Schedules for stock condition surveys
PHASE 1 CONDITION SURVEY SCHEDULE
Property: KDU Southern Campus Class Room 3D
Date: 25 July 2018 Ref:……………………..
Condition Ratings
A = Good
B = Fair
C = Poor
D = Bad
X = Very Bad
REF. PROPERTY / ELEMENT
CONDITION RATING
A B C D/DX
A KDU SOUTHERN CLASS ROOM 3D √
A.1 Wall √
A.2 Floor √
A.3 Ceiling √
A.4 Electrical √
A.5 Partition √
A.6 Lights and Fan Fitting √
A.7 Door and Windows √
2
Identified Defects
A.1 – Wall
A.1.1 Thermal Cracks - Between the windows there are some
Thermal cracks due to the load of lintels
A.1.2 Cracks create between the bricks due to the
Load of beam
A.1.3 Cracks formed between the beam and brick walls
due to the joint issue
3
A.2 – Floor
A.2.1 Floor cracks Due to the lack of titanium mix and the
Proportion of the cement sand mix
A.2.2 The cracks formed in the floor, above the second
floor Beam joints
A.3 – Ceiling
A.3.1 Corrosion in the binding bars which connected with
T-Bars (not strong)
A.3.2 Damages on the ceiling boards
4
A.4 – Electrical
A.4.1 Un protected covers and holes for the electrical
lines it causes to get fire easily
A.5 – Partition
A.5.1 The material used for Compartmentation
material having the chances for get fire. Lack of
passive fire protection.
The partition wall gets damaged and not sound
insulated
A.6 - Lights and Fan Fitting
A.6.1 The speed of the fans reduced (capacitor issue)
A.6.2 Damages on fans and some lights not working
A.7 – Doors and Windows
A.7.1 Damages on the revels of the windows area
A.7.2 ironmongeries of Doors and Windows have
damaged
5
Bill of Quantity for the Remedies
PHASE 2: CONDITION SURVEY SCHEDULE
Property: KDU Southern Campus Class Room 3D
Date: 25 July 2018 Ref:……………………..
ITEM ELEMENT/CONDITION REMEDY QTY RATE COST
A.1
A.1.1
A.1.2
A.2.1
A.3.1
A.3.2
A.4.1
A.5.1
A.6.1
A.6.2
A.7.1
Walls
Thermal Cracks between
widows
Cracks between beam and
walls
Floor Cracks
Corrasion on the bars
Damages on boards
Unprotected electrical
wiring
Damage on
compartmentation
Low speed of Fan
Damages on the plastic
part of fans
Damages on
ironmongeries
Remove the mix from
that place and apply
cement sand mix again
Keep Retiform and
prepare some
expansion joints
Apply cement
rendering for the floor
Replace new bars to
connect rebars
Replace new boards
Wrapping and
covering
Fire retardant material
Install capacitor
Replace the cover
Replace the
ironmongeries
2m2
16m
30m2
2 Roll
3 Nr
12m
49m2
2 Nr
1Nr
2 Nr
533.17
200.00
550.00
125.00
475.00
115.00
375.00
180.00
160.00
320.00
1,066.34
3,200.00
16,500.00
250.00
1,425.00
1,380.00
18,375.00
360.00
160.00
640.00
Total for the Remedies 43,356.00
Sources of cost data _ BSR (Building Department Sri Lanka)

More Related Content

More from anojan kanagarathnam

More from anojan kanagarathnam (7)

Economics
EconomicsEconomics
Economics
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
Micro economics issues
Micro economics issuesMicro economics issues
Micro economics issues
 
Quantity surveyors jargon
Quantity surveyors jargonQuantity surveyors jargon
Quantity surveyors jargon
 
Account as a decession making tool for qs
Account as a decession making tool for qsAccount as a decession making tool for qs
Account as a decession making tool for qs
 

Recently uploaded

Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 

Recently uploaded (20)

Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

Report.docx

  • 1. 1 Schedules for stock condition surveys PHASE 1 CONDITION SURVEY SCHEDULE Property: KDU Southern Campus Class Room 3D Date: 25 July 2018 Ref:…………………….. Condition Ratings A = Good B = Fair C = Poor D = Bad X = Very Bad REF. PROPERTY / ELEMENT CONDITION RATING A B C D/DX A KDU SOUTHERN CLASS ROOM 3D √ A.1 Wall √ A.2 Floor √ A.3 Ceiling √ A.4 Electrical √ A.5 Partition √ A.6 Lights and Fan Fitting √ A.7 Door and Windows √
  • 2. 2 Identified Defects A.1 – Wall A.1.1 Thermal Cracks - Between the windows there are some Thermal cracks due to the load of lintels A.1.2 Cracks create between the bricks due to the Load of beam A.1.3 Cracks formed between the beam and brick walls due to the joint issue
  • 3. 3 A.2 – Floor A.2.1 Floor cracks Due to the lack of titanium mix and the Proportion of the cement sand mix A.2.2 The cracks formed in the floor, above the second floor Beam joints A.3 – Ceiling A.3.1 Corrosion in the binding bars which connected with T-Bars (not strong) A.3.2 Damages on the ceiling boards
  • 4. 4 A.4 – Electrical A.4.1 Un protected covers and holes for the electrical lines it causes to get fire easily A.5 – Partition A.5.1 The material used for Compartmentation material having the chances for get fire. Lack of passive fire protection. The partition wall gets damaged and not sound insulated A.6 - Lights and Fan Fitting A.6.1 The speed of the fans reduced (capacitor issue) A.6.2 Damages on fans and some lights not working A.7 – Doors and Windows A.7.1 Damages on the revels of the windows area A.7.2 ironmongeries of Doors and Windows have damaged
  • 5. 5 Bill of Quantity for the Remedies PHASE 2: CONDITION SURVEY SCHEDULE Property: KDU Southern Campus Class Room 3D Date: 25 July 2018 Ref:…………………….. ITEM ELEMENT/CONDITION REMEDY QTY RATE COST A.1 A.1.1 A.1.2 A.2.1 A.3.1 A.3.2 A.4.1 A.5.1 A.6.1 A.6.2 A.7.1 Walls Thermal Cracks between widows Cracks between beam and walls Floor Cracks Corrasion on the bars Damages on boards Unprotected electrical wiring Damage on compartmentation Low speed of Fan Damages on the plastic part of fans Damages on ironmongeries Remove the mix from that place and apply cement sand mix again Keep Retiform and prepare some expansion joints Apply cement rendering for the floor Replace new bars to connect rebars Replace new boards Wrapping and covering Fire retardant material Install capacitor Replace the cover Replace the ironmongeries 2m2 16m 30m2 2 Roll 3 Nr 12m 49m2 2 Nr 1Nr 2 Nr 533.17 200.00 550.00 125.00 475.00 115.00 375.00 180.00 160.00 320.00 1,066.34 3,200.00 16,500.00 250.00 1,425.00 1,380.00 18,375.00 360.00 160.00 640.00 Total for the Remedies 43,356.00 Sources of cost data _ BSR (Building Department Sri Lanka)