PROJECT HANDLED UNDER UAAC
UNITED ARAB ALUMINUM COMPANY (OCTOBER 2011-CURRENT)
THE LOT AREA OF 670,000 m2 MULTI BILLION RIYALS
PROJECT IS DESIGNED TO MAKE KAIA THE LARGEST
HUB IN THE WORLD
KAIA INTERNATIONAL AIRPORT
King Abdul-Aziz International Airport Development Project
THE LOT AREA OF 670,000 m2 MULTI BILLION DOLLAR
PROJECT IS DESIGNED TO MAKE KAIA THE LARGEST
HUB IN THE WORLD
FIRST ASSIGNMENT
Oct. 25 2011 I took Performance test to release fabrication drawing
for cladding works as per site dimension for Saudi Private Airport
Building
DATA CENTER 1
December 2011 First major project handled as Facade designer
ANTICIPATING PHASE 1 FROM KAIA PROJECTION OF
30 MILLION ANNUAL CAPACITY, WE HAVE THE
OPPORTUNITY TO SUCCESFULLY PROVIDE THE
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 8,000 m2 OF ALUMINUM REQUIREMENTS FOR
THIS BUILDING
FLOOR AREA: 15,800m2
DATA CENTER 2
August 2012 Building assignment as Team leader
TYPICAL BUILDING WITH DATA CENTER 1 WE WERE
ALSO GRANTED TO PROVIDE THE DESIGN,
FABRICATION AND INSTALLATION OF MORE THAN
8,000 m2 OF ALUMINUM REQUIREMENTS FOR THIS
BUILDING (TYPICAL TO DATA CENTER 1)
FLOOR AREA: 15,800m2
METEOROLOGICAL OBSERVATION BUILDING
September 2014 Building Assignment as Team Leader
STATE OF THE ART WEATHER STATION OF KAIA, WE
HAVE THE OPPORTUNITY TO DESIGN, FABRICATE AND
INSTALL MORE THAN 800 m2 OF ALUMINUM
REQUIREMENTS FOR THIS BUILDING
FLOOR AREA: 470m2
CRISIS MANAGEMENT CENTER
January 2014 Building Assignment as Team Leader
WE ALSO HAVE SUCCESSFULLY PROVIDED THE
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 1000 m2 OF ALUMINUM REQUIREMENTS FOR
THIS BUILDING
FLOOR AREA: 1200m2
FUEL FARM
November 2014 Building Assignment Team Leader
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 2000 m2 OF ALUMINUM REQUIREMENTS FOR
KAIA’S OIL DEPOT WAS SUCCESSFULLY PROVIDED BY
UAAC
FLOOR AREA: 1900m2
J250 TREE NURSERY FACILITY BUILDINGS
October 2015 Building Assignment as Team Leader
J250 NURSERY FACILITY BUILDINGS
1. Administration Building
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 7,700 m2 OF ALUMINUM REQUIREMENTS FOR
KAIA’S ADMINISTRATION BUILDING
FLOOR AREA: 2,300m2
J250 NURSERY FACILITY BUILDINGS
2. Housing Facilities
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 9,800 m2 OF ALUMINUM REQUIREMENTS FOR
KAIA’S HOUSING ACCOMMODATIONS
TOTAL FLOOR AREA: 4,800m2 (FOR 8 HOUSING UNITS
& GRAND RECEIVING HALL)
J250 NURSERY FACILITY BUILDINGS
4. MEP Buildings
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 2,600 m2 OF ALUMINUM REQUIREMENTS
TOTAL FLOOR AREA: 2,900 m2 (FOR 4 UNITS)
J250 NURSERY FACILITY BUILDINGS
3. Housing Substation Building
HOUSING SUBSTATION: DESIGN, FABRICATION
AND INSTALLATION OF MORE THAN 500 m2 OF
ALUMINUM REQUIREMENTS
FLOOR AREA: 391m2
GARDEN CENTER SUBSTATION:
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 800 m2 OF ALUMINUM REQUIREMENTS
FLOOR AREA: 493 m2
CHECK POINT:
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 300 m2 OF ALUMINUM REQUIREMENTS
TOTAL FLOOR AREA: 64 m2 (FOR 2 UNITS)
TECH. UNITS:
DESIGN, FABRICATION AND INSTALLATION OF MORE
THAN 1,100 m2 OF ALUMINUM REQUIREMENTS
TOTAL FLOOR AREA: 330 m2 (FOR 10 UNITS)

More Related Content

What's hot (13)

M Arif Shaheen
M Arif ShaheenM Arif Shaheen
M Arif Shaheen
 
Alag abode dombivali east
Alag abode dombivali eastAlag abode dombivali east
Alag abode dombivali east
 
Project - WTS Concrete
Project - WTS ConcreteProject - WTS Concrete
Project - WTS Concrete
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
Linde certificate01.05.2006
Linde certificate01.05.2006Linde certificate01.05.2006
Linde certificate01.05.2006
 
Whole foods #picsby picone
Whole foods #picsby piconeWhole foods #picsby picone
Whole foods #picsby picone
 
Item # 4 PPT 160 Terrell Compatibility Review
Item # 4   PPT 160 Terrell Compatibility ReviewItem # 4   PPT 160 Terrell Compatibility Review
Item # 4 PPT 160 Terrell Compatibility Review
 
Construction update of BridgeCounty
Construction update of BridgeCountyConstruction update of BridgeCounty
Construction update of BridgeCounty
 
Rehab work & costing
Rehab work & costingRehab work & costing
Rehab work & costing
 
Facilities Maintenance Relocation Contract
Facilities Maintenance Relocation ContractFacilities Maintenance Relocation Contract
Facilities Maintenance Relocation Contract
 
Gateway3
Gateway3Gateway3
Gateway3
 
HASAN ALSAIFI
HASAN ALSAIFIHASAN ALSAIFI
HASAN ALSAIFI
 
Planning an itinerary
Planning an itinerary Planning an itinerary
Planning an itinerary
 

Similar to project portfolio - KAIA

M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -
Mohamed Salah
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
Muhammad Hegazy
 
About Mro Facilities
About Mro FacilitiesAbout Mro Facilities
About Mro Facilities
eidderf91
 
GCG Company Profile UPDATED part 3
GCG Company Profile UPDATED part 3GCG Company Profile UPDATED part 3
GCG Company Profile UPDATED part 3
Waleed Al Zuraiqi
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
Daniel DRAGOSIN
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
kahayami
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
AlasAlthaher
 
Presentation Sample KAAU
Presentation Sample KAAUPresentation Sample KAAU
Presentation Sample KAAU
Abdullah Bakhsh
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
Ehab Abdelmoneam
 

Similar to project portfolio - KAIA (20)

Ak. engg profile updated
Ak. engg  profile   updatedAk. engg  profile   updated
Ak. engg profile updated
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
About Mro Facilities
About Mro FacilitiesAbout Mro Facilities
About Mro Facilities
 
Dorce camps
Dorce campsDorce camps
Dorce camps
 
GCG Company Profile UPDATED part 3
GCG Company Profile UPDATED part 3GCG Company Profile UPDATED part 3
GCG Company Profile UPDATED part 3
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Suvo's portfolio
Suvo's portfolioSuvo's portfolio
Suvo's portfolio
 
Mep contractors in abu dhabi
Mep contractors in abu dhabiMep contractors in abu dhabi
Mep contractors in abu dhabi
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
Dynamic architecture
Dynamic architectureDynamic architecture
Dynamic architecture
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2
 
Presentation Sample KAAU
Presentation Sample KAAUPresentation Sample KAAU
Presentation Sample KAAU
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
 

project portfolio - KAIA

  • 1. PROJECT HANDLED UNDER UAAC UNITED ARAB ALUMINUM COMPANY (OCTOBER 2011-CURRENT) THE LOT AREA OF 670,000 m2 MULTI BILLION RIYALS PROJECT IS DESIGNED TO MAKE KAIA THE LARGEST HUB IN THE WORLD
  • 2. KAIA INTERNATIONAL AIRPORT King Abdul-Aziz International Airport Development Project THE LOT AREA OF 670,000 m2 MULTI BILLION DOLLAR PROJECT IS DESIGNED TO MAKE KAIA THE LARGEST HUB IN THE WORLD
  • 3. FIRST ASSIGNMENT Oct. 25 2011 I took Performance test to release fabrication drawing for cladding works as per site dimension for Saudi Private Airport Building
  • 4. DATA CENTER 1 December 2011 First major project handled as Facade designer ANTICIPATING PHASE 1 FROM KAIA PROJECTION OF 30 MILLION ANNUAL CAPACITY, WE HAVE THE OPPORTUNITY TO SUCCESFULLY PROVIDE THE DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 8,000 m2 OF ALUMINUM REQUIREMENTS FOR THIS BUILDING FLOOR AREA: 15,800m2
  • 5. DATA CENTER 2 August 2012 Building assignment as Team leader TYPICAL BUILDING WITH DATA CENTER 1 WE WERE ALSO GRANTED TO PROVIDE THE DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 8,000 m2 OF ALUMINUM REQUIREMENTS FOR THIS BUILDING (TYPICAL TO DATA CENTER 1) FLOOR AREA: 15,800m2
  • 6. METEOROLOGICAL OBSERVATION BUILDING September 2014 Building Assignment as Team Leader STATE OF THE ART WEATHER STATION OF KAIA, WE HAVE THE OPPORTUNITY TO DESIGN, FABRICATE AND INSTALL MORE THAN 800 m2 OF ALUMINUM REQUIREMENTS FOR THIS BUILDING FLOOR AREA: 470m2
  • 7. CRISIS MANAGEMENT CENTER January 2014 Building Assignment as Team Leader WE ALSO HAVE SUCCESSFULLY PROVIDED THE DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 1000 m2 OF ALUMINUM REQUIREMENTS FOR THIS BUILDING FLOOR AREA: 1200m2
  • 8. FUEL FARM November 2014 Building Assignment Team Leader DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 2000 m2 OF ALUMINUM REQUIREMENTS FOR KAIA’S OIL DEPOT WAS SUCCESSFULLY PROVIDED BY UAAC FLOOR AREA: 1900m2
  • 9. J250 TREE NURSERY FACILITY BUILDINGS October 2015 Building Assignment as Team Leader
  • 10. J250 NURSERY FACILITY BUILDINGS 1. Administration Building DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 7,700 m2 OF ALUMINUM REQUIREMENTS FOR KAIA’S ADMINISTRATION BUILDING FLOOR AREA: 2,300m2
  • 11. J250 NURSERY FACILITY BUILDINGS 2. Housing Facilities DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 9,800 m2 OF ALUMINUM REQUIREMENTS FOR KAIA’S HOUSING ACCOMMODATIONS TOTAL FLOOR AREA: 4,800m2 (FOR 8 HOUSING UNITS & GRAND RECEIVING HALL)
  • 12. J250 NURSERY FACILITY BUILDINGS 4. MEP Buildings DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 2,600 m2 OF ALUMINUM REQUIREMENTS TOTAL FLOOR AREA: 2,900 m2 (FOR 4 UNITS)
  • 13. J250 NURSERY FACILITY BUILDINGS 3. Housing Substation Building HOUSING SUBSTATION: DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 500 m2 OF ALUMINUM REQUIREMENTS FLOOR AREA: 391m2 GARDEN CENTER SUBSTATION: DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 800 m2 OF ALUMINUM REQUIREMENTS FLOOR AREA: 493 m2 CHECK POINT: DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 300 m2 OF ALUMINUM REQUIREMENTS TOTAL FLOOR AREA: 64 m2 (FOR 2 UNITS) TECH. UNITS: DESIGN, FABRICATION AND INSTALLATION OF MORE THAN 1,100 m2 OF ALUMINUM REQUIREMENTS TOTAL FLOOR AREA: 330 m2 (FOR 10 UNITS)