SlideShare a Scribd company logo
Muhammad Aiman Basri
E-mail : aiman11.basri@gmail.com
Phone : 010-9686477
PROFESSIONAL SUMMARY
Production Engineer with 2 years of experience in manufacturing industry. Areas of expertise include production
optimization, process improvement, project implementation and budget and expenditure management. Strong
understanding on powder coating line system such as the processes, principles, materials and equipment involved.
CORE COMPETENCIES
• Production line development
• Manufacturing quality control
• Safety and Health practices
• Project Management and Execution
• Project Economic Analysis
• Procurement of tools, machineries, and equipment
EXPERIENCE
Production Engineer 5 January 2015 to Present
DAIKIN MALAYSIA SDN BHD Sungai Buloh, Selangor
 Serve as Engineer in production line of in-house fabrication of air conditioner parts; metal parts painting and
copper coil bending.
 Generate a fact, data and figure (FDF) study analysis on capacity of production line vs. forecast requirement for
management reviews and propose action plan accordingly.
 Work with production executive and team members to evaluates manufacturing processes by studying its
capability and room for improvement activities.
 Develops manufacturing processes by designing, modifying, researching, testing manufacturing methods and
keeps equipment operational; responsible for future line expansion.
 Conferring with equipment vendors.
PROJECTS HIGHLIGHT
PROJECT ENGINEER
-Set up new facilities for powder coating line system- January 2016 – January 2017
 Project benefit: Daikin could save up to RM 2,925,455/year by investing in this project and get ROI in 2.4 years.
Can cope with painted metal parts demand until up to year 2020.
 Served as project leader and held responsible to ensure the project meet deadline as per planned.
 Conducted general FEED approach to control the budget and expenses of the project.
Permanent Address: No 1A, Lorong
Satria 1A, Batu 7 ½, Jalan Oya Lama,
96000, Sibu, Sarawak
Current Address: No 7, Jalan Matang
Jaya 14B, Taman Matang Jaya, 47000,
Sg Buloh, Selangor
 Designed and oversaw conceptual facilities layout for plant utilities and equipment arrangement.
 Presented project scope proposals and contracts to appropriate vendors.
 Confirmed conceptual and detailed design specifications of equipment and facilities as per Daikin standards.
 Assures facilities design, quality and safety comply with Daikin standards by liaising and working
closely with main contractor, sub-contractors and consultant firm during fabrication and installation period
 Provide technical training and briefing for production executive and team members on the new facilities
PROJECT ENGINEER
-Procurement of two machineries for copper coil bending fabrication- July 2015 – August 2016
 Project benefit: Daikin save up to RM 1,094,532/year and get ROI in 1.2 years. Able to cope with copper coil
demand until year 2020.
 Project leader and held responsibility to ensure project is executed on time.
 Confirmed detailed design specifications of machine meet all requirements as per Daikin standards.
 Held responsible on shipping and handling of machineries from vendor’s factory (USA) to Daikin’s factory.
 Improvised workflow, space requirements and equipment layout by performed analyzing and detailed planning
on production floor.
 Provide technical training and briefing for production executive and team members on the new machineries.
EDUCATION
(B. Sc. Industrial and Systems Engineering) May 2014
The Ohio State University Ohio, U.S.A

More Related Content

What's hot

GB_LinkedinResumeFY15
GB_LinkedinResumeFY15GB_LinkedinResumeFY15
GB_LinkedinResumeFY15Grant Bessac
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
ravi kumar
 
Q.C Civil Ispector
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil IspectorImran Alam
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer Lee
 
cv of galisa
cv of galisacv of galisa
cv of galisashas gaib
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkatimran barkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
imran barkat
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoe
Anjhoe Eduria
 
Ravi Kiran Resume
Ravi Kiran ResumeRavi Kiran Resume
Ravi Kiran ResumeRavi Kiran
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cvMadhu Civil
 

What's hot (20)

RESUME - Rajesh
RESUME - RajeshRESUME - Rajesh
RESUME - Rajesh
 
GB_LinkedinResumeFY15
GB_LinkedinResumeFY15GB_LinkedinResumeFY15
GB_LinkedinResumeFY15
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
RITESH cv
RITESH cvRITESH cv
RITESH cv
 
new cv 2017
new cv 2017new cv 2017
new cv 2017
 
Rolando Resume
Rolando ResumeRolando Resume
Rolando Resume
 
Q.C Civil Ispector
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil Ispector
 
ab momin
ab mominab momin
ab momin
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)
 
cv of galisa
cv of galisacv of galisa
cv of galisa
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
BJD_20160625
BJD_20160625BJD_20160625
BJD_20160625
 
Kumaresan CV
Kumaresan CVKumaresan CV
Kumaresan CV
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoe
 
Ravi Kiran Resume
Ravi Kiran ResumeRavi Kiran Resume
Ravi Kiran Resume
 
Nicolas Lampa CV
Nicolas Lampa CVNicolas Lampa CV
Nicolas Lampa CV
 
RESUME (2)
RESUME (2)RESUME (2)
RESUME (2)
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 

Similar to Resume (updated)

Muhammad hafiz
Muhammad hafizMuhammad hafiz
Muhammad hafiz
Muhd Hafiz
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
chirag patel
 
Cv project manager
Cv project managerCv project manager
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
Imaad Ahmed
 
Sureshkumar. s resume latest new
Sureshkumar. s resume latest newSureshkumar. s resume latest new
Sureshkumar. s resume latest new
Sureshkumar Sugumaran
 

Similar to Resume (updated) (20)

cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Muhammad hafiz
Muhammad hafizMuhammad hafiz
Muhammad hafiz
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Cv project manager
Cv project managerCv project manager
Cv project manager
 
My Resume
My ResumeMy Resume
My Resume
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
 
SURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST newSURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST new
 
Sureshkumar. s resume latest new
Sureshkumar. s resume latest newSureshkumar. s resume latest new
Sureshkumar. s resume latest new
 
updated CV
updated CVupdated CV
updated CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 

Resume (updated)

  • 1. Muhammad Aiman Basri E-mail : aiman11.basri@gmail.com Phone : 010-9686477 PROFESSIONAL SUMMARY Production Engineer with 2 years of experience in manufacturing industry. Areas of expertise include production optimization, process improvement, project implementation and budget and expenditure management. Strong understanding on powder coating line system such as the processes, principles, materials and equipment involved. CORE COMPETENCIES • Production line development • Manufacturing quality control • Safety and Health practices • Project Management and Execution • Project Economic Analysis • Procurement of tools, machineries, and equipment EXPERIENCE Production Engineer 5 January 2015 to Present DAIKIN MALAYSIA SDN BHD Sungai Buloh, Selangor  Serve as Engineer in production line of in-house fabrication of air conditioner parts; metal parts painting and copper coil bending.  Generate a fact, data and figure (FDF) study analysis on capacity of production line vs. forecast requirement for management reviews and propose action plan accordingly.  Work with production executive and team members to evaluates manufacturing processes by studying its capability and room for improvement activities.  Develops manufacturing processes by designing, modifying, researching, testing manufacturing methods and keeps equipment operational; responsible for future line expansion.  Conferring with equipment vendors. PROJECTS HIGHLIGHT PROJECT ENGINEER -Set up new facilities for powder coating line system- January 2016 – January 2017  Project benefit: Daikin could save up to RM 2,925,455/year by investing in this project and get ROI in 2.4 years. Can cope with painted metal parts demand until up to year 2020.  Served as project leader and held responsible to ensure the project meet deadline as per planned.  Conducted general FEED approach to control the budget and expenses of the project. Permanent Address: No 1A, Lorong Satria 1A, Batu 7 ½, Jalan Oya Lama, 96000, Sibu, Sarawak Current Address: No 7, Jalan Matang Jaya 14B, Taman Matang Jaya, 47000, Sg Buloh, Selangor
  • 2.  Designed and oversaw conceptual facilities layout for plant utilities and equipment arrangement.  Presented project scope proposals and contracts to appropriate vendors.  Confirmed conceptual and detailed design specifications of equipment and facilities as per Daikin standards.  Assures facilities design, quality and safety comply with Daikin standards by liaising and working closely with main contractor, sub-contractors and consultant firm during fabrication and installation period  Provide technical training and briefing for production executive and team members on the new facilities PROJECT ENGINEER -Procurement of two machineries for copper coil bending fabrication- July 2015 – August 2016  Project benefit: Daikin save up to RM 1,094,532/year and get ROI in 1.2 years. Able to cope with copper coil demand until year 2020.  Project leader and held responsibility to ensure project is executed on time.  Confirmed detailed design specifications of machine meet all requirements as per Daikin standards.  Held responsible on shipping and handling of machineries from vendor’s factory (USA) to Daikin’s factory.  Improvised workflow, space requirements and equipment layout by performed analyzing and detailed planning on production floor.  Provide technical training and briefing for production executive and team members on the new machineries. EDUCATION (B. Sc. Industrial and Systems Engineering) May 2014 The Ohio State University Ohio, U.S.A