Lokesh Reddy 12499 Folsom BLVD
Email: lokeshreddy17@gmail.com Apt No 82 Rancho Cordova
Mobile: 916-586-6776 CA - 95742
Home: 414-431-6360
Professional Summary
 Overall 10.4 years of Experience in Accenture, USA as an Analyst Programmer.
 Expertise on Data stage7.5 / 8.0/ 8.1/8.5/8.7.
 Trained on Informatica power center 7.1 in Accenture on Sept 2010
 Expertise on Teradata / Oracle / SQL Server.
 Work Experience in the fallowing Technologies
a) 10 years of work Experience on Data stage -7.5x/8.0/8.x
b) 2 years of work Experience on MSBI Tools(SSIS,SSRS,SSAS) -
c) 4 years of work Experience on Teradata and Certified on V2R5 Teradata.
d) 8 Years of work Experience on Oracle, PL/SQL – stored procedures.
e) 8 years of work experience on UNIX, Autosys & Control Scripts
 Data stage – Good Exposure on Data stage – Designing, scheduling, Administering, DS - Jobs.
 Teradata – Good Exposure to Load Strategies.(Fast Load, Bulk Loads , TPTS)
 Experience in Data Migration and Data Modeling (Erwin Tool).
 Experience in Writing Shell Script in UNIX.
 Active member of DW/BI Capability in Accenture IDC which is a practice for developing Data
Warehousing and Business Intelligence fields.
 Good exposure to Data warehousing Concepts.
 Team Player with a strong work Attitude, Proactive, Good Presentation Skills and Communication
skill.
Technical Expertise
ETL tools : Data stage, Informatica, MSBI - SSIS
Reporting Tool : Cognos, SSRS
Data Modeling Tool : Erwin Data Model.
Database : Oracle, Teradata, SQLServer2008
Operating Systems : Windows 2K/XP, UNIX / Linux
Programming Language : Java, C, C++, VB, UNIX Shell Scripting
Experience
 Presently working as a Team Lead @ Accenture Services Pvt. Ltd, USA. Leading team of 5 in
training and assisting them in day to day deliverables.
Achievements
 Got Individual Achievement Reward.
 Graded A in Annual ratings across Delivery Unit.
Certifications
 Teradata V2R5 Certified.
 COGNOS Level-1 ( Product User), Level-2 (Report Authoring) Certified
Academic Qualifications
 Master’s in Computer Application, at Alliance Business Academy affiliated to
Bangalore University with 76 %.
 Bachelor of Computer Science at Vijaya College affiliated to Bangalore
University with First Class
 PUC at A.S.B Pre University College Affiliated to Bangalore University First class.
 Board of Secondary Education from Bangalore University with First Class.
Projects
Project # 8 : EDW
Client : State CA- FTB (www.ftb.ca.gov)
Duration : May 2014 To Till Date
Technology : IBM Data Stage 8.7, DB2
Project Description
EDW is enterprise warehouse for FTB integrates data from different source systems like Liens, Bankruptcy,
Business Entity Taxation system and Personal Income Taxation system. Which provides accurate data for
management for their decision making.
Roles & Responsibilities:
As a Team Lead my Detailed Role Description is as below:-
 Requirement gathering and creating Technical Design Documents.
 Analyzing Data models and creating Source to Target mapping Specs, Process flows /
algorithms.
 Design and Build Complex Data stage jobs.
 Writing Unit Test Cases, Writing SQL Scripts for Data Reconciliation & Validation.
 Supporting Test Phase from Development – Production.
 Migration to of ETL code to Different Environments and integration Testing.
 Defect management and providing resolution based on priorities.
Projects
Project # 7 : ORM (Operational Risk Management) & AFS
Client : RBS CITIZENS BANK (www.rbscitizensbank.com)
Duration : November 2012 to April 2014
Technology : Oracle 8i, IBM Data Stage 8.1 Teradata, UNIX
Project Description
The proposed ORM Data Warehouse for Operational Risk Management in combination with a data quality
initiative in context of the ORM Data Warehouse will meet the business demand for data which is
complete, accurate, valid, consistent, and accessible.
Roles & Responsibilities:
As a Team Lead my Detailed Role Description is as below:-
 Requirement gathering through understanding Functional Specification documents.
 Creating Project Estimations and calculating cost for the project based on Estimation
model.
 Creating project plan based on Timelines , Cost and Resources( Onshore/Offshore -
Model)
 Analyzing Data models and creating Source to Target mapping Specs, Process flows /
algorithms.
 Design and Build Complex Data stage jobs.
 Writing Unit Test Cases, Technical Design Documents.
 Supporting Test Phase from Development – Production.
 Migration to of ETL code to Different Environments and integration Testing.
 Creating Autosys jobs and monitoring daily support activities.
Projects
Project # 6 : Einstein R235
Client : MillerCoors (www.millercoors.com)
Duration : April 2012 to 31-Oct-2012
Technology : Oracle 8i, IBM Data Stage 8.0(Server Jobs), Teradata, UNIX
Project Description
Building Common Warehouse for Miller & Coors which is done by integrating Source system of Coors and
miller. This common Warehouse “EIW” feeds data for Managerial Decision Support System.
Roles & Responsibilities:
As a Senior ETL Developer my Detailed Role Description is as below:-
 Reviewing Function Design Documents, Understanding Data Model, Writing Technical
Design Documents, Process Flow Diagrams and Source to Target mapping Specs.
 Walkthrough of Technical Design documents and making offshore team is comfortable in
build of Datastage jobs.
 Reviewing Datastage Jobs and Control Scripts and Validating the Job Results with Unit
Test Cases.
 Walkthrough of Build Deliverables with COE of Cleints.
 Getting Build Approvals and Managing Assembly Test Phase and product Testing.
 Promotion of Jobs from Dev Box to Prod by Import Export Method and by using TFS.
Projects
Project # 5 : IPM (Integrated Price Management)
Client : MillerCoors (www.millercoors.com)
Duration : October 2011 to March 2012
Technology : Oracle 8i, IBM Data Stage 8.0 (Server Jobs), Teradata, UNIX
Project Description
SAP Warehouse supports management Business Overview has been populated by Datastage ETL TOOL.
Roles & Responsibilities:
As a Senior ETL Developer my Detailed Role Description is as below:-
 Understanding Technical Design Documents and Data Models writing Process Flow
Diagrams Source to Target mapping Specs.
 Designing Datastage Jobs, writing Unix Shell Scripts, Control Scripts.
 Reviewing Datastage Jobs and Control Scripts and Validating the Job Results with Unit
Test Cases.
 Promotion of Jobs from Dev Box to QA and then to Prod by Import Export Method and
by using TFS.
 Enhancements Fixes during support Maintenance Phases.
Projects
Project#4 : UED (United Energy Distribution)
Client : Jemena, Melbourne Australia (http://www.jemena.com.au/)
Duration : March 2011 to till date
Technology : Oracle 8i, IBM Data Stage 8.4.
Project Description
SAP Warehouse supports management Business Overview has been populated by Datastage ETL TOOL.
Roles & Responsibilities:
As a Senior ETL Developer my Detailed Role Description is as below:-
Application Development
 Understanding Business requirements/Data Model creating source to Target Mapping
specification Documents.
 Design and build of Data stage Jobs.
 Generating UTP's and SQL Scripts.
 Job Promotion from Development server to Production Server by
Data stage Version Control.
Projects
Project#3 : ARS Management Reporting
Client : AON, Chicago US (https://www.aon.com/)
Duration : October 2007 to 2011
Technology : Oracle 8i, Ascential Data Stage 7.5.2, UNIX, Autosys, SSIS
Project Description
Management Reporting (MR) & Management Information Platform (MIP) Is Data warehouse
Created by integration of information Involving Multiple, Silo operational applications.
The objective of this integration of information is to provide a unified picture of the business.
This unified picture of the business is intended to facilitate integrated management reporting.
It will promote a single, accurate version of the truth in an efficient manor by providing multi
Operational business governance over the reporting Environment.
Roles & Responsibilities:
As a Senior ETL Developer my Detailed Role Description is as below:-
Application Development
 Understanding Business requirements/Data Model creating source to Target Mapping
specification Documents.
 Design and build of Datastage Jobs.
 Generating UTP's and SQL Scripts.
 Job Promotion from Development server to Production Server by
Data stage Version Control.
 Training and assisting team Members on Datastage. Unix shell scripting & SQL
 Leading Team of Size 3 and training them in Datastage, SQL, peer reviewing Datastage
jobs and validating job results with Unit Test case Results and also with Requirement
Traceability matrix.
Application Maintenance
 Handling 24/7 Production Support
 Writing UNIX shell scripts, Autosys Job creation and Job monitoring in Jobscape
 Scheduling The Data stage jobs.
Project#2 : St. Paul Travelers (http://www.traverlers.com/)
Duration : Feb 2007 to Sept 2007
Technology : Teradata SQL Assistant, Cognos
Project Description
St. Paul Travelers is headquartered in Saint Paul, Minnesota, with significant
Operations in Hartford, Connecticut, provide commercial property-casualty insurance, personal property-
casualty insurance and asset management services. It is a leading provider of surety products and of risk
management services to a wide variety of businesses and organizations and to individuals.
St Paul Travelers have two main business units namely Commercial Lines and Personal Lines.
They sell Property and Casualty Insurance products, covering:
1) Commercial Property: including real estate, equipment, etc.
2) Personal Property: including homes, automobiles, boats, jewelry, etc.
Travelers, a member of St. Paul Travelers, are the second largest writer of auto and homeowners
insurance through independent agents.
Roles & Responsibilities:
 Understanding the technical Documents (TDs) provided by the client And writing
Teradata SQL Scripts and validating with business requirements.
 Generating Cognos Reports validating the reports with Teradata SQL results, Checking
Report Headers, Formats etc.
Project#3 : MHRA
Client : UK Government (http://www.mhra.gov.uk)
Duration : August 2005 to Jan 2006
Technology : Oracle 8i, Oracle Apps, Ascential Data Stage 7.5.2, Erwin Data Modeler.
Project Description
Medicines & Healthcare products Regulatory Agency is an Executive Agency of the UK Department of
Health. It is trusted with protecting and promoting public health and Patient safety by ensuring that
medicines, healthcare products and medical equipment meet appropriate standards of Safety, Quality,
Performance, Effectiveness, and are also used safely.
Roles & Responsibilities:
 Understanding the Technical Design Documents (TDs) provided by the client to develop
PLSQL Migration Scripts.
 Designing Datastage jobs performing Data validation/profiling on legacy data before it’s
loaded to the target database.
 Involved in Data Modeling and Analyzing the Existing system model for the
Enhancements.
 Worked on TMS, Oracle Portal, LDAP, OID tools from Oracle Apps.
 Providing Status reports on daily, weekly to the leads.
Extra curricular Activities
• Conducting Trainings at DW capability Level for Datastage.
• Taken interviews on Datastage to identify right talent pool on Datastage for DW Capability.
Personal Details
Father Name : Mr T. Muniyappa Reddy
Date of Birth : Feb 08 1979.
Passport No : H7539899
VISA : H1B.
Validity of VISA : Nov-2015
 Understanding the technical Documents (TDs) provided by the client And writing
Teradata SQL Scripts and validating with business requirements.
 Generating Cognos Reports validating the reports with Teradata SQL results, Checking
Report Headers, Formats etc.
Project#3 : MHRA
Client : UK Government (http://www.mhra.gov.uk)
Duration : August 2005 to Jan 2006
Technology : Oracle 8i, Oracle Apps, Ascential Data Stage 7.5.2, Erwin Data Modeler.
Project Description
Medicines & Healthcare products Regulatory Agency is an Executive Agency of the UK Department of
Health. It is trusted with protecting and promoting public health and Patient safety by ensuring that
medicines, healthcare products and medical equipment meet appropriate standards of Safety, Quality,
Performance, Effectiveness, and are also used safely.
Roles & Responsibilities:
 Understanding the Technical Design Documents (TDs) provided by the client to develop
PLSQL Migration Scripts.
 Designing Datastage jobs performing Data validation/profiling on legacy data before it’s
loaded to the target database.
 Involved in Data Modeling and Analyzing the Existing system model for the
Enhancements.
 Worked on TMS, Oracle Portal, LDAP, OID tools from Oracle Apps.
 Providing Status reports on daily, weekly to the leads.
Extra curricular Activities
• Conducting Trainings at DW capability Level for Datastage.
• Taken interviews on Datastage to identify right talent pool on Datastage for DW Capability.
Personal Details
Father Name : Mr T. Muniyappa Reddy
Date of Birth : Feb 08 1979.
Passport No : H7539899
VISA : H1B.
Validity of VISA : Nov-2015

Lokesh_Reddy_Datastage_Resume

  • 1.
    Lokesh Reddy 12499Folsom BLVD Email: lokeshreddy17@gmail.com Apt No 82 Rancho Cordova Mobile: 916-586-6776 CA - 95742 Home: 414-431-6360 Professional Summary  Overall 10.4 years of Experience in Accenture, USA as an Analyst Programmer.  Expertise on Data stage7.5 / 8.0/ 8.1/8.5/8.7.  Trained on Informatica power center 7.1 in Accenture on Sept 2010  Expertise on Teradata / Oracle / SQL Server.  Work Experience in the fallowing Technologies a) 10 years of work Experience on Data stage -7.5x/8.0/8.x b) 2 years of work Experience on MSBI Tools(SSIS,SSRS,SSAS) - c) 4 years of work Experience on Teradata and Certified on V2R5 Teradata. d) 8 Years of work Experience on Oracle, PL/SQL – stored procedures. e) 8 years of work experience on UNIX, Autosys & Control Scripts  Data stage – Good Exposure on Data stage – Designing, scheduling, Administering, DS - Jobs.  Teradata – Good Exposure to Load Strategies.(Fast Load, Bulk Loads , TPTS)  Experience in Data Migration and Data Modeling (Erwin Tool).  Experience in Writing Shell Script in UNIX.  Active member of DW/BI Capability in Accenture IDC which is a practice for developing Data Warehousing and Business Intelligence fields.  Good exposure to Data warehousing Concepts.  Team Player with a strong work Attitude, Proactive, Good Presentation Skills and Communication skill. Technical Expertise ETL tools : Data stage, Informatica, MSBI - SSIS Reporting Tool : Cognos, SSRS Data Modeling Tool : Erwin Data Model. Database : Oracle, Teradata, SQLServer2008 Operating Systems : Windows 2K/XP, UNIX / Linux Programming Language : Java, C, C++, VB, UNIX Shell Scripting Experience  Presently working as a Team Lead @ Accenture Services Pvt. Ltd, USA. Leading team of 5 in training and assisting them in day to day deliverables. Achievements  Got Individual Achievement Reward.  Graded A in Annual ratings across Delivery Unit. Certifications  Teradata V2R5 Certified.  COGNOS Level-1 ( Product User), Level-2 (Report Authoring) Certified
  • 2.
    Academic Qualifications  Master’sin Computer Application, at Alliance Business Academy affiliated to Bangalore University with 76 %.  Bachelor of Computer Science at Vijaya College affiliated to Bangalore University with First Class  PUC at A.S.B Pre University College Affiliated to Bangalore University First class.  Board of Secondary Education from Bangalore University with First Class. Projects Project # 8 : EDW Client : State CA- FTB (www.ftb.ca.gov) Duration : May 2014 To Till Date Technology : IBM Data Stage 8.7, DB2 Project Description EDW is enterprise warehouse for FTB integrates data from different source systems like Liens, Bankruptcy, Business Entity Taxation system and Personal Income Taxation system. Which provides accurate data for management for their decision making. Roles & Responsibilities: As a Team Lead my Detailed Role Description is as below:-  Requirement gathering and creating Technical Design Documents.  Analyzing Data models and creating Source to Target mapping Specs, Process flows / algorithms.  Design and Build Complex Data stage jobs.  Writing Unit Test Cases, Writing SQL Scripts for Data Reconciliation & Validation.  Supporting Test Phase from Development – Production.  Migration to of ETL code to Different Environments and integration Testing.  Defect management and providing resolution based on priorities. Projects Project # 7 : ORM (Operational Risk Management) & AFS Client : RBS CITIZENS BANK (www.rbscitizensbank.com) Duration : November 2012 to April 2014 Technology : Oracle 8i, IBM Data Stage 8.1 Teradata, UNIX Project Description The proposed ORM Data Warehouse for Operational Risk Management in combination with a data quality initiative in context of the ORM Data Warehouse will meet the business demand for data which is complete, accurate, valid, consistent, and accessible. Roles & Responsibilities: As a Team Lead my Detailed Role Description is as below:-  Requirement gathering through understanding Functional Specification documents.  Creating Project Estimations and calculating cost for the project based on Estimation model.  Creating project plan based on Timelines , Cost and Resources( Onshore/Offshore - Model)  Analyzing Data models and creating Source to Target mapping Specs, Process flows / algorithms.  Design and Build Complex Data stage jobs.  Writing Unit Test Cases, Technical Design Documents.  Supporting Test Phase from Development – Production.  Migration to of ETL code to Different Environments and integration Testing.  Creating Autosys jobs and monitoring daily support activities.
  • 3.
    Projects Project # 6: Einstein R235 Client : MillerCoors (www.millercoors.com) Duration : April 2012 to 31-Oct-2012 Technology : Oracle 8i, IBM Data Stage 8.0(Server Jobs), Teradata, UNIX Project Description Building Common Warehouse for Miller & Coors which is done by integrating Source system of Coors and miller. This common Warehouse “EIW” feeds data for Managerial Decision Support System. Roles & Responsibilities: As a Senior ETL Developer my Detailed Role Description is as below:-  Reviewing Function Design Documents, Understanding Data Model, Writing Technical Design Documents, Process Flow Diagrams and Source to Target mapping Specs.  Walkthrough of Technical Design documents and making offshore team is comfortable in build of Datastage jobs.  Reviewing Datastage Jobs and Control Scripts and Validating the Job Results with Unit Test Cases.  Walkthrough of Build Deliverables with COE of Cleints.  Getting Build Approvals and Managing Assembly Test Phase and product Testing.  Promotion of Jobs from Dev Box to Prod by Import Export Method and by using TFS. Projects Project # 5 : IPM (Integrated Price Management) Client : MillerCoors (www.millercoors.com) Duration : October 2011 to March 2012 Technology : Oracle 8i, IBM Data Stage 8.0 (Server Jobs), Teradata, UNIX Project Description SAP Warehouse supports management Business Overview has been populated by Datastage ETL TOOL. Roles & Responsibilities: As a Senior ETL Developer my Detailed Role Description is as below:-  Understanding Technical Design Documents and Data Models writing Process Flow Diagrams Source to Target mapping Specs.  Designing Datastage Jobs, writing Unix Shell Scripts, Control Scripts.  Reviewing Datastage Jobs and Control Scripts and Validating the Job Results with Unit Test Cases.  Promotion of Jobs from Dev Box to QA and then to Prod by Import Export Method and by using TFS.  Enhancements Fixes during support Maintenance Phases. Projects Project#4 : UED (United Energy Distribution) Client : Jemena, Melbourne Australia (http://www.jemena.com.au/) Duration : March 2011 to till date Technology : Oracle 8i, IBM Data Stage 8.4. Project Description SAP Warehouse supports management Business Overview has been populated by Datastage ETL TOOL. Roles & Responsibilities: As a Senior ETL Developer my Detailed Role Description is as below:- Application Development  Understanding Business requirements/Data Model creating source to Target Mapping specification Documents.
  • 4.
     Design andbuild of Data stage Jobs.  Generating UTP's and SQL Scripts.  Job Promotion from Development server to Production Server by Data stage Version Control. Projects Project#3 : ARS Management Reporting Client : AON, Chicago US (https://www.aon.com/) Duration : October 2007 to 2011 Technology : Oracle 8i, Ascential Data Stage 7.5.2, UNIX, Autosys, SSIS Project Description Management Reporting (MR) & Management Information Platform (MIP) Is Data warehouse Created by integration of information Involving Multiple, Silo operational applications. The objective of this integration of information is to provide a unified picture of the business. This unified picture of the business is intended to facilitate integrated management reporting. It will promote a single, accurate version of the truth in an efficient manor by providing multi Operational business governance over the reporting Environment. Roles & Responsibilities: As a Senior ETL Developer my Detailed Role Description is as below:- Application Development  Understanding Business requirements/Data Model creating source to Target Mapping specification Documents.  Design and build of Datastage Jobs.  Generating UTP's and SQL Scripts.  Job Promotion from Development server to Production Server by Data stage Version Control.  Training and assisting team Members on Datastage. Unix shell scripting & SQL  Leading Team of Size 3 and training them in Datastage, SQL, peer reviewing Datastage jobs and validating job results with Unit Test case Results and also with Requirement Traceability matrix. Application Maintenance  Handling 24/7 Production Support  Writing UNIX shell scripts, Autosys Job creation and Job monitoring in Jobscape  Scheduling The Data stage jobs. Project#2 : St. Paul Travelers (http://www.traverlers.com/) Duration : Feb 2007 to Sept 2007 Technology : Teradata SQL Assistant, Cognos Project Description St. Paul Travelers is headquartered in Saint Paul, Minnesota, with significant Operations in Hartford, Connecticut, provide commercial property-casualty insurance, personal property- casualty insurance and asset management services. It is a leading provider of surety products and of risk management services to a wide variety of businesses and organizations and to individuals. St Paul Travelers have two main business units namely Commercial Lines and Personal Lines. They sell Property and Casualty Insurance products, covering: 1) Commercial Property: including real estate, equipment, etc. 2) Personal Property: including homes, automobiles, boats, jewelry, etc. Travelers, a member of St. Paul Travelers, are the second largest writer of auto and homeowners insurance through independent agents. Roles & Responsibilities:
  • 5.
     Understanding thetechnical Documents (TDs) provided by the client And writing Teradata SQL Scripts and validating with business requirements.  Generating Cognos Reports validating the reports with Teradata SQL results, Checking Report Headers, Formats etc. Project#3 : MHRA Client : UK Government (http://www.mhra.gov.uk) Duration : August 2005 to Jan 2006 Technology : Oracle 8i, Oracle Apps, Ascential Data Stage 7.5.2, Erwin Data Modeler. Project Description Medicines & Healthcare products Regulatory Agency is an Executive Agency of the UK Department of Health. It is trusted with protecting and promoting public health and Patient safety by ensuring that medicines, healthcare products and medical equipment meet appropriate standards of Safety, Quality, Performance, Effectiveness, and are also used safely. Roles & Responsibilities:  Understanding the Technical Design Documents (TDs) provided by the client to develop PLSQL Migration Scripts.  Designing Datastage jobs performing Data validation/profiling on legacy data before it’s loaded to the target database.  Involved in Data Modeling and Analyzing the Existing system model for the Enhancements.  Worked on TMS, Oracle Portal, LDAP, OID tools from Oracle Apps.  Providing Status reports on daily, weekly to the leads. Extra curricular Activities • Conducting Trainings at DW capability Level for Datastage. • Taken interviews on Datastage to identify right talent pool on Datastage for DW Capability. Personal Details Father Name : Mr T. Muniyappa Reddy Date of Birth : Feb 08 1979. Passport No : H7539899 VISA : H1B. Validity of VISA : Nov-2015
  • 6.
     Understanding thetechnical Documents (TDs) provided by the client And writing Teradata SQL Scripts and validating with business requirements.  Generating Cognos Reports validating the reports with Teradata SQL results, Checking Report Headers, Formats etc. Project#3 : MHRA Client : UK Government (http://www.mhra.gov.uk) Duration : August 2005 to Jan 2006 Technology : Oracle 8i, Oracle Apps, Ascential Data Stage 7.5.2, Erwin Data Modeler. Project Description Medicines & Healthcare products Regulatory Agency is an Executive Agency of the UK Department of Health. It is trusted with protecting and promoting public health and Patient safety by ensuring that medicines, healthcare products and medical equipment meet appropriate standards of Safety, Quality, Performance, Effectiveness, and are also used safely. Roles & Responsibilities:  Understanding the Technical Design Documents (TDs) provided by the client to develop PLSQL Migration Scripts.  Designing Datastage jobs performing Data validation/profiling on legacy data before it’s loaded to the target database.  Involved in Data Modeling and Analyzing the Existing system model for the Enhancements.  Worked on TMS, Oracle Portal, LDAP, OID tools from Oracle Apps.  Providing Status reports on daily, weekly to the leads. Extra curricular Activities • Conducting Trainings at DW capability Level for Datastage. • Taken interviews on Datastage to identify right talent pool on Datastage for DW Capability. Personal Details Father Name : Mr T. Muniyappa Reddy Date of Birth : Feb 08 1979. Passport No : H7539899 VISA : H1B. Validity of VISA : Nov-2015