TheartofEngineering
ISTANBUL – MANCHESTER – MUMBAI
2015-2016
www.BerrIndustry.com
TheartofEngineering
BERR INDUSTRY, All Industrial Services provides a complete turn-key service for every stage of
industrial and commercial plant relocation, from dismantlement and relocation plan development to
match marking, heavy machinery moving, rigging, relocation, re-installation and start up.
With our vast experience and our utilization of the latest technologies, equipment and techniques,
BERR can quickly, seamlessly and safely handle your relocation project from start to finish.
We have performed everything from the relocation and machinery moving of a few pieces of
equipment to the relocation of an entire line of an industrial plant.
Our experienced service-engineers provide the following activities:
 Planning, organization and supervision of entire relocation process
 Assistance and supervision of disassembly, transportation and reconstruction
 Implementation of upgrades, optimization strategies and other improvements
 Procurement and delivery of additional components and spare parts
TheartofEngineering
 Full Site Survey And Comprehensive Inspection
 To Prepare Method Statements And Risk Assessments
 Relocation Management & Planning
 Health & Safety & Environment Planning
 Relocation Works Reporting
 Match Marking Of Mechanical, Electrical Parts
 Decommissioning / Dismantling
 Packaging Due To International Standarts
 Lifting & Loading Operations and Transporting
 Maintenance & Equipment Modification
 Mechanical Installation & Insulation
 Electrical Installation & Insulation
BERR, all industrial services provides a complete turn-key service for every stage of industrial and
commercial plant relocation, from dismantlement and relocation plan development to match
marking, heavy machinery moving, rigging, relocation, re-installation and start up.
3
Moving of the Factory
Major Parts Lifting and Loading Works
TheartofEngineering
Critical to the success of many projects is the ability to
understand the importance of utility coordination and
relocations. Over the years BERR has built a name in this aspect
of engineering, by working on utility coordination from
planning, design and into construction. BERR has the expertise
to provide utility records research, utility facility field
investigation and surveying; utility conflict identification and
resolution with the client's proposed project design; utility
relocation design for any and all public and private utility
company facilities utilizing the design criteria/standards of the
utility companies; and various CADD software implementations.
Areas of Expertise
• Survey Utility Engineering – Designation, Locating & Surveys
• Records Research
• Agency Coordination
• Utility Relocation Design
• Conflict Analysis & Resolution
4
Relocation of the Machine Lines
Relocation of the Cooling Towers
TheartofEngineering
5
Gannt Diaphrgam, Time Schedule, Swot Analysis, Risk Assessment, Industrial Project Management and Planning Tools
TheartofEngineering
We provide streamlined, cost-effective, state-of-the-art systems and processes and focus on the
details to ensure our clients' projects are delivered on time and within budget.
The project manager will oversee the project during its implementation phase, and will monitor its
progress on the basis of its action plan. The use of interim reports will keep you informed of the
progress and status.
6
TheartofEngineering
• CHARTS:
Gantt charts provide a detailed visual on the progress of
your tasks in comparison to what was planned. The
resource allocation chart lets you know who is free, who
is engaged and who is overloaded.
• PROJECT COORDINATIONS:
The Coordinators gives you an easy way to get back to
important posts. Feeds.
• TIMESHEETS:
All working on a project can easily log their billable and
non billable hours.
• DOCUMENT MANAGEMENT
• COLLOBRATION
• ONLINE PROJECT CHAT
BERR may also act as a main contractor and assume leadership and responsibility, including managing
any communication with any subcontractors or OEMs. In practice, this is a sound process via which
the BERR project manager is able to oversee all of the activities.
7
TheartofEngineering
Relocation starts with a letter request that is prepared by Client. BERR, makes site survey and
inspection firstly. As second step, BERR identifies the necessary tools and manpower requirements, in
line with their customers needs, utilizing appropriate screening and matching methods to ensure that
only suitably qualified personnel are recommended, in a timely fashion.
8
ASSESSMENT & SITE SURVEY
WORKFORCE PLANNING
IDENTIFICATION THE
TERMS & CONDITIONS
SERVICE
AGREEMENT
WORK
COMMENCEMENT
• Site Survey and Inspection
• Assessment Reporting
• Risk Analyzing
• Workforce Planning
• Equipment an Tools Planning
• Time Scheduling
• Estimated Conditions Reporting
• Project Draft Works
• Technical T&C
• Methode of Statements
• Tasks & Work Arrangement
• Maintenance & Refurbishment
• Equipment and Tools
• Financial T&C
• Progress Payments
• Penalties
TheartofEngineering
200 MVA Combined Cycle
Power Plant Relocation Project.
2 x GE LM 6000 Gas Turbines
and Auxiliaries.
• Disassembly
• Marking, Labelling
• Lifting
• Loading , Unloading
• Assembly , Erection
• Installation
• Settling, Alignment
• Installation
• Flushing, Pickling
• Commissioning and First Firing
TheartofEngineering
All Civil Works as to 200 MVA
Combined Cycle Power Plant
Relocation Project. 2 x GE LM
6000 Gas Turbines and
Auxiliaries
• Excavation Works
• Compacting Works
• Foundation Works
• Infrastructure Works
• Concrete Structure Works
• Steel Structure Works
• Tank Farms
• Hydroulic Post Tensioning
• Pre-Stressing Works
TheartofEngineering
Gas Turbine and Auxiliary Equipment Relocation works. Air Inlet / Intake Filters, Generator Rooms, Lube Oil Skid, Fuel Feed Skids,
Heaters & Filters, Fire Protecting ( Automatical Extinguisher ) Systems, Cooling Raidators, Exhaust Fans, Dampers, Stacks, Enclosure,
MCC, Transformator, Compressors, Gas Reducing and Metering Units, WorkShop, etc.
TheartofEngineering
Balance of Plants, Auxiliaries, Common Units, Major Parts, Body Parts, Heavy Lifting, Packaging, Labelling, Marking, Lifting, Loading,
Unloading, Foundation, Anchoring, Replacing, Relocated, Maintenance, Refurbishment, Removel, Dismantling, Disassembly…
TheartofEngineering
Natural Gas, Diesel and H.F.O. Fuel Fired Engine and Co-Generation Systems. Black Start and Stand By Generators. Engine Power
Plant Equipment, Auxiliaries and Process Lines.
Steam Turbines, Turbine Parts, Rotor, Casing, Blades, Pipes, Pipe Racks, Platforms, CatWays, Ladders, Steel Structures,…etc.
TheartofEngineering
Cement Plants, Concrete Plants, Chemical Factories, Pharmatucal Factories, Steel Constructions, Steel Supports, Steel Rooftops,
Steel Structures, Steel Platforms, Stack & Chinmeys, Exhaust Lines, Producttion and Office Buildings, Containers, Treatment
Systems, Enclosures, Prefabricated Factory Buildings, Mechanical Lines, Electrical Panels & Lines, Lightenings, …etc.
TheartofEngineering
Steel Process, Rolling Mill Machines, Cooling Platforms, Gearboxes, Cooling Towers, Chillers, Furnances, Fans, Machine Lines,
Chemical Processes, Process Lines, Machine Lines, Machine Tools, Steam Generators, Boilers, Flues Gas Heat Recovery Units, Heat
Recovery Steam Generators, Distillation Units, Major Heavy Industrial Parts, Cranes, Platforms, Pump Rooms, Compressors Rooms.
TheartofEngineering
Machine and Machine Lines: Plastic Machines, Extruders, Mixers, Reactors, Silos, Filters, Siklons, Heaters, Process Pumps, Transfer
and Feeding Pumps, Chemical Pumps, Chemical Tanks, Chemical Baths, Distillation Columns, Food Process, Food Machine Lines,
Storage and Feeding Tanks, Process Cooling Systems, Filtering Units, Cable Machines, CNC Machines, Universal Machines, …
TheartofEngineering
Exhaust Lines, Flue Gas Treatment Systems, Silencers, Mufflers, Spark Arrestors, DeSOx, DeNOx Systems, Heat Recovery Systems,
Exhaust Fans, Stacks and Chimneys, Catalytic Convertors, Economizors, Condensers, Gas Seperators, Lube Oil Seperators, Fuel Oil
Seperators, Clarification and Purification Systems, Water and Oil Treatment Units, Fuel Storage Units,
TheartofEngineering
HV - MV – LV Electrical Equipment. Main Switch Panels, Electrical Panels, Transformators, SwitchGears, Circuit Breakers, Relays, Top
Changers, Bushings, Insulators, Parafudrs, Cable Lines, Instrumentation and Control Units, Accumulators, PLC Units, … etc.
TheartofEngineering
TheartofEngineering
Adress:
TR - Postane, Levent Sitesi, I6 No:7 34940 Tuzla, Istanbul, Turkey
UK - Kingston Upon Hull (England) United Kingdom
Telephones:
Headquarters Pbx : +90 216 395 20 34
Support Center : +90 532 163 62 90 ( TR ) & +44 743 246 14 62 ( UK )
URL:
http://www.berrindustry.com
E-Mail:
General Information
UK Contact
India Contact
Business Development
Skype:
Berr.Industry
SlideShare Link for all brochures and referances Go >>>
20
: info@berrindustry.com
: r.moore@berrindustry.com
: m.kumar@berrindustry.com
: k.edes@berrindustry.com

RELOCATION ENGINEERING FOR HEAVY DUTY

  • 1.
    TheartofEngineering ISTANBUL – MANCHESTER– MUMBAI 2015-2016 www.BerrIndustry.com
  • 2.
    TheartofEngineering BERR INDUSTRY, AllIndustrial Services provides a complete turn-key service for every stage of industrial and commercial plant relocation, from dismantlement and relocation plan development to match marking, heavy machinery moving, rigging, relocation, re-installation and start up. With our vast experience and our utilization of the latest technologies, equipment and techniques, BERR can quickly, seamlessly and safely handle your relocation project from start to finish. We have performed everything from the relocation and machinery moving of a few pieces of equipment to the relocation of an entire line of an industrial plant. Our experienced service-engineers provide the following activities:  Planning, organization and supervision of entire relocation process  Assistance and supervision of disassembly, transportation and reconstruction  Implementation of upgrades, optimization strategies and other improvements  Procurement and delivery of additional components and spare parts
  • 3.
    TheartofEngineering  Full SiteSurvey And Comprehensive Inspection  To Prepare Method Statements And Risk Assessments  Relocation Management & Planning  Health & Safety & Environment Planning  Relocation Works Reporting  Match Marking Of Mechanical, Electrical Parts  Decommissioning / Dismantling  Packaging Due To International Standarts  Lifting & Loading Operations and Transporting  Maintenance & Equipment Modification  Mechanical Installation & Insulation  Electrical Installation & Insulation BERR, all industrial services provides a complete turn-key service for every stage of industrial and commercial plant relocation, from dismantlement and relocation plan development to match marking, heavy machinery moving, rigging, relocation, re-installation and start up. 3 Moving of the Factory Major Parts Lifting and Loading Works
  • 4.
    TheartofEngineering Critical to thesuccess of many projects is the ability to understand the importance of utility coordination and relocations. Over the years BERR has built a name in this aspect of engineering, by working on utility coordination from planning, design and into construction. BERR has the expertise to provide utility records research, utility facility field investigation and surveying; utility conflict identification and resolution with the client's proposed project design; utility relocation design for any and all public and private utility company facilities utilizing the design criteria/standards of the utility companies; and various CADD software implementations. Areas of Expertise • Survey Utility Engineering – Designation, Locating & Surveys • Records Research • Agency Coordination • Utility Relocation Design • Conflict Analysis & Resolution 4 Relocation of the Machine Lines Relocation of the Cooling Towers
  • 5.
    TheartofEngineering 5 Gannt Diaphrgam, TimeSchedule, Swot Analysis, Risk Assessment, Industrial Project Management and Planning Tools
  • 6.
    TheartofEngineering We provide streamlined,cost-effective, state-of-the-art systems and processes and focus on the details to ensure our clients' projects are delivered on time and within budget. The project manager will oversee the project during its implementation phase, and will monitor its progress on the basis of its action plan. The use of interim reports will keep you informed of the progress and status. 6
  • 7.
    TheartofEngineering • CHARTS: Gantt chartsprovide a detailed visual on the progress of your tasks in comparison to what was planned. The resource allocation chart lets you know who is free, who is engaged and who is overloaded. • PROJECT COORDINATIONS: The Coordinators gives you an easy way to get back to important posts. Feeds. • TIMESHEETS: All working on a project can easily log their billable and non billable hours. • DOCUMENT MANAGEMENT • COLLOBRATION • ONLINE PROJECT CHAT BERR may also act as a main contractor and assume leadership and responsibility, including managing any communication with any subcontractors or OEMs. In practice, this is a sound process via which the BERR project manager is able to oversee all of the activities. 7
  • 8.
    TheartofEngineering Relocation starts witha letter request that is prepared by Client. BERR, makes site survey and inspection firstly. As second step, BERR identifies the necessary tools and manpower requirements, in line with their customers needs, utilizing appropriate screening and matching methods to ensure that only suitably qualified personnel are recommended, in a timely fashion. 8 ASSESSMENT & SITE SURVEY WORKFORCE PLANNING IDENTIFICATION THE TERMS & CONDITIONS SERVICE AGREEMENT WORK COMMENCEMENT • Site Survey and Inspection • Assessment Reporting • Risk Analyzing • Workforce Planning • Equipment an Tools Planning • Time Scheduling • Estimated Conditions Reporting • Project Draft Works • Technical T&C • Methode of Statements • Tasks & Work Arrangement • Maintenance & Refurbishment • Equipment and Tools • Financial T&C • Progress Payments • Penalties
  • 9.
    TheartofEngineering 200 MVA CombinedCycle Power Plant Relocation Project. 2 x GE LM 6000 Gas Turbines and Auxiliaries. • Disassembly • Marking, Labelling • Lifting • Loading , Unloading • Assembly , Erection • Installation • Settling, Alignment • Installation • Flushing, Pickling • Commissioning and First Firing
  • 10.
    TheartofEngineering All Civil Worksas to 200 MVA Combined Cycle Power Plant Relocation Project. 2 x GE LM 6000 Gas Turbines and Auxiliaries • Excavation Works • Compacting Works • Foundation Works • Infrastructure Works • Concrete Structure Works • Steel Structure Works • Tank Farms • Hydroulic Post Tensioning • Pre-Stressing Works
  • 11.
    TheartofEngineering Gas Turbine andAuxiliary Equipment Relocation works. Air Inlet / Intake Filters, Generator Rooms, Lube Oil Skid, Fuel Feed Skids, Heaters & Filters, Fire Protecting ( Automatical Extinguisher ) Systems, Cooling Raidators, Exhaust Fans, Dampers, Stacks, Enclosure, MCC, Transformator, Compressors, Gas Reducing and Metering Units, WorkShop, etc.
  • 12.
    TheartofEngineering Balance of Plants,Auxiliaries, Common Units, Major Parts, Body Parts, Heavy Lifting, Packaging, Labelling, Marking, Lifting, Loading, Unloading, Foundation, Anchoring, Replacing, Relocated, Maintenance, Refurbishment, Removel, Dismantling, Disassembly…
  • 13.
    TheartofEngineering Natural Gas, Dieseland H.F.O. Fuel Fired Engine and Co-Generation Systems. Black Start and Stand By Generators. Engine Power Plant Equipment, Auxiliaries and Process Lines. Steam Turbines, Turbine Parts, Rotor, Casing, Blades, Pipes, Pipe Racks, Platforms, CatWays, Ladders, Steel Structures,…etc.
  • 14.
    TheartofEngineering Cement Plants, ConcretePlants, Chemical Factories, Pharmatucal Factories, Steel Constructions, Steel Supports, Steel Rooftops, Steel Structures, Steel Platforms, Stack & Chinmeys, Exhaust Lines, Producttion and Office Buildings, Containers, Treatment Systems, Enclosures, Prefabricated Factory Buildings, Mechanical Lines, Electrical Panels & Lines, Lightenings, …etc.
  • 15.
    TheartofEngineering Steel Process, RollingMill Machines, Cooling Platforms, Gearboxes, Cooling Towers, Chillers, Furnances, Fans, Machine Lines, Chemical Processes, Process Lines, Machine Lines, Machine Tools, Steam Generators, Boilers, Flues Gas Heat Recovery Units, Heat Recovery Steam Generators, Distillation Units, Major Heavy Industrial Parts, Cranes, Platforms, Pump Rooms, Compressors Rooms.
  • 16.
    TheartofEngineering Machine and MachineLines: Plastic Machines, Extruders, Mixers, Reactors, Silos, Filters, Siklons, Heaters, Process Pumps, Transfer and Feeding Pumps, Chemical Pumps, Chemical Tanks, Chemical Baths, Distillation Columns, Food Process, Food Machine Lines, Storage and Feeding Tanks, Process Cooling Systems, Filtering Units, Cable Machines, CNC Machines, Universal Machines, …
  • 17.
    TheartofEngineering Exhaust Lines, FlueGas Treatment Systems, Silencers, Mufflers, Spark Arrestors, DeSOx, DeNOx Systems, Heat Recovery Systems, Exhaust Fans, Stacks and Chimneys, Catalytic Convertors, Economizors, Condensers, Gas Seperators, Lube Oil Seperators, Fuel Oil Seperators, Clarification and Purification Systems, Water and Oil Treatment Units, Fuel Storage Units,
  • 18.
    TheartofEngineering HV - MV– LV Electrical Equipment. Main Switch Panels, Electrical Panels, Transformators, SwitchGears, Circuit Breakers, Relays, Top Changers, Bushings, Insulators, Parafudrs, Cable Lines, Instrumentation and Control Units, Accumulators, PLC Units, … etc.
  • 19.
  • 20.
    TheartofEngineering Adress: TR - Postane,Levent Sitesi, I6 No:7 34940 Tuzla, Istanbul, Turkey UK - Kingston Upon Hull (England) United Kingdom Telephones: Headquarters Pbx : +90 216 395 20 34 Support Center : +90 532 163 62 90 ( TR ) & +44 743 246 14 62 ( UK ) URL: http://www.berrindustry.com E-Mail: General Information UK Contact India Contact Business Development Skype: Berr.Industry SlideShare Link for all brochures and referances Go >>> 20 : info@berrindustry.com : r.moore@berrindustry.com : m.kumar@berrindustry.com : k.edes@berrindustry.com