Mohammad Mohammadi
818-966-6667
mo_mohammadii@yahoo.com
Lindley Ave, Northridge CA-91326
Education
Gilan University
2011 – 2013| Master of Business Administration (MBA)
 3.3/4 GPA
 ThesisinAnalyzingthe Effectof BrandMarketingOnCreatingof Brand Value
Shahid Bahonar University of Kerman
 1998-2002 | Bachelor of Applied Mathematics
Career
 Machinery expert, in Dam project in Share-Bijar JTMA( http://www.jtma.ir ) 2012-2014
 Administrative Specialist - Designing and execution of air conditioning - underground structures for
Azad dam, - ( http://www.jtma.ir) -2012
 Supervisor in Dehghani - Karim Bonyad construction site – Share-Bijar DamProject – Guilan -2010-
2011
 Site manager , Gavoshan water dams and water transfer tunnel- reservoir dam and water tunnel
projects, Gavoshan Kurdistan - JTMA( http://www.jtma.ir )-2009
 Assistant of logistic support officer- Water reservoir dam and Water tunnel projects , Gavoshan
Kurdistan - JTMA( http://www.jtma.ir )2004-2009
Professional Skills
 various equipment used in workshops, dam and tunnel
 The design of ventilation systems and rinse
 AutoCAD software
Experience
 Monitoringthe disassemblyof the TBM(Tunnel BoringMachine) andoutof the tunnel forthe
firsttime inthe world.
 Installationof equipmentmaintenance workshopsuchasdrilling,vibration,andconcrete
pumps.
 Designingthe systemof discharge waterinputinthe tunnel (rinse)
 Designingthe ventilationsystemreviewedforfive times(duetothe increaseddistance fromthe
entrance tunnel workface andtransferring activitieswithinthe tunnel)
 Operatingactivitiesinside the tunnel foremergencyelectrical powersupplyandlightinginside
tunnels,monitoringthe activityinvolvesinstallationof 10 KV and 6.6 KV lines
 Optimumdesigningandinstallationof electrical systemsandhydraulictunnel Concrete
Gavoshansite
 Designingandmanufacturingof AbrasiveCutterforcuttinghardobjectsto70 Rc
 Interimconsolidatedmonitoringsystemfortunnel constructionframes(LatticeGirder)
 Foundationof DrillingandDamupside of Share-Bijar,Guilan.
 Dam embankmentupside inShare-Bijar,Guilan.
"Referenceswill be provideduponrequest"

Mohammadi

  • 1.
    Mohammad Mohammadi 818-966-6667 mo_mohammadii@yahoo.com Lindley Ave,Northridge CA-91326 Education Gilan University 2011 – 2013| Master of Business Administration (MBA)  3.3/4 GPA  ThesisinAnalyzingthe Effectof BrandMarketingOnCreatingof Brand Value Shahid Bahonar University of Kerman  1998-2002 | Bachelor of Applied Mathematics Career  Machinery expert, in Dam project in Share-Bijar JTMA( http://www.jtma.ir ) 2012-2014  Administrative Specialist - Designing and execution of air conditioning - underground structures for Azad dam, - ( http://www.jtma.ir) -2012  Supervisor in Dehghani - Karim Bonyad construction site – Share-Bijar DamProject – Guilan -2010- 2011  Site manager , Gavoshan water dams and water transfer tunnel- reservoir dam and water tunnel projects, Gavoshan Kurdistan - JTMA( http://www.jtma.ir )-2009  Assistant of logistic support officer- Water reservoir dam and Water tunnel projects , Gavoshan Kurdistan - JTMA( http://www.jtma.ir )2004-2009 Professional Skills  various equipment used in workshops, dam and tunnel  The design of ventilation systems and rinse  AutoCAD software Experience  Monitoringthe disassemblyof the TBM(Tunnel BoringMachine) andoutof the tunnel forthe firsttime inthe world.  Installationof equipmentmaintenance workshopsuchasdrilling,vibration,andconcrete pumps.  Designingthe systemof discharge waterinputinthe tunnel (rinse)  Designingthe ventilationsystemreviewedforfive times(duetothe increaseddistance fromthe entrance tunnel workface andtransferring activitieswithinthe tunnel)  Operatingactivitiesinside the tunnel foremergencyelectrical powersupplyandlightinginside tunnels,monitoringthe activityinvolvesinstallationof 10 KV and 6.6 KV lines  Optimumdesigningandinstallationof electrical systemsandhydraulictunnel Concrete Gavoshansite  Designingandmanufacturingof AbrasiveCutterforcuttinghardobjectsto70 Rc  Interimconsolidatedmonitoringsystemfortunnel constructionframes(LatticeGirder)  Foundationof DrillingandDamupside of Share-Bijar,Guilan.  Dam embankmentupside inShare-Bijar,Guilan. "Referenceswill be provideduponrequest"