserve Bank of India (RBI) has initiated challenging task of
implementing a Data Warehouse solution to source data from
heterogeneous sources, clean, filter and transform the same and store
in a structure that is easy to access, understand and use by the
business users in the terminology they are comfortable with. The
project aims to get all the data available in different parts of the
organization to work together and synthesize data into a modern
database with a metadata "catalog"
Role Informatica Developer & DBA
Team Size 5
Key Skills Informatica, Oracle
Responsibilities
My role as Informatica Developer in this project were to :
• Involved in requirements study and understanding the
functionalities.
• Used heterogeneous data sources like flat files and Oracle
• Created mappings using the transformations such as the Source
qualifier, Aggregator, Expression, Router, Filter, Rank, Sequence
Generator, and Update Strategy
Start Date Jul-2004
End Date May-2006
Project Maintenance of GEAM Databases
Organization Patni Computer Systems
Client GE U.S.A
Description
GE Asset management Databases stored all the Asset related
transactions for GE throughout the world.
Role Oracle DBA 9i
Team Size 10
Key Skills Oracle
Contribution My role as Oracle DBA in this project were to :
• Maintaining Prod, Dev, Test Databases for the GEAM as a
DBA.
• Maintaining the Replication & Distributed Databases for
smooth functioning of the GEAM Databases.
• Export/Import of complete database from development to
production stage.
• Planning and resizing the databases.
• Backup & Recovery Strategies and checking validity of backed
up data files.
• Job scheduling and email/paging alerts, recommendations,
database and system tuning, Sequence Generator, and
Update Strategy.
Start Date Jun-2004
End Date Jan-2004
Project Maintenance of Production Databases
Organization Embee Software
Client Tata Steel India
Description Maintenance of Production Databases for Tata Steel India.
Role Oracle DBA 9i
Team Size 10
Key Skills Oracle
Contribution
My role as Oracle DBA in this project were to :
• Solely handling 5 Production Databases for the firm as a DBA.
• Maintaining the Replication & Distributed Databases for
smooth functioning of the 3 TATA STEEL Plants.
• Export/Import of complete database from development to
production stage.
• Planning and resizing the databases.
• Backup & Recovery Strategies and checking validity of backed
up datafiles.
• Job scheduling and email/paging alerts, recommendations,
database and system tuning recommendation, SQL
statements tuning
Start Date Jul-2003
End Date Dec-2003
Project Project Pride for ICICI bank
Organization Infoton System Services
Client ICICI Bank Mumbai
Description
Maintenance of Production Databases for Project Pride for Dealing
Transactions of ICICI Bank.
Role Oracle DBA 9i
Team Size 3
Key Skills Oracle 9i
Contribution
My role as Oracle DBA in this project were to :
• Export/Import of complete database from development to
production stage.
• Planning and resizing the database .
• Backup & Recovery Strategies and checking validity of backed
up data files.
• Job scheduling and email/paging alerts, recommendations,
database and system tuning recommendation, SQL
statements tuning, applying of patches.
• Responsible for Oracle DBA support and Dealing Room
Application support.
• Support for installation and maintenance of FBA Urbis (Unisys
Ltd.), Kondor+(Reuters ), NutCracker, SCO Xvisionproduction
stage.
Start Date Feb-2002
End Date Jun-2003
Project DBA Support for Payment Gateway
Organization Diotek Infotech
Client ICICI Bank Mumbai
Description
SQL programmer and DBA support for Payment Gateway for ICICI
Bank
Role Oracle DBA 9i
Team Size 4
Key Skills Oracle 9i
Contribution
My role as Oracle DBA in this project were to :
• Oracle DBA and ASP programmer.
• Planning and resizing the database.
• Backup & Recovery Strategies and checking validity of backed
up data files.
• Job scheduling and email/paging alerts, recommendations,
database and system tuning recommendation, SQL
statements tuning, applying of patches.
Start Date Feb-2001
End Date Jan-2002
Other Achievements:
• Received Certificate of Achievement from TCS for client Honeywell
• Received Certificate of Achievement from TCS for client Warner Brothers
• Received Certificate of Achievement from TCS for client Reserve Bank of India
Other Achievements:
• Received Certificate of Achievement from TCS for client Honeywell
• Received Certificate of Achievement from TCS for client Warner Brothers
• Received Certificate of Achievement from TCS for client Reserve Bank of India

Resume_Sunil_Faroz

  • 1.
    Sunil Faroz E:sunil.faroz@gmail.com M :9820435215 Objective: Tobe resourceful to my organization by being highly analytical and technically sound, seeking career growth in a challenging environment to implement cutting edge technologies. Professional Summary: • Overall 14+ years of experience in IT Application Development, Maintenance and Support • 5+ years of experience in Data Architecture,Data Management and BI Solution Development. • 7+ year experience in ETL methodologies and Informatica PowerCenter 7.x/8.x/9.x • Expertise in Data Modeling,Data Integration, Data Warehousing and abreast with latest Big data technologies. • Experience in Performance Tuning of Informatica components, SQL Queries, lookup overrides and push down optimization techniques. • Experience in configuring and manipulating various data modeling techniques (like Star and Snow-flake) • Experience in conducting Requirement analysis and Impact Analysis on existing Enterprise Data warehouse, analyzing user requirements and providing estimates for best solution within defined scope for design, build, testing and deployment phases considering complexity of solution. • Experience in all ETL development life cycle phases (requirement analysis, impact analysis, design, development, testing, deployment and documentation). • Good experience in data analysis, job monitoring, maintenance and troubleshooting ETL issues. • Proficient in Offshore-Onsite co-ordination, status reporting and inspiring self and others towards establishing & achieving group goals by providing a clear vision, positive attitude towards work & fostering a healthy team spirit. • Proficient in complying with SLAs and on-time delivery maintaining high CSI. • Working knowledge of Big Data technologies like HDFS,HIVE and MapReduce. • Oracle Certified Associate ( OCA certified) Skills Summary: Project Management • Effort estimation • Planning and executing support and development projects • Client Liaison • Quality Assurance/initiatives • Identify and mitigate risk • Resource management System Design & Development • Requirements Gathering and Analysis • Data Analysis • Functional Design. • ETL Design • Development and Testing • UAT
  • 2.
    • Implementation Languages, Softwareand Tools • Informatica Power Center 7.1.4 ,8.1.1,8.5,8.6, 9.1 • SQL, PL/SQL • Business Objects 6.5 RDBMS • Teradata 14.X • Oracle 9i ,Oracle 10G Operating Systems • Windows 2000 • Unix/Linux • HP-UX ,Solaris. Business Areas • Banking – Credit Risk • Manufacturing • Theatrical Distribution • Home Entertainment. Organizational Experience: Organization Position From To Location Tata Consultancy Services Associate Consultant Jul 2004 Till date Mumbai,India Patni Computer Systems DBA Jan 2004 Jun 2004 Mumbai, India Embee Software Services DBA Jul 2003 Dec 2003 Mumbai, India Infoton System Services DBA Feb 2002 Jun 2003 Mumbai, India Diotek Infotech DBA Feb 2001 Jan 2002 Mumbai, India Education: M.H.Saboo Siddik College Of Engg, Mumbai Univ 1999 1st Class Diploma Industrial Electronics, Mumbai Univ 1994 1 st Class 10 th St.Anthonys Convent School, Mah(State board) 1991 Distinction
  • 3.
    Projects: Project AAA &CCAR project – Credit Risk Lending Business Organization TCS Client GE - Capital Description GE -Capital's Credit Risk capture for Lending Business GE Capital is focusing on merging data from all its sub business into an Enterprise wide data warehouse. Teradata proprietary Financial Services Logical Data Model (FSLDM) is selected as the data model and is customized to suit the needs for GEC. For integrating the data from different source systems Informatica and Teradata Utilities are used as data transformation modes. Informatica is used for sourcing the data from the source systems when is then stages into Teradata and BTEQ scripts are used to move it to Core database. AAA - Accuracy Availability Accessibility CCAR - Comprehensive Capital Analysis & Review Role Technical Architect & Offshore Project Lead. Team Size 14 resources (3 DA + 4 Business Analyst + 7 ETL ) Operating System(s) Linux, Windows Key Skills and Technologies used Informatica 9.0, Teradata 14.X,Teradata tools. Responsibilities My role as Offshore Project Lead & DA in this project are: • Lead and responsible for delivery of bi-monthly releases to the FSLDM based on ongoing Business Requirements. • Coordinating with: -Business Partners to understand scope of Requirement Document and identifying gaps in the requirements -Team and reporting progress of project on daily, weekly & monthly basis using HP -ALM (Appl.Lifecycle mgmt) tool. -Business Users, Project Managers, Data Architects & ETL developers to foster good relationship throughout project lifecycle • Generating mapping document between source & target tables based on the results of data profiling and maintaining the results of analysis into a standard template which is a base for ETL development. • Assigning tasks to Offshore Team based on client's requirements Achievements : • Driven initiatives for GE Capital to the tune of $50,000 for AAA and CCAR projects. .Start Date Oct 2013 till date
  • 4.
    Project Enterprise ApplicationIntegration (EAI ) Support Organization TCS Client Paramount Pictures Description Enterprise Application Integration (EAI ) Production Support 24x7 Support. Role Offshore Lead Team Size 7 resources (6 core support + 1 QA lead) Operating System(s) Linux, Windows Key Skills and Technologies used Informatica 9.0, Oracle 10G ,SQL Server Responsibilities My role as Offshore Support Lead in this project are: • Lead and responsible for the 24x7 Production Support program from offshore • Offshore ownership of Incident ,Change and Problem management through ServiceNow. • Drive Process Improvements(PI) and propose Design Strategies with Client – 6 PI’s successfully completed. • Client communication and coordination - daily and weekly conference call with client to track the status of deliverables • To make sure the bug fix and Change management goes smoothly from Informatica- ETL perspective. Mentoring team members – trouble shooting escalated issues, guiding team for solution. .Start Date Aug 2012 till Aug2013 Project SAP Integration Organization TCS Client Honeywell Description SAP Integration of multiple Honeywell sites Role Offshore Technical Lead Team Size 5 (peak size 10) Operating System(s) Unix, Windows Key Skills and Technologies used Informatica, Oracle ,SQL Server Responsibilities My role as Technical Lead in this project are: • Lead and responsible for the program from offshore • Develop and assist team members for Informatica mapping development • Analyze the requirements for development • Client communication and coordination - daily and weekly
  • 5.
    conference call withclient to track the status of deliverables • To make sure the Integration goes smoothly from Informatica perspective • Mentoring team members – trouble shooting escalated issues, guiding team to for solution Start Date Aug 2009 End Date Jul 2012 Project Theatrical Online Business Intelligence ( TOBI ) Organization Tata Consultancy Services Client Warner Brothers Description TOBI is a Data warehousing Solution catering to Warner Bros Theatrical distribution of prints all over the world. It tracks end to end distribution of theatrical releases all over the world (currently 24 territories). The projects has ETL tools ( Informatica, PL/SQL ) and Reporting tool as Business Objects (BO).It handles the Sales, Finance, Marketing , Accounts Receivables functional areas of theatrical distribution Role Offshore Lead Team Size 4 Key Skills and Technologies used Informatica, Oracle 9i Responsibilities My role as Offshore Lead in this project were to : • Study and understand the existing application and contribute enhancements of the application. • Handled analysis of all the requirements from the domain experts • Work on change requests/ enhancements and to ensure software quality compliance • Involved in Release management of Support issues and CR's • Leading team for support activities. Assigning tasks and guiding team in issue resolutions. • Regularly monitoring the batch jobs esp the SLA based jobs. • Create detailed documents • Coordinate with client regularly to understand new requirements • Responsible for setting up the offshore for TOBI in Mumbai in 2006 Start Date June-2006 End Date August- 2007 Onsite UK – Jun 2006 – Dec 2006 , US Jan 2009 Feb 2009
  • 6.
    Project Central DatabaseManagement Systems ( CDBMS ) Organization Tata Consultancy Services Client Reserve Bank of India Description Reserve Bank of India (RBI) has initiated challenging task of implementing a Data Warehouse solution to source data from heterogeneous sources, clean, filter and transform the same and store in a structure that is easy to access, understand and use by the business users in the terminology they are comfortable with. The project aims to get all the data available in different parts of the organization to work together and synthesize data into a modern database with a metadata "catalog" Role Informatica Developer & DBA Team Size 5 Key Skills Informatica, Oracle Responsibilities My role as Informatica Developer in this project were to : • Involved in requirements study and understanding the functionalities. • Used heterogeneous data sources like flat files and Oracle • Created mappings using the transformations such as the Source qualifier, Aggregator, Expression, Router, Filter, Rank, Sequence Generator, and Update Strategy Start Date Jul-2004 End Date May-2006 Project Maintenance of GEAM Databases Organization Patni Computer Systems Client GE U.S.A Description GE Asset management Databases stored all the Asset related transactions for GE throughout the world. Role Oracle DBA 9i Team Size 10 Key Skills Oracle Contribution My role as Oracle DBA in this project were to : • Maintaining Prod, Dev, Test Databases for the GEAM as a DBA. • Maintaining the Replication & Distributed Databases for smooth functioning of the GEAM Databases. • Export/Import of complete database from development to production stage.
  • 7.
    • Planning andresizing the databases. • Backup & Recovery Strategies and checking validity of backed up data files. • Job scheduling and email/paging alerts, recommendations, database and system tuning, Sequence Generator, and Update Strategy. Start Date Jun-2004 End Date Jan-2004 Project Maintenance of Production Databases Organization Embee Software Client Tata Steel India Description Maintenance of Production Databases for Tata Steel India. Role Oracle DBA 9i Team Size 10 Key Skills Oracle Contribution My role as Oracle DBA in this project were to : • Solely handling 5 Production Databases for the firm as a DBA. • Maintaining the Replication & Distributed Databases for smooth functioning of the 3 TATA STEEL Plants. • Export/Import of complete database from development to production stage. • Planning and resizing the databases. • Backup & Recovery Strategies and checking validity of backed up datafiles. • Job scheduling and email/paging alerts, recommendations, database and system tuning recommendation, SQL statements tuning Start Date Jul-2003 End Date Dec-2003 Project Project Pride for ICICI bank Organization Infoton System Services Client ICICI Bank Mumbai Description Maintenance of Production Databases for Project Pride for Dealing Transactions of ICICI Bank. Role Oracle DBA 9i Team Size 3
  • 8.
    Key Skills Oracle9i Contribution My role as Oracle DBA in this project were to : • Export/Import of complete database from development to production stage. • Planning and resizing the database . • Backup & Recovery Strategies and checking validity of backed up data files. • Job scheduling and email/paging alerts, recommendations, database and system tuning recommendation, SQL statements tuning, applying of patches. • Responsible for Oracle DBA support and Dealing Room Application support. • Support for installation and maintenance of FBA Urbis (Unisys Ltd.), Kondor+(Reuters ), NutCracker, SCO Xvisionproduction stage. Start Date Feb-2002 End Date Jun-2003 Project DBA Support for Payment Gateway Organization Diotek Infotech Client ICICI Bank Mumbai Description SQL programmer and DBA support for Payment Gateway for ICICI Bank Role Oracle DBA 9i Team Size 4 Key Skills Oracle 9i Contribution My role as Oracle DBA in this project were to : • Oracle DBA and ASP programmer. • Planning and resizing the database. • Backup & Recovery Strategies and checking validity of backed up data files. • Job scheduling and email/paging alerts, recommendations, database and system tuning recommendation, SQL statements tuning, applying of patches. Start Date Feb-2001 End Date Jan-2002
  • 9.
    Other Achievements: • ReceivedCertificate of Achievement from TCS for client Honeywell • Received Certificate of Achievement from TCS for client Warner Brothers • Received Certificate of Achievement from TCS for client Reserve Bank of India
  • 10.
    Other Achievements: • ReceivedCertificate of Achievement from TCS for client Honeywell • Received Certificate of Achievement from TCS for client Warner Brothers • Received Certificate of Achievement from TCS for client Reserve Bank of India