Real Estate Business Review :A good Project Management Information System will aggregate all project data and information from numerous sources, spreadsheets, and systems to serve as the project management team’s single source of truth.
Earned Value Management involves more that just cost and schedule. Six Business Systems, including EVM, are the basis of credible program performance management.
Here's a suggestion of how to "connect the dots."
Take a look at the 2014 brochure for MainManager. Cloud based, securely hosted award winning CAFM software. Solutions available for large or small budgets.
The CorPeuM mission is to improve the execution of strategy!
The basis of all performance management is in administering an organization’s business activities (sales, marketing, production, product development, etc.) in an environment that is increasingly uncertain. As outlined in ‘What is Strategy Execution?’, a strategy execution system should support the way in which these business processes are planned and monitored. This will require a number of integrated application capabilities, including:
Business Modelling: The system should be able to model an organization’s current and proposed business processes that show how they are connected to achieve the organization’s purpose.
Metric Categories: It should be possible to view that business model in terms of a number of metric categories such as the resources it consumes, the risks being run, the workload being performed, and the outcomes that are generated. Measures from these different categories will need to be displayed in combinations. For example, to show whether an activity is worthwhile requires its costs to be shown, along with the work performed and any outcomes. In addition, these metric views should be tailored to those people responsible for particular areas of the business.
Methodology support: It should adapt to an organisation’s chosen management methodology. i.e. it should conform with the terminology used and the way in which planning activities are prescribed.
Initiative management: It should allow the creation, selection, approval and monitoring of projects/strategic initiatives that improve organizational performance and how they link to corporate goals.
Scenario planning: It should allow combinations of initiatives to be assessed and the side-by-side analysis of alternate business models, through which senior management can set future plans.
Dynamic reports and analyses: It should communicate plans and results through personalised reports, analyses, dashboards, scorecards and strategy maps but in the context of how well the plan is being executed, so that the future can be better managed.
Dynamic workflow management: The system should be able to cope with continuous planning and monitoring of execution, which intelligently involves the right people at the right time, from across the enterprise.
Most people would agree that these capabilities are essential for managing strategy and its execution. Similarly, most CPM software vendors would claim to have these, but as they say, the devil is in the detail.
Longview Planning is a comprehensive, Web-based application that drives finance processes, as well as a wide range of operational planning processes – all from a single repository of real-time, accurate information.
Powerful workflow functionality, that includes e-mail notifications and alerts, simplifies the planning, budgeting and forecasting processes and makes it easy for users to collaborate by tracking and communicating the progress of their plans and budgets.
Flexible rolling forecasts, based on real-time information, provide greater visibility into future operating performance. Longview Planning ties business plans, budgets and forecasts to strategic objectives, operational goals and targets.
Earned Value Management involves more that just cost and schedule. Six Business Systems, including EVM, are the basis of credible program performance management.
Here's a suggestion of how to "connect the dots."
Take a look at the 2014 brochure for MainManager. Cloud based, securely hosted award winning CAFM software. Solutions available for large or small budgets.
The CorPeuM mission is to improve the execution of strategy!
The basis of all performance management is in administering an organization’s business activities (sales, marketing, production, product development, etc.) in an environment that is increasingly uncertain. As outlined in ‘What is Strategy Execution?’, a strategy execution system should support the way in which these business processes are planned and monitored. This will require a number of integrated application capabilities, including:
Business Modelling: The system should be able to model an organization’s current and proposed business processes that show how they are connected to achieve the organization’s purpose.
Metric Categories: It should be possible to view that business model in terms of a number of metric categories such as the resources it consumes, the risks being run, the workload being performed, and the outcomes that are generated. Measures from these different categories will need to be displayed in combinations. For example, to show whether an activity is worthwhile requires its costs to be shown, along with the work performed and any outcomes. In addition, these metric views should be tailored to those people responsible for particular areas of the business.
Methodology support: It should adapt to an organisation’s chosen management methodology. i.e. it should conform with the terminology used and the way in which planning activities are prescribed.
Initiative management: It should allow the creation, selection, approval and monitoring of projects/strategic initiatives that improve organizational performance and how they link to corporate goals.
Scenario planning: It should allow combinations of initiatives to be assessed and the side-by-side analysis of alternate business models, through which senior management can set future plans.
Dynamic reports and analyses: It should communicate plans and results through personalised reports, analyses, dashboards, scorecards and strategy maps but in the context of how well the plan is being executed, so that the future can be better managed.
Dynamic workflow management: The system should be able to cope with continuous planning and monitoring of execution, which intelligently involves the right people at the right time, from across the enterprise.
Most people would agree that these capabilities are essential for managing strategy and its execution. Similarly, most CPM software vendors would claim to have these, but as they say, the devil is in the detail.
Longview Planning is a comprehensive, Web-based application that drives finance processes, as well as a wide range of operational planning processes – all from a single repository of real-time, accurate information.
Powerful workflow functionality, that includes e-mail notifications and alerts, simplifies the planning, budgeting and forecasting processes and makes it easy for users to collaborate by tracking and communicating the progress of their plans and budgets.
Flexible rolling forecasts, based on real-time information, provide greater visibility into future operating performance. Longview Planning ties business plans, budgets and forecasts to strategic objectives, operational goals and targets.
Over 20 + years working as an IT consultant for Accenture, who is the only employer I have had since graduation from U.S.C. Started as a programmer at BCBSSC, IT audit, IT audit Mgr, PM in 9 clients over last 14 years.
EVM is more than people, processes, and tools. It's an integrated service that provides actionable information to the decision makers. Webinar, EcoSys, October 22, 2014.
Earned Value Management is more than people, processes, and tools. It is an integral service that provides actionable information to the decisions makers
Diagramming Change to Better Inform Business Process RenovationCognizant
To gain the full benefits of business process management, banks must apply a business process model and notation-driven approach that identifies organization-wide process re-engineering and change management issues before they undermine project success.
My Single Point is a leading supplier of Enterprise Execution Software. Our Blue-chip customers use My Single Point to translate their strategy from the board-room to execution across the enterprise. Our modular platform ensures business goals and directives are effectively communicated and implemented throughout the organization.
Contact us for a demo www.itaasc.com
Roger SylvesterSystem Architecture and Integration3252016.docxSUBHI7
Roger Sylvester
System Architecture and Integration
3/25/2016
Table of Contents
Contents
BACKGROUND………………………………………….. 1
OBJECTIVES……………………………………………… 1
BUSINESS OR TECHNICAL NEEDS………………….. 2
Human Resource Management and Development:……….. 2
Customer Relationship Management:…………………… 2
Enterprise Performance Management:…………………. 3
MAJOR COMPONENTS OF THE PROJECT………… 3
Customer Relationship Management……………………. 3
Human Resource Management and Development………. 4
Enterprise Performance Management…………………… 4
PROJECT PLAN…………………………………………. 4
Table 1.1 Table showing project timeline……………….. 6
SYSTEM INTEGRATION BEST PRACTICES……….. 6
Figure 1.1. Diagram showing process flow for designing the systems integration architecture…………………………………………… 7
References…………………………………………………. 7
Requirements Specifications……………………………… 8
Stakeholders……………………………………………………… 9
Components……………………………………………….. 10
Interfaces………………………………………………….. 11
System Assumptions……………………………………… 13
References……………………………………………………………………16 Enterprise System Integration Analysis……………………………………………………………………….17
Systems Integration Approach Evaluation and Selection………………....19
References……………………………………………………………………..20
BACKGROUND
The ShopRite Company is a mobile telecommunications company that deals with production and distribution of telecommunication equipment. In its operations, the company has over five hundred employees and different departments. To manage its taskforce and streamline its operations, the company resolved in developing an Enterprise Resource Planning system (ERP). This will see the company’s administrative, financial and human resource activities dedicated to the ERP.OBJECTIVES
Implementation of the system will allow for a unified organization that will be efficient and effective in its daily activities. The main objectives of the ERP system are:
· To establish a clear platform that will enforce a consistent execution and utilization of resource management principles and policies.
· To facilitate an easier decision making process by improving access to enterprise management information.
· To allow Information Communication Technology to support a fully integrated cohesive modern and strategic administrative infrastructure.
· To provide an efficient and effective processes for personnel, performance management, recruiting, payroll and learning through workflow modules that are integrated to encourage collaborative working.
· To provide a transparent system of monitoring the allocation and utilization of resources then comparing them against the expected results which will lead to an optimal utilization of resources available for achievement of particular goals and objectives.
· To improve customer service by formation of a centralized repository for customer information.
· To Use an amalgamated customer data to potentially increase revenues through a better understanding of customer needs.BUSINESS OR T ...
Learn about challenges and solutions for implementing a transformational project based on real integration examples (cases).In any Project Controls (TCM framework, EVMS) implementation: technology, systems/processes, and people are involved. This presentation provides an understanding of integrating two of the essential knowledge areas: cost and schedule. See real examples of integrations explaining frameworks, models, best practices, bodies of knowledge, and standards. Analyze the outcome, challenges, and alternatives.
Explore our comprehensive data analysis project presentation on predicting product ad campaign performance. Learn how data-driven insights can optimize your marketing strategies and enhance campaign effectiveness. Perfect for professionals and students looking to understand the power of data analysis in advertising. for more details visit: https://bostoninstituteofanalytics.org/data-science-and-artificial-intelligence/
Over 20 + years working as an IT consultant for Accenture, who is the only employer I have had since graduation from U.S.C. Started as a programmer at BCBSSC, IT audit, IT audit Mgr, PM in 9 clients over last 14 years.
EVM is more than people, processes, and tools. It's an integrated service that provides actionable information to the decision makers. Webinar, EcoSys, October 22, 2014.
Earned Value Management is more than people, processes, and tools. It is an integral service that provides actionable information to the decisions makers
Diagramming Change to Better Inform Business Process RenovationCognizant
To gain the full benefits of business process management, banks must apply a business process model and notation-driven approach that identifies organization-wide process re-engineering and change management issues before they undermine project success.
My Single Point is a leading supplier of Enterprise Execution Software. Our Blue-chip customers use My Single Point to translate their strategy from the board-room to execution across the enterprise. Our modular platform ensures business goals and directives are effectively communicated and implemented throughout the organization.
Contact us for a demo www.itaasc.com
Roger SylvesterSystem Architecture and Integration3252016.docxSUBHI7
Roger Sylvester
System Architecture and Integration
3/25/2016
Table of Contents
Contents
BACKGROUND………………………………………….. 1
OBJECTIVES……………………………………………… 1
BUSINESS OR TECHNICAL NEEDS………………….. 2
Human Resource Management and Development:……….. 2
Customer Relationship Management:…………………… 2
Enterprise Performance Management:…………………. 3
MAJOR COMPONENTS OF THE PROJECT………… 3
Customer Relationship Management……………………. 3
Human Resource Management and Development………. 4
Enterprise Performance Management…………………… 4
PROJECT PLAN…………………………………………. 4
Table 1.1 Table showing project timeline……………….. 6
SYSTEM INTEGRATION BEST PRACTICES……….. 6
Figure 1.1. Diagram showing process flow for designing the systems integration architecture…………………………………………… 7
References…………………………………………………. 7
Requirements Specifications……………………………… 8
Stakeholders……………………………………………………… 9
Components……………………………………………….. 10
Interfaces………………………………………………….. 11
System Assumptions……………………………………… 13
References……………………………………………………………………16 Enterprise System Integration Analysis……………………………………………………………………….17
Systems Integration Approach Evaluation and Selection………………....19
References……………………………………………………………………..20
BACKGROUND
The ShopRite Company is a mobile telecommunications company that deals with production and distribution of telecommunication equipment. In its operations, the company has over five hundred employees and different departments. To manage its taskforce and streamline its operations, the company resolved in developing an Enterprise Resource Planning system (ERP). This will see the company’s administrative, financial and human resource activities dedicated to the ERP.OBJECTIVES
Implementation of the system will allow for a unified organization that will be efficient and effective in its daily activities. The main objectives of the ERP system are:
· To establish a clear platform that will enforce a consistent execution and utilization of resource management principles and policies.
· To facilitate an easier decision making process by improving access to enterprise management information.
· To allow Information Communication Technology to support a fully integrated cohesive modern and strategic administrative infrastructure.
· To provide an efficient and effective processes for personnel, performance management, recruiting, payroll and learning through workflow modules that are integrated to encourage collaborative working.
· To provide a transparent system of monitoring the allocation and utilization of resources then comparing them against the expected results which will lead to an optimal utilization of resources available for achievement of particular goals and objectives.
· To improve customer service by formation of a centralized repository for customer information.
· To Use an amalgamated customer data to potentially increase revenues through a better understanding of customer needs.BUSINESS OR T ...
Learn about challenges and solutions for implementing a transformational project based on real integration examples (cases).In any Project Controls (TCM framework, EVMS) implementation: technology, systems/processes, and people are involved. This presentation provides an understanding of integrating two of the essential knowledge areas: cost and schedule. See real examples of integrations explaining frameworks, models, best practices, bodies of knowledge, and standards. Analyze the outcome, challenges, and alternatives.
Explore our comprehensive data analysis project presentation on predicting product ad campaign performance. Learn how data-driven insights can optimize your marketing strategies and enhance campaign effectiveness. Perfect for professionals and students looking to understand the power of data analysis in advertising. for more details visit: https://bostoninstituteofanalytics.org/data-science-and-artificial-intelligence/
Techniques to optimize the pagerank algorithm usually fall in two categories. One is to try reducing the work per iteration, and the other is to try reducing the number of iterations. These goals are often at odds with one another. Skipping computation on vertices which have already converged has the potential to save iteration time. Skipping in-identical vertices, with the same in-links, helps reduce duplicate computations and thus could help reduce iteration time. Road networks often have chains which can be short-circuited before pagerank computation to improve performance. Final ranks of chain nodes can be easily calculated. This could reduce both the iteration time, and the number of iterations. If a graph has no dangling nodes, pagerank of each strongly connected component can be computed in topological order. This could help reduce the iteration time, no. of iterations, and also enable multi-iteration concurrency in pagerank computation. The combination of all of the above methods is the STICD algorithm. [sticd] For dynamic graphs, unchanged components whose ranks are unaffected can be skipped altogether.
1. Vital functions of assignment
management statistics gadget
A good Project Management Information System will
aggregate all project data and information from numerous
sources, spreadsheets, and systems to serve as the project
management team’s single source of truth.
Real Estate Business Review :
As the name implies, a project control information system
(PMIS) collects and organizes venture records. A venture
control information machine (PMIS) incorporates software
program programs and procedures or workflows to collect
and use venture facts. assignment managers then use the
data to plot as it should be, execute, and entire AEC
initiatives.
2. there are numerous sorts of PMIS, however the most contain
scheduling gear, price controls, task allow control, and data
amassing and dissemination to all assignment stakeholders.
specific superior structures mechanically create and reveal
key performance indicators (KPIs), at the same time as
others serve entirely as a record repository.
Scheduling and planning:
A PMIS will natively plan and compute the challenge’s
schedule and vital direction or integrate with a scheduling
program which include Microsoft project or Oracle
Primavera P6. A PMIS will create or import the specific time
table for a project and outline the scope baseline.
Budgeting and Estimation:
A nicely-designed project control facts gadget can correlate
assignment expenses to unique duties or additives, resulting
in more unique finances projections. A PMIS have to
3. combine fee estimation, forecasting, value statistics, and
scheduling information to as it should be decide a
assignment’s development and performance. Having all of
this statistics in a single gadget enables value control thru
the procedure of planning, estimating, and regulating a
task’s price range; that is closely related to cost control and
task performance underneath.
Execution:
A well-designed PMIS enables challenge managers to hold
control over the fee and overall performance of their
initiatives. it will enable updating present plans as real in
response to scheduled statistics changes and the supply of
what-if eventualities to stakeholders, all at the same time as
tracking and managing all project adjustments.
deliberate, earned, and actual fees allow the calculation of
additional assignment values that replicate the mission’s
4. present status and performance in terms of budget and
schedule.
Important Functions of Project Management Information System
Additionally, undertaking managers can decide the venture’s
present day progress to crowning glory by using utilizing the
Estimate to finish (and so forth), Estimate at final touch
(EAC), Variance at of completion (VAC), and To-entire
overall performance Index (TCPI).REMFremont, CA: real
property enterprise has been a thriving surroundings where
5. human beings try and make bigger their economic portfolio
and desire to end up financially solid. however with out
proper making plans, it can be challenging to achieve. To
stay in advance and relevant inside the actual estate sector,
mainly belongings management, organizations want to stay
knowledgeable of the trends to have a aggressive facet and
make knowledgeable choices. it’ll additionally help perceive
opportunities and reduce risks.
Here are 3 belongings management tendencies to look out
for:
Advertising and marketing traits :
Many advertising and marketing programs are targeted on
digital advertising and marketing, and internet customers
have the capacity to attain a wide target market. assets
managers frequently create social media account, blogs, web
sites or show up on online forums to provide their
6. information by directing readers to a website which can offer
in-intensity solutions.
New participant and recreation Changers:
As many apartment assets owners look ahead to getting to
know and acquiring new information, they want to be alert
for brand new gamers introducing new tactics and
appearance out for antique and installed assets management
agencies that continuously live applicable and beautify their
abilities.
Automation is an important fashion within the belongings
management region. lease collection, coverage, protection,
tax bills and dealer and service bills are strategies that can be
time-consuming. Automating these procedures will help
property managers mobbing forward. Automation permits
assets managers to perform their paintings seamlessly and
7. additionally effect other additives of property control.ONT,
CA: because the name implies, a undertaking control
information machine (PMIS) collects and organizes
assignment records. A undertaking management statistics
device (PMIS) contains software program programs and
procedures or workflows to collect and use assignment
statistics. mission managers then use the information to plot
as it should be, execute, and entire AEC projects.
There are various types of PMIS, but the maximum
incorporate scheduling gear, cost controls, task permit
control, and information collecting and dissemination to all
project stakeholders. particular superior systems robotically
create and display key performance signs (KPIs), at the same
time as others serve totally as a report repository.
the selection standards for a PMIS will range in step with an
organization’s running requirements. similarly, even as the
scope, layout, and functions presented by maximum
8. undertaking control records structures vary, it’s far critical
when deciding on a PMIS device that it includes as a
minimum the subsequent features and abilties:
Important Functions of Project Management Information System
Scheduling and planning: A PMIS will natively plan and
compute the project’s schedule and important route or
combine with a scheduling program inclusive of Microsoft
mission or Oracle Primavera P6. A PMIS will create or
import the unique schedule for a mission and outline the
scope baseline.
9. Budgeting and Estimation: A nicely-designed challenge
management information system can correlate project
expenses to unique tasks or additives, ensuing in extra
unique finances projections. A PMIS have to integrate value
estimation, forecasting, price data, and scheduling data to
appropriately determine a mission’s progress and
performance. Having all of this facts in one gadget allows
cost control via the procedure of planning, estimating, and
regulating a mission’s price range; this is intently related to
price management and venture overall performance
underneath.
price manage and project
Execution: A well-designed PMIS enables mission managers
to maintain manage over the cost and performance in their
initiatives. it will permit updating current plans as actual in
reaction to scheduled statistics adjustments and the supply
10. of what-if scenarios to stakeholders, all whilst tracking and
handling all project adjustments.
deliberate, earned, and real expenses allow the calculation of
additional project values that replicate the mission’s gift
popularity and overall performance in phrases of price range
and agenda.
moreover, challenge managers can decide the project’s
present day development to completion through utilising the
Estimate to complete (and many others), Estimate at of
entirety (EAC), Variance at final touch (VAC), and
To-complete overall performance Index (TCPI).