Personal Information
RAJESH KUMAR SINGH Eligible to work in Ireland (Stamp 1G)
ETL | Technical Program Manager | Informatica Certified | CSPO Certified
Address: 30 N Great Georges Street, Dublin 1
Contact Number: (+353) 899 622 023
Mail Id: rajesh.1412@yahoo.com
Skype Name: raj141219
LinkedIn URL: https://www.linkedin.com/in/rks1412/
Sex: Male | Date of birth: 14 December 1982
Personal Statement • An accomplished IT Professional with over 12 years of demonstrated experience in
designing and developing ETL and Data Warehouse solutions. Built and shipped
complex software products. Ability to apply an entrepreneurial approach and
passion to problem solving to building products.
• Identifying user requirements to build and administer complex data warehouse.
• Worked in Agile and SDLC models. Worked on Jira Board to track and report
progress to the management / Clients. Estimated user story points, helped in Sprint
planning and carried out Sprint retrospective meetings. Handled go / no-go calls.
• Understanding functional requirements and building the technical specs.
Well versed with ETL tools - Informatica Cloud, IICS, Informatica Powercenter,
Informatica Data Quality (Informatica Developer 9.5.1), SSIS, Talend etc.
Knowledge on various reporting and analytics tools like Tableau, Cognos, SSRS
etc.
• Knowledge of Big Data technologies like Spark, Scala, Hive and Python.
• Designed Integrations with Amazon Redshift, SSMS, SAP, Salesforce, nCino,
Callidus Cloud, Oracle, Netezza, Flat File etc. Have good knowledge on all the
Databases mentioned here, API integartions and can write complex queries.
• Working Knowledge of various tools like Control-M, Bitbucket, SVN, Splunk etc.
Skilled in handling teams, ensuring solutions, building of ETL components and
checking the quality of the deliverables.
• Executing projects with implementation of projects on time along with maintaining
high quality. Adept in analyzing projects that require strategic thinking, clarifying
business requirements, existing procedures/skill sets, and designing process and
system improvements to increase productivity and reduce costs.
Global Exposure • Dexterously interacted with offshore and clients from US, Europe and Australia for
better execution of projects and to ensure smooth functioning of the projects.
• Experienced in working with top MNC companies like Accenture, Infosys Limited
and HP. Worked in United States (FL) at Client side for 2 Years.
Work Experience
Aug 2014 – Jul 2019 Associate Manager / ETL Developer / Data Architect
Accenture
Nov 2012 – Aug 2014 Team Lead
Infosys Limited
Jan 2007 – Oct 2012 Software Engineer
HP
Projects Last 5 Years
Project Title: Pacific Life
Designation / Job Title: ETL Manager / Architect / Developer
Duration: Sep’18 – Jul’19
Team Size: 12
Client: Pacific Life, US/UK Banking & Insurance
Tools/Technology: Informatica Cloud (IICS), Salesforce, Workbench, Data Loader, SQL SSMS, Amazon
Redshift, EC2, Mulesoft, S3, Jira
Key Result Area: • Worked as Program Manager / Data Architect. Building the framework coordinating
with multiple stakeholders involved.
• Pulling data from EDW Publishing layer to the consumption layer.
• Coordinating with Client Product Owners for creating user stories and updating the
same on Jira boards.
• Giving demo of the Integration part for various systems like LID, RID, Salesforce
and Mulesoft related integrations.
Project Title: Amtrak
Designation / Job Title: ETL Developer / Cloud Architect
Duration: Apr’18 – Sep’18
Team Size: 15
Client: Amtrak, US Govt
Tools/Technology: Informatica Powercenter, Oracle11g, Oracle SQL Developer, Amazon Redshift, S3,
EC2, Jira
Key Result Area: • Preparing the POC and design path for the EDW migration
• Working with a big team of ETL developers, testers and managing the technical
aspects with client
• Prepared E2E flow for Oracle to Redshift movement of the warehouse
• SIT, UAT and PROD deployments responsibility and Client presentations handled.
Project Title: Upromise
Designation / Job Title: ETL Manager / Architect
Duration: Aug’17 – Mar’18
Team Size: 8
Client: Sallie Mae, US Bank
Tools/Technology: Informatica Cloud (IICS), Powercenter 10.2.0, Salesforce, Workbench, Data Loader,
Oracle11g, Oracle SQL Developer, Amazon Redshift
Key Result Area: • Working with different teams and prepare the high level ERDs.
• Handling/Designing of Data Migration from Oracle EDW to Amazon Redshift EDW
• Preparing high level SSRS/STTM and getting it verified by Client IT Team. This is
done thru JADs
• Co-ordination activities between teams – Data warehousing, App, testing teams
• Sending invoices to the client for Informatica Team. Managing New resource
onboarding
Title: TD Bank (Toronto-Dominion Bank)
Duration: Jul’15 – Aug’17
Designation: ETL Manager / Architect
Team Size: 12
Client: TD Bank, US
Tools/Technology: Informatica Cloud, nCino APIs, Workbench, Salesforce (SaaS), Data Loader, Oracle11g,
Oracle SQL Developer
Title: Incentive and commission management system (Vodafone)
Duration: Aug’14 – June’15
Designation: ETL Architect/Onsite Coordinator
Team Size: 22
Client: Vodafone
Tools/Technology: Informatica PowerCenter 9.5.1, Truecomp (Callidus Cloud), Oracle11g, Oracle SQL
Developer, Putty, WinSCP
Key Skills
• Data Warehousing , Program / Project Management, Technical Developement
• Design and ETL development, Database Migration, Production Support, RCA
• Functional requirement analysis, Quality Improvement, Regression testing
• Vendor Management, Stakeholder management, Project planning and
documentation
Education
2002 – 2006 Bachelor of Engineering (Information Technology) from RGPV University
2001 Diploma in IT from Sikkim Manipal University
Certifications
Achievements
• PowerCenter Data Integration 10: Developer, Specialist Certification Certified
• Certified Scrum Product Owner (CSPO)
• Splunk Certified
• PDUs for PMP certification
• Trained at Redhat Linux / UNIX - Shell scripting, Computer Networking & Security,
Network Administration
• IZO 007 Certified (OCP Level 1)
• Spot / Recognition / Integration / Mentor Awards received
• Salesforce Practice Recognitions
References: Available upon request

Rajesh CV

  • 1.
    Personal Information RAJESH KUMARSINGH Eligible to work in Ireland (Stamp 1G) ETL | Technical Program Manager | Informatica Certified | CSPO Certified Address: 30 N Great Georges Street, Dublin 1 Contact Number: (+353) 899 622 023 Mail Id: rajesh.1412@yahoo.com Skype Name: raj141219 LinkedIn URL: https://www.linkedin.com/in/rks1412/ Sex: Male | Date of birth: 14 December 1982 Personal Statement • An accomplished IT Professional with over 12 years of demonstrated experience in designing and developing ETL and Data Warehouse solutions. Built and shipped complex software products. Ability to apply an entrepreneurial approach and passion to problem solving to building products. • Identifying user requirements to build and administer complex data warehouse. • Worked in Agile and SDLC models. Worked on Jira Board to track and report progress to the management / Clients. Estimated user story points, helped in Sprint planning and carried out Sprint retrospective meetings. Handled go / no-go calls. • Understanding functional requirements and building the technical specs. Well versed with ETL tools - Informatica Cloud, IICS, Informatica Powercenter, Informatica Data Quality (Informatica Developer 9.5.1), SSIS, Talend etc. Knowledge on various reporting and analytics tools like Tableau, Cognos, SSRS etc. • Knowledge of Big Data technologies like Spark, Scala, Hive and Python. • Designed Integrations with Amazon Redshift, SSMS, SAP, Salesforce, nCino, Callidus Cloud, Oracle, Netezza, Flat File etc. Have good knowledge on all the Databases mentioned here, API integartions and can write complex queries. • Working Knowledge of various tools like Control-M, Bitbucket, SVN, Splunk etc. Skilled in handling teams, ensuring solutions, building of ETL components and checking the quality of the deliverables. • Executing projects with implementation of projects on time along with maintaining high quality. Adept in analyzing projects that require strategic thinking, clarifying business requirements, existing procedures/skill sets, and designing process and system improvements to increase productivity and reduce costs. Global Exposure • Dexterously interacted with offshore and clients from US, Europe and Australia for better execution of projects and to ensure smooth functioning of the projects. • Experienced in working with top MNC companies like Accenture, Infosys Limited and HP. Worked in United States (FL) at Client side for 2 Years. Work Experience Aug 2014 – Jul 2019 Associate Manager / ETL Developer / Data Architect Accenture Nov 2012 – Aug 2014 Team Lead Infosys Limited Jan 2007 – Oct 2012 Software Engineer HP
  • 2.
    Projects Last 5Years Project Title: Pacific Life Designation / Job Title: ETL Manager / Architect / Developer Duration: Sep’18 – Jul’19 Team Size: 12 Client: Pacific Life, US/UK Banking & Insurance Tools/Technology: Informatica Cloud (IICS), Salesforce, Workbench, Data Loader, SQL SSMS, Amazon Redshift, EC2, Mulesoft, S3, Jira Key Result Area: • Worked as Program Manager / Data Architect. Building the framework coordinating with multiple stakeholders involved. • Pulling data from EDW Publishing layer to the consumption layer. • Coordinating with Client Product Owners for creating user stories and updating the same on Jira boards. • Giving demo of the Integration part for various systems like LID, RID, Salesforce and Mulesoft related integrations. Project Title: Amtrak Designation / Job Title: ETL Developer / Cloud Architect Duration: Apr’18 – Sep’18 Team Size: 15 Client: Amtrak, US Govt Tools/Technology: Informatica Powercenter, Oracle11g, Oracle SQL Developer, Amazon Redshift, S3, EC2, Jira Key Result Area: • Preparing the POC and design path for the EDW migration • Working with a big team of ETL developers, testers and managing the technical aspects with client • Prepared E2E flow for Oracle to Redshift movement of the warehouse • SIT, UAT and PROD deployments responsibility and Client presentations handled. Project Title: Upromise Designation / Job Title: ETL Manager / Architect Duration: Aug’17 – Mar’18 Team Size: 8 Client: Sallie Mae, US Bank Tools/Technology: Informatica Cloud (IICS), Powercenter 10.2.0, Salesforce, Workbench, Data Loader, Oracle11g, Oracle SQL Developer, Amazon Redshift Key Result Area: • Working with different teams and prepare the high level ERDs. • Handling/Designing of Data Migration from Oracle EDW to Amazon Redshift EDW • Preparing high level SSRS/STTM and getting it verified by Client IT Team. This is done thru JADs • Co-ordination activities between teams – Data warehousing, App, testing teams • Sending invoices to the client for Informatica Team. Managing New resource onboarding Title: TD Bank (Toronto-Dominion Bank) Duration: Jul’15 – Aug’17 Designation: ETL Manager / Architect Team Size: 12 Client: TD Bank, US Tools/Technology: Informatica Cloud, nCino APIs, Workbench, Salesforce (SaaS), Data Loader, Oracle11g, Oracle SQL Developer Title: Incentive and commission management system (Vodafone) Duration: Aug’14 – June’15 Designation: ETL Architect/Onsite Coordinator Team Size: 22 Client: Vodafone Tools/Technology: Informatica PowerCenter 9.5.1, Truecomp (Callidus Cloud), Oracle11g, Oracle SQL Developer, Putty, WinSCP
  • 3.
    Key Skills • DataWarehousing , Program / Project Management, Technical Developement • Design and ETL development, Database Migration, Production Support, RCA • Functional requirement analysis, Quality Improvement, Regression testing • Vendor Management, Stakeholder management, Project planning and documentation Education 2002 – 2006 Bachelor of Engineering (Information Technology) from RGPV University 2001 Diploma in IT from Sikkim Manipal University Certifications Achievements • PowerCenter Data Integration 10: Developer, Specialist Certification Certified • Certified Scrum Product Owner (CSPO) • Splunk Certified • PDUs for PMP certification • Trained at Redhat Linux / UNIX - Shell scripting, Computer Networking & Security, Network Administration • IZO 007 Certified (OCP Level 1) • Spot / Recognition / Integration / Mentor Awards received • Salesforce Practice Recognitions References: Available upon request