Report On Summer Training At
Siemens Real Estate (SRE) of
Siemens LTD., 6A-Gurgaon
Prepared By
Satyam Peeyush
Undergraduate Student, National Institute Of Technology, Silchar
Mechanical Dept.
Scholar No.- 14-1-2-042
Under the guidance of
Mr. Vivek Dwivedi
SRE, Siemens Ltd. 6A-Gurgaon
1. INTRODUCTION
As a part of curriculum and SiemensScholarship Program and
for the partial fulfillmentof B. Tech degreefrom NIT Silchar, I,
Satyam Peeyushunderwentan industrial Summer Trainingat
SRE of Siemens Ltd. 6A-Gurgaon for 8 weeksin the duration of
May-June2016.
Siemens Ltd. 6A-Gurgaon islocated in Gurgaon near New Delhi,
is a vast industry withwideverity of disciplines. The primary
disciplinesare EMDG, Mobility, EMTS, GSIT, SEM, SPG and SRE.
SRE wasthe departmentin which I was placed for training.
This departmentis concern with Siemens Properties.
As the HVAC revamp projectis going on at this location I was
assigned to go through the project workingprocedureand the
other technical aspects of HVAC.
Under the guidanceof Mr. Amit Garg RC-IN SRE and Mr. Vivek
DwivediRC-IN SRE, I got the opportunity to haveexposureto
the work carried out in the departmentand in the project of
HVAC and hence I learnt a good deal from them. Duringthe
period of two months of industrialtraining, the work primarily
assigned wereconcern with finite analysisand allied topics. A
brief discussion of the assignment given and training
undergoneduringtheperiod follows.
2. Assignmentcompleted duringthe period
Below is the list of primary tasksassigned and completed
duringthe period of training. Brief discussion of each
assignment willfollow under the remainingsub-sections.
2.1. Study of tender and technical details of HVAC project
2.1.1. Study of the Chillers going to install in the system
2.1.2. Study of the compressor going to install in the
system
2.1.3. Study of the design of the whole cooling system
2.2. Room category tracking of north zone
2.2.1. Study of the room category guidelines provided by
Siemens
2.2.2. Handy application of AutoCAD
2.3. Vacancy Analysis
2.3.1. Study of requirement of vacancy analysis
2.3.2. Handy use of data handling
2.1 Study of tender and technical details of HVAC project
The HVAC revamp projectis totally related to the installation of
new chillers to enhance the cooling of the buildingand the
overcomethe currentstruggle from the cooling and air-
conditioningrelated problemsas the old system was not
workingproperly so the new system of chillers needed to
install which consist of two water cooled chillers of capacity
300tr and oneproperly functioning200tr air cooled chiller
from existing system will be taken in account. Asper the
buildingrequirementtotal of 500tr coolingis required so one
300tr willbe standby and for backup system.
2.1.1. The new chillers are water cooled helical screw chillers and
they were factory assembled includingall interconnections
completed and complete wiringof micro-controlcomputer
system. The chillers will be constant speed drive(CSD) and
their performancewillbe certified in accordanceof ARI
Standard 550-92.
2.1.2. Normally there are four typesof compressorsbut as the
chillers are going to install on the top of the tower so we need
the compressor with least vibration with least compromise
with efficiency so weconsidered the hermetic / semi hermetic
or helical screw typecompressors
2.1.3. Design of the cooling system wasprepared by the consultants
so the detailed study of the design is required to have the total
idea the required civil structureto withstand the cooling
system includingthe chillers, cooling towers, pumpsand other
accessories required for proper functioningof the system.
2.2. Room category tracking of north zone
It was the total analysisof the details of the propertiesof
Siemens in North Zone, which consist of 3 in Gurgaon, 1 in each
Delhi, Noida, Lucknow, Jaipur, Chandighar. In this analysis the
whole property can categories in the prescribed category of the
space in the accordingto the provided guidelines. This analysis
was to unify the all propertiesof Siemens in all location so that
we can have an easy track on the property accordingto there
utility.
2.2.1. Study of the guidelinefor the room category tracker to have the
idea of the all-21 category provided by Siemensand their
division and also to judge the given space into the particular
category according to its utility and application.
2.2.2. Use of pre-learned AutoCAD toolto analyzethe area of each
property and then dividethem into differentcategory
according to their application by satisfying the conditions
provided in the guidebook.
2.3 Vacancy Analysis
It was the analysis of the occupancy of the office duringa
particular week of May to analyzethat how work stations are
occupied duringthe workinghour of the office.
ACKNOWLEDGMENT
I would like to thank Mr. AMITGARG, my guidefor the training
and Mr. VIVEK DWIVEDI, my guidefor HVAC project, for
providingmewith the opportunitiesof studying, learningand
gaining practical experience in variousfieldsduringthe period
of training. His invaluable suggestionsnot only helped meto
reach the successful completion of the tasks assigned, but also
mademelearn a lot.
I would like to give special thanks to Mr. AMANDEEPSHIDHU
for helping me throughout with his wise suggestions,
innovativeideas and whole-hearted help.
I want to thank Mrs. PromilaKhanna and all others in the
departmentwho helped me duringmy work here.
And finally I would liketo thank the HR departmentof Siemens
LTD., 6A-Gurgaon, CorporateCitizenship SiemensLtd. and my
institute, NIT Silchar for givingme the opportunity to have a
preciousand rewardingexperienceof trainingin the
prestigious industry of SiemensLTD.

More Related Content

Viewers also liked

Boatner_Terrance_Final_PPP
Boatner_Terrance_Final_PPPBoatner_Terrance_Final_PPP
Boatner_Terrance_Final_PPP
kapitol1
 
Is a creative bottleneck costing your business?
Is a creative bottleneck costing your business? Is a creative bottleneck costing your business?
Is a creative bottleneck costing your business?
Hightail
 
Evaluacion de blog cultural
Evaluacion de blog culturalEvaluacion de blog cultural
Evaluacion de blog cultural
Gricelda Adama Hilario
 
Wordpress customer support
Wordpress customer support Wordpress customer support
Wordpress customer support
wordpress technical support
 
15 μαρτιου 2010 ημεριδα γγκ ομιλια π. καλαποθαρακου
15 μαρτιου 2010 ημεριδα γγκ  ομιλια π. καλαποθαρακου15 μαρτιου 2010 ημεριδα γγκ  ομιλια π. καλαποθαρακου
15 μαρτιου 2010 ημεριδα γγκ ομιλια π. καλαποθαρακουΕ.Κ.ΠΟΙ.ΖΩ.
 
Flexible digital approach to airport terminal design
Flexible digital approach to airport terminal designFlexible digital approach to airport terminal design
Flexible digital approach to airport terminal design
Shishirrai
 
A model of a social chatbot
A model of a social chatbotA model of a social chatbot
A model of a social chatbot
Agnese Augello
 
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
ASHISH KUMAR
 
Srpski online
Srpski onlineSrpski online
Srpski online
Jugoslava Lulic
 
Best Practices In Discussion Forums
Best Practices In Discussion ForumsBest Practices In Discussion Forums
Best Practices In Discussion Forums
Crystal Mosley
 
Industrial Grade Products
Industrial Grade ProductsIndustrial Grade Products
Industrial Grade Products
tabirsir
 
Discussion forums: 6 success factors
Discussion forums: 6 success factorsDiscussion forums: 6 success factors
Discussion forums: 6 success factors
Kerry (aka KerryJ) Johnson
 
M. Krause Resume
M. Krause ResumeM. Krause Resume
M. Krause Resume
Margaret Krause
 
Market & competitor analysis template in PPT
Market & competitor analysis template in PPTMarket & competitor analysis template in PPT
Market & competitor analysis template in PPT
Aurelien Domont, MBA
 

Viewers also liked (14)

Boatner_Terrance_Final_PPP
Boatner_Terrance_Final_PPPBoatner_Terrance_Final_PPP
Boatner_Terrance_Final_PPP
 
Is a creative bottleneck costing your business?
Is a creative bottleneck costing your business? Is a creative bottleneck costing your business?
Is a creative bottleneck costing your business?
 
Evaluacion de blog cultural
Evaluacion de blog culturalEvaluacion de blog cultural
Evaluacion de blog cultural
 
Wordpress customer support
Wordpress customer support Wordpress customer support
Wordpress customer support
 
15 μαρτιου 2010 ημεριδα γγκ ομιλια π. καλαποθαρακου
15 μαρτιου 2010 ημεριδα γγκ  ομιλια π. καλαποθαρακου15 μαρτιου 2010 ημεριδα γγκ  ομιλια π. καλαποθαρακου
15 μαρτιου 2010 ημεριδα γγκ ομιλια π. καλαποθαρακου
 
Flexible digital approach to airport terminal design
Flexible digital approach to airport terminal designFlexible digital approach to airport terminal design
Flexible digital approach to airport terminal design
 
A model of a social chatbot
A model of a social chatbotA model of a social chatbot
A model of a social chatbot
 
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
Process Design Engineer with 8.0 Years of experience in Oil & Gas and Refinery.
 
Srpski online
Srpski onlineSrpski online
Srpski online
 
Best Practices In Discussion Forums
Best Practices In Discussion ForumsBest Practices In Discussion Forums
Best Practices In Discussion Forums
 
Industrial Grade Products
Industrial Grade ProductsIndustrial Grade Products
Industrial Grade Products
 
Discussion forums: 6 success factors
Discussion forums: 6 success factorsDiscussion forums: 6 success factors
Discussion forums: 6 success factors
 
M. Krause Resume
M. Krause ResumeM. Krause Resume
M. Krause Resume
 
Market & competitor analysis template in PPT
Market & competitor analysis template in PPTMarket & competitor analysis template in PPT
Market & competitor analysis template in PPT
 

Similar to Report On Summer Training

CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
Sandeep Anugade
 
Kec training report
Kec training reportKec training report
Kec training report
Jasvinder Singh
 
CV_Ashu Bhatt
CV_Ashu BhattCV_Ashu Bhatt
CV_Ashu Bhatt
Ashu Bhatt
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
 
Working Experience
Working ExperienceWorking Experience
Working Experience
thaufan ikhwanul katsir
 
5.12.15
5.12.155.12.15
5.12.15
satish kumar
 
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATEOPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
IRJET Journal
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdf
INDRAKUMARPADWANI1
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
sunil kumar
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Modelling for Linear and Radial Heat Transfer using 3D Experience
Modelling for Linear and Radial Heat Transfer using 3D ExperienceModelling for Linear and Radial Heat Transfer using 3D Experience
Modelling for Linear and Radial Heat Transfer using 3D Experience
IRJET Journal
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
radheya karmarkar
 
IRJET- IoT based DC Motor Protection, Control and Monitoring
IRJET-  	  IoT based DC Motor Protection, Control and MonitoringIRJET-  	  IoT based DC Motor Protection, Control and Monitoring
IRJET- IoT based DC Motor Protection, Control and Monitoring
IRJET Journal
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
IRJET Journal
 
Syed C.V
Syed C.VSyed C.V
Adil_Abdulla CV
Adil_Abdulla CVAdil_Abdulla CV
Adil_Abdulla CV
Adil Addulla
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
PANKAJ PAL
 
Mayank_Gupta_Resume
Mayank_Gupta_ResumeMayank_Gupta_Resume
Mayank_Gupta_Resume
Mayank Gupta
 
PLC and SCADA.ppt
PLC and SCADA.pptPLC and SCADA.ppt
PLC and SCADA.ppt
Nayan351985
 
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTUREDESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
IRJET Journal
 

Similar to Report On Summer Training (20)

CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
Kec training report
Kec training reportKec training report
Kec training report
 
CV_Ashu Bhatt
CV_Ashu BhattCV_Ashu Bhatt
CV_Ashu Bhatt
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
 
Working Experience
Working ExperienceWorking Experience
Working Experience
 
5.12.15
5.12.155.12.15
5.12.15
 
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATEOPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdf
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
Modelling for Linear and Radial Heat Transfer using 3D Experience
Modelling for Linear and Radial Heat Transfer using 3D ExperienceModelling for Linear and Radial Heat Transfer using 3D Experience
Modelling for Linear and Radial Heat Transfer using 3D Experience
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
IRJET- IoT based DC Motor Protection, Control and Monitoring
IRJET-  	  IoT based DC Motor Protection, Control and MonitoringIRJET-  	  IoT based DC Motor Protection, Control and Monitoring
IRJET- IoT based DC Motor Protection, Control and Monitoring
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Adil_Abdulla CV
Adil_Abdulla CVAdil_Abdulla CV
Adil_Abdulla CV
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
Mayank_Gupta_Resume
Mayank_Gupta_ResumeMayank_Gupta_Resume
Mayank_Gupta_Resume
 
PLC and SCADA.ppt
PLC and SCADA.pptPLC and SCADA.ppt
PLC and SCADA.ppt
 
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTUREDESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
DESIGN AND DEVELOPMENT OF AUTOMATED WELDING FIXTURE
 

Report On Summer Training

  • 1. Report On Summer Training At Siemens Real Estate (SRE) of Siemens LTD., 6A-Gurgaon Prepared By Satyam Peeyush Undergraduate Student, National Institute Of Technology, Silchar Mechanical Dept. Scholar No.- 14-1-2-042 Under the guidance of Mr. Vivek Dwivedi SRE, Siemens Ltd. 6A-Gurgaon
  • 2. 1. INTRODUCTION As a part of curriculum and SiemensScholarship Program and for the partial fulfillmentof B. Tech degreefrom NIT Silchar, I, Satyam Peeyushunderwentan industrial Summer Trainingat SRE of Siemens Ltd. 6A-Gurgaon for 8 weeksin the duration of May-June2016. Siemens Ltd. 6A-Gurgaon islocated in Gurgaon near New Delhi, is a vast industry withwideverity of disciplines. The primary disciplinesare EMDG, Mobility, EMTS, GSIT, SEM, SPG and SRE. SRE wasthe departmentin which I was placed for training. This departmentis concern with Siemens Properties. As the HVAC revamp projectis going on at this location I was assigned to go through the project workingprocedureand the other technical aspects of HVAC. Under the guidanceof Mr. Amit Garg RC-IN SRE and Mr. Vivek DwivediRC-IN SRE, I got the opportunity to haveexposureto the work carried out in the departmentand in the project of HVAC and hence I learnt a good deal from them. Duringthe period of two months of industrialtraining, the work primarily assigned wereconcern with finite analysisand allied topics. A brief discussion of the assignment given and training undergoneduringtheperiod follows.
  • 3. 2. Assignmentcompleted duringthe period Below is the list of primary tasksassigned and completed duringthe period of training. Brief discussion of each assignment willfollow under the remainingsub-sections. 2.1. Study of tender and technical details of HVAC project 2.1.1. Study of the Chillers going to install in the system 2.1.2. Study of the compressor going to install in the system 2.1.3. Study of the design of the whole cooling system 2.2. Room category tracking of north zone 2.2.1. Study of the room category guidelines provided by Siemens 2.2.2. Handy application of AutoCAD 2.3. Vacancy Analysis 2.3.1. Study of requirement of vacancy analysis 2.3.2. Handy use of data handling
  • 4. 2.1 Study of tender and technical details of HVAC project The HVAC revamp projectis totally related to the installation of new chillers to enhance the cooling of the buildingand the overcomethe currentstruggle from the cooling and air- conditioningrelated problemsas the old system was not workingproperly so the new system of chillers needed to install which consist of two water cooled chillers of capacity 300tr and oneproperly functioning200tr air cooled chiller from existing system will be taken in account. Asper the buildingrequirementtotal of 500tr coolingis required so one 300tr willbe standby and for backup system. 2.1.1. The new chillers are water cooled helical screw chillers and they were factory assembled includingall interconnections completed and complete wiringof micro-controlcomputer system. The chillers will be constant speed drive(CSD) and their performancewillbe certified in accordanceof ARI Standard 550-92. 2.1.2. Normally there are four typesof compressorsbut as the chillers are going to install on the top of the tower so we need the compressor with least vibration with least compromise with efficiency so weconsidered the hermetic / semi hermetic or helical screw typecompressors 2.1.3. Design of the cooling system wasprepared by the consultants so the detailed study of the design is required to have the total idea the required civil structureto withstand the cooling system includingthe chillers, cooling towers, pumpsand other accessories required for proper functioningof the system.
  • 5. 2.2. Room category tracking of north zone It was the total analysisof the details of the propertiesof Siemens in North Zone, which consist of 3 in Gurgaon, 1 in each Delhi, Noida, Lucknow, Jaipur, Chandighar. In this analysis the whole property can categories in the prescribed category of the space in the accordingto the provided guidelines. This analysis was to unify the all propertiesof Siemens in all location so that we can have an easy track on the property accordingto there utility. 2.2.1. Study of the guidelinefor the room category tracker to have the idea of the all-21 category provided by Siemensand their division and also to judge the given space into the particular category according to its utility and application. 2.2.2. Use of pre-learned AutoCAD toolto analyzethe area of each property and then dividethem into differentcategory according to their application by satisfying the conditions provided in the guidebook. 2.3 Vacancy Analysis It was the analysis of the occupancy of the office duringa particular week of May to analyzethat how work stations are occupied duringthe workinghour of the office.
  • 6. ACKNOWLEDGMENT I would like to thank Mr. AMITGARG, my guidefor the training and Mr. VIVEK DWIVEDI, my guidefor HVAC project, for providingmewith the opportunitiesof studying, learningand gaining practical experience in variousfieldsduringthe period of training. His invaluable suggestionsnot only helped meto reach the successful completion of the tasks assigned, but also mademelearn a lot. I would like to give special thanks to Mr. AMANDEEPSHIDHU for helping me throughout with his wise suggestions, innovativeideas and whole-hearted help. I want to thank Mrs. PromilaKhanna and all others in the departmentwho helped me duringmy work here. And finally I would liketo thank the HR departmentof Siemens LTD., 6A-Gurgaon, CorporateCitizenship SiemensLtd. and my institute, NIT Silchar for givingme the opportunity to have a preciousand rewardingexperienceof trainingin the prestigious industry of SiemensLTD.