PROJECT MANAGEMENT: A Handbook for Small Projects
INTRODUCTION
This Information for Engineers document comprises two sections.
Section 1 contains the components of the GBHE Project Process, the capabilities and competencies required by a Project Manager and, finally, specific project management good practices including value improving practices.
Section 2 contains information that supports the practices contained within Section 1. This includes helpful checklists, references and information about deliverables and other examples, all of which will provide practical help to Project Managers and their project teams.
The document assists client sites in meeting the necessary engineering requirements related to safety, health and environmental matters on their sites, and supports the GBHE Safety, Security, Health and Environmental Policy.
Pressure Relief Systems
BACKGROUND TO RELIEF SYSTEM DESIGN Vol.1 of 6
The Guide has been written to advise those involved in the design and engineering of pressure relief systems. It takes the user from the initial identification of potential causes of overpressure or under pressure through the process design of relief systems to the detailed mechanical design. "Hazard Studies" and quantitative hazards analysis are not described; these are seen as complementary activities. Typical users of the Guide will use some Parts in detail and others in overview.
CONTENTS
1 SCOPE
2 PROPERTIES OF FLUID
2.1 General Properties of Sodium Hydroxide
2.2 Physical Properties of Sodium Hydroxide and its Solutions
2.3 Chemical Properties and uses of Sodium Hydroxide
2.4 Physiological effects of Sodium Hydroxide
2.5 Specifications of Commercial Caustic Soda Grades
3 CHOICE OF PUMP TYPE
3.1 Pump Duty
3.2 Pump Type
4 RECOMMENDED LINE DIAGRAMS
5 RECOMMENDED LAYOUT
6 CONSTRUCTION FEATURES
7 MATERIALS OF CONSTRUCTION
7.1 Nickel and Nickel Alloys
7.2 Austenitic Stainless Steel
7.3 Aluminium, Aluminium Alloys, etc.
7.4 Non-Metallic Materials
TABLES
1 PHYSICAL PROPERTIES (Solid Form)
2 PHYSICAL PROPERTIES (Solution Form)
3 CAUSTIC SODA GRADES
FIGURES
1.1 LINE DIAGRAM - HORIZONTAL GLANDED, GLANDLESS AND VERTICAL IN-LINE PUMPS
1.2 LINE DIAGRAM - VERTICAL SPINDLE CANTILEVER PUMPS
1.3 LINE DIAGRAM - SELF PRIMING PUMPS
1.4 LINE DIAGRAM - RECIPROCATING PLUNGER METERING PUMPS
1.5 LINE DIAGRAM - POSITIVE DISPLACEMENT DIAPHRAGM METERING PUMPS
1.6 WATER FLUSHING ARRANGEMENT FOR DOUBLE MECHANICAL SEAL
1.7 WATER FLUSH (QUENCH) ARRANGEMENT FOR SINGLE HARD FACED (CARBIDE) SEAL AND BACK-UP LIP SEAL
2 PHASE DIAGRAM OF NaOH-H2O
3 VISCOSITY OF AQUEOUS CAUSTIC SODA SOLUTIONS
4 VAPOR PRESSURE OF AQUEOUS CAUSTIC SODA SOLUTIONS
5 ENTHALPY CONCENTRATION FOR AQUEOUS CAUSTIC SODA SOLUTIONS
6 SPECIFIC GRAVITY FOR AQUEOUS CAUSTIC SODA SOLUTIONS
7 DILUTION OF CAUSTIC SODA LIQUOR
8 THERMAL CONDUCTIVITY OF AQUEOUS CAUSTIC SODA SOLUTIONS
9 SPECIFIC HEAT OF CAUSTIC SODA SOLUTIONS
10 BOILING POINTS OF STRONG CAUSTIC SODA SOLUTIONS AT REDUCED PRESSURE
11 COMMENCEMENT OF FREEZING OF CAUSTIC SODA SOLUTIONS (0 - 52% W/W)
12 TEMPERATURES ATTAINED ON DISSOLUTION OF ANHYDROUS CAUSTIC SODA
13 HEAT OF SOLUTION FOR ANHYDROUS CAUSTIC SODA
14 SOLUBILITY OF SODIUM CHLORIDE IN CAUSTIC SODA SOLUTIONS
15 DENSITY - CONCENTRATION TABLES FOR CAUSTIC SODA SOLUTIONS AT 600 F (15.5 0 C)
16 MATERIAL SELECTION CHART FOR CAUSTIC SODA HANDLING
Integration of Special Purpose Centrifugal Pumps into a ProcessGerard B. Hawkins
Integration of Special Purpose Centrifugal Pumps into a Process
CONTENTS
1 SCOPE
2 PRELIMINARY CHOICE OF PUMP
SECTION A - INLET CONDITIONS
Al Calculation of Basic Nett Positive Suction Head (NPSH)
A2 Correction to Basic NPSH for Temperature Rise at Pump Inlet
A3 Correction to Basic NPSH for Acceleration Head
A4 Calculation of Available NPSH
A5 Correction to NPSH for Fluid Properties
A6 Calculation of Suction Specific Speed
A7 Priming
A8 Submergence
SECTION B – FLOW / HEAD RATING SEQUENCE
B1 Calculation of Static Head
B2 Calculation of Margins for Control
B3 Calculation of Q-H Duty
B4 Stability and Parallel Operation
B5 Corrections to Q-H Duty for Fluid Properties
B6 Guide to Pump Type and Speed
SECTION C – DRIVER POWER RATING
C1 Estimation of Pump Efficiency
C2 Calculation of Absorbed Power
C3 Calculation of Driver Power Rating
C4 Preliminary Power Ratings of Electric Motors
C5 Starting Conditions for Electric Motors
C6 Reverse Flow and Reverse Rotation
SECTION D - CASING PRESSURE RATING
D1 Calculation of Maximum Inlet Pressure
D2 Calculation of Differential Pressure
D3 Pressure Waves
D4 Pressure due to Liquid Thermal Expansion
D5 Casing Hydrostatic Test Pressure
SECTION E – SEALING CONSIDERATIONS
E1 Preliminary Choice of Seal
E2 Fluid Attributes
E3 Definition of Flushing Arrangements
APPENDICES
A RELIABILITY CLASSIFICATION
B SYMBOLS AND PREFERRED UNITS
DOCUMENTS REFERRED TO IN THIS ENGINEERING DESIGN GUIDE
Cashco - Válvula de controle e reguladores sanitáriosRenan Sehn Santos
A Cashco possui uma linha de válvulas para o segmento sanitário.
A linha de produtos inclui: válvula de controle sanitária, regulador de pressão sanitária, regulador de contrapressão sanitária, controladores e válvulas de inertização sanitárias.
PROJECT MANAGEMENT: A Handbook for Small Projects
INTRODUCTION
This Information for Engineers document comprises two sections.
Section 1 contains the components of the GBHE Project Process, the capabilities and competencies required by a Project Manager and, finally, specific project management good practices including value improving practices.
Section 2 contains information that supports the practices contained within Section 1. This includes helpful checklists, references and information about deliverables and other examples, all of which will provide practical help to Project Managers and their project teams.
The document assists client sites in meeting the necessary engineering requirements related to safety, health and environmental matters on their sites, and supports the GBHE Safety, Security, Health and Environmental Policy.
Pressure Relief Systems
BACKGROUND TO RELIEF SYSTEM DESIGN Vol.1 of 6
The Guide has been written to advise those involved in the design and engineering of pressure relief systems. It takes the user from the initial identification of potential causes of overpressure or under pressure through the process design of relief systems to the detailed mechanical design. "Hazard Studies" and quantitative hazards analysis are not described; these are seen as complementary activities. Typical users of the Guide will use some Parts in detail and others in overview.
CONTENTS
1 SCOPE
2 PROPERTIES OF FLUID
2.1 General Properties of Sodium Hydroxide
2.2 Physical Properties of Sodium Hydroxide and its Solutions
2.3 Chemical Properties and uses of Sodium Hydroxide
2.4 Physiological effects of Sodium Hydroxide
2.5 Specifications of Commercial Caustic Soda Grades
3 CHOICE OF PUMP TYPE
3.1 Pump Duty
3.2 Pump Type
4 RECOMMENDED LINE DIAGRAMS
5 RECOMMENDED LAYOUT
6 CONSTRUCTION FEATURES
7 MATERIALS OF CONSTRUCTION
7.1 Nickel and Nickel Alloys
7.2 Austenitic Stainless Steel
7.3 Aluminium, Aluminium Alloys, etc.
7.4 Non-Metallic Materials
TABLES
1 PHYSICAL PROPERTIES (Solid Form)
2 PHYSICAL PROPERTIES (Solution Form)
3 CAUSTIC SODA GRADES
FIGURES
1.1 LINE DIAGRAM - HORIZONTAL GLANDED, GLANDLESS AND VERTICAL IN-LINE PUMPS
1.2 LINE DIAGRAM - VERTICAL SPINDLE CANTILEVER PUMPS
1.3 LINE DIAGRAM - SELF PRIMING PUMPS
1.4 LINE DIAGRAM - RECIPROCATING PLUNGER METERING PUMPS
1.5 LINE DIAGRAM - POSITIVE DISPLACEMENT DIAPHRAGM METERING PUMPS
1.6 WATER FLUSHING ARRANGEMENT FOR DOUBLE MECHANICAL SEAL
1.7 WATER FLUSH (QUENCH) ARRANGEMENT FOR SINGLE HARD FACED (CARBIDE) SEAL AND BACK-UP LIP SEAL
2 PHASE DIAGRAM OF NaOH-H2O
3 VISCOSITY OF AQUEOUS CAUSTIC SODA SOLUTIONS
4 VAPOR PRESSURE OF AQUEOUS CAUSTIC SODA SOLUTIONS
5 ENTHALPY CONCENTRATION FOR AQUEOUS CAUSTIC SODA SOLUTIONS
6 SPECIFIC GRAVITY FOR AQUEOUS CAUSTIC SODA SOLUTIONS
7 DILUTION OF CAUSTIC SODA LIQUOR
8 THERMAL CONDUCTIVITY OF AQUEOUS CAUSTIC SODA SOLUTIONS
9 SPECIFIC HEAT OF CAUSTIC SODA SOLUTIONS
10 BOILING POINTS OF STRONG CAUSTIC SODA SOLUTIONS AT REDUCED PRESSURE
11 COMMENCEMENT OF FREEZING OF CAUSTIC SODA SOLUTIONS (0 - 52% W/W)
12 TEMPERATURES ATTAINED ON DISSOLUTION OF ANHYDROUS CAUSTIC SODA
13 HEAT OF SOLUTION FOR ANHYDROUS CAUSTIC SODA
14 SOLUBILITY OF SODIUM CHLORIDE IN CAUSTIC SODA SOLUTIONS
15 DENSITY - CONCENTRATION TABLES FOR CAUSTIC SODA SOLUTIONS AT 600 F (15.5 0 C)
16 MATERIAL SELECTION CHART FOR CAUSTIC SODA HANDLING
Integration of Special Purpose Centrifugal Pumps into a ProcessGerard B. Hawkins
Integration of Special Purpose Centrifugal Pumps into a Process
CONTENTS
1 SCOPE
2 PRELIMINARY CHOICE OF PUMP
SECTION A - INLET CONDITIONS
Al Calculation of Basic Nett Positive Suction Head (NPSH)
A2 Correction to Basic NPSH for Temperature Rise at Pump Inlet
A3 Correction to Basic NPSH for Acceleration Head
A4 Calculation of Available NPSH
A5 Correction to NPSH for Fluid Properties
A6 Calculation of Suction Specific Speed
A7 Priming
A8 Submergence
SECTION B – FLOW / HEAD RATING SEQUENCE
B1 Calculation of Static Head
B2 Calculation of Margins for Control
B3 Calculation of Q-H Duty
B4 Stability and Parallel Operation
B5 Corrections to Q-H Duty for Fluid Properties
B6 Guide to Pump Type and Speed
SECTION C – DRIVER POWER RATING
C1 Estimation of Pump Efficiency
C2 Calculation of Absorbed Power
C3 Calculation of Driver Power Rating
C4 Preliminary Power Ratings of Electric Motors
C5 Starting Conditions for Electric Motors
C6 Reverse Flow and Reverse Rotation
SECTION D - CASING PRESSURE RATING
D1 Calculation of Maximum Inlet Pressure
D2 Calculation of Differential Pressure
D3 Pressure Waves
D4 Pressure due to Liquid Thermal Expansion
D5 Casing Hydrostatic Test Pressure
SECTION E – SEALING CONSIDERATIONS
E1 Preliminary Choice of Seal
E2 Fluid Attributes
E3 Definition of Flushing Arrangements
APPENDICES
A RELIABILITY CLASSIFICATION
B SYMBOLS AND PREFERRED UNITS
DOCUMENTS REFERRED TO IN THIS ENGINEERING DESIGN GUIDE
Cashco - Válvula de controle e reguladores sanitáriosRenan Sehn Santos
A Cashco possui uma linha de válvulas para o segmento sanitário.
A linha de produtos inclui: válvula de controle sanitária, regulador de pressão sanitária, regulador de contrapressão sanitária, controladores e válvulas de inertização sanitárias.
Determination of Anions by Ion Chromatography
1 SCOPE AND FIELD OF APPLICATION
This method is suitable for the determination of inorganic anions in Ammonia Solution in the range 100 ppb to 50 ppm m/v.
2 PRINCIPLE
The sample is passed through a column of anion exchange resin, on which the anions are absorbed and separated. They are then eluted with dilute sodium carbonate/sodium hydrogen carbonate solution and passed through a suppressor. This replaces the cations with hydrogen ions and thus reduces the background conductivity of the eluent. Final measurement is by conductivity
LOADING AND START-UP: ADSORBENTS AND ADSORPTION UNITS
PHILOSOPHY
PACKAGING AND INSPECTION
LOADING
1.1 Vessel Inspection
1.2 Loading of Bottom Support Material
1.3 Loading of Sieve
1.4 Special Precautions in the Case of PSA and VPSA Applications
1.5 Loading of Top Support Material
1.6 The vessel should then be closed in ready for process start-up.
2. START-UP
2.1 Check list before Commencing Start-up
3. INITIAL REGENERATION
3.1 Regeneration Gas Availability
3.2 Initial Regeneration Procedure
4. PROCESS START-UP
Inogent Laboratories Pvt. Ltd is the manufacturing and development services subsidiary of GVK Biosciences (GVK BIO). Inogent offers a broad spectrum of services that include Custom Research & Development, Custom Synthesis, Contract Manufacturing and Commercial Manufacturing, while also intelligently managing and offering Intermediates & Bulk Actives to a large base of clients globally.
Forberg scientific mi facility brochure 2012 single page displayJohn Peters
Forberg Scientific was established in 1971 as a distributor/manufacturers
representative organization with a passion for customer service and innovative problem solving. We’ve grown considerably since our beginnings yet these two traits continue to permeate our company’s culture, and our approach to the marketplace. We pride ourselves on partnering with leading edge suppliers that bring the highest quality products to the instrumentation marketplace.
Operational Problems
Catalytic Reactor Process - Prompt List
- Feed Issues:
- Pipe work type Issues
- Operational Issues
- Vessel Loading
- Vessel Designs
- Wider Process Issues
- Material Issues
- Discharge issues
- Things to look at
- Things to consider trying
Gas Mixing
0 INTRODUCTION/PURPOSE
1 SCOPE
2 FIELD OF APPLICATION
3 DEFINITIONS
4 RECOMMENDATIONS FOR GAS MIXING:
PLUG FLOW
5 RECOMMENDATIONS FOR GAS MIXING:
BACKMIXED INITIAL ZONE
6 BIBLIOGRAPHY
We are manufacturers of quartz water distillation unit, water distillation unit suppliers, quartz water distillation plant, water distillation plants India, steel water distillation plant India, quartz water distillation unit India, water distillation unit manufacturers India, water distillation plants suppliers. For More Information Please Logon http://cutt.us/vSgb
Systec Products brochure - Autoclaves, Media preparators and automated Plate ...Helena Wolf-Labombarda
Systec GmbH is a manufacturer of autoclaves (steam sterilizers), especially laboratory autoclaves, media preparators and filling devices for liquid media and microbiological culture media. Attached you can find the current overview brochure of the Systec product range.
For further Information please visit also our Website www.systec-lab.com
Seeking a challenging career in dynamic & leading organization preferably a large-scale Chemical-Petrochemical\ Fertilizers\ Petroleum Refinery or Oil and Gas that would help me cultivate and nature my skills to the fullest with an opportunity to display my talent and become an asset to any medium\ large national or multinational organization. 11.5 years work experience in utilities & process operation Area in petrochemical, chemical and power.
Determination of Anions by Ion Chromatography
1 SCOPE AND FIELD OF APPLICATION
This method is suitable for the determination of inorganic anions in Ammonia Solution in the range 100 ppb to 50 ppm m/v.
2 PRINCIPLE
The sample is passed through a column of anion exchange resin, on which the anions are absorbed and separated. They are then eluted with dilute sodium carbonate/sodium hydrogen carbonate solution and passed through a suppressor. This replaces the cations with hydrogen ions and thus reduces the background conductivity of the eluent. Final measurement is by conductivity
LOADING AND START-UP: ADSORBENTS AND ADSORPTION UNITS
PHILOSOPHY
PACKAGING AND INSPECTION
LOADING
1.1 Vessel Inspection
1.2 Loading of Bottom Support Material
1.3 Loading of Sieve
1.4 Special Precautions in the Case of PSA and VPSA Applications
1.5 Loading of Top Support Material
1.6 The vessel should then be closed in ready for process start-up.
2. START-UP
2.1 Check list before Commencing Start-up
3. INITIAL REGENERATION
3.1 Regeneration Gas Availability
3.2 Initial Regeneration Procedure
4. PROCESS START-UP
Inogent Laboratories Pvt. Ltd is the manufacturing and development services subsidiary of GVK Biosciences (GVK BIO). Inogent offers a broad spectrum of services that include Custom Research & Development, Custom Synthesis, Contract Manufacturing and Commercial Manufacturing, while also intelligently managing and offering Intermediates & Bulk Actives to a large base of clients globally.
Forberg scientific mi facility brochure 2012 single page displayJohn Peters
Forberg Scientific was established in 1971 as a distributor/manufacturers
representative organization with a passion for customer service and innovative problem solving. We’ve grown considerably since our beginnings yet these two traits continue to permeate our company’s culture, and our approach to the marketplace. We pride ourselves on partnering with leading edge suppliers that bring the highest quality products to the instrumentation marketplace.
Operational Problems
Catalytic Reactor Process - Prompt List
- Feed Issues:
- Pipe work type Issues
- Operational Issues
- Vessel Loading
- Vessel Designs
- Wider Process Issues
- Material Issues
- Discharge issues
- Things to look at
- Things to consider trying
Gas Mixing
0 INTRODUCTION/PURPOSE
1 SCOPE
2 FIELD OF APPLICATION
3 DEFINITIONS
4 RECOMMENDATIONS FOR GAS MIXING:
PLUG FLOW
5 RECOMMENDATIONS FOR GAS MIXING:
BACKMIXED INITIAL ZONE
6 BIBLIOGRAPHY
We are manufacturers of quartz water distillation unit, water distillation unit suppliers, quartz water distillation plant, water distillation plants India, steel water distillation plant India, quartz water distillation unit India, water distillation unit manufacturers India, water distillation plants suppliers. For More Information Please Logon http://cutt.us/vSgb
Systec Products brochure - Autoclaves, Media preparators and automated Plate ...Helena Wolf-Labombarda
Systec GmbH is a manufacturer of autoclaves (steam sterilizers), especially laboratory autoclaves, media preparators and filling devices for liquid media and microbiological culture media. Attached you can find the current overview brochure of the Systec product range.
For further Information please visit also our Website www.systec-lab.com
Seeking a challenging career in dynamic & leading organization preferably a large-scale Chemical-Petrochemical\ Fertilizers\ Petroleum Refinery or Oil and Gas that would help me cultivate and nature my skills to the fullest with an opportunity to display my talent and become an asset to any medium\ large national or multinational organization. 11.5 years work experience in utilities & process operation Area in petrochemical, chemical and power.
Ammonia Plant Technology
Pre-Commissioning Best Practices
GBHE-APT-0102
PICKLING & PASSIVATION
CONTENTS
1 PURPOSE OF THE WORK
2 CHEMICAL CONCEPT
3 TECHNICAL CONCEPT
4 WASTES & SAFETY CONCEPT
5 TARGET RESULTS
6 THE GENERAL CLEANING SEQUENCE MANAGEMENT
6.6.1 Pre-cleaning or “Physical Cleaning
6.6.2 Pre-rinsing
6.6.3 Chemical Cleaning
6.6.4 Critical Factors in Cleaning Success
6.6.5 Rinsing
6.6.6 Inspection and Re-Cleaning, if Necessary
7 Systems to be treated by Pickling/Passivation
1. Mon Anly Villaflor
Address : Street 38, Gate 47
Salwa, Industrial Area
Doha, Qatar
Contact Number : +974 7758 7297
Email Address : mon.villaflor@gmail.com
CHEMICAL ENGINEER
Skilled and certified PRC licensed Engineer with a Bachelor of Science in Chemical Engineering.
Resourceful, analytical and detail-driven with capabilities in completing multiple projects with competing
deadlines. Aggressive in identifying and resolving inefficient operational process.
A strong team member, able to motivate others to achieve optimal production rates while maintaining high
safety methods and practices. Reliable follow-through skills, fulfilling all administrative requirements.Clear
communicator, both oral and written. Excel in unpredictable and hectic environment.
AREAS OF EXPERTISE
DrillingFluids formulationandOptimization
Chemical EngineeringOperations
Heat TransferProcess:EvaporationandHeatexchange
Mass TransferProcess: Distillation,GasAbsorption,Extraction,Adsorption,andDrying
Mechanical Process:SolidsTransportation,CrushingandPulverizing,andScreeningandSieving
EquipmentandProcessFlowDesign
Technical Drawing
MS Office (Excel,Word,Outlook,Powerpoint)
Basic Autocadand SketchUp
2. PROFESSIONAL EXPERIENCE
Halliburton Worldwide Limited
Street No. 38, Gate No. 47, Salwa Industrial Area
PO Box 3036, Doha, Qatar
December 7, 2013– Present
Drilling Fluids Technician
Job Description:
Formulate and Optimize Drilling fluids
Perform Specified test for the formulation
Evaluate Mud properties
Support Rig Operation
Implement 5S (Sort, Set in order, Shine, Standardize, and Sustain) in the Laboratory
Maintain Laboratory Inventory on chemicals and equipment
Control in and out of Laboratory chemical samples
Implement Waste Management Plan and Chemical Hygiene Plan in the Lab
Conduct monthly and quarterly Tiered Inspection
Practice API(American Petroleum Institute)13B-1 Recommended Practice for Field Testing Water
Based Drilling Fluids
Practice API(American Petroleum Institute)13A Specification for Drilling Fluids Materials
Conduct pre-job safety meeting
Maintain MSDS updates
Calibrate Laboratory Equipment and Rig Equipment
Operate the following equipment:
Rheometer, Mud Balance, Pressurized Mud Balance, HPHT Filter Apparatus, PPA (Permeability
Plugging Apparatus), pH meter, Retort, API Filter Press, GGT (Garret Gas Train), Centrifuge,
Infracal (Total Hydrocarbon determation), Brookfield Viscometer, PSD (Particle Size Distribution)
Analyzer, CST (Capillary Suction Time), Sand Bed test Equipment, Methylene Blue Kit,
Trainings and Certificates:
Halliburton University Trainings:
Dropped Objects Lead Assignment
Halliburton Dropped Objects Training
Hand and Finger Safety
Risk Management – Hazard Identification
3. Risk Management – Evaluating Risk
Risk Management – Controlling Risk
Silicosis Awareness
Radiation General Awareness
Explosive General Awareness – Nonuser
Ergonomics General Awareness
Environmental Awareness & Incident Reporting
Bloodborne Pathogens Awareness Level
Hazards Communication
Fann Instrument Calibration and Operation Training:
HPHT Filter Press
PPA (Permeability Plugging Apparatus)
Heating Cup
Viscometer model 35
EST
Retort
Roller Oven
Mud Balance
TBOSIET Training(OPITO Approved), ENERTECH QATAR
Date of Issue: July 24, 2014
Date of Expiry: July 23, 2016
H2S Training(OPITO Approved), ENERTECH QATAR
Date of Issue: July 24, 2014
Date of Expiry: July 23, 2016
Basic Fire Fighting, VENTURE GULF TRAINING CENTRE
Date of Issue: March 25, 2014
Date f Expiry: March 24, 2017
4. Roxol BioenergyCorporation
Brgy. RSB, La Carlota City
Negross Occidental, Philippines
Feb. 25, 2013 – October 15, 2013
Distillation Plant Operator
Job Description:
Operate a DCS (Distributed Control System) Distillation Plant
Supervised 6 Personnel
Maintain temperature and pressure parameters on all 6 unit operation columns
Maintain 99-99.6% Bioethanol production
Conduct pressure test on pressurized columns before star-up or during maintenance period
Conduct vacuum test on vacuumed columns before star-up or during maintenance period
Conduct leak test for valves and fittings before star-up or during maintenance period
Supervise chemical clean-up of columns
Inspect and supervise cleaning of Heat exchangers
Conduct checking on all pumps for service
Check Distributed Control System daily for accurate controls in pneumatic valves and automated
pumps.
Perform Normal Start-up and Shutdown operation
Perform Emergency shutdown
Maintain an incident free workplace
Conduct Safety toolbox meeting before the Job
Fermentation Plant Operator
Job Description:
Operate Fermentation Plant
Supervised 6 Personnel
Perform Normal Plant Star-up and Shutdown
Perform Plant Emergency shutdown
Supervise culture propagation
Ensure proper treatment on unwanted bacteria contamination
5. Ensure proper feeding and nurturing of yeast culture
Ensure 9% and above alcohol percentage in beer.
Supervise fermenter bath clean-up during down time
Maintain an incident free workplace
Conduct Safety toolbox meeting before the Job
Evaporation Plant Operator
Job Description:
Operate a 500 kW DCS (Distributed Control System) Evaporation Plant
Perform Normal Plant Star-up and Shutdown
Perform Plant Emergency shutdown
Supervised 6 Personnel
Ensure efficient removal of water from vinasse feed
Ensure water condensate of evaporators are clear
Ensure Steam Condensate is free from contamination for boiler return
Ensures all Centrifugal and Vacuum pumps are all working and in good condition
Supervised weekly cleaning of Falling Film Evaporator Calandrias, and Heat exchangers
Conduct pressure test on pressurized columns before star-up or during maintenance period
Conduct vacuum test on vacuumed columns before star-up or during maintenance period
Conduct leak test for valves and fittings before star-up or during maintenance period
Revised flow process for improvement
Check Distributed Control System daily for accurate controls in pneumatic valves and automated
pumps.
Maintain an incident free workplace
Conduct Safety toolbox meeting before the Job
6. Central Azucarera de La Carlota Inc.
Brgy. RSB, La Carlota City
Negross Occidental, Philippines
Sept. 10, 2010 – Jan. 12, 2012
Laboratory Technician
Job Description:
Quality analysis on Sugarcane Juice, Molasses and Sugar Product
Calibrate Laboratory Equipment
Evaluate Lab results
Manage laboratory Inventory of chemicals and equipment
Make Solution Standards for test
Core Sampling of Sugarcane
Follow Standard Practice for sugar analysis
EDUCATIONAL BACKGROUND
Universityof Negros Occidental –Recoletos 2005 – 2010
Bachelor of Science in Chemical Engineering
PERSONAL INFORMATION
Date of birth : February 26, 1988
Civil Status : Single
Nationality : Filipino
Language : English, Tagalog
Religion : Roman Catholic
Qatar Visa : Residence Visa (Company Sponsor)
Passport No. : EC5378328