1. RESUME
PATRICK O. JEGEDE
13 HACKBERRY PL, CAMERON NC 28326
(910)354-5768
patrickjegede@Gmail.com
CLEARANCE: SECRET CLEARANCE
EDUCATION (CIVILIAN)
-BSc Building Construction Technology, Stella Maris Polytechnic 2006 GPA: 3.13 Monrovia, Liberia
-AA Architectural Engineering, Don Bosco Polytechnic, 2005
-Certificate in e-Technology Computing (basic web programming), National Institute Of Information
Technology 2004 SCORE: 71.7% Accra, Ghana
EDUCATION (MILITARY)
-Technical Engineer Certificate, US ARMY ENGINEER School, 2011 Fort Leonard Wood, Missouri
-Warrior Leadership Course, XVIII Airborne Corps Warrior Leadership Academy 2014, Fort Bragg, North
Carolina
WORK EXPERIENCE:
UNITED STATES ARMY (ACTIVE DUTY 2013-2016)
-Administration and Tasking assistant, 127th Engineer Battalion (Airborne), 20th Engineer Brigade, Fort
Bragg, North Carolina (2013)
Conducts and oversees the routine maintenance of all the S3 shop vehicles, using the department of the
army form 5988 to complete and the army -10 manual to perform maintenance
Acquires stationary supplies for the shops needs
Supports the Battalion as a repair and upgrade personnel
Performs a 24hour staff duty
Supports the S3 shop during field exercises or training rotations
2. -Technical Engineer, 27th Engineer Battalion (Combat Airborne), 20th Engineer Brigade, Fort Bragg,
North Carolina (2013)
Conducted CAD drawings for the parking pad to be used by the Special Operations Headquarters
Performed Construction Surveys for the 82ND Sustainment Brigade Headquarters parking pad
enhancement project
-Construction Surveyor, 919th Engineer Support Company, 307th Engineer Battalion (Combat Airborne),
Fort Bragg, North Carolina (2012-2013)
Produced CAD, Civil3D, and Terramodel Drawings for roads, drainages, spillways and concrete flooring
for tent Pads
Surveyed and redesigned roads within CAMP JOHN Pratt a Forward Operating Base in Afghanistan
Designed a spillway ditch and assisted with the construction using survey stakes and markings,
calculated the design slopes as well
Designed and supervised the construction of the Combat Outpost meant for the Afghan local Police
-Technical Engineer, Headquarters and Headquarters Company, 307th Engineer Battalion (combat
Airborne), 20th Engineer Brigade, Fort Bragg, North Carolina (2011-2012)
Provided detailed CAD drawings for the Battalion physical fitness Area
Conducted Topographic surveys with my survey section of the Camp McCall Training Area to provide
specific design changes to a training village
SUMMARY:
Conducted and performed all Survey and design related task to 100% completion. Tracked and updated
the project tracker for project deliverables until
they were individually up to a 100% completion. Completed all tent pads, drainage ditching, and roads
required for the individual projects.
AWARDS (MILITARY)
Army Commendation Medal ...2013
Certificate of Achievement.......2013
Army Good Conduct Medal....2014