Rakesh Kumar
SAP BASIS
Mob: +44-7440527112 Email: Rakeshkumar@hcl.com
PROFESSIONAL SUMMARY:
 Having 6.5 + years of experience as SAP BASIS Consultant.
 Completed 2 full life cycle implementations.
 Working on LBG – R2P and KSOR Project as Basis Consultant at Halifax, UK
 Worked on Implementation Project “Twining’s” as a landed resource in Andover, UK
 Performed Key Role in Xerox BAU Project Transition from Malaysia to India
 Shift Lead for the Xerox BAU Offshore support which runs for 24X7
 Awarded as Delivery Champion for 2nd
Quarter of Xerox BAU Support
 Easily adaptable to new environment, positive in approach, good at decision making and problem
solving skills.
KEY SKILLS:
 Have Performed EHP7 upgrade for ECC 6.0 Finance system using SUM tool
 Have installed and configured SAP Screen Persona 3.0 on ECC system
 Have performed BW upgrade from SAP Netweaver 7.0 to 7.4 using SUM tool
 Have Configured CTS+ using Solution Manager for Portal system landscape
 SAP Solution Manager Wily Introscope Agent Installation and upgrade to Wily 9.0 SP15
 Have Installed Portal SAP Netweaver 7.31 in distributed environment for high availability on
GRID infrastructure with database Oracle 11G ASM
 Performed the SRM EHP2 upgrade from SRM 7.0 to EHP2 SRM 7.0 SP09 using SUM tool
 Performed Oracle upgrade from 10.2.0.4 to 11.2.0.3 and 11.2.0.4 and also applied latest SBP
patches followed by Kernel upgrade to latest level of 7.21 EXT Patch 300
 SAP application Migration from AIX 5.1 to Red Hat Linux 6.2
 Build new SAP System ECC 6.0 using the Oracle offline Backup.
 Build new SAP System SRM 7.0 using the Oracle offline Backup.
 Patched the Portal 7.31 to SP09 using SUM tool
 Worked on Solution Manager 7.1 SP10 and configure many systems like ABAP, JAVA and Dual
stack into it for EWA, alerting and reporting.
 Have Installed new SAP component like ECC 6.6, BW 7.3, SCM 7.1, SRM 7.0, PI 7.3, Live Cache,
Portal 7.3 and Solution Manager 7.1
 Have exposure to various versions of SAP R/3 (ECC 5.0/6.0). Sound Knowledge of New
Dimension Products like WAS 6.20/6.40/700, SCM 4.0/5.0/7.0, BIW3.5/7.0,CRM 5.0,Solution
Manager 3.2/4.0/7.0/7.1, Enterprise Portal 6.0/7.0/7.3,NWDI and Exchange infrastructure(XI 3.0
/NW 7.0/PI 7.1/7.3)
 Have performed the post installation steps of Solution Manager 7.1 which includes SMD, Host
Agents, IS Agents and Wily installation.
 Have installed and configured ORACLE RAC (Real Application Cluster) 11.2.0.2 with MCOD and
performing daily cluster node monitoring.
 Performance Analysis: Monitoring the workload analysis, buffer management, Performance
tuning, etc
 Database Administration: Oracle upgrade to 11g, Database refresh, Table space management
and backup using BR tools, restoring the database, Oracle Compression and execution of reorg
scripts, DB2 installation and administration
 System Cloning and Post cloning using flex clone and Host Based copy.
 Health checks and Monitoring: Daily monitoring activities like analyzing ABAP dumps, alert
monitor, system traces, lock entries set alert threshold, operation modes.
 Client Administration: Client Creation, Deletion, including Local, Remote client copy and Client
export, import.
 Background Jobs: Scheduling background jobs and monitoring background jobs using Redwood
Scheduler CPS
 Support Packages: Kernel upgrade, SPAM Update, add-on installation.
 Java Stack: Appling the java patches using JSPM and SDM, configured java stack using visual
administrator and Config tool,SPS28 support pack upgrade for Solution Manager.
 SMD Agents: Setup of Solution Manager Diagnostics & Wily Introscope on satellite systems.
 Installations: Installation of SAP R/3 4.6C, 4.7 EE, ECC 5.0,ECC 6.0, CPS (Redwood Scheduler)
 Have installed and configured Web Dispatchers, TREX and Content Server
 Security/User Management: Management of Users, Authorization, Roles and Profiles.
 Transport Express Tool: Transport Express installation, Transport through TE, Adding new
system to TE, Configuring new Path, etc
 CLICK: Click Installation, Configuration and Monitoring.
 Business Object Installation, Configuration and Monitoring
EDUCATIONAL QUALIFICATION:
 M.C.A (Master of Computer Applications) from VIT University with 9.14(CGPA).
TECHNICAL SKILLS:
ERP : SAP R/3 6.6, NW 7.3, SCM 7.1
Operating Systems : Win NT/ Server, UNIX, LINUX, AIX
Databases/RDBMS : Oracle, DB2, SAP DB.
ONSITE EXPERIENCE:
 Currently working at client location for Lloyds banking Group at Halifax, UK since Dec’13.
 7 Month of onsite expose at Client Location (TWINING’S), Andover, UK where I have
successfully implemented the new SAP Solution and also work as onsite coordinator (From
Sept’12 to Mar’13).
 10 Weeks of onsite exposure at Client Location(XEROX), London, where I have successfully
done Building & Cloning of new layer, RAC’ing, CPS administration, installation of SMD,CCMS
agents in Solution Manager, etc. (From Nov’11 to May’12).
 Worked in “HCL Malaysia SDN BHD“ as Consultant for 8 Month (From Mar’10 to Oct’10)
HCL Technologies
Project # 1:
Client : Lloyds Banking Group – Requisite to Pay (R2P) and KSOR Halifax UK
Project : Implementation
SAP version : ECC 6.0, NW 7.31, SRM 7.02, EP 7.31, PI 7.1 and SOLMAN 7.1
Environment : AIX 7.1, Linux 6.2, Oracle 10g/11g
Work location : Halifax UK
Role : Onsite Basis Resource
Period : Dec 2013 to Till Date
Description: Lloyds Banking Group is more than 240 year old and the biggest financial services group
focused on retail and commercial customers - with millions of customers in the UK, and a presence in
nearly every community.
Roles & Responsibilities
 Have Installed Portal SAP Netweaver 7.31 in distributed environment for high availability on
GRID infrastructure with database Oracle ASM
 Performed the SRM EHP2 upgrade from SRM 7.0 to EHP2 SRM 7.0 SP09 using SUM tool
 Performed Oracle upgrade from 10.2.0.4 and 10.2.0.5 to 11.2.0.3 and 11.2.0.4 and also applied
latest SBP patches after 11g upgrade
 PI 7.1 patching from SP10 to SP17 then followed by SP19 using SUM tool
 PI 7.0 Patching from SP30 to SP32 using SUM tool
 EHP7 Upgrade from ECC 6.0 to SP09
 Installation of SAP Screen Persona 3.0 SP01
 Netweaver 7.0 BW upgrade to Netweaver 7.4 SP11
 CTS+ configuration using Solution Manager for Portal system
 SAP Solution Manager Wily Introscope Agent Installation and upgrade to Wily 9.0 SP15
 Build new SAP System ECC 6.0 using the Oracle offline Backup.
 Build new SAP System SRM 7.0 using the Oracle offline Backup.
 Patched the Portal 7.31 to SP09 using SUM tool
 Worked on Solution Manager 7.1 SP10 and configure many systems like ABAP, JAVA and Dual
stack into it for EWA, alerting and reporting.
 Worked on the tool NWDS for patching BP components
 SAP application Migration from AIX 5.3 to Red Hat Linux 6.2
Project # 2:
Client : UK Share Services
Project : Support
SAP version : ECC 6.6, BW 7.1, NW 7.1, EP 7.0, PI 7.1, and SOLMAN 7.1
Environment : AIX 5.3, Linux, Windows, Oracle 10g, MS-SQL, DB2
Work location : Bangalore
Role : Offshore Basis Lead (L2/L3 support)
Period : July 2013 to Nov 2013
Description: UK Share Service was the kind of pool project where we had 8 different but small clients. It
was the BAU support project where team was working for each client based on the ticket received from
Remedy Tool. Since, we had 8 different clients, so I got the exposer for various kind of SAP environment
on different platform.
Roles & Responsibilities
 Offshore Lead
 Helped team resolve various technical issues specially P1/P2
 Educate team and enhance skill set with the knowledge and experience
 Day to day Interaction with onsite co-ordinate and give the progress report
 Prepare the report for higher management on no. of ticket raised and resolved over a week and
month and present to management on weekly basis
 Manage team and its shift Rota as this was 24X7 support
 Day to day interaction with the team on their personal issue
Project # 3:
Client : TWINING’S Andover UK
Project : Implementation
SAP version : ECC 6.6, BW 7.3, NW 7.3, SCM 7.1, SRM 7.0, EP 7.3, SMP 7.1, and Live Cache
Environment : AIX 7.1, DB2 9.7.5
Work location : Andover UK (till March’13)/Bangalore
Role : Onsite coordinator (Till March’13)/Offshore Lead (L2/L3 support)
Period : Aug 2012 to June 2013
Description: Twining’s is 300 year old world’s leading Tea company across the globe. Headquartered is
in London, UK, and with 42,000 employees in 41 countries. As a €8.2 billion company, Twining is selling
more than 200 teas in more than 100 countries throughout the world.
Roles & Responsibilities
 Onsite Coordinator
 Offshore Lead
 Installation and Post Installation of new SAP Component like ECC 6.6, BW 7.3, NW
7.3,SCM 7.1,SRM 7.0, EP 7.3
 PI 7.3 administration
 Installation and Post Installation of Live Cache
 Installation and Post Installation Solution Manager 7.1
 Configuration related to SLD-LMDB-SMSY
 Configuring Early watch Alerts/reporting for all SAP systems through SMD agents
 Setting up the SAP System Landscape as per functional requirement
 Maintenance Optimizer configuration for download of support Packs
 Applying support packs and Enhancement Packages
 Installation and configuration of SMD agents
 Maintaining consistency in performance of SAP Systems throughout the Landscape.
 Config tool Administration
 TE Administration and Transports
 Have written the script to automate the starting/stopping SAPDB system and all the
system of a layer together
 Establish the SSH connection between different servers
 Middleware configuration for SRM 7.0
 Kernel upgrade
 CUA Configuration
 R/3 and Java License Installation and profile maintenance
 Email Configuration using SCOT
 Configuring Transport Management Systems
 Performed Client Copies and related activities
 Spool/Printer Configuration
 RFC creation and Administration
 Data volume Migration to different files/Disks
 Installation of Commvault Agents for Backup
 Applying SAP Notes as per requirement
 ABAP Dump analysis and fixes
 IDOC administration
 Troubleshooting issues with Updates
 Creation and maintenance of users and roles
 Background Job and variant creation as per business requirement.
 Portal administration, applying patches using JSPM
 SAP Pre & Post go live action and checks as per Earlywatch and Service Delivery Report
and recommendations
Project # 4:
Client : Xerox BAU Integrated Support Rel1.1
Project : Support
SAP version : ECC 6.0, BW 7.0, SMP 7.0, NW 7.0, CRM 5.0, and SRM 4.0.
Environment : Linux, Oracle 11g
Work location : Bangalore
Role : Offshore BAU Shift Lead (L2/L3 support)
Period : Oct 2011 to July 2012
Description: Xerox is world’s leading enterprise for business process and document management. Head
quartered in Norwalk, CT, and with 130,000 employees in 160 countries, Xerox never far from your
business. As a $22 billion company, Xerox is world’s leading enterprise for business process and
document management.
Roles & Responsibilities
 Leading a team of 10 members.
 Mentoring and raising the skill level of team with conducting timely one-on-one’s
 Cloning & Post Cloning
 RAC Installation & Configuration
 RAC administration
 Creating or rebuilding index
 TREX & Content server administration
 Installation and configuration of SMD agents
 Configtool &VA administration
 TE Administration
 Click Installation
 Click Configuration & Monitoring
 System refresh
 CPS Installation & Configuration
 CPS administration
 IDOC/BDOC administration
 CCMS configuration/Administration
 Portal administration
 ESAP VLAN and IP-Mapping administrations
 CRM Administration
 Business Object Installation, Configuration and Monitoring
Project # 5:
Client : Xerox Release 1.1
Project : Implementation
SAP version : ECC 6.0, BW 7.0, solution manager 7.0, NW 7.0, CRM 5.0, and SRM 4.0.
Environment : Linux, Oracle 11.2.0.2.
Work location : Bangalore
Role : Consultant (L1 and L2 support)
Period : Nov 2010 to Sept 2011
Responsibilities
 RAC administration
 Post cloning Activity
 Creating or rebuilding index
 Content server administration
 Trex Administration
 Installation and configuration of SMD agents
 VA administration and Configtool administration
 System refresh
 CPS administration
 CRM administration
 CCMS configuration/Administration
 Portal administration
 ESAP VLAN and IP-Mapping administrations
 Click installation, Configuration & Monitoring
 Business Object Installation, Configuration and Monitoring
Project # 6:
Client : Xerox Integrated Support.
Project : Support
SAP version : ECC 6.0, BW 7.0, solution manager 7.0, NW 7.0, CRM 5.0, and SRM 4.0.
Environment : Linux, Oracle 10.2.0.4.
Work location : Malaysia
Role : Consultant (L1 support)
Period : from March 2010 to Oct’10
Responsibilities
 RAC administration
 Portal administration
 TREX and Content Server administration
 Installation and configuration of SMD agents
 VA administration and Configtool administration
 System refresh
 CPS administration
 IDOC/BDOC administration
 CCMS configuration/Administration
 ESAP VLAN and IP-Mapping administrations
Project # 7:
Client : Fonterra
Project : Support
SAP version : ECC 5.0, CRM 5.0, BW 7.0 solution manager 3.2, NW 7.0
Environment : HP-UX 11.23, Oracle 9.2.0.6.
Work location : Noida, UP
Period : Oct 2009 to Feb 2010
Description: Fonterra is New Zealand based Dairy milk Product Company which produces world’s largest
dairy product which supplies their product across all over Asia, Europe & America. Fonterra has
implemented the entire latest SAP product and one of the fastest growing milk product companies.
 Solving the authorization related issues
 Monitoring servers
 Prepare Reports for Business
 User administration and User License
 Client administration
 Kernel upgrade
 Configure Transport Management System
 Transport using TMS
 Opening system for SAP at Service Market Place
 Opening system for change
Project # 8:
Client : SAP Training Project
Project : Implementation
SAP version : ECC 6.0
Environment : Windows NT, Oracle.
Role : Technical Consultant Trainee
Work location : Noida, UP
Role : SAP Basis Trainee
Period : Jun 09 – Oct 09
Responsibilities:
 Installing ECC 6.0, R/3 4.7
 Configure TMS
 Kernel upgrade
 User Administration
 Client Administration(Local and Remote client copy)
 Creating RFC connections
 Database administration
 Applying support packs (ABAP)
Personal Detail:
 Father’s Name : Late Gupteshwar Sharma
 Date of Birth : 1st
March 1982
 Passport No. : G5564304
 Gender : Male
 Marital Status : Married
 Languages Known : English, Hindi
 Present Address : Apt-4, Calder Court, Town Hall Street East, Halifax, HX1 1UU

Rakesh_CV

  • 1.
    Rakesh Kumar SAP BASIS Mob:+44-7440527112 Email: Rakeshkumar@hcl.com PROFESSIONAL SUMMARY:  Having 6.5 + years of experience as SAP BASIS Consultant.  Completed 2 full life cycle implementations.  Working on LBG – R2P and KSOR Project as Basis Consultant at Halifax, UK  Worked on Implementation Project “Twining’s” as a landed resource in Andover, UK  Performed Key Role in Xerox BAU Project Transition from Malaysia to India  Shift Lead for the Xerox BAU Offshore support which runs for 24X7  Awarded as Delivery Champion for 2nd Quarter of Xerox BAU Support  Easily adaptable to new environment, positive in approach, good at decision making and problem solving skills. KEY SKILLS:  Have Performed EHP7 upgrade for ECC 6.0 Finance system using SUM tool  Have installed and configured SAP Screen Persona 3.0 on ECC system  Have performed BW upgrade from SAP Netweaver 7.0 to 7.4 using SUM tool  Have Configured CTS+ using Solution Manager for Portal system landscape  SAP Solution Manager Wily Introscope Agent Installation and upgrade to Wily 9.0 SP15  Have Installed Portal SAP Netweaver 7.31 in distributed environment for high availability on GRID infrastructure with database Oracle 11G ASM  Performed the SRM EHP2 upgrade from SRM 7.0 to EHP2 SRM 7.0 SP09 using SUM tool  Performed Oracle upgrade from 10.2.0.4 to 11.2.0.3 and 11.2.0.4 and also applied latest SBP patches followed by Kernel upgrade to latest level of 7.21 EXT Patch 300  SAP application Migration from AIX 5.1 to Red Hat Linux 6.2  Build new SAP System ECC 6.0 using the Oracle offline Backup.  Build new SAP System SRM 7.0 using the Oracle offline Backup.  Patched the Portal 7.31 to SP09 using SUM tool  Worked on Solution Manager 7.1 SP10 and configure many systems like ABAP, JAVA and Dual stack into it for EWA, alerting and reporting.  Have Installed new SAP component like ECC 6.6, BW 7.3, SCM 7.1, SRM 7.0, PI 7.3, Live Cache, Portal 7.3 and Solution Manager 7.1  Have exposure to various versions of SAP R/3 (ECC 5.0/6.0). Sound Knowledge of New
  • 2.
    Dimension Products likeWAS 6.20/6.40/700, SCM 4.0/5.0/7.0, BIW3.5/7.0,CRM 5.0,Solution Manager 3.2/4.0/7.0/7.1, Enterprise Portal 6.0/7.0/7.3,NWDI and Exchange infrastructure(XI 3.0 /NW 7.0/PI 7.1/7.3)  Have performed the post installation steps of Solution Manager 7.1 which includes SMD, Host Agents, IS Agents and Wily installation.  Have installed and configured ORACLE RAC (Real Application Cluster) 11.2.0.2 with MCOD and performing daily cluster node monitoring.  Performance Analysis: Monitoring the workload analysis, buffer management, Performance tuning, etc  Database Administration: Oracle upgrade to 11g, Database refresh, Table space management and backup using BR tools, restoring the database, Oracle Compression and execution of reorg scripts, DB2 installation and administration  System Cloning and Post cloning using flex clone and Host Based copy.  Health checks and Monitoring: Daily monitoring activities like analyzing ABAP dumps, alert monitor, system traces, lock entries set alert threshold, operation modes.  Client Administration: Client Creation, Deletion, including Local, Remote client copy and Client export, import.  Background Jobs: Scheduling background jobs and monitoring background jobs using Redwood Scheduler CPS  Support Packages: Kernel upgrade, SPAM Update, add-on installation.  Java Stack: Appling the java patches using JSPM and SDM, configured java stack using visual administrator and Config tool,SPS28 support pack upgrade for Solution Manager.  SMD Agents: Setup of Solution Manager Diagnostics & Wily Introscope on satellite systems.  Installations: Installation of SAP R/3 4.6C, 4.7 EE, ECC 5.0,ECC 6.0, CPS (Redwood Scheduler)  Have installed and configured Web Dispatchers, TREX and Content Server  Security/User Management: Management of Users, Authorization, Roles and Profiles.  Transport Express Tool: Transport Express installation, Transport through TE, Adding new system to TE, Configuring new Path, etc  CLICK: Click Installation, Configuration and Monitoring.  Business Object Installation, Configuration and Monitoring
  • 3.
    EDUCATIONAL QUALIFICATION:  M.C.A(Master of Computer Applications) from VIT University with 9.14(CGPA). TECHNICAL SKILLS: ERP : SAP R/3 6.6, NW 7.3, SCM 7.1 Operating Systems : Win NT/ Server, UNIX, LINUX, AIX Databases/RDBMS : Oracle, DB2, SAP DB. ONSITE EXPERIENCE:  Currently working at client location for Lloyds banking Group at Halifax, UK since Dec’13.  7 Month of onsite expose at Client Location (TWINING’S), Andover, UK where I have successfully implemented the new SAP Solution and also work as onsite coordinator (From Sept’12 to Mar’13).  10 Weeks of onsite exposure at Client Location(XEROX), London, where I have successfully done Building & Cloning of new layer, RAC’ing, CPS administration, installation of SMD,CCMS agents in Solution Manager, etc. (From Nov’11 to May’12).  Worked in “HCL Malaysia SDN BHD“ as Consultant for 8 Month (From Mar’10 to Oct’10) HCL Technologies Project # 1: Client : Lloyds Banking Group – Requisite to Pay (R2P) and KSOR Halifax UK Project : Implementation SAP version : ECC 6.0, NW 7.31, SRM 7.02, EP 7.31, PI 7.1 and SOLMAN 7.1 Environment : AIX 7.1, Linux 6.2, Oracle 10g/11g Work location : Halifax UK Role : Onsite Basis Resource Period : Dec 2013 to Till Date Description: Lloyds Banking Group is more than 240 year old and the biggest financial services group focused on retail and commercial customers - with millions of customers in the UK, and a presence in nearly every community. Roles & Responsibilities  Have Installed Portal SAP Netweaver 7.31 in distributed environment for high availability on GRID infrastructure with database Oracle ASM  Performed the SRM EHP2 upgrade from SRM 7.0 to EHP2 SRM 7.0 SP09 using SUM tool  Performed Oracle upgrade from 10.2.0.4 and 10.2.0.5 to 11.2.0.3 and 11.2.0.4 and also applied latest SBP patches after 11g upgrade  PI 7.1 patching from SP10 to SP17 then followed by SP19 using SUM tool  PI 7.0 Patching from SP30 to SP32 using SUM tool  EHP7 Upgrade from ECC 6.0 to SP09  Installation of SAP Screen Persona 3.0 SP01  Netweaver 7.0 BW upgrade to Netweaver 7.4 SP11  CTS+ configuration using Solution Manager for Portal system
  • 4.
     SAP SolutionManager Wily Introscope Agent Installation and upgrade to Wily 9.0 SP15  Build new SAP System ECC 6.0 using the Oracle offline Backup.  Build new SAP System SRM 7.0 using the Oracle offline Backup.  Patched the Portal 7.31 to SP09 using SUM tool  Worked on Solution Manager 7.1 SP10 and configure many systems like ABAP, JAVA and Dual stack into it for EWA, alerting and reporting.  Worked on the tool NWDS for patching BP components  SAP application Migration from AIX 5.3 to Red Hat Linux 6.2 Project # 2: Client : UK Share Services Project : Support SAP version : ECC 6.6, BW 7.1, NW 7.1, EP 7.0, PI 7.1, and SOLMAN 7.1 Environment : AIX 5.3, Linux, Windows, Oracle 10g, MS-SQL, DB2 Work location : Bangalore Role : Offshore Basis Lead (L2/L3 support) Period : July 2013 to Nov 2013 Description: UK Share Service was the kind of pool project where we had 8 different but small clients. It was the BAU support project where team was working for each client based on the ticket received from Remedy Tool. Since, we had 8 different clients, so I got the exposer for various kind of SAP environment on different platform. Roles & Responsibilities  Offshore Lead  Helped team resolve various technical issues specially P1/P2  Educate team and enhance skill set with the knowledge and experience  Day to day Interaction with onsite co-ordinate and give the progress report  Prepare the report for higher management on no. of ticket raised and resolved over a week and month and present to management on weekly basis  Manage team and its shift Rota as this was 24X7 support  Day to day interaction with the team on their personal issue Project # 3: Client : TWINING’S Andover UK Project : Implementation SAP version : ECC 6.6, BW 7.3, NW 7.3, SCM 7.1, SRM 7.0, EP 7.3, SMP 7.1, and Live Cache Environment : AIX 7.1, DB2 9.7.5 Work location : Andover UK (till March’13)/Bangalore Role : Onsite coordinator (Till March’13)/Offshore Lead (L2/L3 support) Period : Aug 2012 to June 2013 Description: Twining’s is 300 year old world’s leading Tea company across the globe. Headquartered is in London, UK, and with 42,000 employees in 41 countries. As a €8.2 billion company, Twining is selling more than 200 teas in more than 100 countries throughout the world.
  • 5.
    Roles & Responsibilities Onsite Coordinator  Offshore Lead  Installation and Post Installation of new SAP Component like ECC 6.6, BW 7.3, NW 7.3,SCM 7.1,SRM 7.0, EP 7.3  PI 7.3 administration  Installation and Post Installation of Live Cache  Installation and Post Installation Solution Manager 7.1  Configuration related to SLD-LMDB-SMSY  Configuring Early watch Alerts/reporting for all SAP systems through SMD agents  Setting up the SAP System Landscape as per functional requirement  Maintenance Optimizer configuration for download of support Packs  Applying support packs and Enhancement Packages  Installation and configuration of SMD agents  Maintaining consistency in performance of SAP Systems throughout the Landscape.  Config tool Administration  TE Administration and Transports  Have written the script to automate the starting/stopping SAPDB system and all the system of a layer together  Establish the SSH connection between different servers  Middleware configuration for SRM 7.0  Kernel upgrade  CUA Configuration  R/3 and Java License Installation and profile maintenance  Email Configuration using SCOT  Configuring Transport Management Systems  Performed Client Copies and related activities  Spool/Printer Configuration  RFC creation and Administration  Data volume Migration to different files/Disks  Installation of Commvault Agents for Backup  Applying SAP Notes as per requirement  ABAP Dump analysis and fixes  IDOC administration  Troubleshooting issues with Updates  Creation and maintenance of users and roles  Background Job and variant creation as per business requirement.  Portal administration, applying patches using JSPM  SAP Pre & Post go live action and checks as per Earlywatch and Service Delivery Report and recommendations Project # 4: Client : Xerox BAU Integrated Support Rel1.1 Project : Support SAP version : ECC 6.0, BW 7.0, SMP 7.0, NW 7.0, CRM 5.0, and SRM 4.0. Environment : Linux, Oracle 11g Work location : Bangalore
  • 6.
    Role : OffshoreBAU Shift Lead (L2/L3 support) Period : Oct 2011 to July 2012 Description: Xerox is world’s leading enterprise for business process and document management. Head quartered in Norwalk, CT, and with 130,000 employees in 160 countries, Xerox never far from your business. As a $22 billion company, Xerox is world’s leading enterprise for business process and document management. Roles & Responsibilities  Leading a team of 10 members.  Mentoring and raising the skill level of team with conducting timely one-on-one’s  Cloning & Post Cloning  RAC Installation & Configuration  RAC administration  Creating or rebuilding index  TREX & Content server administration  Installation and configuration of SMD agents  Configtool &VA administration  TE Administration  Click Installation  Click Configuration & Monitoring  System refresh  CPS Installation & Configuration  CPS administration  IDOC/BDOC administration  CCMS configuration/Administration  Portal administration  ESAP VLAN and IP-Mapping administrations  CRM Administration  Business Object Installation, Configuration and Monitoring Project # 5: Client : Xerox Release 1.1 Project : Implementation SAP version : ECC 6.0, BW 7.0, solution manager 7.0, NW 7.0, CRM 5.0, and SRM 4.0. Environment : Linux, Oracle 11.2.0.2. Work location : Bangalore Role : Consultant (L1 and L2 support) Period : Nov 2010 to Sept 2011 Responsibilities  RAC administration  Post cloning Activity  Creating or rebuilding index  Content server administration
  • 7.
     Trex Administration Installation and configuration of SMD agents  VA administration and Configtool administration  System refresh  CPS administration  CRM administration  CCMS configuration/Administration  Portal administration  ESAP VLAN and IP-Mapping administrations  Click installation, Configuration & Monitoring  Business Object Installation, Configuration and Monitoring Project # 6: Client : Xerox Integrated Support. Project : Support SAP version : ECC 6.0, BW 7.0, solution manager 7.0, NW 7.0, CRM 5.0, and SRM 4.0. Environment : Linux, Oracle 10.2.0.4. Work location : Malaysia Role : Consultant (L1 support) Period : from March 2010 to Oct’10 Responsibilities  RAC administration  Portal administration  TREX and Content Server administration  Installation and configuration of SMD agents  VA administration and Configtool administration  System refresh  CPS administration  IDOC/BDOC administration  CCMS configuration/Administration  ESAP VLAN and IP-Mapping administrations Project # 7: Client : Fonterra Project : Support SAP version : ECC 5.0, CRM 5.0, BW 7.0 solution manager 3.2, NW 7.0 Environment : HP-UX 11.23, Oracle 9.2.0.6. Work location : Noida, UP Period : Oct 2009 to Feb 2010 Description: Fonterra is New Zealand based Dairy milk Product Company which produces world’s largest dairy product which supplies their product across all over Asia, Europe & America. Fonterra has implemented the entire latest SAP product and one of the fastest growing milk product companies.  Solving the authorization related issues  Monitoring servers
  • 8.
     Prepare Reportsfor Business  User administration and User License  Client administration  Kernel upgrade  Configure Transport Management System  Transport using TMS  Opening system for SAP at Service Market Place  Opening system for change Project # 8: Client : SAP Training Project Project : Implementation SAP version : ECC 6.0 Environment : Windows NT, Oracle. Role : Technical Consultant Trainee Work location : Noida, UP Role : SAP Basis Trainee Period : Jun 09 – Oct 09 Responsibilities:  Installing ECC 6.0, R/3 4.7  Configure TMS  Kernel upgrade  User Administration  Client Administration(Local and Remote client copy)  Creating RFC connections  Database administration  Applying support packs (ABAP) Personal Detail:  Father’s Name : Late Gupteshwar Sharma  Date of Birth : 1st March 1982  Passport No. : G5564304  Gender : Male  Marital Status : Married  Languages Known : English, Hindi  Present Address : Apt-4, Calder Court, Town Hall Street East, Halifax, HX1 1UU