Kenya Project Status Dec. 2014
2
Entrance wall; entrance gate design
Entrance wall condition before
3
Entrance wall condition after
EATL Office
Office conditions before
5
The side view of the office block, the entrance view
off the Administration block and the door step
made of marble with painting works complete
Office Block: aluminum cladding complete; AC installation complete, entry staircase done.
6
Reception Area of Office Block - before
7
Office Block – Reception Area
8
Office Block – Reception Area
9
Office Block – Interior staircase - before
10
Office Block – Interior staircase; the
correction of the previous status
11
Office Partitions Inside Office Block - Before
12
Office Block – all interior works complete; tint, and repainting of the office walls
13
Office meeting room before
14
Office meeting room after
Loading Bay
Before.
16
Loading Bay: access and observation platform complete; loading headers & valve
installation complete
Loading Bay
17
Loading Bay
Before.
After.
18
Entry weigh bridge: Before
Entry weighbridge
19
Entry Weigh Bridge & Cabin – After; Painting is complete. Installation of side beams to guard
vehicle is complete.
Entry weighbridge
20
Boundary Wall before
21
Street Lights
Installation of the street lights is complete.
22
Boundary Wall After.
Painting of the boundary wall is complete
23
Generator Room/ Oil Tank: before
Generator Room
24
Generator Room with diesel tank on top; the road is ready.
Generator Room
25
Generator Room with diesel tank on top
Generator Room
26
Before: With no paint and testing of RO & boiler was not done; pipe lines to RO was not
complete
Boiler and RO Plant House
27
Boiler & RO installation complete; water line to boiler and RO complete; insulation of steam
line in progress.
Boiler and RO Plant House
28
Installed RO and Boiler; Heavy fuel and water overhead tanks complete.
Boiler and RO Plant House
29
Weigh bride cabin with internet and
telephone.
30
Wide view for both Genset, Boiler weighbridge 2 plus cabin and water tank. - before
31
Wide view for both Genset, Boiler weighbridge 2 plus cabin and water tank.
32
Before; the weighbridge was not installed
Public Wash Room
33
wash Hand basins, toilets, overhead tanks and shower heads completed
Public Wash Room
34
Pump House
35
Tank farm MCC installed successfully – was moved from the temporary location (transformer
room) to here permanently. Foundation of the pump house is complete and fitting of the Header.
Pump House
36
Entry Guard House Before
37
Entry Guard house – ready with telephone and internet cable for connecting CCTV screen or
desktop to monitor trucks way in and out.
Entry Guard House
38
Exit Guard house – Side View
Exit Guard House
39
Before.
KRA Office & Transformer room
40
Ready with both AC, Telephone and internet point.
KRA Office
41
Transformer Room
42
Tank 1:
Tanks
43
Tank 2: Before
Tanks
44
Tank 3: Before
Tanks
45
Tank 4: Before
Tanks
46
Tanks Side view
Tanks
47
Tanks Side view
Tanks
48
Water Tank & Chimney for the boiler: 100% complete
Tanks
49
Pipe installation at the water tank. Successfully installed
Piping
50
Fire hydrant and product line from tanks to
loading bay
Piping
51
Road Works 100% done
Roads
52
Fire hydrant pipe before
Fire Hydrant pipes before and water line
from the county 100% complete
53
Fire hydrant pipe after
54
Insulation of steam lines complete
Pipe Insulation
55
Pipe Insulation
56
Will be used to trap any oil spillage from the tanks
Dyke Wall
57
To direct water away from the compound
Water Drainage before
58
Water Drainage after
59
Fire Hydrant line from the back side of the tank farm is 75% complete.
Water transfer line from Tank 1 to tank 7 is on-going.
60
Installation of the agitators as per the
required recommendations is complete in
phase one.
THANK YOU

More Related Content

What's hot

Ibrahim Mohamed Ibrahim Issa Resume
Ibrahim Mohamed Ibrahim Issa  ResumeIbrahim Mohamed Ibrahim Issa  Resume
Ibrahim Mohamed Ibrahim Issa ResumeIBRAHIM ISSA
 
SB-12 Energy Star Training
SB-12 Energy Star TrainingSB-12 Energy Star Training
SB-12 Energy Star Trainingtboyko
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016Ahmed Maamoun
 
Alfanar SPADC Riyadh Project - Steel Structural package
Alfanar SPADC Riyadh Project - Steel Structural packageAlfanar SPADC Riyadh Project - Steel Structural package
Alfanar SPADC Riyadh Project - Steel Structural packageMuhammad Nouman
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 
eng.ahmad fathi C.V
eng.ahmad fathi C.Veng.ahmad fathi C.V
eng.ahmad fathi C.Vahmad fathi
 

What's hot (13)

Ibrahim Mohamed Ibrahim Issa Resume
Ibrahim Mohamed Ibrahim Issa  ResumeIbrahim Mohamed Ibrahim Issa  Resume
Ibrahim Mohamed Ibrahim Issa Resume
 
SB-12 Energy Star Training
SB-12 Energy Star TrainingSB-12 Energy Star Training
SB-12 Energy Star Training
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
 
Mpe. muhammad elkhatib
Mpe. muhammad elkhatibMpe. muhammad elkhatib
Mpe. muhammad elkhatib
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
Alfanar SPADC Riyadh Project - Steel Structural package
Alfanar SPADC Riyadh Project - Steel Structural packageAlfanar SPADC Riyadh Project - Steel Structural package
Alfanar SPADC Riyadh Project - Steel Structural package
 
fire & gas specialsit
fire & gas specialsitfire & gas specialsit
fire & gas specialsit
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Curriculum vitae vn
Curriculum vitae   vnCurriculum vitae   vn
Curriculum vitae vn
 
eng.ahmad fathi C.V
eng.ahmad fathi C.Veng.ahmad fathi C.V
eng.ahmad fathi C.V
 

Similar to Project Status 1

Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Crosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020Crosstown TO
 
Fall Central Open House - Oct 21
Fall Central Open House  - Oct 21Fall Central Open House  - Oct 21
Fall Central Open House - Oct 21Crosstown TO
 
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue StationsFall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue StationsCrosstown TO
 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleCrosstown TO
 
Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Crosstown TO
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Crosstown TO
 
Public Meeting of Facility Services Building at Eglinton Station - February 2018
Public Meeting of Facility Services Building at Eglinton Station - February 2018Public Meeting of Facility Services Building at Eglinton Station - February 2018
Public Meeting of Facility Services Building at Eglinton Station - February 2018Crosstown TO
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open HouseCrosstown TO
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects BrochureSteven MacDonald
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Crosstown TO
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Crosstown TO
 
Migaa progress update september 2016-1
Migaa progress update   september 2016-1Migaa progress update   september 2016-1
Migaa progress update september 2016-1Delight Homes kenya
 
Migaa progress update september 2016-1
Migaa progress update   september 2016-1Migaa progress update   september 2016-1
Migaa progress update september 2016-1Delight Homes kenya
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv newkarl davis
 
Company portfolio
Company portfolioCompany portfolio
Company portfolioDave Kelly
 
West works open house deck March 12 2020
West works open house deck   March 12 2020 West works open house deck   March 12 2020
West works open house deck March 12 2020 Crosstown TO
 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCrosstown TO
 

Similar to Project Status 1 (20)

Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020
 
Fall Central Open House - Oct 21
Fall Central Open House  - Oct 21Fall Central Open House  - Oct 21
Fall Central Open House - Oct 21
 
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue StationsFall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to Cedarvale
 
Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
 
Public Meeting of Facility Services Building at Eglinton Station - February 2018
Public Meeting of Facility Services Building at Eglinton Station - February 2018Public Meeting of Facility Services Building at Eglinton Station - February 2018
Public Meeting of Facility Services Building at Eglinton Station - February 2018
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open House
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
 
Migaa progress update september 2016-1
Migaa progress update   september 2016-1Migaa progress update   september 2016-1
Migaa progress update september 2016-1
 
Migaa progress update september 2016-1
Migaa progress update   september 2016-1Migaa progress update   september 2016-1
Migaa progress update september 2016-1
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
Company portfolio
Company portfolioCompany portfolio
Company portfolio
 
West works open house deck March 12 2020
West works open house deck   March 12 2020 West works open house deck   March 12 2020
West works open house deck March 12 2020
 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House Presentation
 

Project Status 1