List the primary job duties and responsibilities using headings and then give examples of the types of activities under each heading. Using headings and giving examples of the types of activities to be done allows you to develop a flexible job description that encourages employee to ‘work outside the box’ and within reason, discourages “that’s not my job”.
• Identify between three and eight primary duties and responsibilities for the position
• List the primary duties and responsibilities in order of importance
• Begin each statement with an action verb
• Use the present tense of verbs
• Use gender neutral language such as s/he
• Use generic language such a photocopy instead of Xerox
• Where appropriate use qualifiers to clarify the task – where, when, why or how often – for example instead of “greet visitor to the office” use “greet visitors to the office in a professional and friendly manner”
• Avoid words that are open to interpretation – for example instead of “handle incoming mail” use “sort and distribute incoming mail”
List the primary job duties and responsibilities using headings and then give examples of the types of activities under each heading. Using headings and giving examples of the types of activities to be done allows you to develop a flexible job description that encourages employee to ‘work outside the box’ and within reason, discourages “that’s not my job”.
• Identify between three and eight primary duties and responsibilities for the position
• List the primary duties and responsibilities in order of importance
• Begin each statement with an action verb
• Use the present tense of verbs
• Use gender neutral language such as s/he
• Use generic language such a photocopy instead of Xerox
• Where appropriate use qualifiers to clarify the task – where, when, why or how often – for example instead of “greet visitor to the office” use “greet visitors to the office in a professional and friendly manner”
• Avoid words that are open to interpretation – for example instead of “handle incoming mail” use “sort and distribute incoming mail”
Having 7years’Experience in various angels of MEP with consultant back ground from 05-06-2012 to till Date working as.Associate HVAC Engineer,(MEP Draftsman,Coordinator,Quantity Surveyor), in Green design Engineering Consultant. OMEGASTAR Electromechnical LLC DUBAI-, ADVANCE TECH Electromechnical System DUBAI
Having 7years’Experience in various angels of MEP with consultant back ground from 05-06-2012 to till Date working as.Associate HVAC Engineer,(MEP Draftsman,Coordinator,Quantity Surveyor), in Green design Engineering Consultant. OMEGASTAR Electromechnical LLC DUBAI-, ADVANCE TECH Electromechnical System DUBAI
6 Years of experience as a MEP Draftsman like piping layout, isometric design, P&ID Drawings and civil buildings, section wise drawings. I have good communication skills.
6 Years of experience as a MEP Draftsman like piping layout, isometric design, P&ID Drawings and civil buildings, section wise drawings. I have good communication skills.
1. MOHAMMAD ZAMIN
DRAUGHTSMAN-HVAC & MEP+REVIT MEP MODELER (5.5 Yrs.)
1- April 2014-TillDate
Worked as a 3D MEP Modeler at B.K. Gulf W.L.L., Doha, Qatar since April, 2014 to Till Date.
RUNNING PROJECT:
NATIONAL MUSEUM OF QATAR (NMOQ), DOHA, QATAR.
2- July 2010-October2013
Worked as a Draughtsman-MEP/Revit MEPin ETA STAR ELECTROMECH (SAUDI) CO.
LTD., Riyadh Kingdom of Saudi Arabia (KSA) since July 2010.
PROJECT WORKED:
King Abdullah Financial District (KAFD), Riyadh (Kingdom of Saudi Arabia):
Parcel-2.07(5B+G+11+Roof, Tower-A, Tower B&Tower-C),
Parcel-2.08 (5B+G+11, Tower-A &Tower B),
Parcel-2.11 ((5B+G+11+Roof),
Parcel-2.12 (5B+G+24+ Roof)&
Parcel-2.13 (5B+G+ 34+ Roofs).
3- July 2009 - July 2010
Worked as a Draughtsman-HVAC in APCO AIRCON, New Delhi (INDIA)
PROJECTS WORKED:
Hotel theLalit B+G+21+RF in New Delhi.
Maruti Corporation Gurgaon.
Max Mall B+G+4+RF, Noida.
(Continued on Page 2/3)
A-CONTACT INFO
Personal Information
PERMANENT ADDRESS:
House no. L-13/A, Railway Colony, Roza Jn.,
Shahjahanpur, Uttar Pradesh,
India.
Mo.#+97430367421(QA),+918009047059(IND)
E-mail: mohdzamin_123@yahoo.com,
zamin92646@gmail.com
B-RESUME
Work Experience
2. (Page 2/3)
4- July 2008 - June 2009
Worked as a Draughtsman-HVAC in Menasco Mechanical Contracting LLC,
DUBAI (UAE).
PROJECTS WORKED:
2B+G+27+RF (MARINA WHARF-1) at Marsa, Dubai.
NMC Hospital at Al Fujairah.
132/11kv DEWA substation at AL BARARI, Dubai.
2 Nos 132/11kv DEWA substation at NAD AL SHEBA, Dubai.
132/11kv DEWA substation at New Garhoud, Dubai.
132/11kv DEWA substation at Factories Area, Dubai.
132/11kv DEWA substation at Emirates Road, Dubai.
Job Responsibilities:-
1. Designing of ducts using Ductsizer.
2. Designing of pipes for open piping and closed piping using Standard graphs.
3. Planning for the ducts, pipes and equipment.
4. Preparing Shop Drawings & As Built Drawings for Chilled Water & Ducting Layout from Design
Drawings.
5. Receiving Commented Drawings from the Consultant & Submitting the Amended Drawing to the
Engineers.
6. To make Builders work related to MEP Drawings (Slab Opening, Wall opening).
7. Making Quantities for HVAC services from Shop drawings.
8. Sections of Various areas.
9. Designing duct and piping system layout.
10. To Make MEP Co-Ordination Drawings from the respective their shop drawings.
11. Manage and participate in the creation of Mechanical and Electrical Building Information Models
With multiple teams.
12. Assist with BIM project setup including template formation, library creation and Workflow
analysis through various technologies.
13. Utilizing Building Information Modeling (BIM) at the corporate and the project levels.
14. Producing 2D & 3D drawings using Revit MEP.
15. Placement of mechanical equipment (AHU, CHILLERS, BOILER ETC). Logical & physical
connections.
16. Manual and auto layout for ducting and piping.
17. 3D modeling and Co-ordination of all type of building services.
18. Creating documentations view.
19. Annotation and dimensions the layout.
20. Creating Families with details.
21. Designing of Water Supply system.
22. Sprinkles system, hose reel system& pipe sizing.
23. Arrangement of light fixtures & receptacle
24. Drawings using Fabrication CAD MEP 2014.
25. Drawing using review Fabrication FAB reviews 2013.
26. Drawing using reviewNavisworks Manage 2014.
27. Service clashes reports checking in Digital Project V1, R4.
28. Drawings using Revit MEP (2012 & 2013).
29. Ability to work independently.
30. Quick learning and adopting capabilities.
(Continued on Page 3/3)
3. (Page 3/3)
AutoCAD Course from Institute of Technical Studies, New Delhi in 2004.
I.T.I. (Govt.) in Refrigeration & Air-conditioning (N.C.V.T.) from Nave Technical Institute,
Shahjahanpur, (U.P.) India in July 2007
Diploma in Mechanical Engineering from Karnataka State Open University, Mysore, India in
2013.
Revit MEP-BIM Certificate Course from S. M. TECHNO, Hyderabad, A. P. In January 2013.
Passed High School from U.P. Board in 2002.
Passed Intermediate (10+2) from U.P. Board in 2004.
Passed B.A. (Pvt.) From M.J.P. Rohilkhand University in 2007.
Auto-CAD; Release-2008, 2009, 2010& 2012, CAD MEP, Navisworks, Digital Project, Revit
MEP-2012& 2014.
MS-Office,
Internet Browsing etc.
Father’s Name : Mr. Ali Kauser
Date of Birth : 08-03-1986
Marital Status : Unmarried
Nationality : Indian
Passport Number : G-4746949
Issue Date : 01.07.2007
Expiry Date : 30.09.2017
Place of Issue : Bareilly (India)
Willing to face challenge in life,
Reading Books
I sincerely believe in team spirit, hard work and Loyalty. I hope the particulars in the attached resume are
in line of your requirement and opportunity would be provided to prove my worth. The above furnished
details are true to the best of my knowledge and belief.
Place: . . . . . . . . . . . . . . . . . . .
Date: . . . . . . . . . . . . . . . . . . .
(MOHD ZAMIN)
C-QUALIFICATIONS
Technical
Educational
Computer Proficiency
D-OTHER INFORMATIONS
Personal Data
Passport Details
Attitude/Hobbies
Declaration