EMPLOYMENT RECORDS:
 POSITION : CIVIL ENGINEER / QUANTITY SURVEYOR (April 2014 – Up to Present)
COMPANY : Red Sea Housing ServicesLtd.
Private Mail Bag, Tema, Ghana,West Africa
JOB DESCRIPTION :
 Prepares,tendersand contracts documentsincludingbill of quantities.
 Preparesand analyzescosting for tenders.
 Analyzesand estimatesquantity of materialstake off and preparing detailedprogress
reports.
 Estimate quantitiesand cost of materials,equipmentor labor to determine project
feasibility.
 Test soilsand materials to determine the adequacy and strength of foundations,
concrete,asphalt or steel.
 POSITION : CIVIL ENGINEER / QUANTITY SURVEYOR (May 2010 – March 2014)
 PROJECT : DAMS / WATER TANKS / CHLORINATION SYSTEM
COMPANY : ABDULWAHAB AL DAKHEEL SON’SAND TRADING
RIYADH,KINGDOMOF SAUDIARABIA
JOB DESCRIPTION :
 Prepares,tendersand contracts documentsincludingbill of quantities.
 Preparesand analyzescosting for tenders.
 Allocateswork to sub contractors.
 Analyzesand estimatesquantity of materialstake off and preparing detailedprogress
reports.
 Valuescompletedworks and arranging payments.
 Designas builtplans as for actual conditionson site using AutoCAD 2010 and Eagle
point.
 Preparesschedule and assignedtasks of manpower for dailyworks as per time
schedule.
 Estimate quantitiesand cost of materials,equipmentor labor to determine project
feasibility.
 Designsroad networksand landscapingfor Water Tanks areas.
 Designsand analyzes structural buildingsusingETABS 2013.
 Test soilsand materials to determine the adequacy and strength of foundations,
concrete, asphalt or steel.
 Providestechnical advice regardingdesign,construction or programs modifications
and structural repairs to industrial and managerial personnel.
 Supervisesconstructionof water tanks, Control Building,Chlorinationbuildingsand
instrumentationof chlorinationsystem.
 Supervisesconstructionof road networks for the “REPLENISHMENT OF WATER
TRANSMISSIONTO NORTHERN PROJECTS IN NAJRAN,KINGDOM OFSAUDI ARABIA”.
 POSITION : PROJECT OPERATION ENGINEER ( 2008 – 2010)
 PROJECT : HORIZONTAL CONSTRUCTION
COMPANY : SR. STO. NINO DE CEBU RESOURCES AND DEV’T. CORP.
16TH
FLOOR,ROBINSON’STOWER
ORTIGASCENTER,PASIGCITY, PHILIPPINES
JOB DESCRIPTION :
 Estimates quantityof materials as per plan.
 Preparesquantity of materials for billingpurposes.
 Preparesbillingdocuments.
 Preparesschedule and assignedtasks of manpower for dailyworks as per time
schedule.
 Verifiesthe accuracy and authenticationof land titles.
 Inspectsquality of road works, retainingwall and drainage system as per plans and
specifications.
 POSITION : SUPERVISOR ENGINEER ( 2006 - 2008 )
 PROJECT : HOUSING
COMPANY : J & LG CITIHOMES, INC.
DECA HOMES
MARILAO,BULACAN,PHILIPPINES
JOB DESCRIPTION :
Inspectthe accuracy of layout of housesfor proper location.
Inspectquality of weldedconnectionofpre fabricated panelsof housingstructure (row
houses).
Check the billingofcontractors as per assignedand completedworks.
 POSITION : SITE ENGINEER ( 2005 – 2006)
 PROJECT : LAEUNA DE TAAL RESORT (TALISAY,BATANGAS)
COMPANY : MARKBILT CORP.
MADRIGALBUSINESSPARK
AYALA,ALABANG,MUNTINLUPA CITY,PHILIPPINES
JOB DESCRIPTION :
Estimate quantity of materialsas perplan.
Prepare quantity of materials for billingpurposes.
Prepare billingdocuments.
Prepare schedule and assignedtasks of manpower for daily works as per time schedule.
Verifyaccuracy and authentication ofland titles.
Inspectquality of works for retainingwalls (gabions) and drainage systemas per plans and
specifications.Andin- charge of laboratory testingfor compaction of grades and base coarse
for preparation of road concreting.
SKILLS :
 Energetic,highlymotivated,multi-lingual individual withpositive attitude,accomplish
assignmentson time and withquality to the utmost satisfactionmanagement and
client.
 Goodcommunication, interpersonal,andanalytical skillsand exceptional approach.
 Team orientedwith a can do attitude and soundstructural knowledge.
 ProficientinEnglish both oral and written.
 Knowledge ofACI, ASTM, ASCI Code
COMPUTER PROFICIENCY :
 Windows(all operatingsystem),Ms – Office and Internetapp.
 AutoCAD 2010, Prima Vera, E-TABS 2013
 Eagle Pointsoftware
EDUCATIONAL BACKGROUND:
ADOBE PHOTOSHOP / EAGLE POINT
AUTOCADD / AUTODESK CERTIFICATE FEBRUARY – MARCH 2008
MICROCADD CENTER
CYBERZONE,SM NORTHEDSA
QUEZON CITY, PHILIPPINES
LICENSED CIVIL ENGINEER MAY 2005 (BOARD EXAM - PASSED)
PROFFESSIONALREGULATION COMMISSION(PRC)
P.R.C NO. 0101996
MANILA,PHILIPPINES
MEMBER
PHILIPPINE INSTITUTE OF CIVIL ENGINEER(PICE)
PANGASINAN CHAPTER
BACHELOR OF SCIENCE IN CIVILENGINEERING JUNE 2000 - APRIL 2005 (GRADUATED)
PANGASINANSTATE UNIVERSITY
COLLEGE OF ENGINEERING AND TECHNOLOGY
URDANETA CITY,PANGASINAN,PHILIPPINES
PERSONAL DATA :
DATE OF BIRTH : JANUARY13, 1983
PLACE OF BIRTH : INFANTA,PANGASINAN,PHILIPPINES
CIVIL STATUS : MARRIED
NATIONALITY : FILIPINO
LANGUAGE/ DIALECT : ENGLISH(fluent),ARABIC (fluent),TAGALOG ANDILOCANO
I hereby declare thatthe aboveinformation aretrueand correct to thebest of my knowledgeand beliefs.
LOUIE M. BUSTRIA

LOUIE M. BUSTRIA- CIVIL ENGINEER

  • 1.
    LOUIE M. BUSTRIA CAREEROBJECTIVES : Aspiringtobe part ofan organizationthatwouldutilizemy talent andcapabilities,providingmean opportunityto enhancemy knowledge, experience sincerelyand energetically, inthe interest of my employer. Current Location : #16 Pinagbuklod St., Tawiran Ext., Santolan, Pasig City PASSPORT NO. : EC3132949 EMAIL ADD : airtsub_1200@yahoo.com / lmbustria@gmail.com MOBILE NO : +639302550808 EMPLOYMENT RECORDS:  POSITION : CIVIL ENGINEER / QUANTITY SURVEYOR (April 2014 – Up to Present) COMPANY : Red Sea Housing ServicesLtd. Private Mail Bag, Tema, Ghana,West Africa JOB DESCRIPTION :  Prepares,tendersand contracts documentsincludingbill of quantities.  Preparesand analyzescosting for tenders.  Analyzesand estimatesquantity of materialstake off and preparing detailedprogress reports.  Estimate quantitiesand cost of materials,equipmentor labor to determine project feasibility.  Test soilsand materials to determine the adequacy and strength of foundations, concrete,asphalt or steel.  POSITION : CIVIL ENGINEER / QUANTITY SURVEYOR (May 2010 – March 2014)  PROJECT : DAMS / WATER TANKS / CHLORINATION SYSTEM COMPANY : ABDULWAHAB AL DAKHEEL SON’SAND TRADING RIYADH,KINGDOMOF SAUDIARABIA JOB DESCRIPTION :  Prepares,tendersand contracts documentsincludingbill of quantities.  Preparesand analyzescosting for tenders.  Allocateswork to sub contractors.  Analyzesand estimatesquantity of materialstake off and preparing detailedprogress reports.  Valuescompletedworks and arranging payments.  Designas builtplans as for actual conditionson site using AutoCAD 2010 and Eagle point.
  • 2.
     Preparesschedule andassignedtasks of manpower for dailyworks as per time schedule.  Estimate quantitiesand cost of materials,equipmentor labor to determine project feasibility.  Designsroad networksand landscapingfor Water Tanks areas.  Designsand analyzes structural buildingsusingETABS 2013.  Test soilsand materials to determine the adequacy and strength of foundations, concrete, asphalt or steel.  Providestechnical advice regardingdesign,construction or programs modifications and structural repairs to industrial and managerial personnel.  Supervisesconstructionof water tanks, Control Building,Chlorinationbuildingsand instrumentationof chlorinationsystem.  Supervisesconstructionof road networks for the “REPLENISHMENT OF WATER TRANSMISSIONTO NORTHERN PROJECTS IN NAJRAN,KINGDOM OFSAUDI ARABIA”.  POSITION : PROJECT OPERATION ENGINEER ( 2008 – 2010)  PROJECT : HORIZONTAL CONSTRUCTION COMPANY : SR. STO. NINO DE CEBU RESOURCES AND DEV’T. CORP. 16TH FLOOR,ROBINSON’STOWER ORTIGASCENTER,PASIGCITY, PHILIPPINES JOB DESCRIPTION :  Estimates quantityof materials as per plan.  Preparesquantity of materials for billingpurposes.  Preparesbillingdocuments.  Preparesschedule and assignedtasks of manpower for dailyworks as per time schedule.  Verifiesthe accuracy and authenticationof land titles.  Inspectsquality of road works, retainingwall and drainage system as per plans and specifications.  POSITION : SUPERVISOR ENGINEER ( 2006 - 2008 )  PROJECT : HOUSING COMPANY : J & LG CITIHOMES, INC. DECA HOMES MARILAO,BULACAN,PHILIPPINES JOB DESCRIPTION : Inspectthe accuracy of layout of housesfor proper location. Inspectquality of weldedconnectionofpre fabricated panelsof housingstructure (row houses). Check the billingofcontractors as per assignedand completedworks.  POSITION : SITE ENGINEER ( 2005 – 2006)  PROJECT : LAEUNA DE TAAL RESORT (TALISAY,BATANGAS)
  • 3.
    COMPANY : MARKBILTCORP. MADRIGALBUSINESSPARK AYALA,ALABANG,MUNTINLUPA CITY,PHILIPPINES JOB DESCRIPTION : Estimate quantity of materialsas perplan. Prepare quantity of materials for billingpurposes. Prepare billingdocuments. Prepare schedule and assignedtasks of manpower for daily works as per time schedule. Verifyaccuracy and authentication ofland titles. Inspectquality of works for retainingwalls (gabions) and drainage systemas per plans and specifications.Andin- charge of laboratory testingfor compaction of grades and base coarse for preparation of road concreting. SKILLS :  Energetic,highlymotivated,multi-lingual individual withpositive attitude,accomplish assignmentson time and withquality to the utmost satisfactionmanagement and client.  Goodcommunication, interpersonal,andanalytical skillsand exceptional approach.  Team orientedwith a can do attitude and soundstructural knowledge.  ProficientinEnglish both oral and written.  Knowledge ofACI, ASTM, ASCI Code COMPUTER PROFICIENCY :  Windows(all operatingsystem),Ms – Office and Internetapp.  AutoCAD 2010, Prima Vera, E-TABS 2013  Eagle Pointsoftware EDUCATIONAL BACKGROUND: ADOBE PHOTOSHOP / EAGLE POINT AUTOCADD / AUTODESK CERTIFICATE FEBRUARY – MARCH 2008 MICROCADD CENTER CYBERZONE,SM NORTHEDSA QUEZON CITY, PHILIPPINES LICENSED CIVIL ENGINEER MAY 2005 (BOARD EXAM - PASSED) PROFFESSIONALREGULATION COMMISSION(PRC) P.R.C NO. 0101996 MANILA,PHILIPPINES MEMBER PHILIPPINE INSTITUTE OF CIVIL ENGINEER(PICE) PANGASINAN CHAPTER BACHELOR OF SCIENCE IN CIVILENGINEERING JUNE 2000 - APRIL 2005 (GRADUATED) PANGASINANSTATE UNIVERSITY COLLEGE OF ENGINEERING AND TECHNOLOGY URDANETA CITY,PANGASINAN,PHILIPPINES
  • 4.
    PERSONAL DATA : DATEOF BIRTH : JANUARY13, 1983 PLACE OF BIRTH : INFANTA,PANGASINAN,PHILIPPINES CIVIL STATUS : MARRIED NATIONALITY : FILIPINO LANGUAGE/ DIALECT : ENGLISH(fluent),ARABIC (fluent),TAGALOG ANDILOCANO I hereby declare thatthe aboveinformation aretrueand correct to thebest of my knowledgeand beliefs. LOUIE M. BUSTRIA