1. Education
09. 2010 - Present
Software
Revit Architecture, AutoCAD, Rhino, Adobe Creative Suite, Google SketchUp,
Grasshopper
Mandarin Chinese, English
Languages
Brian Healy
Principle
Brian Healy Architects
(617) 628 - 2717
brian@bhealy.com
Michael Kim
Principle
Michael Kim Associates
(617) 739 - 6925
mkim@mkimarchitecture.com
Matthew Pierce
SeniorDesigner
Perkins +Will
(617) 406 -3463
matthew.pierce@perkinswill.com
Jessica Leong
Designer
CBT Architects
j.leong9601@gmail.com
Personal Reference
83SaintBotolphStreet,#503,Boston,MA02116 (407)446-3656 shichongxie@gmail.com
SHICHONG XIE
Boston Architectural College, Boston, MA
CandidateforBachelorofArchitecture
09. 2007 - 05. 2010Valencia Community College, Orlando, FL
AssociateofArtinArchitecture
Firms
DREAM Collaborative LLC
Designer
Small size commercial firm located in Boston. Project sizes range from small to medium, type varies.Working closely with
the clients, performing general project coordinations. Project scope from DD to CD phase. (See project)
07. 2015 - PresentBoston, MA
Michael Kim Associate
Internship
Small architectural firm located in Brookline, MA. General administrative work, surveying and creating existing
conditions from the survey. Creating drawings ranged from schematic design to construction document.The
projects consist of primarily residential and small scale commercial such as restaurants.
11. 2012 - PresentBoston, MA
SchweizerWaldroff Architects Incorporated
Part-timeInternship
Project assistant, attended site meetings with the architect, suggested design solutions, received mentorship from princi-
pal, and client relations.
10. 2009 - 04. 2010Orlando, FL
Design Communication, LTD
AssistantFabricator
As part of on-call team, my role was to assist fabricators, task included general labor such as metal sanding and the move-
ment of the materials, vinyl applications and occasional site installations.
07. 2011 - 09. 2011Boston, MA
Projects
Enfold Pavilion
Part-timeinternship
Celebratory art installation with Perkin +Will in the Fenway Historical District. Process including the initial testing
and final fabrication by using inexpensive gardening fabric and wires to create an organic pavilion that wraps around the
park. In addition, LED lights were integrated for night use.
Boston, MA 09. 2012 - 10. 2012
Chinatown Library Furniture Project
Designer/Fabricator
BAC Gateway Project.To design a set of versatile furniture that can be easily reconfigured accordingly to the needs of the
library. My primary responsibility during the project consisted of design adjustments and creating study models to
incorporate with space planning. Final fabrication included assembly of the units and finishing.
Boston, MA 02. 2012 - 07. 2012
Wynn Casino & Resort - DREAM Collaborative LLC, Jacobs Engineering
Designer
Large mix-use project, program consist of a hotel tower, main casino levels included gaming floors with conference rooms
and other supporting programs, and a three level underground parking garage. As part of the garage team, the primary
focus was preparing the documents from DD to CD phrase while coordinating between the clients and all con-
sultants of the project. Day to day operations include working closely with the project architect to identify issues
on hand and resolve conflicts between architecture and engineering discipline. Additional role such as project
BIM leader, performing weekly Revit model maintenance and conduct quality control of project documents such
as sheet counts.
07. 2015 - PresentBoston, MA
SOHA Lofts - Brian Healy Architect
Designer
Creating exterior renderings for project presentations.Working collaboratively with the consultants to generate final
Design Development sets, tasks include assist Revit modeling and creating sheets.
-Rhino,Revit,AdobeCreativeSuite
05.2015 - 07.2015Boston, MA