P.O.Box 88962, Los Angeles, CA 90009
Phone: 310-946-1573
http://www.darrenjohnson.org
johnsodd1@gmail.com
SENIOR PROGRAM DIRECTOR / PROJECT ENGINEERING
Program Management / Systems & Electrical Engineering / Product Design
A dynamic, highly innovative Engineering Management professional with a successful track record in project
and systems engineering, hardware design, software integration, technical documentation, modeling and
simulation, electrical engineering, and process improvements technical guidance. Adept at combining solid
business knowledge, technical expertise, and hands-on experience to achieve successful outcomes. Proven
ability to develop and lead projects from conception through readiness testing and manufacturing processes.
Excellent leader, communicator, and presenter.
KEY STRENGTHS
Operations Management  Systems Engineering  Electrical Engineering  Quality Assurance
Project Management  Statistical Analysis  Budget & Cost Control  ISO Standards Compliance
CRM Applications  Production Management  Earned Value Management  Business Administration
New Product Design & Development  Strategic Planning  Customer & Shareholder Relations
Team Leadership  CMMI & ECO Standards  Technical Support  Continuous Improvement
Problem Resolution  Sheet Metal & Plastics Manufacturing Processes  DoD & Aerospace Industries
EDUCATION, SECURITY & RESIDENCES
Masters of Business Administration/Finance (MBA), Syracuse University, Syracuse, NY
Bachelor of Science, Electrical Engineering (BSEE), University of South Carolina, Columbia, SC
Microsoft Certified Professional (MCP) | CompTIA A+ Certification
Top Secret Clearance, Defense Industrial Security Clearance Office (DISCO), 10/2010 –11/2015
International Residencies: Johannesburg, S. Africa, Buenos Aires, Argentina, London, England, Seoul, S. Korea
PROFESSIONAL PLATFORM
TECHNOLOGY RESEARCH SERVICES, Long Beach, CA 2008– PRESENT
DIRECTOR OF PROGRAMS / ENGINEERING CONSULTANT
Initiating a product development program while paving the way for successful entry into the medical device and
biometric sensor design market. Provide research oversight as principle investigator/co-principle investigator,
and manage risk analysis to uncover investment opportunities, establish research programs, and screen
solicitations based on team and company objectives.
 Coordinate student recruitment for research projects, and define working groupsfor research
collaboration with principle investigator.
 Prepare integrated master schedules (IMS) for program and project management.
 Conduct lab testing, validate results, write weekly journals, and white papers for government
distribution and general publication, detailingfindings, opportunities, and status.
 Partner with universities to collaborate on research share of cost and fringe benefits agreements,and
forecast research costs and budget for period of performance (POP).
 Author technical proposals to obtain National Science Foundation (NSF) and Small BusinessInnovative
Research (SBIR) awards.
CURTISS-WRIGHT CONTROLS, Santa Clarita, CA 2010– 2012
SENIOR SYSTEMS ENGINEER
Directed the highly successful launch and integration of a robust design-to-requirement verification and
validation program, cementing market dominance in avionic certification through architectural traceability to
requirements via modeling language (ML).
 Directed major engineeringreviews, preliminarydesign reviews (PDR), critical design reviews (CDR),
test readinessreviews (TRR), and system readinessreviews (SRR) for technical peers, company, and
federal government participation.
DARREN JOHNSON, BSEE, MBA
DARREN JOHNSON, BSEE, MBA johnsodd1@gmail.com Resume,Page 2
PROFESSIONAL PLATFORM (continued)
 Developed mission management and flight control systems, ensuringadherence to FAA certification
standards(DO-178, DO-254/Level 3).
 Analyzed requirements,allocation, traceability, and verification for avionic systems, and identified,
baselined and archived tech specifications in dynamic object-oriented requirementssystems(DOORS).
 Completed factory acceptance and environmental testsaligned with flight worthiness(FAR 14 CFR,
part 25) and environmental conditions(Mil-Std-810G).
 Redesigned electrical and electronic line replaceable units (LRUs) for family of militaryvehicles and
avionic systems.
 Led the RequirementsManagement component of Scope of Work for Broad Area Maritime Surveillance
(BAMS), Northrop Grumman, managingall engineeringdiscipline requirements, overseeing
engineeringchange order processes, assisting with lab testing, and providingsystems engineering
oversight of first manufactured prototypes.
LOCKHEED MARTIN, Vandenberg AFB, CA 2009– 2010
SENIOR SYSTEMS ENGINEER
Provided end-to-end project leadership on major ground-to-air launches for national defense avionic and
aerospace application, including developing designs for long-range aerospace and telemetry system architectures.
Directed hardware design, developmental testing, and production strategies.
 Coordinated service-oriented architecture (SOA) design activitiesfor web-based flight control systems;
guided network management design strategies, selection, and implementation aswell as security
access control.
 Authored product, design, and system-level requirementsfor U.S. Air Force SystemsEngineering
Integration & Test (SEIT) group.
 Performed and directed technical readinessreviews (TRR), preliminarydesign reviews (PDR), and
critical design reviews (CDR).
 Published technical memos,engineeringtrade/feasibilitiesstudies, in addition torisk mitigation plans.
 Deployed a controlled architectural aerospace design aligned with Defense Information Assurance
Certification and Accreditation Process (DIACAP) standards.
 Orchestrated software integration, development, and certification process.
 Implemented Air Force Launch and Test Range System (LTRS) activities, including managing system
requirements,writingrequirements, producingDoD architecture frameworkdrawings, managing
LTRS airborne and avionic systems project, leading federal government consulting in preliminary and
critical design reviews and test readinessreviews (TRR), providing statusreports, earned value
management (EVM), integrated master schedule (IMS), and identifyingschedule cost by task utilizing
WBS strategies.
BOEING, Huntington Beach, CA 2006– 2009
SENIOR SYSTEMS ENGINEER
Secured over $1M in savings by developing a cryptographic interface design for long-haul circuit switching, an
innovative tool enabling hardware redesign of Intelligent Product Switches lacking remote cryptographic
switching. Managed System Integration Lab (SIL) testing, and prototype design. Developed network management
software solutions, ensuring maximium performance and relabiilty of mission-critical systems.
 Engineered fiberopticlong-haul networks designed for DoD weapon system sustainment; developed
network topology drawings,OPNET simulations, and logical network maps.
 Leveraged DOORS database to maintain and archive design specifications.
 Authored Concept of Operations (ConOps) for aerospace and weapons systems; developed technical
design documents (TDD), version design descripions (VDD), interface control documents (ICD), and
system design descriptions (SDD).
 Led techical readinessreviews (TRR), preliminarydesign reviews(PDR), and critical design reviews
(CDR).
DARREN JOHNSON, BSEE, MBA johnsodd1@gmail.com Resume,Page 3
PROFESSIONAL PLATFORM (continued)
 Enhanced the long-haul system manager (LSM) for network and element management of aerospace
systems.
 Created network intrusion management (NIM)solutions aligned with secure ground, airborne,
information technology platforms, and cybersecurityinitiatives.
 Oversaw network management systemslinked to Air Force Ground Based Midcourse Defense (GMD),
includingweapons systems,operational sustainability, communication systems, and engineering
disciplines; Managed server platforms(HPUX, Windows, Linux), software integration, hardware
testing, scripting(i.e. Perl), router and switch configuration, Storage Area Networks(LAN) backup and
recovery solutions, cryptographicequipment (installation and configuration), LAN, WAN, and status
reportingto militaryJoint Program Officers.
DEFENSE TECHNOLOGIES INC., Gastonia, NC 2004– 2006
ENGINEERING MANAGER (2005– 2006)
ELECTRICAL ENGINEER (2004– 2005)
Managed the design of wireless products and accessories vital to company achievement of numerous federal
government awards for Unmanned Aerial Vehices (UAV) and ground control station application. Coordinated
development strategies for JAUS/STANAG software compliant coding, and integration for aerospace and avionic
systems. Developed product marketing strategies to support new product development and promote successful
market entry.
 Analyzed, allocated, and implemented traceabilityofavionic system requirements.
 Implemented schematiccapture, AutoCAD, and state machine workflows for airborne systems.
 Performed electrical/electronicdesign, bench testing, signal analysis, and mechanical design using
modeling and simulation applications.
 Provided leadership and direction for electrical and systemsengineers, engineeringtechnicians,and
software developers.
 Led team of engineersin product design, wireless communications, electronicPCB design, embedded
software development, and avionic systemsintegration for the Wing Bomb Bay Launched (WBBL)
Unmanned Aerial Vehicles(UAV) | NAVAIR/PMA 290 projects. The successful design of wireless data
link platformsand wirelesscommunication devices resulted in a promotion to management, and
ultimatelymanagingthe entire engineeringprogram.
EXPERIENCE PRIOR TO 2004
ENGINEERING RESEARCHER / SYSTEMS ANALYST, UNIV. OF SOUTH.CAROLINA, Columbia, SC 3 Years
Analyzed R&D opportunities to securie research sponsorship. Performed electromagnetic interference
research for high-speed computing systems; developed AutoCAD drawings for nanotechnology applications.
Facilitated engineering presentations for nanotechnology probing instrumentation concepts. Designed and
deployed wireless communication networks; managed troubleshooting, repaired, and instituted upgrades
across complex computing systems. Provided Unix, Windows, and Linux software support for administration
and faculty. Provided requirements analysis for technical grant application.
COMPUTER PROFICIENCIES
SolidWorks, CircuitWorks, AutoDesk Inventor, AutoCAD 2D & 3D, Showcase, Rhino, Altium, Eagle, Matlab,
Labview, MS Project, PowerSim, Xilinx, Exsedia, Protel, PSpice, HSpice, MS NET, MS Project

Resume- Director of Engineering

  • 1.
    P.O.Box 88962, LosAngeles, CA 90009 Phone: 310-946-1573 http://www.darrenjohnson.org johnsodd1@gmail.com SENIOR PROGRAM DIRECTOR / PROJECT ENGINEERING Program Management / Systems & Electrical Engineering / Product Design A dynamic, highly innovative Engineering Management professional with a successful track record in project and systems engineering, hardware design, software integration, technical documentation, modeling and simulation, electrical engineering, and process improvements technical guidance. Adept at combining solid business knowledge, technical expertise, and hands-on experience to achieve successful outcomes. Proven ability to develop and lead projects from conception through readiness testing and manufacturing processes. Excellent leader, communicator, and presenter. KEY STRENGTHS Operations Management  Systems Engineering  Electrical Engineering  Quality Assurance Project Management  Statistical Analysis  Budget & Cost Control  ISO Standards Compliance CRM Applications  Production Management  Earned Value Management  Business Administration New Product Design & Development  Strategic Planning  Customer & Shareholder Relations Team Leadership  CMMI & ECO Standards  Technical Support  Continuous Improvement Problem Resolution  Sheet Metal & Plastics Manufacturing Processes  DoD & Aerospace Industries EDUCATION, SECURITY & RESIDENCES Masters of Business Administration/Finance (MBA), Syracuse University, Syracuse, NY Bachelor of Science, Electrical Engineering (BSEE), University of South Carolina, Columbia, SC Microsoft Certified Professional (MCP) | CompTIA A+ Certification Top Secret Clearance, Defense Industrial Security Clearance Office (DISCO), 10/2010 –11/2015 International Residencies: Johannesburg, S. Africa, Buenos Aires, Argentina, London, England, Seoul, S. Korea PROFESSIONAL PLATFORM TECHNOLOGY RESEARCH SERVICES, Long Beach, CA 2008– PRESENT DIRECTOR OF PROGRAMS / ENGINEERING CONSULTANT Initiating a product development program while paving the way for successful entry into the medical device and biometric sensor design market. Provide research oversight as principle investigator/co-principle investigator, and manage risk analysis to uncover investment opportunities, establish research programs, and screen solicitations based on team and company objectives.  Coordinate student recruitment for research projects, and define working groupsfor research collaboration with principle investigator.  Prepare integrated master schedules (IMS) for program and project management.  Conduct lab testing, validate results, write weekly journals, and white papers for government distribution and general publication, detailingfindings, opportunities, and status.  Partner with universities to collaborate on research share of cost and fringe benefits agreements,and forecast research costs and budget for period of performance (POP).  Author technical proposals to obtain National Science Foundation (NSF) and Small BusinessInnovative Research (SBIR) awards. CURTISS-WRIGHT CONTROLS, Santa Clarita, CA 2010– 2012 SENIOR SYSTEMS ENGINEER Directed the highly successful launch and integration of a robust design-to-requirement verification and validation program, cementing market dominance in avionic certification through architectural traceability to requirements via modeling language (ML).  Directed major engineeringreviews, preliminarydesign reviews (PDR), critical design reviews (CDR), test readinessreviews (TRR), and system readinessreviews (SRR) for technical peers, company, and federal government participation. DARREN JOHNSON, BSEE, MBA
  • 2.
    DARREN JOHNSON, BSEE,MBA johnsodd1@gmail.com Resume,Page 2 PROFESSIONAL PLATFORM (continued)  Developed mission management and flight control systems, ensuringadherence to FAA certification standards(DO-178, DO-254/Level 3).  Analyzed requirements,allocation, traceability, and verification for avionic systems, and identified, baselined and archived tech specifications in dynamic object-oriented requirementssystems(DOORS).  Completed factory acceptance and environmental testsaligned with flight worthiness(FAR 14 CFR, part 25) and environmental conditions(Mil-Std-810G).  Redesigned electrical and electronic line replaceable units (LRUs) for family of militaryvehicles and avionic systems.  Led the RequirementsManagement component of Scope of Work for Broad Area Maritime Surveillance (BAMS), Northrop Grumman, managingall engineeringdiscipline requirements, overseeing engineeringchange order processes, assisting with lab testing, and providingsystems engineering oversight of first manufactured prototypes. LOCKHEED MARTIN, Vandenberg AFB, CA 2009– 2010 SENIOR SYSTEMS ENGINEER Provided end-to-end project leadership on major ground-to-air launches for national defense avionic and aerospace application, including developing designs for long-range aerospace and telemetry system architectures. Directed hardware design, developmental testing, and production strategies.  Coordinated service-oriented architecture (SOA) design activitiesfor web-based flight control systems; guided network management design strategies, selection, and implementation aswell as security access control.  Authored product, design, and system-level requirementsfor U.S. Air Force SystemsEngineering Integration & Test (SEIT) group.  Performed and directed technical readinessreviews (TRR), preliminarydesign reviews (PDR), and critical design reviews (CDR).  Published technical memos,engineeringtrade/feasibilitiesstudies, in addition torisk mitigation plans.  Deployed a controlled architectural aerospace design aligned with Defense Information Assurance Certification and Accreditation Process (DIACAP) standards.  Orchestrated software integration, development, and certification process.  Implemented Air Force Launch and Test Range System (LTRS) activities, including managing system requirements,writingrequirements, producingDoD architecture frameworkdrawings, managing LTRS airborne and avionic systems project, leading federal government consulting in preliminary and critical design reviews and test readinessreviews (TRR), providing statusreports, earned value management (EVM), integrated master schedule (IMS), and identifyingschedule cost by task utilizing WBS strategies. BOEING, Huntington Beach, CA 2006– 2009 SENIOR SYSTEMS ENGINEER Secured over $1M in savings by developing a cryptographic interface design for long-haul circuit switching, an innovative tool enabling hardware redesign of Intelligent Product Switches lacking remote cryptographic switching. Managed System Integration Lab (SIL) testing, and prototype design. Developed network management software solutions, ensuring maximium performance and relabiilty of mission-critical systems.  Engineered fiberopticlong-haul networks designed for DoD weapon system sustainment; developed network topology drawings,OPNET simulations, and logical network maps.  Leveraged DOORS database to maintain and archive design specifications.  Authored Concept of Operations (ConOps) for aerospace and weapons systems; developed technical design documents (TDD), version design descripions (VDD), interface control documents (ICD), and system design descriptions (SDD).  Led techical readinessreviews (TRR), preliminarydesign reviews(PDR), and critical design reviews (CDR).
  • 3.
    DARREN JOHNSON, BSEE,MBA johnsodd1@gmail.com Resume,Page 3 PROFESSIONAL PLATFORM (continued)  Enhanced the long-haul system manager (LSM) for network and element management of aerospace systems.  Created network intrusion management (NIM)solutions aligned with secure ground, airborne, information technology platforms, and cybersecurityinitiatives.  Oversaw network management systemslinked to Air Force Ground Based Midcourse Defense (GMD), includingweapons systems,operational sustainability, communication systems, and engineering disciplines; Managed server platforms(HPUX, Windows, Linux), software integration, hardware testing, scripting(i.e. Perl), router and switch configuration, Storage Area Networks(LAN) backup and recovery solutions, cryptographicequipment (installation and configuration), LAN, WAN, and status reportingto militaryJoint Program Officers. DEFENSE TECHNOLOGIES INC., Gastonia, NC 2004– 2006 ENGINEERING MANAGER (2005– 2006) ELECTRICAL ENGINEER (2004– 2005) Managed the design of wireless products and accessories vital to company achievement of numerous federal government awards for Unmanned Aerial Vehices (UAV) and ground control station application. Coordinated development strategies for JAUS/STANAG software compliant coding, and integration for aerospace and avionic systems. Developed product marketing strategies to support new product development and promote successful market entry.  Analyzed, allocated, and implemented traceabilityofavionic system requirements.  Implemented schematiccapture, AutoCAD, and state machine workflows for airborne systems.  Performed electrical/electronicdesign, bench testing, signal analysis, and mechanical design using modeling and simulation applications.  Provided leadership and direction for electrical and systemsengineers, engineeringtechnicians,and software developers.  Led team of engineersin product design, wireless communications, electronicPCB design, embedded software development, and avionic systemsintegration for the Wing Bomb Bay Launched (WBBL) Unmanned Aerial Vehicles(UAV) | NAVAIR/PMA 290 projects. The successful design of wireless data link platformsand wirelesscommunication devices resulted in a promotion to management, and ultimatelymanagingthe entire engineeringprogram. EXPERIENCE PRIOR TO 2004 ENGINEERING RESEARCHER / SYSTEMS ANALYST, UNIV. OF SOUTH.CAROLINA, Columbia, SC 3 Years Analyzed R&D opportunities to securie research sponsorship. Performed electromagnetic interference research for high-speed computing systems; developed AutoCAD drawings for nanotechnology applications. Facilitated engineering presentations for nanotechnology probing instrumentation concepts. Designed and deployed wireless communication networks; managed troubleshooting, repaired, and instituted upgrades across complex computing systems. Provided Unix, Windows, and Linux software support for administration and faculty. Provided requirements analysis for technical grant application. COMPUTER PROFICIENCIES SolidWorks, CircuitWorks, AutoDesk Inventor, AutoCAD 2D & 3D, Showcase, Rhino, Altium, Eagle, Matlab, Labview, MS Project, PowerSim, Xilinx, Exsedia, Protel, PSpice, HSpice, MS NET, MS Project