The document describes several projects the author has worked on as a project coordinator or member between 2015-2016. For Eaton International School in 2016, they designed and implemented a cabling and PBX phone system project including wireless access points and bandwidth control. In 2015 for Clinton International School, they completed a similar cabling and PBX phone system setup. Additionally, they installed cabling and routers for internet cafes and schools, configuring extensions, load balancing routers and a wireless router for a library.