This document lists 6 projects that an individual was involved in between 2012-2014. The projects include proposals for modifications to increase gas recovery from the Berantai Marginal Field in Indonesia, development plans for the Ande Ande Lumut Field involving installation of infrastructure and wells, a feasibility study of an FPSO for refurbishment, providing support for proposals for the development of the Tembikai and Chenang fields through a risk service contract, evaluating assets and potential modifications for the KSB, PTT, PTB Aceh Onshore fields, and a proposal for converting a Floating Production Unit for the Husky CNOOC Madura Field in Indonesia.
Project comprised of the demolition of 22 Tons concrete decking with trucks standing by for transport to reclamation sites throughout the Seattle area.
Project comprised of the demolition of 22 Tons concrete decking with trucks standing by for transport to reclamation sites throughout the Seattle area.
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...PowerLift Events
www.powerlogisticsasia.com is an annual project logistics event which is taking place in Singapore. The event brings together the heavy transport and lifting industry that is catering to the oil, gas, heavy engineering, power, mining and other related industries. It offers a great opportunity for participants to hold up the flag in the South East Asian project cargo market. It comprises of educational workshops, conferences, seminars and an exhibition.
www.powerlogisticsasia.com
Case Study - University of Colorado Parking Garage and FieldAMSYSCO Inc.
The University of Colorado Colorado Springs (UCCS)
needed more campus parking for the Alpine Village student
housing complex. In addition, the UCCS planning board
approved financing to expand their sporting complex.
This project served two purposes: a parking structure
that acted as a recreational field. The 1200-car, four-story
post-tensioned (PT) parking structure supported the
240 x 360 ft (73 x 110 m) artificial turf field on the roof
level.
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...PowerLift Events
www.powerlogisticsasia.com is an annual project logistics event which is taking place in Singapore. The event brings together the heavy transport and lifting industry that is catering to the oil, gas, heavy engineering, power, mining and other related industries. It offers a great opportunity for participants to hold up the flag in the South East Asian project cargo market. It comprises of educational workshops, conferences, seminars and an exhibition.
www.powerlogisticsasia.com
Case Study - University of Colorado Parking Garage and FieldAMSYSCO Inc.
The University of Colorado Colorado Springs (UCCS)
needed more campus parking for the Alpine Village student
housing complex. In addition, the UCCS planning board
approved financing to expand their sporting complex.
This project served two purposes: a parking structure
that acted as a recreational field. The 1200-car, four-story
post-tensioned (PT) parking structure supported the
240 x 360 ft (73 x 110 m) artificial turf field on the roof
level.
1. No. Description Year
1.
Berantai Marginal Field, PM309
Modification proposal for current process system by installing turbo expander as a
second driver for offgas compression system.
Flare reduction exercise in order to solve high flaring issue during unit shut down and
to increase export gas recovery.
Project support team on behalf of JV partner throughout working period.
2012- 2015
2.
Ande Ande Lumut Field Indonesia. Proposal of Development Plan for installation of
WHP (tripods, flexible / rigid pipeline to FPSO), lease FPSO with refurbish topside
facilities and drilling of 43 development wells.
2013
3.
FPSO Cossack Pioneer. Feasibility study on potential FPSO to hire/purchase prior
refurbishment and installation of topside facilities (e.g. technical evaluation of existing
facilities and risk evaluation)
2013
4.
Tembikai & Chenang Field. Provide support to Field Development Department for
Proposal of Tembikai & Chenang marginal field development through Risk Service
Contract (RSC).
2014
5.
KSB, PTT, PTB Aceh Onshore. Feasibility study to perform asset evaluation (current
facilities) and proposal for modification/rejuvenation scope. 2014
6.
Husky CNOOC Madura Field Indonesia. Proposal for conversion of Floating Production
Unit (FPU) inclusive Engineering, Procurement, Construction, Installation and
Commissioning (EPCIC) scope.
2014
PROJECTS INVOLVED