Gautam Deka
E-Mail: dekagautam2@gmail.com; Contact: 09310685466
Address: C-201, Kshitij co-operative housing society, film city road.
Gokuldham Colony, Goregaon East
Mumbai-400063
Electrical Design & Engineering and Project Management
Preferred Location: Mumbai
Professional Preface
> An astute, seasoned & highly competent professional with 9.5 years of experience in:-
Electrical Design & Engineering Project Engineering & Management
Budgeting
Bid Evaluation & TER Site Commissioning Material
Reconciliation
Liaising & Coordination Relationship Management Team Management
> Proficient in electrical distribution system (415 VAC to 400 KV), logics, schematics, protection and metering,
Electrical Load flow, control philosophy.
> Sound knowledge of various electrical equipment’s, preparing - technical specification, Single Line Diagram,
equipment sizing calculation, logics, layouts, design calculation etc.
> Currently associated with Hindustan Power Project Pvt. Ltd., India as Deputy Manager (Design &
Engineering - Thermal Engineering).
> Adept in managing project, commissioning and maintenance activities involving resource planning, in-process
inspection and coordination with internal / external departments.
> Qualified with B.Tech. (Electrical Engineering).
> An excellent communicator with effective relationship management, problem solving and organisational abilities.
Areas of Expertise
Technical
> Specification/Tender documents, SLD, logics, control philosophy, schematics, and Data sheet of
electrical equipment’s: LT Switchgear/HT Switchgear, MV/LV transformer, Illumination system, 33KV and 132
KV Switchyard, 132KV CTPT/isolator/Circuit breaker ,132 KV Transmission line, Emergency DG set, HT/LT cables,
DC system, battery and charger, Township, etc.
> Electrical Layouts: Electrical room design, equipment layout, cable tray & cable tray routing layout, earthing
and lightning layouts, illumination layouts etc. Finalization and release of drawing for construction.
> Design & Calculation: Illumination system, earthing and lightning, Voltage drop calculation, Transformer
sizing, bus duct sizing, battery sizing, 132 KV Switchyard CT PT sizing, DSLP and earthing calculation of 132KV
Switchyard etc.
> Electrical Part of Mechanical System: Ash handling plant, Boiler and turbine auxiliaries, Coal handling plant,
DM-PT plant, water system, HVAC system, Railway siding-OHE, DCS and PLC interfacing , Mill reject and
compressor system, etc.
> Site commissioning activities: Commissioning and monitoring of various electrical equipments at site.
Functional
> Overseeing projects for the set up standards with accountability for strategic utilisation & deployment of available
resources to achieve organisational objectives.
> Focussing on cost reduction, time cycle reduction, improvement of process variables and enhancement of process
conditions. Ensuring completion of all project activities within the time & cost parameters.
> Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment
downtime & maximise plant availability.
> Identifying areas of obstruction / defects and conducting service and repair to rectify the equipment’s through the
application of troubleshooting tools.
> Overseeing commissioning of machines & equipment and ensuring completion of project in minimum turnaround
time effective resource utilisation to maximise the output.
> Supporting & coordinating with basic engineering team for improvement on process point of view, technical
evaluation for package systems, and finalisation of load lists, room layout & equipment locations.
> Mentoring & monitoring the team members to ensure efficiency in process operations.
Employment Scan
Since Nov’11 with Hindustan Power Project Pvt. Ltd., India as Deputy Manager (Design & Engineering
- Thermal Engineering)
(Project: 2 x 600 MW Anuppur Thermal Power Project Phase – I).
Accountabilities
> Designing and calculating electrical system and parameters.
> Finalising and releasing construction drawing.
> Conducting technical discussion in pre award meetings and preparation of MOMs, project review meetings, etc.
> Providing site support and supervision of electrical commissioning work at site.
> Coordinating and interfacing with mechanical / C & I package vendor.
> Preparing:-
o Documents and approving it from CEA, Delhi.
o Cost estimation and examining rates.
o Reviewing & approving specification / tender documents, SLD, logics, control philosophy, schematics,
and data sheet of electrical equipment’s.
o Electrical layouts inclusive of electrical room design, equipment layout, cable tray & cable tray routing
layout, earthing and lightning layouts, illumination layouts, etc.
Jul’08-Nov’11 with Reliance Infrastructure Ltd., India as Assistant Manager (Design & Engineering -
Electrical Engineering)
(Project: 4 x 300 MW Rosa Thermal Power Project Stage - I & II).
Accountabilities
> Coordinated and interfaced with mechanical / C & I package vendor.
> Conducted technical discussion in pre award meetings and preparation of MOMs, project review meetings, etc.
> Prepared:-
o Reviewed & approved specification / tender documents, SLD, logics, control philosophy, schematics,
and data sheet of electrical equipment’s.
o Electrical layouts inclusive of electrical room design, equipment layout, cable tray & cable tray routing
layout, earthing and lightning layouts, illumination layouts, etc.
Jul’07-Jul’08 with Reliance Infrastructure Ltd., India as GET (Design & Engineering - Electrical
Engineering)
(Project: 4 x 300 MW Rosa Thermal Power Project Stage – I)
Accountabilities
> Reviewed & approved data sheet, GA drawings and schematics of electrical equipment’s.
> Monitored package and followed up with vendors.
> Handled proactive engineering activities.
> Offered site support activities and resolved site related engineering problems.
> Prepared Technical Evaluation Report (TER) & MOMs; handled technical discussion in pre award meetings.
> Responsible for material reconciliation; supervised electrical commissioning work at site.
> Coordinated and interfaced with mechanical package vendor.
IT Skills: Conversant with SAP, MS – Office, AutoCAD, ETAP(basic) and Adobe Acrobat PDF.
Scholastics
B.Tech. (Electrical Engineering)
National Institute of Technology Silchar, Assam in 2007. Secured 7.03 CPI.
XII
Cotton College, Guwahati affiliated to AHSEC council, Assam in 2002. Secured 69.4% marks.
X
RHS School, Guwahati affiliated to SEBA, Assam in 2000. Secured 82.6% marks.
Personal Dossier
Date of Birth : 12th
August, 1984
Linguistic Abilities : English, Hindi, Assamese and Bengali

resume_GAUTAM_03112016

  • 1.
    Gautam Deka E-Mail: dekagautam2@gmail.com;Contact: 09310685466 Address: C-201, Kshitij co-operative housing society, film city road. Gokuldham Colony, Goregaon East Mumbai-400063 Electrical Design & Engineering and Project Management Preferred Location: Mumbai Professional Preface > An astute, seasoned & highly competent professional with 9.5 years of experience in:- Electrical Design & Engineering Project Engineering & Management Budgeting Bid Evaluation & TER Site Commissioning Material Reconciliation Liaising & Coordination Relationship Management Team Management > Proficient in electrical distribution system (415 VAC to 400 KV), logics, schematics, protection and metering, Electrical Load flow, control philosophy. > Sound knowledge of various electrical equipment’s, preparing - technical specification, Single Line Diagram, equipment sizing calculation, logics, layouts, design calculation etc. > Currently associated with Hindustan Power Project Pvt. Ltd., India as Deputy Manager (Design & Engineering - Thermal Engineering). > Adept in managing project, commissioning and maintenance activities involving resource planning, in-process inspection and coordination with internal / external departments. > Qualified with B.Tech. (Electrical Engineering). > An excellent communicator with effective relationship management, problem solving and organisational abilities. Areas of Expertise Technical > Specification/Tender documents, SLD, logics, control philosophy, schematics, and Data sheet of electrical equipment’s: LT Switchgear/HT Switchgear, MV/LV transformer, Illumination system, 33KV and 132 KV Switchyard, 132KV CTPT/isolator/Circuit breaker ,132 KV Transmission line, Emergency DG set, HT/LT cables, DC system, battery and charger, Township, etc. > Electrical Layouts: Electrical room design, equipment layout, cable tray & cable tray routing layout, earthing and lightning layouts, illumination layouts etc. Finalization and release of drawing for construction. > Design & Calculation: Illumination system, earthing and lightning, Voltage drop calculation, Transformer sizing, bus duct sizing, battery sizing, 132 KV Switchyard CT PT sizing, DSLP and earthing calculation of 132KV Switchyard etc. > Electrical Part of Mechanical System: Ash handling plant, Boiler and turbine auxiliaries, Coal handling plant, DM-PT plant, water system, HVAC system, Railway siding-OHE, DCS and PLC interfacing , Mill reject and compressor system, etc. > Site commissioning activities: Commissioning and monitoring of various electrical equipments at site. Functional > Overseeing projects for the set up standards with accountability for strategic utilisation & deployment of available resources to achieve organisational objectives. > Focussing on cost reduction, time cycle reduction, improvement of process variables and enhancement of process conditions. Ensuring completion of all project activities within the time & cost parameters. > Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximise plant availability. > Identifying areas of obstruction / defects and conducting service and repair to rectify the equipment’s through the application of troubleshooting tools.
  • 2.
    > Overseeing commissioningof machines & equipment and ensuring completion of project in minimum turnaround time effective resource utilisation to maximise the output. > Supporting & coordinating with basic engineering team for improvement on process point of view, technical evaluation for package systems, and finalisation of load lists, room layout & equipment locations. > Mentoring & monitoring the team members to ensure efficiency in process operations. Employment Scan Since Nov’11 with Hindustan Power Project Pvt. Ltd., India as Deputy Manager (Design & Engineering - Thermal Engineering) (Project: 2 x 600 MW Anuppur Thermal Power Project Phase – I). Accountabilities > Designing and calculating electrical system and parameters. > Finalising and releasing construction drawing. > Conducting technical discussion in pre award meetings and preparation of MOMs, project review meetings, etc. > Providing site support and supervision of electrical commissioning work at site. > Coordinating and interfacing with mechanical / C & I package vendor. > Preparing:- o Documents and approving it from CEA, Delhi. o Cost estimation and examining rates. o Reviewing & approving specification / tender documents, SLD, logics, control philosophy, schematics, and data sheet of electrical equipment’s. o Electrical layouts inclusive of electrical room design, equipment layout, cable tray & cable tray routing layout, earthing and lightning layouts, illumination layouts, etc. Jul’08-Nov’11 with Reliance Infrastructure Ltd., India as Assistant Manager (Design & Engineering - Electrical Engineering) (Project: 4 x 300 MW Rosa Thermal Power Project Stage - I & II). Accountabilities > Coordinated and interfaced with mechanical / C & I package vendor. > Conducted technical discussion in pre award meetings and preparation of MOMs, project review meetings, etc. > Prepared:- o Reviewed & approved specification / tender documents, SLD, logics, control philosophy, schematics, and data sheet of electrical equipment’s. o Electrical layouts inclusive of electrical room design, equipment layout, cable tray & cable tray routing layout, earthing and lightning layouts, illumination layouts, etc. Jul’07-Jul’08 with Reliance Infrastructure Ltd., India as GET (Design & Engineering - Electrical Engineering) (Project: 4 x 300 MW Rosa Thermal Power Project Stage – I) Accountabilities > Reviewed & approved data sheet, GA drawings and schematics of electrical equipment’s. > Monitored package and followed up with vendors. > Handled proactive engineering activities. > Offered site support activities and resolved site related engineering problems. > Prepared Technical Evaluation Report (TER) & MOMs; handled technical discussion in pre award meetings. > Responsible for material reconciliation; supervised electrical commissioning work at site. > Coordinated and interfaced with mechanical package vendor. IT Skills: Conversant with SAP, MS – Office, AutoCAD, ETAP(basic) and Adobe Acrobat PDF. Scholastics B.Tech. (Electrical Engineering) National Institute of Technology Silchar, Assam in 2007. Secured 7.03 CPI. XII Cotton College, Guwahati affiliated to AHSEC council, Assam in 2002. Secured 69.4% marks. X
  • 3.
    RHS School, Guwahatiaffiliated to SEBA, Assam in 2000. Secured 82.6% marks. Personal Dossier Date of Birth : 12th August, 1984 Linguistic Abilities : English, Hindi, Assamese and Bengali