CHURCH FLOOR PLAN
5/5/2013
NARTHEX / CHURCH ENTRY
5/5/2013
5/5/2013
BAPTISMAL FONT5/5/2013
REAR NAVE
FROM SIDE
5/5/2013
SANCTUARY 15/5/2013
SANCTUARY 25/5/2013
SANCTUARY from behind MUSIC5/5/2013
REAR NAVE5/5/2013
Worship Space Enhancement
Removal / Repair of exterior walls
New Reredos, ERC, and Tabernacle
wall with new Cross and Corpus
New porcelain tile Sanctuary floor
Clerestory window shades
Music Area improvements and
enlargement
New A/V equipment
Flooring replacement throughout
5/5/2013
Worship Space Enhancement-cont.
Hearing -impaired loop system and
Sound improvements
South wall video screens for Priest,
Choir and Cantor
Kneelers on respaced Pews
Cleaning and refinishing of Pews
New HVAC system
New energy-efficient Lighting with
“theatrical” controls
New Liturgical Furnishings
Electronic Organ5/5/2013
Project Scope - WORSHIP SPACE ENHANCEMENTS
•Design Modification to
Nave Doors
•New Baptismal Font
•Relocation of A/V control
console
•Replace floor tile at Narthex
and Lobby Vestibule
•Creation of Family Area
•Backlight relocated Mary-
Child Window
•New rear acoustic wall with
seasonal art work
•New acoustic ceiling
treatment5/5/2013
Existing
Playfield
 Electronic Carillon
 Landscape Improvements
 New Exterior Signage
Existing
Playground
Church School
Gym
111
111
Existing
Playfield
896 ft.
111
New
Bathrooms
111
414.5ft.
111New Sign
New Sign
Exterior
Enhancement
McDonald St.
PaulineSt.
GlendaleSt.
5/5/2013
Project Scope
Other Renovations
Lower Level Bathroom
Addition
 Security System
Improvements
 Main (School) entrance
Reception/Hospitality
Office and Security Area
5/5/2013

Renovation has begun!