SlideShare a Scribd company logo
Résumé
Alok Kumar Singh
RoomNo.-2200,
LIG-540, Block No.-252,
G.H.B. Pandesara, Surat (Gujarat)
Phone: 07600969318.
Email:
singhalok00188@gmail.com
______________________________________________________________________
Job Objective
As I have worked for Telecom operators for 7.5+ years & I am eying to get a chance to
be more intensely familiar with telecom equipment’s(NSN,HUAWEI) and its
undisclosed algorithm of work procedure by working with Telecom Organizations. I
am also interested in taking responsibility to run any project.
Summary of Skills
I am currently working as an RF Engineer in Essjay Ericsson India Pvt. Ltd For RCOM
network. I am highly responsible for managing of all technical activities in the
designated zone for improving Network Performances and to maintain it.
Chronology of ProfessionalExperience
Organization
name
Project Duration
Primary
Equipments
Technology
Essjay Ericsson
Pvt. Ltd(As an
RF Engineer)
Reliance
Communication
Dec 2015
to till
now
Huawei GSM 2G
Alcatel-Lucent
India Pvt.
Ltd(As an RF
Engineer)
Telenor
June 2013
to Nov
2015
NSN GSM 2G
Essjay Ericsson
Pvt. Ltd(As an
RF Engineer)
Telenor
July 2011
to June
2013
NSN GSM 2G
Tata teleservices
Ltd
Self/ In
Operator
July 2008
to July
2011
Huawei/Motorola CDMA
Key Qualification/ Highlights of ProfessionalExperience
Job responsibility (Reliance Communication):
 Deliver RF Optimization of GSM Voice & Data KPIs of Ahmedabad Cluster for
RCOM, Gujarat.
 Worst cells Analysis to improve – TCH drop, SDCCH Drop, HOSR, TASR &
TBF Establishment Rate, TBF Drop rate, User Throughput.
 Analyzing row counter wise cause, modify HO control & Power Control
parameter, validating parameter dump and rectify any discrepancy. Huawei
System (RCOM Project)
 BCCH-TCH freq. provision for new TRX addition & change TCH freq. in NW
to improve quality.
 Benchmark and Baseline Drive test logs analysis and provide solution like
physical optimization, freq. change to enhance coverage & remove interference.
 PS KPI optimization to secure good user throughput.
 Check PCU utilization & provide recommendation to provision if required.
 Periodically verification of RF Parameter Dump & resolve discrepancy
 PerformingEMF testingof sites with DOT officer by using Narda testing meter
and always try to get site’s evaluation below than 200mW/meter Square.
Job responsibility(Telenor):
 Working as an RF Engineer for Surat Cluster(3 BSCs and 602 sites) of Uninor
(Gujarat) Operator.
 Circle SPOC for Pabis Implementation in NSN systems.
 Circle SPOC for 2nd E1 / Dedicated E1 implementation.
 Monitoring and Analyzing daily NBH-BBH Reports for KPIs like TCH/SD
Blocking, Call success rate, Call Drop Rate, Hand-Over Success Rate, DL/UL
Quality, Cell Utilization etc. and suggesting proper changes or come up with
root cause analysis for the poor KPI’s.
 Worked On DFCA unit of NSN BTS which is used for Dynamic Frequency
channel allocation for improving site’s Performance.
 Parametric optimization activity after analysis of daily KPI reports.
 RaisingCRF to implement parametricchanges (if required) after analysis of all
network reports.
 Co-ordination with Drive Test team to carry out drive test and optimization of
sites.
 Co-ordination with documentation (PPT) team for making parameter plots
such as BCCH plot, Coverage plot, Quality plot and C/I plot, cluster plots etc.
according to customer requirements.
 Planningand implement for New TRX addition and deletion activity to sustain
site’s performance and KPI in proper way.
 Working on NSN Flexi 300 BSC for basic activities (Alarm removal, Block –TRX,
site status) on daily bases even provide the data to clear service
affecting/Hardware alarms to BSS team after analyzing daily Active alarms of
BTSs of all 3 BSCs.
 Coverage, frequency and capacity planning according to the necessity.
 Primary verification of drive data and taking necessary corrective measures,
like Neighbor list addition and interference analysis.
 Prioritize hardware faults to meet customer demands within the required time
frame along with analysis, solution and reports the same.
 Resolution of customer complaints within required time frame.
 Planning of new sites on the basis of customer complaints data.
 Analyzing interference, Call Drops, Handover failures, Error in Connection,
Channel reselections, Rx Quality, Rx level etc. and generating Rx Level &
Quality Plots using MapInfo.
Job Responsibility(In TTSL/TATA):
 O & M of Tata CDMA cell sites.
 Worked on Motorola and Huawei BTS.
 Technical skills of installation,operation and maintenance of Huawei CDMA
BTS3900 and Huawei DUAL BTS3900 & MOTOROLA BTS.
 Handling & Rectification of various network alarm /faults of BTS, MICROWAVE
etc.
 Operation & Maintenance of wire line circuits (PRI/LL) and POI’s in Vapi of Surat
Zone for Tata Tele Services Ltd.
 Leading the Project of wire lines(PRI, LL,ILL,NPLC,MPLS,BRI,DLC) to complete
within SLA and also handover the same circuit to customer
 Worked on wire line Equipments i.e. Loop, Radwin.
 Keep maintenance of NEC & Ceragon microwave and made ring of same for
protection.
 Installation, Commissioning of ECI MUX (BG20, BG30, microsdm, XDM-100,
XDM-300).
 O&M of ECI MUX & NEC, Ceragon microwave.
 Attend the customer complaint regarding voice and data Coverage issue and also
optimization done for solution.
 Installation of Indoor Building Solution and their maintenance for coverage
improvement.
 Responsible for bringing new sites on air and responsible for Pre- acceptance tests of
new cell sites (i.e. testing calls, handovers and verifying all external alarms reporting
to the OMC.
 Co-ordination with BSNL & other operators for POI & other issues related to
network.
 Successfully Swapping CDMA BTS from Motorola to Huawei BTS.
 Completed the 2G Tata Docomo Project on Huawei equipments/BTS.
Project Activity:
 Performed with full efficiency& accuracyto complete project of 100 Uninor sites
of my Region in 2013-2014 year.
 Also done provisioning of Transmission media of BTS E1 before integration of
same with loop-break/media testing.
 Executed properly all movement activity of project material with Installation
team for site Installation before targeted time line.
 Tried to resolve all Infra related issue before Site Integration of IP for proper
execution of Site installation.
Tools used: NSN Equipments Software, TNMS, MapInfo, GPS, Binoculars, Compass,
Net monitor,
Academic Qualification
B.Tech. in Electronics & Communication Engg.
Examination
passed Board/ University Institute
Year of
passing Percentage
B. Tech
J.R.N. Rajasthan
Vidyapeeth
University
Indian Institute of
Engineering 2013 62%
Diploma Gujarat University
Govt. Polytechnic
College
Ahmadabad 2008 70%
12th
G.H.S.E.B(Gujarat
Board)
Lions Silk city
School 2005 53%
10th
G.S.E.B.(Gujarat
Board)
Shri Krishna Geeta
School 2003 82%
Technical Skill
 WINDOWS XP, MS-office, MS-Excel, MS-Word, Power Point
PersonalDetail
Nationality : INDIAN
Date of Birth : 1st JAN 1988
Father’s Name : Mr. Ashok Singh
Mother’s Name : Mrs. Usha Devi
Sex : Male
Marital Status : Unmarried
Languages Known : English, Hindi, Gujarati
Declaration
I consider myself familiar with Telecommunication Engineering Aspects. I am
also confident of my ability to work in a team.
I hereby declare that the above mentioned details are true to the best of my
knowledge and belief.
Place : Ahmedabad
Date : 05/02/2016 (Alok Kumar Singh)

More Related Content

What's hot (20)

Sukanta_CV
Sukanta_CVSukanta_CV
Sukanta_CV
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
Birendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_ResumeBirendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_Resume
 
Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016
 
Himanshu resume 2016
Himanshu resume 2016Himanshu resume 2016
Himanshu resume 2016
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
Delivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JDDelivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JD
 
KUNAL
KUNALKUNAL
KUNAL
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
AJITKUMARSHARMACV
AJITKUMARSHARMACVAJITKUMARSHARMACV
AJITKUMARSHARMACV
 
SACHIN 4.6 years Exp
SACHIN 4.6 years ExpSACHIN 4.6 years Exp
SACHIN 4.6 years Exp
 
Ghanshyam Yadav CV
Ghanshyam Yadav CVGhanshyam Yadav CV
Ghanshyam Yadav CV
 
Cover letter M Ali Khan
Cover letter M Ali KhanCover letter M Ali Khan
Cover letter M Ali Khan
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
Akash Tandon - Resume
Akash Tandon - ResumeAkash Tandon - Resume
Akash Tandon - Resume
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Cv rf 8 years experience sridhar
Cv rf 8 years experience sridharCv rf 8 years experience sridhar
Cv rf 8 years experience sridhar
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 

Similar to Resume Alok

CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_HanifNajmudin Hanif
 
ajay awasthi resume.....
ajay awasthi resume.....ajay awasthi resume.....
ajay awasthi resume.....Ajay Awasthi
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
Devendra Tiwari
 
Resume With 5.1 years exp.
Resume With 5.1 years exp.Resume With 5.1 years exp.
Resume With 5.1 years exp.
sanjeev kumar
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jibran
 

Similar to Resume Alok (20)

CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Amit chakraborty_Resume
Amit chakraborty_ResumeAmit chakraborty_Resume
Amit chakraborty_Resume
 
irshadali_CV
irshadali_CVirshadali_CV
irshadali_CV
 
Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
ajay awasthi resume.....
ajay awasthi resume.....ajay awasthi resume.....
ajay awasthi resume.....
 
DIPU CV
DIPU CVDIPU CV
DIPU CV
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
 
Resume With 5.1 years exp.
Resume With 5.1 years exp.Resume With 5.1 years exp.
Resume With 5.1 years exp.
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
Rajbir Resume
Rajbir ResumeRajbir Resume
Rajbir Resume
 
Sangamesh reddy CV.
Sangamesh reddy CV.Sangamesh reddy CV.
Sangamesh reddy CV.
 
Chiranjit Chatterjee_Updated_ CV
Chiranjit Chatterjee_Updated_ CVChiranjit Chatterjee_Updated_ CV
Chiranjit Chatterjee_Updated_ CV
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
Deepak patel
Deepak patelDeepak patel
Deepak patel
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 

Resume Alok

  • 1. Résumé Alok Kumar Singh RoomNo.-2200, LIG-540, Block No.-252, G.H.B. Pandesara, Surat (Gujarat) Phone: 07600969318. Email: singhalok00188@gmail.com ______________________________________________________________________ Job Objective As I have worked for Telecom operators for 7.5+ years & I am eying to get a chance to be more intensely familiar with telecom equipment’s(NSN,HUAWEI) and its undisclosed algorithm of work procedure by working with Telecom Organizations. I am also interested in taking responsibility to run any project. Summary of Skills I am currently working as an RF Engineer in Essjay Ericsson India Pvt. Ltd For RCOM network. I am highly responsible for managing of all technical activities in the designated zone for improving Network Performances and to maintain it. Chronology of ProfessionalExperience Organization name Project Duration Primary Equipments Technology Essjay Ericsson Pvt. Ltd(As an RF Engineer) Reliance Communication Dec 2015 to till now Huawei GSM 2G Alcatel-Lucent India Pvt. Ltd(As an RF Engineer) Telenor June 2013 to Nov 2015 NSN GSM 2G Essjay Ericsson Pvt. Ltd(As an RF Engineer) Telenor July 2011 to June 2013 NSN GSM 2G
  • 2. Tata teleservices Ltd Self/ In Operator July 2008 to July 2011 Huawei/Motorola CDMA Key Qualification/ Highlights of ProfessionalExperience Job responsibility (Reliance Communication):  Deliver RF Optimization of GSM Voice & Data KPIs of Ahmedabad Cluster for RCOM, Gujarat.  Worst cells Analysis to improve – TCH drop, SDCCH Drop, HOSR, TASR & TBF Establishment Rate, TBF Drop rate, User Throughput.  Analyzing row counter wise cause, modify HO control & Power Control parameter, validating parameter dump and rectify any discrepancy. Huawei System (RCOM Project)  BCCH-TCH freq. provision for new TRX addition & change TCH freq. in NW to improve quality.  Benchmark and Baseline Drive test logs analysis and provide solution like physical optimization, freq. change to enhance coverage & remove interference.  PS KPI optimization to secure good user throughput.  Check PCU utilization & provide recommendation to provision if required.  Periodically verification of RF Parameter Dump & resolve discrepancy  PerformingEMF testingof sites with DOT officer by using Narda testing meter and always try to get site’s evaluation below than 200mW/meter Square. Job responsibility(Telenor):  Working as an RF Engineer for Surat Cluster(3 BSCs and 602 sites) of Uninor (Gujarat) Operator.  Circle SPOC for Pabis Implementation in NSN systems.  Circle SPOC for 2nd E1 / Dedicated E1 implementation.  Monitoring and Analyzing daily NBH-BBH Reports for KPIs like TCH/SD Blocking, Call success rate, Call Drop Rate, Hand-Over Success Rate, DL/UL Quality, Cell Utilization etc. and suggesting proper changes or come up with root cause analysis for the poor KPI’s.  Worked On DFCA unit of NSN BTS which is used for Dynamic Frequency channel allocation for improving site’s Performance.  Parametric optimization activity after analysis of daily KPI reports.  RaisingCRF to implement parametricchanges (if required) after analysis of all network reports.  Co-ordination with Drive Test team to carry out drive test and optimization of sites.
  • 3.  Co-ordination with documentation (PPT) team for making parameter plots such as BCCH plot, Coverage plot, Quality plot and C/I plot, cluster plots etc. according to customer requirements.  Planningand implement for New TRX addition and deletion activity to sustain site’s performance and KPI in proper way.  Working on NSN Flexi 300 BSC for basic activities (Alarm removal, Block –TRX, site status) on daily bases even provide the data to clear service affecting/Hardware alarms to BSS team after analyzing daily Active alarms of BTSs of all 3 BSCs.  Coverage, frequency and capacity planning according to the necessity.  Primary verification of drive data and taking necessary corrective measures, like Neighbor list addition and interference analysis.  Prioritize hardware faults to meet customer demands within the required time frame along with analysis, solution and reports the same.  Resolution of customer complaints within required time frame.  Planning of new sites on the basis of customer complaints data.  Analyzing interference, Call Drops, Handover failures, Error in Connection, Channel reselections, Rx Quality, Rx level etc. and generating Rx Level & Quality Plots using MapInfo. Job Responsibility(In TTSL/TATA):  O & M of Tata CDMA cell sites.  Worked on Motorola and Huawei BTS.  Technical skills of installation,operation and maintenance of Huawei CDMA BTS3900 and Huawei DUAL BTS3900 & MOTOROLA BTS.  Handling & Rectification of various network alarm /faults of BTS, MICROWAVE etc.  Operation & Maintenance of wire line circuits (PRI/LL) and POI’s in Vapi of Surat Zone for Tata Tele Services Ltd.  Leading the Project of wire lines(PRI, LL,ILL,NPLC,MPLS,BRI,DLC) to complete within SLA and also handover the same circuit to customer  Worked on wire line Equipments i.e. Loop, Radwin.  Keep maintenance of NEC & Ceragon microwave and made ring of same for protection.  Installation, Commissioning of ECI MUX (BG20, BG30, microsdm, XDM-100, XDM-300).  O&M of ECI MUX & NEC, Ceragon microwave.  Attend the customer complaint regarding voice and data Coverage issue and also optimization done for solution.  Installation of Indoor Building Solution and their maintenance for coverage improvement.
  • 4.  Responsible for bringing new sites on air and responsible for Pre- acceptance tests of new cell sites (i.e. testing calls, handovers and verifying all external alarms reporting to the OMC.  Co-ordination with BSNL & other operators for POI & other issues related to network.  Successfully Swapping CDMA BTS from Motorola to Huawei BTS.  Completed the 2G Tata Docomo Project on Huawei equipments/BTS. Project Activity:  Performed with full efficiency& accuracyto complete project of 100 Uninor sites of my Region in 2013-2014 year.  Also done provisioning of Transmission media of BTS E1 before integration of same with loop-break/media testing.  Executed properly all movement activity of project material with Installation team for site Installation before targeted time line.  Tried to resolve all Infra related issue before Site Integration of IP for proper execution of Site installation. Tools used: NSN Equipments Software, TNMS, MapInfo, GPS, Binoculars, Compass, Net monitor, Academic Qualification B.Tech. in Electronics & Communication Engg. Examination passed Board/ University Institute Year of passing Percentage B. Tech J.R.N. Rajasthan Vidyapeeth University Indian Institute of Engineering 2013 62% Diploma Gujarat University Govt. Polytechnic College Ahmadabad 2008 70% 12th G.H.S.E.B(Gujarat Board) Lions Silk city School 2005 53% 10th G.S.E.B.(Gujarat Board) Shri Krishna Geeta School 2003 82%
  • 5. Technical Skill  WINDOWS XP, MS-office, MS-Excel, MS-Word, Power Point PersonalDetail Nationality : INDIAN Date of Birth : 1st JAN 1988 Father’s Name : Mr. Ashok Singh Mother’s Name : Mrs. Usha Devi Sex : Male Marital Status : Unmarried Languages Known : English, Hindi, Gujarati Declaration I consider myself familiar with Telecommunication Engineering Aspects. I am also confident of my ability to work in a team. I hereby declare that the above mentioned details are true to the best of my knowledge and belief. Place : Ahmedabad Date : 05/02/2016 (Alok Kumar Singh)