Kumarasamy Murugavelu is an Indian electrical engineer from Tamil Nadu with over 23 years of experience in India and Saudi Arabia. He has worked on various power plant and oil refinery construction and maintenance projects for companies like ANSALDO, ARAMCO, and YASREF. Murugavelu holds an SSC and a diploma in electrical and electronics engineering and is currently working as a shift supervisor at a YASREF oil refinery plant in Saudi Arabia.
1. RESUME
KUMARASAMY MURUGAVELU
9B/2, Murugan kovil street,
V.O.C. Nagar,
Abatharanapuram,
Vadalur – 607 303, E. MAIL: murugu403@yahoo. Co. in
Cuddalore – District. Phone No: 00966 542263536(KSA)
Tamil Nadu. Cell No: 0091 9443553802(India)
Father’s Name : M. Kumarasamy
Nationality & Religion : Indian & Hindu
Marital Status : Married
Spouse Name : Murugavelu Uma Maheswari
Number of Children : Two (Male)
Date of Birth : 13.10.1972
Educational Qualification : S. S. L. C
Percentage & Class : 65% & 1st
Class
Year of Passing : April 1988
Technical Qualification : Diploma in
Electrical&Electronic
Engineering
Percentage & Class : 74% & 1st
Class
Year of Passing : April 1991
2. Passport Details:
Old New
Passport Number : E6580077 Passport Number : K 7195775
Date of Issue : 09-09-2003 Date of Issue : 22-11-2012
Date of Expiry : 08-08-2013 Date of Expiry : 21-11-2022
Place of Issue : Chennai Place of Issue :Chennai
Work Experience in India :10 years
Work Experience in Abroad :13 years
I hereby declare that the above information are true to
the best of my knowledge and belief.
PLACE : Vadalur
DATE :
Signature
3. JOB DESCRIPTION:
From May 1991 to November 1993
Work experience in maintenance of Bucket Wheel Machine
and Splitter Machine Controller at Coal MINE.(INDIA)
From November 1993 to April 1996
33KV Sub Station Maintenance and Switch Yard
Maintenance at Thermal power plant.(INDIA)
From July 1996 to June 1997
Construction of Power Plant, Erection of Panel Board, Pre –
commissioning & Testing.(Safolo sugar refinery. TPL.
Jeddha. K.S.A)
From November 1996 to June 1997
Cable Termination, Panel Board Termination, Installation of
Motors, Erection of Sub Station Panel Boards and
Termination of Cement Packing Machine as per schedule.
(Yanbu. YCC. KHD. K.S.A)
From July 1997 to November 1997
Construction of Switchgear room, Termination of Control
Panel, Construction of Battery room, Termination of Cables
(Yanbu. PTA. K.S.A)
4. From November 1997 to April 1998
115 KV Power Cable dissalination, 115 KV Switch yard
construction, SF6 breaker installation, Commissioning of
115KV Switch yard and Mimic board control for Switches.
(Yanbu. Siemens.AEI. K.S.A)
From April 1998 to September 1998
Construction of switch gear room, Panel Board Erection,
Transformer Erection, Power and control cable
termination, pre- commissioning & testing.(Jeddha. KAIA
Airport . Al-Mabani. K.S.A)
September 1998 to July 1999
Panel Board Erection, lighting erection & wiring, cable
termination, commissioning & testing.(Jeddha. KKH
hospital . Imprigilo. K.S.A)
October 1999 to January 2001
Crude oil Refinery maintenance for instrument analyzer, Oil
– in – Water analyzer, O2 analyzer, H2O analyzer, H2S
analyzer, PH and conductivity analyzer etc. (Rabigh.
ARAMCO. K.S.A)
5. March 2001 to October 2001
Construction of power plant and water refinery plant.
Worked as a Electrical Supervisor for electrical and
instrumentation. (Rabigh. ARAMCO. K.S.A)
October 2001 to April 2002
Construction of Water Desalination for acid injection
system, cable termination and pre- commissioning. Worked
as a Electrical Supervisor. (Rabigh. ARAMCO. K.S.A)
September 2002 to January 2003
Construction and maintenance for OFF- SHORE crude
pumping station, Gathering station, Loading and Gas
separation platform. Worked as Electrical Foreman.
Replacement of exciting Electrical equipment and
instruments and installed new instrument and electrical
equipment.
(Khabji. ARAMCO-KJO. K.S.A)
January 2003 to March 2003
Construction for Gas oil separation Plant. Working as a
Electrical Foreman in Electrical and Instrumentation.
(Hafuf. GOSP. ARAMCO. K.S.A)
6. April 2003 to October 2005
Construction for 2 * 210MW Thermal Power Station Project,
MV/LV Panel erection, cable jointing. Lighting panel
erection cable laying and termination. All types of lighting
fixtures installation and lighting start up. ( ANSALDO.
INDIA)
October 2005 to March 2007
Working as a Electrical Supervisor for 2 * 210 MW Power
Station Maintenance work for Generator Transformer and
MV/LV Panels and Switch gears. (ANSALDO . INDIA)
March 2007 to March 2009
Working as a Electrical Superintend for GOSP (Gas oil
Separation Plant) and Construction of Refinery & Water
Desalination Plant all types of Electrical Activities were
carried out. (PETRO RABIGH. ARAMCO. K.S.A)
April 2009 to March 2013
Working as a Electrical Engineer for 2 * 210 MW Thermal
Power Station work for Running Maintenance of all the
Electrical Activities. (VOLTECH. INDIA)
April 2013 to Till Now
Working as a Shift Supervisor ESO (Electrical Switch
OPERATOR) at YSREF Oil Refinery Plant (ARAMCO Based.
K.S.A)
7. Work Experience : Total 23 Years
Designation Nature of
Work
Project
Name
Name of the
Company
Years
Electrician Operation Lignite Mine N. L. C. Mine, India May 1991 to
Nov. 1993
Electrician Operation Thermal Power
Plant
N. L. C. Power Plant,
India
Nov. 1993 to
Apr. 1996
Electrician Construction Safola Sugar
Refinery, JED
K. S. A
T. P. L Jul. 1996 to
Nov. 1996
Electrician Construction Y. C. C Cement
Plant, Yanbu
K. S. A
K. H. D Nov. 1996 to
Jan. 1997
Electrician Construction P. T. A Project
K. S. A
C. C. C Jan. 1997 to
Nov. 1997
Electrician Construction 115 KV Power
Plant & Switch
Yard, Yanbu,
K. S. A
Siemens (AEI) Nov. 1997 to
Apr. 1998
Electrician Fore
man
Construction KAIA Airport
K. S. A
AL - MABINI
Apr. 1998 to
Sep. 1998
Electrician Fore
man
Construction K. K. H
Hospital
K. S. A
IMPRIGILO Sep. 1998 to
Jul. 1999
8. Designation Nature of
Work
Project
Name
Name of the
Company
Years
Instrument
Analyzer
Technician
Maintenance RABIGH
Refinery
K. S. A
ARAMCO Oct. 1999 to
Jan. 2001
Supervisor Construction RABIGH
Refinery
K. S. A
ARAMCO Mar. 2001 to
Oct. 2001
Electrical Fore
man
Construction RABIGH Oil
Refinery
K. S. A
ARAMCO Oct. 2001 to
Apr. 2002
Electrical Fore
man
Construction Offshore
Project
K. S. A
ARAMCO (KJO)
Sep. 2002 to
Jan. 2003
Electrical Fore
man
Construction Gas Oil
Separation
Plant, Hafuf
K. S. A
ARAMCO Jan. 2003 to
Mar. 2003
Electrical
Supervisor
Erection N. L.C 2 * 210
MW Power
Plant. India
ANSALDO Apr. 2003 to
Oct 2005
Electrical
Supervisor
Operation N. L.C 2 * 210
MW Power
Plant. India
ANSALDO Oct 2005 to
Mar 2007
9. Designation Nature of
Work
Project
Name
Name of the
Company
Years
Electrical
Superintended
Erection Oil Refinery
Rabigh
K. S. A
PETRO RABIGH Mar. 2007 to
Mar2009
Electrical
Engineer
Operation N. L.C 2 * 210
MW Power
Plant. India
VOLTECH Apr. 2009 to
Mar-2014
Shift Supervisor
(ES0)
Operation Oil Refinery
K. S. A
YASREF Apr. 2013 to
Till now