I have majored electrical engineering in Seoul National University of Technology and joined ABB Korea
starting career as an electrical engineer from 2008. My first job was QC engineer who was responsible for
quality control and to carry out internal test of MV/LV switchgear. Moreover, I had been dispatched to site for
commissioning as a supervisor for several time during belonging to QC department. I have transferred to design
department in 2011 and changed my role to a MV switchgear design engineer, who is responsible for project
engineering.
I am a responsible, goal-oriented, disciplined, self-motivated fast learner who has a deep interest in engineering
field. I am currently investigating new opportunities where I can apply my knowledge and experience towards
broader responsibilities and advancement. I would appreciate any assistance you could kindly provide to help
me achieve and fulfill my desire.
My resume is enclosed for your interview. I will provide you with specific information regarding my
background and abilities. I can be reached at 010-5791-7511 by cellular phone or hypnos80@empas.com by E-
mail. I would appreciate the opportunities to be considered as a future member of your company and look
forward to having an interview with you
Thank you for your consideration
Your sincerely,
Jang-wook Lee.
JANG-WOOK LEE
Address : 107-102, Greenvil, Baek-suk dong, Seobuk gu, Chonan si,Chungnam do, Korea.
E-mail : hypnos80@empas.com / Mobile : 010-5791-7511
Education
Mar 2002~
Aug 2008
Seoul National University of Technology
∙ Bachelor’s Degree in Electrical Engineering.
∙ GPA 3.21 / 4.5
Military Service
Dec 2005
~ Dec 2007
Korean Augmentation Troops to U.S. Army ( KATUSA )
∙ 1st
Brigade 15th
Regiment Field Artillery Battalion, 2nd
Infantry Division(Camp Casey)
∙ Received AAM(Army Achievement Medal).
∙ Served as a Senior-Katusa in last 6 months
Certificates and Skills
∙ Language
∙ Certificate
∙ Computer skills
Korean, English
Electrical engineer : 1st
level (Korean)
MS office, AutoCad, Eplan
Role and Responsibility for current job in ABBKR
Project Engineer for MV SWGR projects.
∙ Interpretation of project specification.
- Clarification and deviation
- Selection of application in accordance with project specification.
∙ Correspondence with customer regarding technical issues and provide solutions.
∙ Vendor print submission and control.
- Technical specification for MV SWGR
- Single line diagram
- General arrangement and outlook drawing
- Schematic drawing including logic diagram
- Others
∙ Management of project material (BOM).
Work Experiences
No PROEJCT YEAR JOB EPC END USER SITE ITEM BUDGET(USD)
1 PTTPE ETHANE CRACKER
PROJECT
2009 Supervisor
Dispatch
TOYO ENGINEERING
(JAPAN)
PTT POLYETHYLENE
CORPORATION
THAILAND MV SWGR 2,476,700
2 SHUQAIQ PHASE-2 IWPP
PROJECT
2009 Supervisor
Dispatch
MITSBUSHI HEAVY
INDUSTRY
(JAPAN)
ACWA GROUP SAUDI MV SWGR 7,745,870
3 BM FEED PROJECT 2010 Supervisor
Dispatch
MITSBUSHI HEAVY
INDUSTRY
(JAPAN)
BRUNEI METHANOL
COMPANY(BMO)
BRUNEI MV SWGR 843,640
4 EVA PLANT AND UTILITIES
PROJECT
2011 Design GS E&C
(KOREA)
INTERNATIONAL POLYMERS
COMPANY
SAUDI MV SWGR 2,900,000
5 KNPC NORTH LPG TANK FARM
PROJECT
2012 Design GS E&C
(KOREA)
KUWAIT NATIONAL PETROLEUM
COMPANY
KUWAIT MV SWGR 3,770,000
6 MUSANDAM GAS PLANT
PROJECT
2012 Design HYUNDAI
ENGINEERING
(KOREA)
OMAN OIL COMPANY
EXPLORATION & PRODUCTION
LLC
OMAN MV SWGR 2,140,520
7 MEGA DEAL POWER PLANT
SHAT AL BASRA PROJECT
2012 Design METKA
(GREECE)
MINISTRY OF ELECTRICITY IRAQ MV SWGR 2,404,980
8 132KV REHABILITATION OF
KIYUNGI SUBSTATION
PROJECT
2013 Design GS E&C
(KOREA)
TANZANIA ELECTRIC SUPPLY
COMPANY LTD.
TANZANIA GIS
(Secondary
Engineering)
1,083,100
9 QMAX/VLCC FLOATING DOCK
PROJECT
2013 Design HUNDAI SAMHO
HEAVY INDUSTRY
(KOREA)
QATAR GAS TRANSPORT
COMPANY LTD.(NAKILAT)
QATAR MV SWGR
(in Floating Dock)
365,600
10 1131.1MW COMBINED CYCLE
POWER PLANT AT RAS DJINET
PROJECT
2014 Design DAEWOO E&C
(KOREA)
SOCIETE ALGERIENNE DE
PRODUCTION
D'ELECTRICITE(S.P.E)
ALGERIA MV SWGR 3,632,860
11 PREPARATORY WORKS FOR
CFP AT MAA AND
MAB REFINERIES PROJECT
2013 Design SAMSUNG C&T
(KOREA)
KUWAIT NATIONAL PETROLEUM
COMPANY
KUWAIT MV SWGR
(in EHOUSE)
767,900
12 SOCAR AMMONIA AND UREA
COMPLEX PROJECT
2015 Design SAMSUNG E&C
(KOREA)
STATE OIL COMPANY OF
AZERBAIJAN REPUBLIC
AZERBAIJAN MV SWGR 1,800,000
13 KNPC CFP MAB2 PROJECT 2015 Design FDH JV
(FLOUR, DAEWOO
E&C, HYUNDAI
HEAVY INDUSTRY)
KUWAIT NATIONAL PETROLEUM
COMPANY
KUWAIT MV SWGR 14,660,000

More Related Content

What's hot

moin_132601354(1)
moin_132601354(1)moin_132601354(1)
moin_132601354(1)moin khan
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
nijaz aboobacker
 
resume (3) - Copy
resume (3) - Copyresume (3) - Copy
resume (3) - Copyabdul azeez
 
Cv vijay mondkar 2018 short
Cv   vijay mondkar 2018 shortCv   vijay mondkar 2018 short
Cv vijay mondkar 2018 short
VIJAYPMONDKAR
 
Cv docx
Cv docxCv docx

What's hot (20)

CV Inesh
CV IneshCV Inesh
CV Inesh
 
moin_132601354(1)
moin_132601354(1)moin_132601354(1)
moin_132601354(1)
 
Resume
ResumeResume
Resume
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
AYENI AKEEM cv
AYENI AKEEM cvAYENI AKEEM cv
AYENI AKEEM cv
 
Resume for all
Resume for allResume for all
Resume for all
 
Resume - Andika RZ
Resume - Andika RZResume - Andika RZ
Resume - Andika RZ
 
BIBHUTI_CURRICULUM_VITAE-1
BIBHUTI_CURRICULUM_VITAE-1BIBHUTI_CURRICULUM_VITAE-1
BIBHUTI_CURRICULUM_VITAE-1
 
resume (3) - Copy
resume (3) - Copyresume (3) - Copy
resume (3) - Copy
 
Shaik Akbar Pasha_Resume
Shaik Akbar Pasha_ResumeShaik Akbar Pasha_Resume
Shaik Akbar Pasha_Resume
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Ajay Surendran
Ajay SurendranAjay Surendran
Ajay Surendran
 
Cv vijay mondkar 2018 short
Cv   vijay mondkar 2018 shortCv   vijay mondkar 2018 short
Cv vijay mondkar 2018 short
 
abdul majeed cv
abdul majeed cvabdul majeed cv
abdul majeed cv
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
Cv docx
Cv docxCv docx
Cv docx
 
javed CV
javed CVjaved CV
javed CV
 
abmcv Dec 2016
abmcv Dec 2016abmcv Dec 2016
abmcv Dec 2016
 

Similar to Resume_Lee Jangwook

Alvin latest cv 2015
Alvin latest cv 2015Alvin latest cv 2015
Alvin latest cv 2015Alvin Poh
 
Resume mju 03.10.2016
Resume mju 03.10.2016Resume mju 03.10.2016
Resume mju 03.10.2016
Jashim Pd-2
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur ResumeRita Thakur
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016ZUBER AHAMED
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016Jashim Pd-2
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
Jashim Pd-2
 
JIYUAN FAN resume
JIYUAN FAN resumeJIYUAN FAN resume
JIYUAN FAN resumeFAN JIYUAN
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV GULMOHAMMED IBRAHIM
 

Similar to Resume_Lee Jangwook (20)

Alvin latest cv 2015
Alvin latest cv 2015Alvin latest cv 2015
Alvin latest cv 2015
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Resume mju 03.10.2016
Resume mju 03.10.2016Resume mju 03.10.2016
Resume mju 03.10.2016
 
Nagappa
NagappaNagappa
Nagappa
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur Resume
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
nk resume
nk resumenk resume
nk resume
 
CV2015
CV2015CV2015
CV2015
 
C.V.
C.V.C.V.
C.V.
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
JIYUAN FAN resume
JIYUAN FAN resumeJIYUAN FAN resume
JIYUAN FAN resume
 
HM SIAL
HM SIALHM SIAL
HM SIAL
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV
 
Amitava_resume
Amitava_resumeAmitava_resume
Amitava_resume
 

Resume_Lee Jangwook

  • 1. JANG-WOOK LEE 107-102, Greenvil, Baek-suk dong Seobuk gu, Chonan si Chungnam do, Korea Dear Sir / Madam, I have majored electrical engineering in Seoul National University of Technology and joined ABB Korea starting career as an electrical engineer from 2008. My first job was QC engineer who was responsible for quality control and to carry out internal test of MV/LV switchgear. Moreover, I had been dispatched to site for commissioning as a supervisor for several time during belonging to QC department. I have transferred to design department in 2011 and changed my role to a MV switchgear design engineer, who is responsible for project engineering. I am a responsible, goal-oriented, disciplined, self-motivated fast learner who has a deep interest in engineering field. I am currently investigating new opportunities where I can apply my knowledge and experience towards broader responsibilities and advancement. I would appreciate any assistance you could kindly provide to help me achieve and fulfill my desire. My resume is enclosed for your interview. I will provide you with specific information regarding my background and abilities. I can be reached at 010-5791-7511 by cellular phone or hypnos80@empas.com by E- mail. I would appreciate the opportunities to be considered as a future member of your company and look forward to having an interview with you Thank you for your consideration Your sincerely, Jang-wook Lee.
  • 2. JANG-WOOK LEE Address : 107-102, Greenvil, Baek-suk dong, Seobuk gu, Chonan si,Chungnam do, Korea. E-mail : hypnos80@empas.com / Mobile : 010-5791-7511 Education Mar 2002~ Aug 2008 Seoul National University of Technology ∙ Bachelor’s Degree in Electrical Engineering. ∙ GPA 3.21 / 4.5 Military Service Dec 2005 ~ Dec 2007 Korean Augmentation Troops to U.S. Army ( KATUSA ) ∙ 1st Brigade 15th Regiment Field Artillery Battalion, 2nd Infantry Division(Camp Casey) ∙ Received AAM(Army Achievement Medal). ∙ Served as a Senior-Katusa in last 6 months Certificates and Skills ∙ Language ∙ Certificate ∙ Computer skills Korean, English Electrical engineer : 1st level (Korean) MS office, AutoCad, Eplan Role and Responsibility for current job in ABBKR Project Engineer for MV SWGR projects. ∙ Interpretation of project specification. - Clarification and deviation - Selection of application in accordance with project specification. ∙ Correspondence with customer regarding technical issues and provide solutions. ∙ Vendor print submission and control. - Technical specification for MV SWGR - Single line diagram - General arrangement and outlook drawing - Schematic drawing including logic diagram - Others ∙ Management of project material (BOM).
  • 3. Work Experiences No PROEJCT YEAR JOB EPC END USER SITE ITEM BUDGET(USD) 1 PTTPE ETHANE CRACKER PROJECT 2009 Supervisor Dispatch TOYO ENGINEERING (JAPAN) PTT POLYETHYLENE CORPORATION THAILAND MV SWGR 2,476,700 2 SHUQAIQ PHASE-2 IWPP PROJECT 2009 Supervisor Dispatch MITSBUSHI HEAVY INDUSTRY (JAPAN) ACWA GROUP SAUDI MV SWGR 7,745,870 3 BM FEED PROJECT 2010 Supervisor Dispatch MITSBUSHI HEAVY INDUSTRY (JAPAN) BRUNEI METHANOL COMPANY(BMO) BRUNEI MV SWGR 843,640 4 EVA PLANT AND UTILITIES PROJECT 2011 Design GS E&C (KOREA) INTERNATIONAL POLYMERS COMPANY SAUDI MV SWGR 2,900,000 5 KNPC NORTH LPG TANK FARM PROJECT 2012 Design GS E&C (KOREA) KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT MV SWGR 3,770,000 6 MUSANDAM GAS PLANT PROJECT 2012 Design HYUNDAI ENGINEERING (KOREA) OMAN OIL COMPANY EXPLORATION & PRODUCTION LLC OMAN MV SWGR 2,140,520 7 MEGA DEAL POWER PLANT SHAT AL BASRA PROJECT 2012 Design METKA (GREECE) MINISTRY OF ELECTRICITY IRAQ MV SWGR 2,404,980 8 132KV REHABILITATION OF KIYUNGI SUBSTATION PROJECT 2013 Design GS E&C (KOREA) TANZANIA ELECTRIC SUPPLY COMPANY LTD. TANZANIA GIS (Secondary Engineering) 1,083,100 9 QMAX/VLCC FLOATING DOCK PROJECT 2013 Design HUNDAI SAMHO HEAVY INDUSTRY (KOREA) QATAR GAS TRANSPORT COMPANY LTD.(NAKILAT) QATAR MV SWGR (in Floating Dock) 365,600 10 1131.1MW COMBINED CYCLE POWER PLANT AT RAS DJINET PROJECT 2014 Design DAEWOO E&C (KOREA) SOCIETE ALGERIENNE DE PRODUCTION D'ELECTRICITE(S.P.E) ALGERIA MV SWGR 3,632,860 11 PREPARATORY WORKS FOR CFP AT MAA AND MAB REFINERIES PROJECT 2013 Design SAMSUNG C&T (KOREA) KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT MV SWGR (in EHOUSE) 767,900 12 SOCAR AMMONIA AND UREA COMPLEX PROJECT 2015 Design SAMSUNG E&C (KOREA) STATE OIL COMPANY OF AZERBAIJAN REPUBLIC AZERBAIJAN MV SWGR 1,800,000 13 KNPC CFP MAB2 PROJECT 2015 Design FDH JV (FLOUR, DAEWOO E&C, HYUNDAI HEAVY INDUSTRY) KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT MV SWGR 14,660,000