The document is a resume for N. Santhosh Goud detailing his career objective, skills, experience, responsibilities, employment history, projects handled, and education. He has over 6 years of experience in materials management and currently works as an Executive of Stores and Logistics for Coastal Marine Construction & Engineering Ltd. His roles have included procurement, inventory control, and transportation coordination across several infrastructure projects.
Firstly checking the document LR COPY, CENVAT COPY, TEX INVOICE, DELIVERY CHALLAN, COA, PACKING LIST, MSDS and the material quantity verified with challan quantity then after unloading the material on palate and de dusting material after Stores at under test area and preparing (GRN) receipts. after then informing Q.C Department for taking sample for analysis after approve material by QC department material store in manner and systematic in RM store if material reject to store in RM rejection lock in key.
- All Receipt/Issue & Inspection of materials in stores along with proper formalities & Documentations.
- Responsible for the store, the material & the manpower associated with it, including its safe custody & security. All materials stored as per MSDS spec.
- Daily material stock register maintains.
- Material requirement to be planning department.
- Daily site issue register maintains.
- Co-Ordinate to the planning Department.
- Daily stock ledger maintains.
- Daily basis Receipt, issued & balance maintain to be system.
- Responsible for account all materials received at project site, maintain proper & correct records of such materials & reconcile with planning department.
- Co-ordinate to be site engineers & site supervisor.
- To follow the delivery part list which has been incorporate with fabrication & Erection drawing transmittal-
- To have the good co-ordination with the site engineers, related project staff and planning dept. as well as to attend the meeting with the contractor for making brief discussion regarding materials to be required for the up swing project which will be held once in a week.
Firstly checking the document LR COPY, CENVAT COPY, TEX INVOICE, DELIVERY CHALLAN, COA, PACKING LIST, MSDS and the material quantity verified with challan quantity then after unloading the material on palate and de dusting material after Stores at under test area and preparing (GRN) receipts. after then informing Q.C Department for taking sample for analysis after approve material by QC department material store in manner and systematic in RM store if material reject to store in RM rejection lock in key.
- All Receipt/Issue & Inspection of materials in stores along with proper formalities & Documentations.
- Responsible for the store, the material & the manpower associated with it, including its safe custody & security. All materials stored as per MSDS spec.
- Daily material stock register maintains.
- Material requirement to be planning department.
- Daily site issue register maintains.
- Co-Ordinate to the planning Department.
- Daily stock ledger maintains.
- Daily basis Receipt, issued & balance maintain to be system.
- Responsible for account all materials received at project site, maintain proper & correct records of such materials & reconcile with planning department.
- Co-ordinate to be site engineers & site supervisor.
- To follow the delivery part list which has been incorporate with fabrication & Erection drawing transmittal-
- To have the good co-ordination with the site engineers, related project staff and planning dept. as well as to attend the meeting with the contractor for making brief discussion regarding materials to be required for the up swing project which will be held once in a week.
Key Duties and Responsibilities:
• Making Purchase Requisition (PR) (Job, Stock, General & Consumable), co-ordinate with management & suppliers for purchasing of materials.
• Receipt of incoming material from the suppliers and physical inspection to ensure that correct quantity receipt in good condition as per the delivery note/ packing list/ purchase order.
• Supervise unloading of incoming materials and loading while dispatching the finished goods.
• Prepare Goods Receipt Note (GRN), Material Received Voucher (M.R.V) and sent to accounts department for payment of supplier.
• Familiar with ORACLE / ERP System for inventories.
• Give intimation about receipt of material to concerned dept. and arrange for quality inspection.
• Ensure proper storage of all incoming materials at designated place with proper labeling etc.
• Issue all materials against the MRF (Material Request Form) sign by authorized person. Follow by FIFO system. And making computer entries in the system.
• Delivers materials to the allocated sites and divisions, as per there official daily requests.
• Stock taking of Inventory on regular basis for fast moving items to reconcile physical stock with system, and timely inform to procurement department.
• International Purchase entry, Creating new product code, Price/Qty/Stock searching, Cash sale of material issue out by system.
• To follow up the suppliers to deliver the materials, standard quantity in due time to maintain lead time, cycle time & safety position.
• Conduct appropriate housekeeping and upkeep of store premises as required and maintain safe work environment for all staff.
• Fully aware with safety measures in store, stock verification and legal aspects of store.
• Keep some items under adequate temperature control place.
• Making Monthly Report (Stock Valuation Report & Consumption Report).
Key Duties and Responsibilities:
• Making Purchase Requisition (PR) (Job, Stock, General & Consumable), co-ordinate with management & suppliers for purchasing of materials.
• Receipt of incoming material from the suppliers and physical inspection to ensure that correct quantity receipt in good condition as per the delivery note/ packing list/ purchase order.
• Supervise unloading of incoming materials and loading while dispatching the finished goods.
• Prepare Goods Receipt Note (GRN), Material Received Voucher (M.R.V) and sent to accounts department for payment of supplier.
• Familiar with ORACLE / ERP System for inventories.
• Give intimation about receipt of material to concerned dept. and arrange for quality inspection.
• Ensure proper storage of all incoming materials at designated place with proper labeling etc.
• Issue all materials against the MRF (Material Request Form) sign by authorized person. Follow by FIFO system. And making computer entries in the system.
• Delivers materials to the allocated sites and divisions, as per there official daily requests.
• Stock taking of Inventory on regular basis for fast moving items to reconcile physical stock with system, and timely inform to procurement department.
• International Purchase entry, Creating new product code, Price/Qty/Stock searching, Cash sale of material issue out by system.
• To follow up the suppliers to deliver the materials, standard quantity in due time to maintain lead time, cycle time & safety position.
• Conduct appropriate housekeeping and upkeep of store premises as required and maintain safe work environment for all staff.
• Fully aware with safety measures in store, stock verification and legal aspects of store.
• Keep some items under adequate temperature control place.
• Making Monthly Report (Stock Valuation Report & Consumption Report).
PGDM in Marketing & Finance with 6.5+ Years Experience in Corporate Marketing...Pinaki Basu
Currently working as Deputy Manager in Project Logistics and having qualitative experience with Project Cargo, Break Bulk, ODC/OOG, Logistics, Supply Chain Management, comprising of Strategic Planning, Marketing, Business Developments, Key Accounts Management, Vendor Development, Project Operations Management and Client Servicing.
1. N.SANTHOSH GOUD RESUME
N.Santhosh Goud,
H.No : 8-13,
Sardhana Village,
Medak.
E-mail : nsanthoshgoud@yahoo.com
Phone : +919010197988.
Career Objective:
I step forward with my skills and abilities for an organization, where there is a
potential growth and recognition to put in maximum contribution, so I can utilize my
knowledge for the development and growth of the company in the field of “STORES”.
Summary of Skills and Experience:
Having 6+ Years experience in execution of various type of materials in
Residential Buildings, Highway construction, Bridges / Flyovers & Water Projects.
Currently serving as an Executive (Stores cum Logistics) with M/s Coastal Marine
Construction & Engineering Ltd., Nellore, Andhra Pradesh.
Worked in various areas like Material Receipts and Issues, Goods Inward Entry,
Preparation of Material Receipt Note, Forwarding Bills, Stock Register Updating,
Quotation Collection and comparisons, Preparation of Purchase Orders, Preparing
Monthly Stock Statements.
Strengths & Abilities:
Successfully implementing the inventory control system in the Company.
Successfully control the related jobs in a smooth and descent manner.
Planning of store control system in the Company.
Material Management: Command complete inward/outward movement of
materials. Manage material right from the initial stage of sourcing, to negotiation,
procurement & storing. Identify new & better space saving techniques, methods of
goods identification, storage and movement, responsible for managing scrap &
obsolescence of company’s assets.
Logistics / Supply Chain Management: Monitor flow/movement of procured
items including raw material, consumables and finished goods. Handle logistics
functions; negotiate with transporters to reach the site in time.
Responsibilities:
Handling of entire Stores & dispatch function and heading the dept.
Material planning and preparing the purchase requisition.
Maintaining the minimum and maximum stock level & Maintaining 0% of
breakdown due to Unavailability of stock.
Receipts and issues of materials like Steel, Cement, Bitumen, Aggregates, Sand
etc,
Material handling, storage and preservation.
Page 1 of 4
2. N.SANTHOSH GOUD RESUME
Co-ordination with Quality dept. for inspection of incoming materials.
Responsible for In-ward and Out-ward Transportation.
Stock verification by using perpetual inventory system.
Dispatch of Finished goods.
Review of stock obsolescence materials(Non-moving & slow moving)
Accounting the receipts and issues and generating the reports.
Store reconciliation & making physical verifications by regular intervals.
Scrap accounting and sale of scrap.
Maintaining Register of Fixed Assets.
Support top management by preparing necessary MIS Reports.
Employment Record:
November 2011 to Till Date : Coastal Marine Construction & Eng. Ltd.
May 2011 to October 2011 : Ramky Infrastructure Limited
September 2010 to April 2011 : Vensar Construction Company Limited
December 2009 to August 2010 : IVRCL Infrastructures & Projects Ltd.
July 2008 to December 2009 : APR Projects Private Limited (Ramky)
October 2006 to June 2008 : Ramky Infrastructure Limited
April 2006 to September 2006 : Panchayathiraj, Medak
Projects Handled:
From November 2011 to Till Date:
Project IX: Construction of Sea water Intake & Out falling System for Ph#1,2x660 MW
Super Critical Thermal Power Plant at Krishnapatnam in Nellore, Andhra Pradesh.
Employer : Coastal Marine Construction & Engineering Limited
Position : Executive (Stores cum Logistics)
From May 2011 to October 2011:
Project VIII: Improvement/Up gradation of SH-78 Road Project (Bhita to Sarmera) 100.4
Kms (Bihar)
Employer : Ramky Infrastructure Limited
Position : Stores Officer (Supply Chain Management)
From September 2010 to April 2011:
Project VII: Construction of IIIT Campus, Basara, Adilabad.
Employer : Vensar Construction Company Limited
Position : Senior Stores Executive
Page 2 of 4
3. N.SANTHOSH GOUD RESUME
From December 2009 to August 2010:
Project VI: Civil & Electromechanical Works at Ground Level Reservoirs at Bangalore.
Employer : IVRCL Infrastructures & Projects Ltd
Position : Senior Assistant – Stores
From July 2008 to December 2009:
Project V: Construction of G+3 Pattern Houses Under JNNURM Project Jakkampudi,
Vijayawada.
Project IV: Construction of Outer Ring Road at shamshabad, Hyderabad.
Employer : APR Projects Private Limited (Ramky)
Position : Assistant – Stores & Purchase
From May 2011 to October 2011:
Project III: Construction of Ramky towers at Gachibowli, Hyderabad.
Project II: Construction of Puravankara I.T.Park in Hyderabad.
Employer : Ramky Infrastructure Limited
Position : Assistant - Materials
From May 2011 to October 2011:
Project I: Construction Works of C.C Roads and Buildings
Employer : Panchayathiraj, Medak
Position : Work Inspector
Educational Qualifications:
Pursuing P.G Diploma in Materials Management from Annamalai University.
B.A (H.E.P) in Govt.Degree College, Medak, (Osmania University) 2003-06.
Intermediate (M.P.C) in Adarsha Jr.College, Medak 2001-03.
S.S.C in Z.P.High School, Sardhana, Medak 2000-01.
Key Skills:
Ms-office, ERP (Inventory Package), Materials Management, Good Internet
proficiency, All Stores & Purchase Activities.
Page 3 of 4
4. N.SANTHOSH GOUD RESUME
Personal Details:
Father’s Name : Narsagouni Nagabhushanam Goud
Date of Birth : 21-03-1986
Sex : Male
Marital Status : Married
Passport No : H5323178
Languages known : English, Hindi & Telugu
Total Experience in yrs. : 6+ Years
Current CTC : 3.54 Lakh + (Accommodation & Transportation)
Per Annum
Present Location : Nellore, Andhra Pradesh.
Permanent Address : N Santhosh Goud
S/o. N Nagabhushanam Goud
D: No: 8-13
Indira Nagar Colony,
Sardhana Village
Medak Dist.-502130.
Place:
Date:
(N.SANTHOSH GOUD)
Page 4 of 4