SlideShare a Scribd company logo
ROHAN BADADHE
B-101, Kartik Kunj, D-13
rohan.badadhe@live.com
Sector-44, Noida
Uttar Pradesh – 201303
Mob No: +91-9910772616
OBJECTIVE
To pursue a successful career in professional organization at responsible position by using accumulated skills acquired
through education and experience and seeking new challenging opportunities to build up a dynamic professional career
in Engineering.
WORK EXPERIENCE:
7 Years’ Experience in Energy (Oil & Gas, Power). Proposal, Basic and Detail engineering of Refinery Tank Farm, coal
and gas based thermal power projects. RFQ/MR Preparation, Specification Preparation, Data Sheet Preparation,
Technical Bid Evaluation, Vendor Drawing Review, Bill of quantity Preparation.
SOFTWARES:
Smart Plant Instrumentation (SPI), Smart Plant Electrical (SPEL), PRODOK, AUTOCAD, MICROSOFT OFFICE.
Organization 1:
CTCI Cinda Engineering and Construction
Duration Jul 2016 to till Date
Designation DESIGN ENGINEER [ Instrumentation]
Job Profile Engineering, Procurement and Commissioning Support for Control and
Instrumentation of PETRONET, LNG Regas Phase IIIB-1, Dahej, India.
Package Lead for DCS/ESD/FGS/MMS/Advance Systems and Integration.
Checker for Layout Engineering, Installation Documents, Layout and SP3D
activities.
Work Handled Leading Following Packages
 DCS/ESD/FGS/TGS/MMS Package
 Fire and Gas Devices
 Bulk Material for Instrument Installation
 Cable, Cable Trays, MCT, Junction Boxes
 Mechanical Packages (Air Compressor, Air Dryer)
Honeywell EPKS with C300 Controllers and Foundation Fieldbus System.
Safety net PLC for ESD and FGS.
Projects PETRONET LNG Regasification Project, Phase IIIB1, Dahej, India
Organization 2:
Punj Llyod Engineering
Duration Jan 2015 to Jul 2016
Designation SR. ENGINEER [ Instrumentation]
Job Profile Engineering, Procurement and Commissioning Support for Control and
Instrumentation of Refinery Tank Farm of RAPID, Malaysia (PETRONAS).
Lead for Interface Engineering with Various Contractors for RAPID Project
(OUI JV, Toyo, CCSM, TRSA, ICT, TI) of both Instrumentation and Telecom.
Work Handled Lead Following Packages
 DCS/ESD/FGS/TGS Package
 Automatic Crude Sampling Package
 HSSD Package
 Fire and Gas Devices
 Bulk Material for Instrument Installation
 Hook Up Material for Instrument Installation
 Flow Elements, Gauges
 Electronic Transmitters (Wireless/ Non Wireless)
 Radar/ GWR Level Transmitters
 Cable, Cable Trays, MCT, Junction Boxes
 Mechanical Packages (Chemical Dosing, UV Sterilization, Flare
Package)
Studies Handled
 Instrumentation Member for HAZOP Study for Refinery Tank Farm of
RAPID.
 Lead for IPF Study for Refinery Tank Farm of RAPID Project.
 Lead for Alarm Rationalization Study for Refinery Tank Farm of
RAPID Project.
Layout/ Physical Engineering
Successfully completed 30% and 60% Model review for the Project in SP3D.
Interface Engineering
Lead for Instrumentation and Telecom for various interfaces with Other
Contractors for the RAPID Project.
Telecom Engineering
Exposure of Telecom devices and requirement. Prepared Block Diagrams and
Layout for CCTV, DTRS, Telephone, PAGA.
Projects Package P22 (Refinery Tank Farm Area) of Refinery and Petrochemical
Integrated Development (RAPID) project in Pengerang, Johor, Malaysia.
Organization 3:
Lahmeyer International (India) Pvt. Ltd. (LII)
Duration APRIL 2010 to Jan 2015
Designation SR. ENGINEER [Control & Instrumentation].
Job Profile Basic and Detail Engineering Activities for Thermal Power Project.
Work Handled Preparation of I&C Design Criteria document
Preparation of Control System Configuration diagram
Preparation of Control Room Layout, Local Control Room Layout
Preparation of Instrument List (SPI tool used)
Preparation of Control Signal Interface Principle (Drive Philosophy)
Package Handled
 DM and RO System
 CW System
 Fuel Oil System
Preparation of Datasheet for Field Instruments (SPI tool used)
Preparation of DCS I/O List
Preparation of Instrument Installation drawings (Autocad tool used)
Preparation of JB Schedule (Autocad tool used)
Preparation of Cable BOQ, Cable Schedule, Interconnection diagram etc.
(SPEL tool used)
 Review of C&I engineering documents/ drawings.
 Bid Evaluation and Technical Evaluation Report.
Projects  Detail Engineering for 660 MW Lignite Coal Fired Boiler in Greece.
 Detailed Engineering for Three open cycle Projects of Najran, Sharourah
and Wadi by M/s Al Toukhi. (Completed- Site work in progress)
 BIO CCPP 2400MW- Detailed engineering for BOP and auxiliary packages
 Daewoo 4x600 MW TPP in Shuqaiq, Saudi Arabia- Proposal Engineering
Project. (Completed-As Built in progress)
 2400 MW Combined Cycle Power Plant, Raz AZ Zawr, KSA Project -
Basic Engineering Activities and Site Deputation for 2 Months. (Project
Scope Completed)
 Lanco Babandh 2 X 660 MW TPP – Review Engineering.
Organization 4:
Shiva Engineering Consultants Pvt. Ltd.
Duration June 2009 to March 2010
Designation Engineer [Control & Instrumentation].
Job Profile Preparation of Control System Configuration diagram
Preparation of Control Room Layout, Local Control Room Layout
Preparation of Instrument List.
Professional Qualification
 B.E- Applied Electronics and Instrumentation from A.B.E.S Engineering College, Ghaziabad, U.P.T.U with 68%
aggregate.
 12TH
Passed in First class from Rajendra Jr. College, Nagpur, Higher Secondary School with 80% aggregate.
 10TH
Passed in First class from S.S.C board with 65 % aggregate.
Personal Details
Date of Birth September 29, 1987.
Nationality Indian.
Marital status Single.
Languages known English, Marathi and Hindi
Passport Details Passport no:,H7405552 Date of Expiry: .17/08/2019
Current CTC 920000 Indian Rupees Per Annum (INR 9.2 LPA)
Expected CTC Negotiable (as per Industry Standard)
Rohan Badadhe Date:

More Related Content

What's hot

CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
Faheem Ijaz Janjua, PMP
 
Resume Gupta Ravi
Resume Gupta RaviResume Gupta Ravi
Resume Gupta Ravi
meinazadhoon
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014Om Jangid
 
Resume
ResumeResume
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelMichel Kazadi
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
Rixit Patel
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
Rajesh Raval
 
G. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerG. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerNaveen Kumar
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 

What's hot (20)

Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
I_SQUARE_PROFILE. A
I_SQUARE_PROFILE. AI_SQUARE_PROFILE. A
I_SQUARE_PROFILE. A
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Ashish Resume
Ashish ResumeAshish Resume
Ashish Resume
 
Igwebuike CV_Project Control Engineer
Igwebuike CV_Project Control EngineerIgwebuike CV_Project Control Engineer
Igwebuike CV_Project Control Engineer
 
Resume Gupta Ravi
Resume Gupta RaviResume Gupta Ravi
Resume Gupta Ravi
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Resume
ResumeResume
Resume
 
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, Michel
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
G. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design EngineerG. Naveen Kumar-Instrumentation Design Engineer
G. Naveen Kumar-Instrumentation Design Engineer
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Resume
ResumeResume
Resume
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 

Similar to Resume Rohan Badadhe

Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeMEHTA VIVEK
 
Taj resume updated 26.06.16
Taj resume updated 26.06.16Taj resume updated 26.06.16
Taj resume updated 26.06.16
Tajuddin Zari
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017Shaukat Mahmood Khan
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_ResumeMEHTA VIVEK
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
Subhash +966535838322
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEloisa Zuniga-Bonavente
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
Subhash +966535838322
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CVTods Almeron
 

Similar to Resume Rohan Badadhe (20)

Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
resume16 - Copy
resume16 - Copyresume16 - Copy
resume16 - Copy
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
CV
CVCV
CV
 
Instrument_Engg_Sharat
Instrument_Engg_SharatInstrument_Engg_Sharat
Instrument_Engg_Sharat
 
Taj resume updated 26.06.16
Taj resume updated 26.06.16Taj resume updated 26.06.16
Taj resume updated 26.06.16
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
AK+CV
AK+CVAK+CV
AK+CV
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_Resume
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 

Resume Rohan Badadhe

  • 1. ROHAN BADADHE B-101, Kartik Kunj, D-13 rohan.badadhe@live.com Sector-44, Noida Uttar Pradesh – 201303 Mob No: +91-9910772616 OBJECTIVE To pursue a successful career in professional organization at responsible position by using accumulated skills acquired through education and experience and seeking new challenging opportunities to build up a dynamic professional career in Engineering. WORK EXPERIENCE: 7 Years’ Experience in Energy (Oil & Gas, Power). Proposal, Basic and Detail engineering of Refinery Tank Farm, coal and gas based thermal power projects. RFQ/MR Preparation, Specification Preparation, Data Sheet Preparation, Technical Bid Evaluation, Vendor Drawing Review, Bill of quantity Preparation. SOFTWARES: Smart Plant Instrumentation (SPI), Smart Plant Electrical (SPEL), PRODOK, AUTOCAD, MICROSOFT OFFICE. Organization 1: CTCI Cinda Engineering and Construction Duration Jul 2016 to till Date Designation DESIGN ENGINEER [ Instrumentation] Job Profile Engineering, Procurement and Commissioning Support for Control and Instrumentation of PETRONET, LNG Regas Phase IIIB-1, Dahej, India. Package Lead for DCS/ESD/FGS/MMS/Advance Systems and Integration. Checker for Layout Engineering, Installation Documents, Layout and SP3D activities. Work Handled Leading Following Packages  DCS/ESD/FGS/TGS/MMS Package  Fire and Gas Devices  Bulk Material for Instrument Installation  Cable, Cable Trays, MCT, Junction Boxes  Mechanical Packages (Air Compressor, Air Dryer) Honeywell EPKS with C300 Controllers and Foundation Fieldbus System. Safety net PLC for ESD and FGS. Projects PETRONET LNG Regasification Project, Phase IIIB1, Dahej, India
  • 2. Organization 2: Punj Llyod Engineering Duration Jan 2015 to Jul 2016 Designation SR. ENGINEER [ Instrumentation] Job Profile Engineering, Procurement and Commissioning Support for Control and Instrumentation of Refinery Tank Farm of RAPID, Malaysia (PETRONAS). Lead for Interface Engineering with Various Contractors for RAPID Project (OUI JV, Toyo, CCSM, TRSA, ICT, TI) of both Instrumentation and Telecom. Work Handled Lead Following Packages  DCS/ESD/FGS/TGS Package  Automatic Crude Sampling Package  HSSD Package  Fire and Gas Devices  Bulk Material for Instrument Installation  Hook Up Material for Instrument Installation  Flow Elements, Gauges  Electronic Transmitters (Wireless/ Non Wireless)  Radar/ GWR Level Transmitters  Cable, Cable Trays, MCT, Junction Boxes  Mechanical Packages (Chemical Dosing, UV Sterilization, Flare Package) Studies Handled  Instrumentation Member for HAZOP Study for Refinery Tank Farm of RAPID.  Lead for IPF Study for Refinery Tank Farm of RAPID Project.  Lead for Alarm Rationalization Study for Refinery Tank Farm of RAPID Project. Layout/ Physical Engineering Successfully completed 30% and 60% Model review for the Project in SP3D. Interface Engineering Lead for Instrumentation and Telecom for various interfaces with Other Contractors for the RAPID Project. Telecom Engineering Exposure of Telecom devices and requirement. Prepared Block Diagrams and Layout for CCTV, DTRS, Telephone, PAGA. Projects Package P22 (Refinery Tank Farm Area) of Refinery and Petrochemical Integrated Development (RAPID) project in Pengerang, Johor, Malaysia.
  • 3. Organization 3: Lahmeyer International (India) Pvt. Ltd. (LII) Duration APRIL 2010 to Jan 2015 Designation SR. ENGINEER [Control & Instrumentation]. Job Profile Basic and Detail Engineering Activities for Thermal Power Project. Work Handled Preparation of I&C Design Criteria document Preparation of Control System Configuration diagram Preparation of Control Room Layout, Local Control Room Layout Preparation of Instrument List (SPI tool used) Preparation of Control Signal Interface Principle (Drive Philosophy) Package Handled  DM and RO System  CW System  Fuel Oil System Preparation of Datasheet for Field Instruments (SPI tool used) Preparation of DCS I/O List Preparation of Instrument Installation drawings (Autocad tool used) Preparation of JB Schedule (Autocad tool used) Preparation of Cable BOQ, Cable Schedule, Interconnection diagram etc. (SPEL tool used)  Review of C&I engineering documents/ drawings.  Bid Evaluation and Technical Evaluation Report. Projects  Detail Engineering for 660 MW Lignite Coal Fired Boiler in Greece.  Detailed Engineering for Three open cycle Projects of Najran, Sharourah and Wadi by M/s Al Toukhi. (Completed- Site work in progress)  BIO CCPP 2400MW- Detailed engineering for BOP and auxiliary packages  Daewoo 4x600 MW TPP in Shuqaiq, Saudi Arabia- Proposal Engineering Project. (Completed-As Built in progress)  2400 MW Combined Cycle Power Plant, Raz AZ Zawr, KSA Project - Basic Engineering Activities and Site Deputation for 2 Months. (Project Scope Completed)  Lanco Babandh 2 X 660 MW TPP – Review Engineering. Organization 4: Shiva Engineering Consultants Pvt. Ltd. Duration June 2009 to March 2010 Designation Engineer [Control & Instrumentation].
  • 4. Job Profile Preparation of Control System Configuration diagram Preparation of Control Room Layout, Local Control Room Layout Preparation of Instrument List. Professional Qualification  B.E- Applied Electronics and Instrumentation from A.B.E.S Engineering College, Ghaziabad, U.P.T.U with 68% aggregate.  12TH Passed in First class from Rajendra Jr. College, Nagpur, Higher Secondary School with 80% aggregate.  10TH Passed in First class from S.S.C board with 65 % aggregate. Personal Details Date of Birth September 29, 1987. Nationality Indian. Marital status Single. Languages known English, Marathi and Hindi Passport Details Passport no:,H7405552 Date of Expiry: .17/08/2019 Current CTC 920000 Indian Rupees Per Annum (INR 9.2 LPA) Expected CTC Negotiable (as per Industry Standard) Rohan Badadhe Date: