Ram Kumar Anandan has over 27 years of experience in project management, business development, procurement, and construction. He is seeking a position where he can utilize his skills and experience to contribute to organizational growth. He has extensive experience managing complex projects in the oil and gas industry in Saudi Arabia, Algeria, Oman, and UAE.
Vipin mv civil engineer cv and coverlettervipin m.v
I am a B.Tech (Bachelor of technology in CIVIL) holder, specialized in Estimation, Quantity Takeoff, Reinforcement quantity for estimation and execution, Boq preparation, Tendering , Data preparation , Labour and material cash flow , Project planning, Site engineering.I have 5+ years of experience.
Vipin mv civil engineer cv and coverlettervipin m.v
I am a B.Tech (Bachelor of technology in CIVIL) holder, specialized in Estimation, Quantity Takeoff, Reinforcement quantity for estimation and execution, Boq preparation, Tendering , Data preparation , Labour and material cash flow , Project planning, Site engineering.I have 5+ years of experience.
Dear Sir,
Respectfully, I am Engr. Rizwan Asif and have been working with Multinational Engineering Companies in UAE since last six years plus one year in Pakistan. I am graduate in Mechanical Engineering and completed my degree with 3.4 GPA (85%).I have MEP Facilities management, maintenance, Mechanical Mega projects construction experiences on high rise buildings, residential, commercial , airport and Healthcare projects with different Multinational companies.
My CV/Resume provides you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to your organization.
All the information that I have given are true and best of my knowledge and my record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.
I look forward to speaking with you soon.
Thanks & Kind Regards,
Engr. Rizwan Asif
00971-55-3879768
100 Words Per Hour : Volume 001 (Learn Like A Vocab Ninja)Amit Kumar
To Learn English Words The Smart Way, Word-A-Holic-Z Helps Thousands Of Students Master Difficult English Words In A Smart, Scientific And Permanent Way To Comprehensively Master Vocab.
Happy Learning
Team Word-A-Holic-Z
100 Words Per Hour : Volume 002 (Learn Like A Vocab Ninja)Amit Kumar
To Learn English Words The Smart Way....
Word-A-Holic-Z Helps Thousands Of Students Master Difficult English Words In A Smart, Scientific And Permanent Way To Comprehensively Master Vocab.
Happy Learning
Team Word-A-Holic-Z
Dear Sir,
Respectfully, I am Engr. Rizwan Asif and have been working with Multinational Engineering Companies in UAE since last six years plus one year in Pakistan. I am graduate in Mechanical Engineering and completed my degree with 3.4 GPA (85%).I have MEP Facilities management, maintenance, Mechanical Mega projects construction experiences on high rise buildings, residential, commercial , airport and Healthcare projects with different Multinational companies.
My CV/Resume provides you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to your organization.
All the information that I have given are true and best of my knowledge and my record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.
I look forward to speaking with you soon.
Thanks & Kind Regards,
Engr. Rizwan Asif
00971-55-3879768
100 Words Per Hour : Volume 001 (Learn Like A Vocab Ninja)Amit Kumar
To Learn English Words The Smart Way, Word-A-Holic-Z Helps Thousands Of Students Master Difficult English Words In A Smart, Scientific And Permanent Way To Comprehensively Master Vocab.
Happy Learning
Team Word-A-Holic-Z
100 Words Per Hour : Volume 002 (Learn Like A Vocab Ninja)Amit Kumar
To Learn English Words The Smart Way....
Word-A-Holic-Z Helps Thousands Of Students Master Difficult English Words In A Smart, Scientific And Permanent Way To Comprehensively Master Vocab.
Happy Learning
Team Word-A-Holic-Z
A slideshow specially designed for non-english teachers in engineering colleges to help them improve their vocabulary and to help them learn certain vocabulary learning and teaching techniques.
1. 1
RAM KUMAR ANANDAN
Objective:
To be part of a peerless organization, where I can put in the best of my efforts by making
use of my skills and competencies, thereby contributing to the growth of the organization
and simultaneously upgrading my skills, knowledge and personality.
Personal Profile / Personal Attributes
Over 27 years expertise in Project Management, Business development, Procurement
& Construction
Result-driven, logical and methodical approach to achieving tasks and objectives
Entrepreneurial and pro-active - strong drive and keen business mind
Identifies and develops opportunities; innovates and makes things happen
Good motivator able to build/mentor Team and implement Procedures for execution
and achieve the desired results
Looking for new responsibilities to constantly upgrade skill set
Experience:
Business Development Tendering Project Management
Engineering Coordination Procurement
Construction/Contracts
management
Achievements
Handled Complex Projects working with International Oil & Gas Majors ( Technip,
Snamprogetti, AMEC & JGC Corporation) for S.Aramco Projects in Saudi Arabia ( For
EHV Substations and Transmission Lines)
Participate in the pricing of tenders and technical documentation for upcoming projects
as required
Represent the Company and enhance relationships in dealings with clients, consultants
and regulatory authorities
Review contract documents and administer all issues related to the project in
conjunction with Senior Management in accordance with Company’s policies and
procedures
2. 2
Prepare the project execution plan for management review and approval and manage
approved plan to achieve project deliverables and timeline objectives
Manage resources and expenses to achieve contract completion within budget and
time frame
Liaise with the Design, HSE and Quality Department for the preparation and issue of
project Deliverables, safety and quality manuals to ensure Engineering, Health,
Safety & Environment standards are met.
Ensure timely payments are received from the customer in accordance with contract
conditions
Identifying and ensuring skills and training needs of assigned manpower aligned to
project requirements and support recruitment activities to source technically
competent personnel for the project
Leading Project teams to ensure timeframes and customer satisfaction are met.
Identifying additional works and technical upgrades not covered in the contract to
enhance the project deliverables, customer satisfaction and improve Company’s
revenue.
Handle complete Procurement Function including, vendor selection, negotiation,
Finalization of P.Os, design follow-up, expediting, inspection co-ordination, shipping,
port clearance and delivery of material to site.
Exposure to working in live areas, where strict coordination is required to implement
projects without affecting the operations.
Career History
Feb 2010 to Dec 2014 : National Contracting Co. Ltd. Saudi Arabia (UAE Branch)
July 2007 to Jan 2010 : Mott MacDonald Pvt. Ltd, Chennai, TN
Sep 1999 to April 2007 : National Contracting Co. Ltd. Saudi Arabia
Nov 1998 to Aug 1999 : Hi-Tech Carbon, Gummidipoondi, Tamil Nadu, India.
Aug 1995 to Oct 1998 : National Contracting Co. Ltd. Saudi Arabia
Sep 1989 to July 1995 : Shriram Industrial Entp. Ltd., Delhi, India
Dec 1988 to Aug 1989 : Easwaran & Sons Engineers Ltd. Chennai
May 1988 to Nov 1988 : Dowel Erectors ( Pvt. Ltd.), Chennai
Responsibilities
National Contracting Co. Abudhabi, UAE
Designation: Project Manager - T & D Division
Responsibilities include:
• Business Development,
• Bidding, Contract finalization,
• Project Management,
• Engineering & Design co-ordination,
• Procurement, Inspection Co-ordination,
• Construction Co-ordination
3. 3
• For Extra High Voltage Substations & Transmission line projects in UAE, Oman and
Algeria.
Mott MacDonald Pvt. Ltd., Chennai, India
Designation: Manager- Projects
Project Manager for Execution of multi disciplinary projects pertaining to Various
Types of Industries. ( Sterlite, Essilor, GR Engg. Kent Qatar, KMML)
Responsibilities include:
• Co-ordination with Clients and act as a single point of contact for all project related
matters
• Provide inputs to Design team and manage Design activities
• Liaise with Manufacturers and vendor for Engineering inputs
• Procurement Assistance functions ( Including Preparation of Purchase Requisitions,
Floating of Enquiry, Evaluation of offers, Finalization of P.Os, Review of vendor
submittals, Inspection coordination, shipment and delivery
• Construction Management services (Site supervision for installation, testing and
commissioning, training of field staff, project closure records etc.)
National Contracting Co. Al-Khobar, KSA
Designation: Project Co-Coordinator - T & D Division
Responsibilities include:
• Business Development,
• Bidding, Contract finalization,
• Project Management,
• Engineering & Design co-ordination,
• Procurement, Inspection Co-ordination,
• Construction Co-ordination
• Contracts Management
For Extra High Voltage Substations & Transmission line projects.
HI-Tech Carbon, Chennai
Designation: In-charge- Safety
Responsible for Safety co-ordination for Petrochemical plant w.r.t. Fire protection,
Electrical Safety Systems etc.
4. 4
National Contracting Co. Saudi Arabia
Designation: Site Engineer- Electrical
Responsible for:
Project Execution of Extra High Voltage Substation For SABIC (Petrokemya) and SEC-EOA.
Construction Management for installation
Testing and commissioning
training of field staff thro’ vendors
Project closure records etc.
Shriram Industrial Enterprises Limited, Delhi, India:
Designation: Sr. Officer (Utilities)
Responsible for
Design co-ordination, Procurement, Project execution, Operation and Maintenance of
Aquaculture Project.
Maintenance and upkeep of Electrical Safety Systems for Foods & Chemical Plant.
Easwaran & Sons Engineers Ltd., Chennai, India:
Designation: Trainee (Electrical QC & QA)
Responsible for
QC activities for LV Switchgear.
Dowel Erectors Pvt. Ltd, Chennai, India:
Designation: Trainee (Electrical)
Responsible for
Electrical Support Facilities for HP Boiler Pipe welding and installation.
5. 5
EDUCATIONAL:
QUALIFICATION NAME OF INSTITUTION BOARD/UNIVERSITY
Master of Business
Administration ( Project
Management)
Alagappa University
Alagappa University,
Tamilnadu.
Bachelor of Technology
( Electrical Engineering)
Vinayaka Mission University
Vinayaka Mission
University, Salem
Diploma in Electrical &
Electronics Engineering
C.N. Polytechnic, Chennai.
Department of Technical
Education, Tamilnadu.
PERSONAL PROFILE
Father Name : S.R. Anandan
Date of birth : 25 November 1967
Nationality : Indian
Languages known to speak : English, Tamil, Hindi
Languages known to write : English, Tamil
Marital Status : Married
CONTACT DETAILS
EMAIL: ramkumar_1967@yahoo.com
MOBILE: +91 99410 36733/9841551519
SKYPE ID ramkumar_1967
ENCL: synopsis of projects handled in Middle East/North Africa
6. 6
SYNOPSIS OF PROJECTS HANDLED
ALGERIA ( NORTH AFRICA):ALGERIA ( NORTH AFRICA):ALGERIA ( NORTH AFRICA):ALGERIA ( NORTH AFRICA):
Sl.No. CONTRACT # CLIENT PROJECT TITLE VALUE
1 95/2009 CEEG, Algeria Construction new outdoor 220/60 KV
Substation at Chlef 2, 60/30 KV
substation at Ain Mrene and 60 kv Bay
expansion at Oumdrou
USD.40.75 MILLION
2 132/2012 CEEG, Algeria • LOT 1 – Poste Exterior 220/60 kV
D’El Eulma – 2 x 120 MVA.
USD.10.12 MILLION
3 131/2012 CEEG, Algeria • LOT 3 – Poste Exterior 220/60 kV DE
TOUGGOURT II – 3 x 120 MVA.
USD.14 MILLION
4 129/2012 CEEG, Algeria • LOT 4 – Poste Exterior 60/30 kV DE
HASSI BAHBAH – 2 x 40 MVA.
USD.6.5 MILLION
5 130/2012 CEEG, Algeria • LOT 9 – Poste Exterior 60/30 kV DE
MESSERGHINE II - 2 x 40 MVA.
USD.5.8 MILLION
6 128/2012 CEEG, Algeria • LOT 11 – Poste Exterior 60/30 kV DE
CHETMA - 2 x 40 MVA.
USD.6.2 MILLION
7 124/2012 CEEG, Algeria • LOT 15 - Poste Exterior 60/30
Moustakabel– 2 x 40 MVA.
USD.6.2MILLION
8 127/2012 CEEG, Algeria • LOT 17 – Poste Extérieur 60/30 kV
DE OURLLEL- 2 x 40 MVA.
USD.6.4 MILLION
9 97/2013 CEEG, Algeria • LOT 3 – Poste Extérieur 220/60 kV
ATTATBA- 3 x 120 MVA.
USD.28.5 MILLION
10 96/2013 CEEG, Algeria LOT 7 – Poste Extérieur 60/30
IFLISSEN- 2 x 40 MVA
USD.15.6 MILLION
11 74/2013 CEEG, Algeria LOT 6 – Poste Extérieur 220/60 kV
D’El Eulma Nord – 2 x 40 MVA.
USD.12.2 MILLION
OMAN:
Sl.No. CONTRACT # CLIENT PROJECT TITLE VALUE
1 74/2010 OETC Construction of New High Voltage
Substation (220/132kV/11 KV) AT Sur,
Oman
USD.88 MILLION
(20.79 Million SS)
2 85/2010 OETC Construction of New High Voltage
Substation (220/33 KV) AT Misfah &
Barka, Oman.
USD.68 MILLION
(15.5 Million SS)
3 29/2012 OETC Upgrading 132/33 kv Grid Station to
220 KV
USD. 24.65 MILLION
4 27/2012 RAECO EPC For 132 kV Transmission lines
and associated 132/33/11 kV
Substations in Musandam
Governorate.
USD. 98.00 MILLION
( 46.51 Million S/S)
7. 7
UAE:
Sl.No. CONTRACT # CLIENT PROJECT TITLE VALUE
1111 112-A8- Phase
III/2010
GCCIA ( KSA) Construction Of New High Voltage
Substation (400/33 KV), for GCCIA at
Silla, interconnecting KSA to UAE
GRID
USD.44 MILLION
2222 E-18/2012 FEWA Construction Of 8 New Substations
(33/11 KV), for FEWA at CENTRAL
AND WESTERN AREAS OF
NORTHERN EMIRATES, UAE
USD.91 MILLION
3.3.3.3. E-19/2012 FEWA Construction Of 14 New Substations
(33/11 KV), for FEWA at CENTRAL
AND WESTERN AREAS OF
NORTHERN EMIRATES, UAE
USD.150 MILLION
KSA:
Sl.No. CONTRACT # CLIENT PROJECT TITLE VALUE
1111 PEP/95PEP/95PEP/95PEP/95 PETROKEMYAPETROKEMYAPETROKEMYAPETROKEMYA 230/34.5 KV POWER230/34.5 KV POWER230/34.5 KV POWER230/34.5 KV POWER
EXPANSION PROJECT,EXPANSION PROJECT,EXPANSION PROJECT,EXPANSION PROJECT,
PETROKEMYA, JUBAIL.PETROKEMYA, JUBAIL.PETROKEMYA, JUBAIL.PETROKEMYA, JUBAIL.
USD.5.5 MILLION
2222 82484/199682484/199682484/199682484/1996 SAU.DI ELECTRICITY COSAU.DI ELECTRICITY COSAU.DI ELECTRICITY COSAU.DI ELECTRICITY CO NEW 115/13.8 KVNEW 115/13.8 KVNEW 115/13.8 KVNEW 115/13.8 KV
SUBSTATSUBSTATSUBSTATSUBSTATIONS ATIONS ATIONS ATIONS AT
NARIYAH, KSA.NARIYAH, KSA.NARIYAH, KSA.NARIYAH, KSA.
USD.17 MILLION
3.3.3.3. BIBIBIBI----3150/20003150/20003150/20003150/2000 SAUDI ARAMCO/AMECSAUDI ARAMCO/AMECSAUDI ARAMCO/AMECSAUDI ARAMCO/AMEC
BKW UK.BKW UK.BKW UK.BKW UK.
ETHANEETHANEETHANEETHANE RECOVERYRECOVERYRECOVERYRECOVERY
PROJECT, BERRI GASPROJECT, BERRI GASPROJECT, BERRI GASPROJECT, BERRI GAS
PLANT, KSA.PLANT, KSA.PLANT, KSA.PLANT, KSA.
Construction of New
230/ 115 kv SS# 30
including a 115 kv
Transmission Line to
Substation # 1,11 & 20
along with modification
works
USD.31 MILLION
4444 BIBIBIBI----/2002/2002/2002/2002 SAUDI ARAMCO/SAUDI ARAMCO/SAUDI ARAMCO/SAUDI ARAMCO/TECHNIPTECHNIPTECHNIPTECHNIP
ITALYITALYITALYITALY
Qatif Facilities at Berri
Gas Plant- Exp. of
Bay # 7 At SS# 30
Expansion of Existing
SS# 30 including a new
115 kv Bay # 7 and a
115 kv Transmission
Line to Substation # 10
USD.6 MILLION
5555 BIBIBIBI----3103103103105555/2003/2003/2003/2003 SAUDI ARAMCO/JGCSAUDI ARAMCO/JGCSAUDI ARAMCO/JGCSAUDI ARAMCO/JGC
CORP. JAPANCORP. JAPANCORP. JAPANCORP. JAPAN
Berri Cogeneration
Project – SS# 40 &
Transmission Lines
New High Voltage
Substation
(115/13.8kV), for Berri
Cogeneration Plant and
associated
USD.10 MILLION
8. 8
Transmission Lines
from SS # 30 and
Modification of Existing
Substations.
6666 6600011125/
2004200420042004
SAUDI ARAMCOSAUDI ARAMCOSAUDI ARAMCOSAUDI ARAMCO HV Electrical
Interconnection for 3rd
Party Cogen Project
- 230 kv Switchyard
Juaymah Gas Plant-
Juaymah Modification
of existing 230 kv
Switchyard to
interconnect the new
230 T/L from 3rd
Party
Cogeneration
Switchyard Juaymah
Gas Plant
USD.6.0 MILLION
7777 18567/18567/18567/18567/ 2005200520052005 SAUDISAUDISAUDISAUDI
ARAMCO/SNAMPROGETTI,ARAMCO/SNAMPROGETTI,ARAMCO/SNAMPROGETTI,ARAMCO/SNAMPROGETTI,
ITALYITALYITALYITALY
Hawiyah
NGLRecovery
Program Project- 230
kv Switchyard New
High Voltage
Substation
(230/13.8kV), for Gas
Treatment and
Compression Facilities,
HNRP Project
USD. 7 MILLION
8888 6600017206,207,2086600017206,207,2086600017206,207,2086600017206,207,208----
2006200620062006
SAUDI ARAMCOSAUDI ARAMCOSAUDI ARAMCOSAUDI ARAMCO Khurais Area 34.5 kv
Distribution Lines
Project Infrastructure
Development Project
for Khurais Fields for
Saudi Aramco-
Construction of 34.5
Distribution Lines In
Khurais, Abu Jifan and
Mazalij Area Oil
Facilities
USD 152
MILLION