The document summarizes the challenges and solutions involved in building a railway connecting Beijing to Lhasa, Tibet across difficult terrain. Formidable obstacles included high mountains, unstable permafrost, and protecting the fragile ecosystem. Engineers overcame permafrost issues through stone embankments, thermosiphons, and the world's longest bridge on permafrost. Over $4 billion was invested in environmental protections like animal passages. The completed Qinghai-Tibet Railway opens up remote Tibet and brings prosperity, with the station resembling an airport terminal.
The document summarizes the challenges and solutions involved in building a railway connecting Beijing to Lhasa, Tibet across difficult terrain. Formidable mountains, unstable permafrost, and a fragile high-altitude ecosystem presented major obstacles. Engineers overcame these through techniques like building stone embankments, thermosiphons to regulate ground temperature, and 25 passageways for wildlife. Over $4 billion was invested in environmental protections like limiting habitat disruption and installing train facilities to prevent pollution. The completed Qinghai-Tibet Railway, including the world's highest rail tunnel, promotes economic development and tourism in remote Tibet while protecting the local environment and culture.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting Beijing to Lhasa in Tibet, highlighting formidable mountain barriers, unstable permafrost, and fragile ecosystems. It describes how engineers overcame these obstacles through solutions like stone embankments, thermosiphons, bridges, tunnels, and environmental protections. The railway opened in 2006, bringing tourism and economic development to remote Tibet but also concerns about its cultural and environmental impacts.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to the difficult terrain of high altitudes, permafrost, and fragile ecosystem. Engineers overcame obstacles through solutions like stone embankments, thermosiphons, and bridges. Environmental protection including passageways for wildlife was a priority. The railway development supports Tibet's economy and prosperity through infrastructure investment from China's central government.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to Tibet's high altitude and fragile permafrost environment. Engineers overcame obstacles through innovations like stone embankments, thermosiphons, and the world's highest rail tunnel. The railway development aims to help Tibet's economy while investing heavily in environmental protections like passageways for migrating animals. The document concludes by arguing the railway has brought prosperity to Tibet.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive environmental protection measures were implemented, such as building tunnels, bridges, and passages for wildlife. The 1,956 km railway now connects Tibet's capital Lhasa to other parts of China, boosting the province's economy and development.
The document summarizes the challenges and solutions involved in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. Some key obstacles included traversing formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Engineers overcame obstacles by building tunnels, bridges, installing heating systems to prevent freezing, and minimizing environmental impact through careful routing and provisions for wildlife. The 1,956 km Qinghai-Tibet Railway, completed in 2006, connects Tibet to the national network and has contributed significantly to development in the remote region.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and transformed Tibet's economy.
The document summarizes the challenges and solutions involved in building a railway connecting Beijing to Lhasa, Tibet across difficult terrain. Formidable mountains, unstable permafrost, and a fragile high-altitude ecosystem presented major obstacles. Engineers overcame these through techniques like building stone embankments, thermosiphons to regulate ground temperature, and 25 passageways for wildlife. Over $4 billion was invested in environmental protections like limiting habitat disruption and installing train facilities to prevent pollution. The completed Qinghai-Tibet Railway, including the world's highest rail tunnel, promotes economic development and tourism in remote Tibet while protecting the local environment and culture.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting Beijing to Lhasa in Tibet, highlighting formidable mountain barriers, unstable permafrost, and fragile ecosystems. It describes how engineers overcame these obstacles through solutions like stone embankments, thermosiphons, bridges, tunnels, and environmental protections. The railway opened in 2006, bringing tourism and economic development to remote Tibet but also concerns about its cultural and environmental impacts.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to the difficult terrain of high altitudes, permafrost, and fragile ecosystem. Engineers overcame obstacles through solutions like stone embankments, thermosiphons, and bridges. Environmental protection including passageways for wildlife was a priority. The railway development supports Tibet's economy and prosperity through infrastructure investment from China's central government.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to Tibet's high altitude and fragile permafrost environment. Engineers overcame obstacles through innovations like stone embankments, thermosiphons, and the world's highest rail tunnel. The railway development aims to help Tibet's economy while investing heavily in environmental protections like passageways for migrating animals. The document concludes by arguing the railway has brought prosperity to Tibet.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive environmental protection measures were implemented, such as building tunnels, bridges, and passages for wildlife. The 1,956 km railway now connects Tibet's capital Lhasa to other parts of China, boosting the province's economy and development.
The document summarizes the challenges and solutions involved in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. Some key obstacles included traversing formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Engineers overcame obstacles by building tunnels, bridges, installing heating systems to prevent freezing, and minimizing environmental impact through careful routing and provisions for wildlife. The 1,956 km Qinghai-Tibet Railway, completed in 2006, connects Tibet to the national network and has contributed significantly to development in the remote region.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and transformed Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Specific obstacles included constructing sections over 16,000 feet high and tunnels at oxygen-deficient altitudes. Environmental protections such as bridges over permafrost and passages for migrating animals were implemented. The 1,956 km railway was completed in 2006, bringing economic development while investing in ecological conservation.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as wildlife passageways and elevated tracks.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The attached power point presentation shows a visual treat of the Chinese effort and final results of laying a railroad connection to Tibet from Beijing.
Tibet - Journey across the roof of the world.......!!!!!!!!!!!!!!!! (Courtesy: Eddy Cheong)
The Other Home is committed to this form of Responsible Tourism...
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive engineering solutions such as tunnels, bridges, and environmental protections were required. The railway now connects Beijing to Lhasa, promoting economic development while safeguarding the region's environment and wildlife.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. Some key obstacles included traversing formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Engineers had to develop innovative solutions to tunnel through rock and lay tracks at high altitudes with low oxygen. Over $4 billion was invested to minimize environmental impacts through measures like bridges, tunnels, and passages for migrating wildlife. The 1,956 km railway, completed in 2006, passes through the world's highest rail track and tunnel and helps develop Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest track at 5,072m. Special environmental protections include limiting habitat disruption, under-track fencing and tunnels, and allocating $180 million or 8% of costs to conservation efforts.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 17,000 construction workers helped build over 1,956 km of track, tunnels, bridges and stations across the "Roof of the World" over difficult terrain over 4,500 meters above sea level, with temperatures as low as -45°C. Special measures were taken to minimize environmental impact, including elevating sections, tunnels, and fencing to allow wildlife passage.
ZOOM International is a call recording and quality management company with over 12 years of experience. It has over 800 customers in more than 73 countries, and its customer base and number of offices have grown substantially since it was founded. ZOOM provides an integrated quality management suite of call recording, screen recording, live monitoring, quality management, and workforce management tools through a global network of technology partners.
This document discusses how to avoid living useless and miserable lives by identifying common pitfalls. It warns against seeing only our own good deeds, being hypocritical in our words and actions, demanding too much of others, and feeling neglected by focusing on serving others rather than our own needs. The document encourages living useful and happy lives by controlling our tongue, turning from evil and doing good, seeking peace, and keeping God's commands through faithfulness.
Este documento proporciona una guía sobre los requisitos básicos de la Secretaría de Comunicaciones y Transportes de México para el embarque de materiales peligrosos. Explica los puntos principales a cubrir como la identificación adecuada del químico, los documentos necesarios del expedidor, los requisitos para envases y embalajes, las inspecciones requeridas, y los requisitos para la carga del material peligroso. El objetivo es que quienes manejan materiales peligrosos reconozcan estos requerimientos para real
Sigilo - Cellular Transmitter For Property SecurityChief Innovation
This was my second patent I filed, back from 2001. I still love the idea, and not seen anyone do it. Just posting this since someone asked me about it from a post on 1,000 Ideas. This would have been a 'big' project to get funded, but for me, the premise is still sound. Amazon's 'buttons' are kind of like it for a different application, but this one still has no competition as far as I know. Just posting it as an example, the deck was still in rough draft form.
Este documento presenta definiciones breves de varios términos relacionados con aplicaciones educativas y la tecnología. Define avatar, código EMBED, pensamiento visible, perfil personal, rutinas de pensamiento y URL. Cada definición viene acompañada de una imagen ilustrativa del término. El objetivo general es explicar conceptos clave para comprender mejor el uso de herramientas digitales en entornos educativos.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to the difficult terrain of high altitudes, permafrost, and fragile ecosystem. Engineers overcame obstacles through solutions like stone embankments, thermosiphons, and bridges. Environmental protection including passageways for wildlife was a priority. The railway development supports Tibet's economy and prosperity through infrastructure investment from China's central government.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Specific obstacles included constructing sections over 16,000 feet high and tunnels at oxygen-deficient altitudes. Environmental protections such as bridges over permafrost and passages for migrating animals were implemented. The 1,956 km railway was completed in 2006, bringing economic development while investing in ecological conservation.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as wildlife passageways and elevated tracks.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The attached power point presentation shows a visual treat of the Chinese effort and final results of laying a railroad connection to Tibet from Beijing.
Tibet - Journey across the roof of the world.......!!!!!!!!!!!!!!!! (Courtesy: Eddy Cheong)
The Other Home is committed to this form of Responsible Tourism...
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive engineering solutions such as tunnels, bridges, and environmental protections were required. The railway now connects Beijing to Lhasa, promoting economic development while safeguarding the region's environment and wildlife.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the national railway network. Some key obstacles included traversing formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Engineers had to develop innovative solutions to tunnel through rock and lay tracks at high altitudes with low oxygen. Over $4 billion was invested to minimize environmental impacts through measures like bridges, tunnels, and passages for migrating wildlife. The 1,956 km railway, completed in 2006, passes through the world's highest rail track and tunnel and helps develop Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest track at 5,072m. Special environmental protections include limiting habitat disruption, under-track fencing and tunnels, and allocating $180 million or 8% of costs to conservation efforts.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 17,000 construction workers helped build over 1,956 km of track, tunnels, bridges and stations across the "Roof of the World" over difficult terrain over 4,500 meters above sea level, with temperatures as low as -45°C. Special measures were taken to minimize environmental impact, including elevating sections, tunnels, and fencing to allow wildlife passage.
ZOOM International is a call recording and quality management company with over 12 years of experience. It has over 800 customers in more than 73 countries, and its customer base and number of offices have grown substantially since it was founded. ZOOM provides an integrated quality management suite of call recording, screen recording, live monitoring, quality management, and workforce management tools through a global network of technology partners.
This document discusses how to avoid living useless and miserable lives by identifying common pitfalls. It warns against seeing only our own good deeds, being hypocritical in our words and actions, demanding too much of others, and feeling neglected by focusing on serving others rather than our own needs. The document encourages living useful and happy lives by controlling our tongue, turning from evil and doing good, seeking peace, and keeping God's commands through faithfulness.
Este documento proporciona una guía sobre los requisitos básicos de la Secretaría de Comunicaciones y Transportes de México para el embarque de materiales peligrosos. Explica los puntos principales a cubrir como la identificación adecuada del químico, los documentos necesarios del expedidor, los requisitos para envases y embalajes, las inspecciones requeridas, y los requisitos para la carga del material peligroso. El objetivo es que quienes manejan materiales peligrosos reconozcan estos requerimientos para real
Sigilo - Cellular Transmitter For Property SecurityChief Innovation
This was my second patent I filed, back from 2001. I still love the idea, and not seen anyone do it. Just posting this since someone asked me about it from a post on 1,000 Ideas. This would have been a 'big' project to get funded, but for me, the premise is still sound. Amazon's 'buttons' are kind of like it for a different application, but this one still has no competition as far as I know. Just posting it as an example, the deck was still in rough draft form.
Este documento presenta definiciones breves de varios términos relacionados con aplicaciones educativas y la tecnología. Define avatar, código EMBED, pensamiento visible, perfil personal, rutinas de pensamiento y URL. Cada definición viene acompañada de una imagen ilustrativa del término. El objetivo general es explicar conceptos clave para comprender mejor el uso de herramientas digitales en entornos educativos.
The document summarizes the construction of the Qinghai-Tibet Railway connecting Beijing to Lhasa, Tibet. It faced immense challenges due to the difficult terrain of high altitudes, permafrost, and fragile ecosystem. Engineers overcame obstacles through solutions like stone embankments, thermosiphons, and bridges. Environmental protection including passageways for wildlife was a priority. The railway development supports Tibet's economy and prosperity through infrastructure investment from China's central government.
The document summarizes the challenges and solutions involved in building the Qinghai-Tibet Railway connecting Beijing to Lhasa across the high-altitude Tibetan Plateau. Formidable obstacles included mountains over 17,000 feet high, permafrost, and fragile ecosystems. Engineers overcame these challenges through techniques like building stone embankments, thermosiphons, and bridges to stabilize permafrost. The railway also included measures to minimize environmental impacts like selecting routes away from animal habitats and installing passages for wildlife. Completing the railway in 2006 was an important achievement that connected remote Tibet and has supported its economic development.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as wildlife passageways and elevated tracks.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were used, including building stone embankments and installing pipes to regulate ground temperature in permafrost areas. Over $180 million was budgeted for environmental protection, including elevating sections and putting in wildlife crossings. The 1,956 km railway, with the world's highest bridge and tunnel, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive engineering solutions such as tunnels, bridges, and environmental protections were required. The railway now connects Beijing to Lhasa, promoting economic development while safeguarding the region's environment and wildlife.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as wildlife passageways and elevated tracks.
The document summarizes the challenges in building a railway connecting China's Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections were incorporated, such as passageways for migrating animals.
The document summarizes the challenges in building a railway connecting China's remote Tibet province to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Extensive engineering solutions such as tunnels, bridges, and environmental protections were required. The railway now connects Beijing to Lhasa, promoting economic development while safeguarding the region's environment and wildlife.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Special construction techniques were needed like building stone embankments and tunnels at high altitudes. Over $180 million was invested in environmental protection measures, including establishing passages for migrating animals and minimizing disturbance to nature reserves. The 1,956 km railway, with the highest point at over 16,000 feet, was completed in 2006 and opened up Tibet's economy.
The document summarizes the challenges in building a railway connecting China's remote Tibet Autonomous Region to the rest of the country. It discusses overcoming formidable mountain barriers, unstable permafrost, and protecting the fragile high-altitude ecosystem. Over 550km of permafrost had to be addressed through methods like stone embankments, ventilation pipes, and thermosiphons. The 1,956km railway, completed in 2006 for $4.1 billion, passes through the world's highest rail tunnel at 4,905m and highest rail track at 5,072m. Special environmental protections include elevated tracks, fencing, tunnels, and passageways to minimize impacts on migrating animals.
The Qinghai-Tibet Railway connects Xining in Qinghai Province to Lhasa in Tibet, ending Tibet's isolation and setting a new record as the highest railway in the world. Construction faced immense challenges from Tibet's high altitude, fragile ecosystem, lack of oxygen, and permafrost. Engineers overcame these obstacles through solutions like oxygen stations, environmental protections, and stone embankments. Since opening in 2006, the 1,956 km railway has become a vital transportation link and engineering marvel, facilitating economic development on the Tibetan Plateau.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....Lacey Max
“After being the most listed dog breed in the United States for 31
years in a row, the Labrador Retriever has dropped to second place
in the American Kennel Club's annual survey of the country's most
popular canines. The French Bulldog is the new top dog in the
United States as of 2022. The stylish puppy has ascended the
rankings in rapid time despite having health concerns and limited
color choices.”
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf46adnanshahzad
How to Start Up a Company: A Step-by-Step Guide Starting a company is an exciting adventure that combines creativity, strategy, and hard work. It can seem overwhelming at first, but with the right guidance, anyone can transform a great idea into a successful business. Let's dive into how to start up a company, from the initial spark of an idea to securing funding and launching your startup.
Introduction
Have you ever dreamed of turning your innovative idea into a thriving business? Starting a company involves numerous steps and decisions, but don't worry—we're here to help. Whether you're exploring how to start a startup company or wondering how to start up a small business, this guide will walk you through the process, step by step.
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Neil Horowitz
On episode 272 of the Digital and Social Media Sports Podcast, Neil chatted with Brian Fitzsimmons, Director of Licensing and Business Development for Barstool Sports.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...my Pandit
Explore the fascinating world of the Gemini Zodiac Sign. Discover the unique personality traits, key dates, and horoscope insights of Gemini individuals. Learn how their sociable, communicative nature and boundless curiosity make them the dynamic explorers of the zodiac. Dive into the duality of the Gemini sign and understand their intellectual and adventurous spirit.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
Qinghai tibet railway000(r)
1. From Beijing to Lhasa
China’s Railway Across the Roof of the
World
A tribute to the world’s greatest railroad builders.
Author: Eddy Cheong
2. Challenges
Since the founding of the Republic of China by Dr. Sun Yat-sun in 1911, it has
been China’s dream to have a national railway system connecting all provinces of
the nation.
Tibet became the last province to remain unconnected owing to great and
insurmountable obstacles. Since the 1950s, among the many challenges facing
Chinese railway planners, the following were the most significant:-
Formidable mountain barriers
Unstable permafrost & swampy wetlands
A Fragile Ecosystem
3. Kunlun Mountain Range.
This is the legendary “Mother of Thousands of Mountains.” American writer Paul Theroux once prophesied that this “formidable mountain range that divides
Tibet from the rest of China would guarantee that a train to Lhasa - which China has dreamed of since the 1950s – will never be built.”
About 85 percent of the entire rail track is located in the “Forbidden Zone.“ This is also known as the “Death Zone” because of thin air, harsh and unpredictable
weather, fierce sandstorms and high UV radiation. Annual average temp is minus zero. Temp drops to as low as -45 degree C. Average altitude of rail track
here is 13,500 feet above sea level. The highest point is 16,700 feet making it the world's most elevated track.
When constructing the Fenghuo Mountain Tunnel - 16,000 ft above seal level – workers had to be equipped with oxygen cylinders. An oxygen-producing station
to "feed" the tunnel was built. Seventeen such stations were built along the railway line equipped with high-pressure oxygen cabins for workers to recover.
Question:
How do you build a railway across
these mountains to China’s most remote province,
Tibet?
4. There were 17,000 ft-high mountains to climb, 12 kilometre-wide valleys to bridge,
hundreds of kilometres of perennial ice and slush that could never support tracks and
trains. How could anyone tunnel through rock at -40C, or lay rails when the least exertion
sends you gasping for oxygen in the thin air?
5. Unstable Permafrost
There is a total of 550 km of permafrost along the rail route. Permafrost is soft and wet soil in summer, hard and
expanding in winter - a nightmare for all railroad engineers.
•The most viable solution is the building of stone embankments for the railroad foundation. In some places, engineers
bury ventilation pipes in the ground to allow cold air to circulate underneath the rail-bed.
•In other spots, a pipe called a thermosiphon is sunk 15 feet into the ground and filled at the bottom with ammonia.
The ammonia becomes gas at low temperatures, giving off a vapour that draws heat from the bottom of the tube and
flushes it out the top.
•Building a bridge over the permafrost. This has the least impact on the area, but is also the most expensive. E.g.,
The 11.7km Qingshuihe Bridge is the world-longest bridge built on permafrost.
•A round-the-clock monitoring system has been installed to keep tab on the temperature change along
the 550 km permafrost stretch of the route.
6. Environmental protection of fragile ecosystem:
Some RMB2.54 billion was invested by Chinese authorities in the environmental protection in the project.
•Protection of the ecological environment has been an essential concern in the design. The routes were selected so that they would keep away fro m the major
habitats of wild animals. E.g, the original route was abandoned because it passed through the reserves of black-necked cranes. While in some other places like
the section cutting through the Hohxil, Qumar and Soga nature reserves, the planners minimized disturbance to the nature reserves for endangered Tibetan
antelope and wild ass by building 25 passageways for wild animals based on their migration habit.
•Reducing adverse impact on ecological environment to the minimum during rail construction.
•All the train cars are installed with environment-friendly toilets, wastewater deposit tanks and garbage treatment facilities to protect the environment along the
route.
10. For environmental protection purposes, all trains entering China's Tibet province are equipped with garbage compacters and vacuum toilets.
No garbage are allowed to be left behind after the trains leave. In this photo, you can see workers collecting toilet wastes from a train on the
Qinghai-Tibet Railway utilizing vacuum flush technology at the station in Golmud.
11. The Qinghai-Tibet railway stretches for 1,956 kilometres from Xining, capital of Qinghai Province to Lhasa. It cost the Chinese
Govt approx. USD4.1 billion and was completed in June 2006 – one year ahead of schedule.
12. Protection of the fragile environment is an important priority for China’s rail planners
14. Tibet is China’s most remote province and has been part of China since the time of Emperor Kublai Khan. The Qinghai-Tibetan Plateau is the home of the chiru
– Tibetan Antelope. Chiru is a highly protected animal in China. Four national protected areas have been set aside specifically to safeguard Tibetan Plateau
wildlife species, including chiru populations and habitat: Chang Tang Nature Reserve, Xianza Nature, Kekexili National Reserve, and Arjin Shan Nature Reserve
Despite legal protection of the highest order, the population of chiru is continually on the decline and today the species is extremely endangered. Poaching is the
main threat. It is being slaughtered illegally for its wool which is known in the international market as "shahtoosh" or "king of wool.” Due to remoteness however,
these nature reserves are incapable of effectively protecting the chiru or its habitat.
Shahtoosh is considered to be one of the finest animal fibres in the world and shahtoosh shawls and scarves have become high fashion status symbols in the
West, selling for as much as $10,000 each. Wool is smuggled from Tibet mainly to Kashmir where it is woven into an extremely fine fabric from which the
shawls and scarves are woven. Although the chiru is protected in China, it is still legal to weave shahtoosh in India..
16. Service on the train is excellent. Friendly staff provides daily refreshments of fruits, snacks and drinks with a
17. Passengers do not suffer high altitude sickness because the carriages are all fully air-conditioned and pressurised like an airplane.
Oxygen masks are also available in your sleeping cabins as well as throughout the train corridors and washrooms if ever required.
19. Targeting environmental issues of the Tibet Plateau high-altitude eco-system, authorities budgeted some 8% of the total construction cost -
at least RMB2.54 billion (US$180 million ) - for ecological conservation, the biggest amount of all China's railway construction projects.
Since most livestock and wild-life are free-grazing, the railroad has been elevated in most places. If not, it utilizes fencing and tunnels cut
under the tracks. to
21. •Building
Building a bridge over the permafrost. This has the least impact on the area, but is also the most expensive. The 11.7km Qingshuihe
Bridge is the world-longest bridge built on permafrost
25. Wherever possible, the rail line is elevated to allow passage to migratory species (e.g.,
wild antelopes) and to minimize any other adverse impact on the natural environment.
28. The train ascends to an altitude above 5,000 meters – more than 16,000 feet.
29. The total length of Qingzang railway is 1956 km. The line includes the Tanggula Pass, at 5,072 m (16,640 feet) above sea level the
world's highest rail track. The 1,338 m Fenghuoshan tunnel is the highest rail tunnel in the world, at 4,905 m above sea level. The
3,345-m Yangbajing tunnel is the longest tunnel on the line.
30. Stopping by to take a photo with a glacier as the backdrop
31. Our train passes glaciers and snow-capped mountains on the way to Lhasa
32.
33. Right from the start, related departments of railway design and construction paid close attention to
environment protection . Measures included setting aside of passage ways for migrating Tibetan antelopes.
34. Other wild life such as bears and wild donkeys have now successfully adapted to the presence of the rail line.
38. Our train passes by Patola Monastery on the way to Lhasa Railway Station
39. With the opening of the Qinghai-Tibet Railway and the new Nyingchi airport,
tourists flood into Tibet and the numbers exceeded 4 million last year, an increase of 60 percent.
43. Lhasa Station - looking more like a 1st
-Class airport terminal than a railway station.
According to my local Tibetan Tourist guide when I was in Lhasa, she told me that Tibet’s economy has never been self-sufficient enough to give its people
a meaningful life. Every year, Tibet suffers from a perennial budget shortfall and therefore, relies heavily and wholly on federal funding from the central
Govt. Thanks to Beijing, development and prosperity has finally arrived in this remote Chinese province. I saw miles after miles of impressive roads,
expressways, bridges, railways and other top-notch infrastructure.
The Central Govt poured more than USD$4 billion into the construction of this railway system alone – the most costly in the world.
44. Tibet is China’s most remote province. It has been part of China since the Yuan Dynasty (1279 – 1368 AD). The Nationalist Kuomintang Govt under Chiang Kai-
Shek was too poor to look after itself - let alone a distant mountainous province such as Tibet. Contrary to western propaganda however, Tibet under the Dalai
Lama was a slave society where the privilege lamas owned everything. Tibetans were indoctrinated by Lama Buddhism to accept their lives as servants and
slaves to the powerful and wealthy lamas who lived a life of luxury. Chairman Mao changed all that when he established effective control and administration after
he defeated Chiang and proclaimed the founding of the People’s Republic of China in October, 1949.
With the covert backing of the CIA, the Dalai Lama fled to India in 1950 with a handful of followers. The Dalai Lama has publicly admitted that till today, he is still
under the payroll and patronage of the Americans. The US puppet lives in self-exile in India today where his group of die-hard supporters continue to receive
arms, training and funding from the US Administration.
45. A new bridge across the Tsangpo river to the railway station
47. THE END
Lhasa River Bridge connects downtown Lhasa with the new railway station..