PROJECT CHARTER
General Information
Project Name: ShelterBubble
Project Budget: $40,000
Project Deadline: Sept.5th
,2017 – Sept.4th
, 2019
Project Sponsor: ShawnAlborz
Project Manager: SivanLubinin
Date Prepared: Sept.5th
, 2017
Client/Customer: ShawnAlborz
Project Purpose/Business Case
ShelterBubble wascreatedtodecrease numberof casualtyfromnatural disasterespeciallywaterbased
disasters.Tomanypeople are unpreparedforthingslike hurricanesandotherdisasters.Theyare stranded in
housesandsome eventryto escape incars but unfortunately,some die inthe process. The ShelterBubble is
createdto have enoughspace foran average family.Itisbuilttosustaina familyforabouta week.
Project Preliminary Scope
ShelterBubble will containabathroomandan area to store foodand water.Itwill be able tofloatand
anchor. The bathroomwill justuse vacuumsuctionlike inplanes.The shell will be carbonfiberwithLine Xspray
protectionaroundit.It will alsohave acooling andheatingmechanismsaswell asanoxygenandcarbon dioxide
regulator.The shell willbe able tofloat.There will be seatswithharnessesaswell.
In Scope Out of Scope
Seats Water
Heat andCooling Light
Page 2 of 6
Storage Food
Anchor Firstaid kit
Bathroom
Floatable Shell
OxygenandCarbonDioxide Regulator
Key Milestones and Deliverables
The ShelterBubble willhave fivedifferentmilestones.The firstone itatthe completionof the planning
stage. Up to thispointnothingphysical wouldbe constructed.The secondmilestone isatthe completionof the
firstprototype whenthe firstphysical productiscomplete.Atthispointof the projectnoteston itssafetyor
durabilityhasbeentested.The thirdmilestoneistocomplete all the safety,durability,equipmentfunctionsas
well asadjustthe prototype astestresultscomesout. The fourthstepwouldbe tocomplete all the marketing
and sellsresearch,reports,andstrategy. The lastmilestone wouldbe toadjustthe firstprototype accordingto
the testresultsgatheredfromthe thirdmilestoneaswell asmarketreports. More testswill be done before the
completionof thismilestone.
The firstmilestone isidentifiedbasedonthe physical workload. Thiswhere all the planningisdone,
and because planningisthe mostimportantportionandisthe foundationforthe whole project thusnophysical
constructionof the prototype will be done beforethisstage iscomplete. Fourmonthsis allocatedtothisstage
for that exactreason. The completionof the firstprototype isthe secondmilestone andafourmonthis
allocatedforthis stage as well. While mostof the exactstepof the constructionof the firstprototype are listed
inthe planningstate,itismuchmore cost efficientformistakestobe fixedduringthe initialstage of
construction,thus,thisperiodallowsformistakestobe caughtand fixed.Afterthatisthe completionof the
testingstage. Onlyfourmonthsisgivenforthismilestonebecause thisthe initialtestingstage togatherall the
data and notactuallywithinthe fixingstage. Once the prototype isdone constructing,the marketingportionof
the team will startgatherdifferentmarketreportsaswell asfuture marketforecast. A total of 10 monthwill be
givenforthisstage because mostof the data gatheredisgoingtobuildthe basesforforecasting. While the
marketingsectionisgoing,the constructingof the final prototypewillalsobe inprogressafterthe third
milestone. Itwill take one yearforthisprototype tocomplete because more testwill be done asadjustments
are made to ensure safety of ShelterBubble.
At the due date of the firstmilestone,the blueprintsof the interiorandexteriorwillbe done aswell as
the blueprintof all the electricals.Atthe secondmilestone,the constructionof the firstprototype willbe done
as well as firstroundof testsas the constructionof the prototype isbeingbuild. Thisstage will alsotestthe
marketfor the product. At the endof the thirdmilestone,all majortestswill be complete intermsof revisionof
Page 3 of 6
designandimprovementof designs. Atthe fourthmilestonemarketresearchandreportswill be done. Alsoat
thisstage 5 improvedprototype will be soldtosee how well itwill reactwiththe market. Atthe lastmilestone,
all changeswill be final,andall the necessarytesttoinsure the safetyof the productwill be done andisready
for the market.Table onnextpage.
Milestone Deliverable Date
Completionof
Planningstate
· X Blueprintof interiorandexterior
· X Blueprintof electricals
December
31st, 2017
Completionof first
prototype
· X Testingof differentaspectinalab
· X Testinginmarket
May 5th, 2018
Completionof
Testing
· X Revisiontopreviousdesign
· X Improve design
September
5th, 2018
Completionof
Marketing/Sell
· X Sell 5to test featuresinmarket
· X Receive fullreportof whatislikedandwhat
needstobe changed.
February31st,
2019
Completionof Final
prototype
· X Make changestoprototype
· X FinishTestingproductagain
September
4th,
2019
Project High-Level Assumptions
Our assumptionsare decidedbasedonwhatwe envisionedourproducttobe and what functionisgoing
to serve. Ourvisionincludesthatit’sgoingtokeepfamilies’safe duringnatural disastersthuswe assume that
it’sgoingto at leastbe able to fita familyandthuscan’t be small insize. We alsoassume thatthere isgoingto
be a longperiodof time (oversix month) betweenthe time thisproductisboughtanditis usedthuswe assume
that it’snot goingtocome withelectricity,food,water. We alsoassume thatour initial draftof the productis
Page 4 of 6
not goingto be perfectandthuswe wouldneedmore thanone prototype. Withthese assumptionsinplace,
we will planandschedule aroundthose assumptionstoensure thatyourprojectsaysonschedule andon
budget.
Assumptionsinclude:
● It won’tbe small because itwill fitafamily
● Electricswill workwiththe designteamtofitinelectricals
● Once the customerbuysit, theyare responsibleforstockingit
● There will be more thanone prototype due tothe needto testthe product.
Key Critical Success Factors
● Make sure that all aspectsof the projectare testedthoroughlyforsafetyreasons
● At leastmiddle-classfamiliescanpurchase ShelterBubble
● Make sure that the product isconvenientforpeople tostore
● Make sure that all the interiordesignsare matchingtocustomers'preferences
Key Stakeholders
The stakeholderisone of the mostimportantthe resource forthisproject.If the projectdoesnot have
any stakeholders,thenthere wouldnothave moneyorsponsors.Inthisproject,mostof fundingwill come from
ShawnAlborz.ShawnAlborzneedstoagree thisprojectandgive the permissiontostarton it.
Stakeholder Primary Role
ShawnAlborz Sponsor/Client
Potential Risks
Since ShawnAlborzalreadyhada ShelterBubble,one of the biggestrisksandobstaclesof the productis
not safetyenough.The teamstartto preventrisksandobstaclesbycomingupsome brightideasandnew
designbefore startingmakinganewShelterBubble.Aswell asidentifiedall the risksandobstaclesneedtobe
overcome fromthe previousShelterBubblebyShawnAlborzandmake sure the riskswill notappearagain.
These risksare importantformakingShelterBubble becauseitislike planningforthe worstandsee
whatkindof problemsmightbe happenedtoitand helpbusinesstopreventitwhenhappening.The firstriskis
aboutsafety,if itis notsafetywhyshouldcustomerscome andbuy.The secondriskis aboutthe product istoo
heavyto move fromone place to another.Forexample,afterpurchasingShelterBubble,people wouldlike to
move fromHoustonto Dallas,whichisinconvenientdue tothe heavyweight.The thirdriskisaboutShelter
Page 5 of 6
Bubble'svolume. Toputmore stuffsinone ShelterBubble,the diameterisabouttwomen'sheight.However,
there doesnothave enoughspace to store it.Since Shawnhas alreadybeenusingShelterBubbleforalong
time,the teamisaware of these risksandtakesthemvery seriously.
The mitigationof the risksisto make sure to create multiple blueprintvariationsaheadof time,tomake
ShelterBubble weightlight,anddesignthe producttobe able to fitintoa small room.Alsothe most
importantly,the mitigationcan raise volumesof customerstopurchase the ShelterBubble.
Risk Potential Impact Remedy/Mitigation/Approach
The product isn’tsafe Setsback productiondate
and release date
Create multiple blueprint
variationsaheadof time
The product istoo heavyto
move fromone place to
another
Decrease salesvolume Use lightmaterialsinsteadinboth
interiorandexteriordesign
The product doesn’thave a
place to store
Lowerspotential sales
volume due tolackof
storage space
Designthe productto be able to
fitinside asingle cargarage
Potential Dependencies
Thisdependonour ownarchitectural engineers,electricians,accountants,andmarketresearcher.The
external dependenciesincludeLine XSpray,a companywe are goingto collaborate upwith.Theycurrently
manufacture a sprayfor truck bedsthatcan transformweakersubstancesintosomethingthatisvirtually
indestructible.We will be dependentontheirproduct.
Internal Dependencies External Dependencies
Architectural Engineers Line X Spray
Electricians
Accountant
Page 6 of 6
Market researcher
Acceptance Criteria
The ShelterBubble issupposedtoprovide protectionemotionallyandphysically.Itshouldbe as
affordable asa car so that more people have accesstoit and itisn’tjustusedas a toy. Thiscouldsave livesina
newand unique way.The factthat itwill appeal more tothose whocrave preparedness,itwill alsoappealto
those whohave beenaffectedbynatural disasterssothattheyare preparedinthe future.Non-profit’scanalso
buythese as theywill wanttoassistpeople innatural disasters.
Acceptance criteriainclude:
● Safety
● Affordability
● Unique
Signatures/Approvals
The signaturesbelowformallyapprove the projectcharterandempowerthe projectmanagertoproceedwith
the projectas outlinedinthischart.
ClientName andSignature:_____________Shawn Alborz_______________ Date:___9/11/2017_____
ProjectSponsorName andSignature:_______Shawn Alborz_____________ Date: ___9/11/2017____
ProjectManager Name andSignature:___________Sivan Lubinin__________ Date: ___9/11/2017___

More Related Content

Similar to Project Charter for Shelter Bubble

Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
Massimo Menichinelli
 
Essay Writing My Pet Animal. Online assignment writing service.
Essay Writing My Pet Animal. Online assignment writing service.Essay Writing My Pet Animal. Online assignment writing service.
Essay Writing My Pet Animal. Online assignment writing service.
Alexis Thelismond
 
Department of Finance Faculty of Business, Bentley Univer.docx
Department of Finance  Faculty of Business, Bentley Univer.docxDepartment of Finance  Faculty of Business, Bentley Univer.docx
Department of Finance Faculty of Business, Bentley Univer.docx
salmonpybus
 
Unit VIII Course Project University Case Study Congratulations! .docx
Unit VIII Course Project University Case Study Congratulations! .docxUnit VIII Course Project University Case Study Congratulations! .docx
Unit VIII Course Project University Case Study Congratulations! .docx
marilucorr
 
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
marc dowling
 
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docxInfo for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
jaggernaoma
 
Useful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope CreepUseful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope Creep
Michael Vaughn
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
MargaritoWhitt221
 
Untangle the tangle Project report
Untangle the tangle Project reportUntangle the tangle Project report
Untangle the tangle Project report
Abhi RG , CSCP
 
Solar Project 2015
Solar Project 2015Solar Project 2015
Solar Project 2015
Peter Mercado
 
Delta Beacon Time Capsule
Delta Beacon Time CapsuleDelta Beacon Time Capsule
Delta Beacon Time Capsule
Timø Ronan
 
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docxSheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
maoanderton
 
Pay Someone To Write My Essay - Can I Pay Someone T
Pay Someone To Write My Essay - Can I Pay Someone TPay Someone To Write My Essay - Can I Pay Someone T
Pay Someone To Write My Essay - Can I Pay Someone T
Dustin Pytko
 
Unicorn Invasion: The Next Level of Sparkle and Stuff
Unicorn Invasion: The Next Level of Sparkle and StuffUnicorn Invasion: The Next Level of Sparkle and Stuff
Unicorn Invasion: The Next Level of Sparkle and Stuff
Brandy Porter
 
- Attached exhibits which are readable and understandable (I sugge.docx
- Attached exhibits which are readable and understandable (I sugge.docx- Attached exhibits which are readable and understandable (I sugge.docx
- Attached exhibits which are readable and understandable (I sugge.docx
mercysuttle
 
New Business Plan
New Business PlanNew Business Plan
New Business Plan
Charles Bowe
 
SustainabilitySamsung has claimed so much in their sustainabilit.docx
SustainabilitySamsung has claimed so much in their sustainabilit.docxSustainabilitySamsung has claimed so much in their sustainabilit.docx
SustainabilitySamsung has claimed so much in their sustainabilit.docx
deanmtaylor1545
 
Reservoir modelling
Reservoir modellingReservoir modelling
Reservoir modelling
Ingemmet Peru
 
Research plan for sustainable furniture development
Research plan for sustainable furniture developmentResearch plan for sustainable furniture development
Research plan for sustainable furniture development
Apoorv Gupta
 
Engl313 ada project4_slidedoc2 (1)
Engl313 ada project4_slidedoc2 (1)Engl313 ada project4_slidedoc2 (1)
Engl313 ada project4_slidedoc2 (1)
KatieKrahn
 

Similar to Project Charter for Shelter Bubble (20)

Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
Come scalare progetti di Design autoprodotto @ Operae Torino.09.11.2012
 
Essay Writing My Pet Animal. Online assignment writing service.
Essay Writing My Pet Animal. Online assignment writing service.Essay Writing My Pet Animal. Online assignment writing service.
Essay Writing My Pet Animal. Online assignment writing service.
 
Department of Finance Faculty of Business, Bentley Univer.docx
Department of Finance  Faculty of Business, Bentley Univer.docxDepartment of Finance  Faculty of Business, Bentley Univer.docx
Department of Finance Faculty of Business, Bentley Univer.docx
 
Unit VIII Course Project University Case Study Congratulations! .docx
Unit VIII Course Project University Case Study Congratulations! .docxUnit VIII Course Project University Case Study Congratulations! .docx
Unit VIII Course Project University Case Study Congratulations! .docx
 
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
 
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docxInfo for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
Info for Matrix AssignmentMemo for Matrix Assignment.docxBo.docx
 
Useful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope CreepUseful Tips on Mitigating Scope Creep
Useful Tips on Mitigating Scope Creep
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
 
Untangle the tangle Project report
Untangle the tangle Project reportUntangle the tangle Project report
Untangle the tangle Project report
 
Solar Project 2015
Solar Project 2015Solar Project 2015
Solar Project 2015
 
Delta Beacon Time Capsule
Delta Beacon Time CapsuleDelta Beacon Time Capsule
Delta Beacon Time Capsule
 
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docxSheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
 
Pay Someone To Write My Essay - Can I Pay Someone T
Pay Someone To Write My Essay - Can I Pay Someone TPay Someone To Write My Essay - Can I Pay Someone T
Pay Someone To Write My Essay - Can I Pay Someone T
 
Unicorn Invasion: The Next Level of Sparkle and Stuff
Unicorn Invasion: The Next Level of Sparkle and StuffUnicorn Invasion: The Next Level of Sparkle and Stuff
Unicorn Invasion: The Next Level of Sparkle and Stuff
 
- Attached exhibits which are readable and understandable (I sugge.docx
- Attached exhibits which are readable and understandable (I sugge.docx- Attached exhibits which are readable and understandable (I sugge.docx
- Attached exhibits which are readable and understandable (I sugge.docx
 
New Business Plan
New Business PlanNew Business Plan
New Business Plan
 
SustainabilitySamsung has claimed so much in their sustainabilit.docx
SustainabilitySamsung has claimed so much in their sustainabilit.docxSustainabilitySamsung has claimed so much in their sustainabilit.docx
SustainabilitySamsung has claimed so much in their sustainabilit.docx
 
Reservoir modelling
Reservoir modellingReservoir modelling
Reservoir modelling
 
Research plan for sustainable furniture development
Research plan for sustainable furniture developmentResearch plan for sustainable furniture development
Research plan for sustainable furniture development
 
Engl313 ada project4_slidedoc2 (1)
Engl313 ada project4_slidedoc2 (1)Engl313 ada project4_slidedoc2 (1)
Engl313 ada project4_slidedoc2 (1)
 

Recently uploaded

The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
Freelance
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
dpbossdpboss69
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 

Project Charter for Shelter Bubble

  • 1. Page 1 of 6 PROJECT CHARTER General Information Project Name: ShelterBubble Project Budget: $40,000 Project Deadline: Sept.5th ,2017 – Sept.4th , 2019 Project Sponsor: ShawnAlborz Project Manager: SivanLubinin Date Prepared: Sept.5th , 2017 Client/Customer: ShawnAlborz Project Purpose/Business Case ShelterBubble wascreatedtodecrease numberof casualtyfromnatural disasterespeciallywaterbased disasters.Tomanypeople are unpreparedforthingslike hurricanesandotherdisasters.Theyare stranded in housesandsome eventryto escape incars but unfortunately,some die inthe process. The ShelterBubble is createdto have enoughspace foran average family.Itisbuilttosustaina familyforabouta week. Project Preliminary Scope ShelterBubble will containabathroomandan area to store foodand water.Itwill be able tofloatand anchor. The bathroomwill justuse vacuumsuctionlike inplanes.The shell will be carbonfiberwithLine Xspray protectionaroundit.It will alsohave acooling andheatingmechanismsaswell asanoxygenandcarbon dioxide regulator.The shell willbe able tofloat.There will be seatswithharnessesaswell. In Scope Out of Scope Seats Water Heat andCooling Light
  • 2. Page 2 of 6 Storage Food Anchor Firstaid kit Bathroom Floatable Shell OxygenandCarbonDioxide Regulator Key Milestones and Deliverables The ShelterBubble willhave fivedifferentmilestones.The firstone itatthe completionof the planning stage. Up to thispointnothingphysical wouldbe constructed.The secondmilestone isatthe completionof the firstprototype whenthe firstphysical productiscomplete.Atthispointof the projectnoteston itssafetyor durabilityhasbeentested.The thirdmilestoneistocomplete all the safety,durability,equipmentfunctionsas well asadjustthe prototype astestresultscomesout. The fourthstepwouldbe tocomplete all the marketing and sellsresearch,reports,andstrategy. The lastmilestone wouldbe toadjustthe firstprototype accordingto the testresultsgatheredfromthe thirdmilestoneaswell asmarketreports. More testswill be done before the completionof thismilestone. The firstmilestone isidentifiedbasedonthe physical workload. Thiswhere all the planningisdone, and because planningisthe mostimportantportionandisthe foundationforthe whole project thusnophysical constructionof the prototype will be done beforethisstage iscomplete. Fourmonthsis allocatedtothisstage for that exactreason. The completionof the firstprototype isthe secondmilestone andafourmonthis allocatedforthis stage as well. While mostof the exactstepof the constructionof the firstprototype are listed inthe planningstate,itismuchmore cost efficientformistakestobe fixedduringthe initialstage of construction,thus,thisperiodallowsformistakestobe caughtand fixed.Afterthatisthe completionof the testingstage. Onlyfourmonthsisgivenforthismilestonebecause thisthe initialtestingstage togatherall the data and notactuallywithinthe fixingstage. Once the prototype isdone constructing,the marketingportionof the team will startgatherdifferentmarketreportsaswell asfuture marketforecast. A total of 10 monthwill be givenforthisstage because mostof the data gatheredisgoingtobuildthe basesforforecasting. While the marketingsectionisgoing,the constructingof the final prototypewillalsobe inprogressafterthe third milestone. Itwill take one yearforthisprototype tocomplete because more testwill be done asadjustments are made to ensure safety of ShelterBubble. At the due date of the firstmilestone,the blueprintsof the interiorandexteriorwillbe done aswell as the blueprintof all the electricals.Atthe secondmilestone,the constructionof the firstprototype willbe done as well as firstroundof testsas the constructionof the prototype isbeingbuild. Thisstage will alsotestthe marketfor the product. At the endof the thirdmilestone,all majortestswill be complete intermsof revisionof
  • 3. Page 3 of 6 designandimprovementof designs. Atthe fourthmilestonemarketresearchandreportswill be done. Alsoat thisstage 5 improvedprototype will be soldtosee how well itwill reactwiththe market. Atthe lastmilestone, all changeswill be final,andall the necessarytesttoinsure the safetyof the productwill be done andisready for the market.Table onnextpage. Milestone Deliverable Date Completionof Planningstate · X Blueprintof interiorandexterior · X Blueprintof electricals December 31st, 2017 Completionof first prototype · X Testingof differentaspectinalab · X Testinginmarket May 5th, 2018 Completionof Testing · X Revisiontopreviousdesign · X Improve design September 5th, 2018 Completionof Marketing/Sell · X Sell 5to test featuresinmarket · X Receive fullreportof whatislikedandwhat needstobe changed. February31st, 2019 Completionof Final prototype · X Make changestoprototype · X FinishTestingproductagain September 4th, 2019 Project High-Level Assumptions Our assumptionsare decidedbasedonwhatwe envisionedourproducttobe and what functionisgoing to serve. Ourvisionincludesthatit’sgoingtokeepfamilies’safe duringnatural disastersthuswe assume that it’sgoingto at leastbe able to fita familyandthuscan’t be small insize. We alsoassume thatthere isgoingto be a longperiodof time (oversix month) betweenthe time thisproductisboughtanditis usedthuswe assume that it’snot goingtocome withelectricity,food,water. We alsoassume thatour initial draftof the productis
  • 4. Page 4 of 6 not goingto be perfectandthuswe wouldneedmore thanone prototype. Withthese assumptionsinplace, we will planandschedule aroundthose assumptionstoensure thatyourprojectsaysonschedule andon budget. Assumptionsinclude: ● It won’tbe small because itwill fitafamily ● Electricswill workwiththe designteamtofitinelectricals ● Once the customerbuysit, theyare responsibleforstockingit ● There will be more thanone prototype due tothe needto testthe product. Key Critical Success Factors ● Make sure that all aspectsof the projectare testedthoroughlyforsafetyreasons ● At leastmiddle-classfamiliescanpurchase ShelterBubble ● Make sure that the product isconvenientforpeople tostore ● Make sure that all the interiordesignsare matchingtocustomers'preferences Key Stakeholders The stakeholderisone of the mostimportantthe resource forthisproject.If the projectdoesnot have any stakeholders,thenthere wouldnothave moneyorsponsors.Inthisproject,mostof fundingwill come from ShawnAlborz.ShawnAlborzneedstoagree thisprojectandgive the permissiontostarton it. Stakeholder Primary Role ShawnAlborz Sponsor/Client Potential Risks Since ShawnAlborzalreadyhada ShelterBubble,one of the biggestrisksandobstaclesof the productis not safetyenough.The teamstartto preventrisksandobstaclesbycomingupsome brightideasandnew designbefore startingmakinganewShelterBubble.Aswell asidentifiedall the risksandobstaclesneedtobe overcome fromthe previousShelterBubblebyShawnAlborzandmake sure the riskswill notappearagain. These risksare importantformakingShelterBubble becauseitislike planningforthe worstandsee whatkindof problemsmightbe happenedtoitand helpbusinesstopreventitwhenhappening.The firstriskis aboutsafety,if itis notsafetywhyshouldcustomerscome andbuy.The secondriskis aboutthe product istoo heavyto move fromone place to another.Forexample,afterpurchasingShelterBubble,people wouldlike to move fromHoustonto Dallas,whichisinconvenientdue tothe heavyweight.The thirdriskisaboutShelter
  • 5. Page 5 of 6 Bubble'svolume. Toputmore stuffsinone ShelterBubble,the diameterisabouttwomen'sheight.However, there doesnothave enoughspace to store it.Since Shawnhas alreadybeenusingShelterBubbleforalong time,the teamisaware of these risksandtakesthemvery seriously. The mitigationof the risksisto make sure to create multiple blueprintvariationsaheadof time,tomake ShelterBubble weightlight,anddesignthe producttobe able to fitintoa small room.Alsothe most importantly,the mitigationcan raise volumesof customerstopurchase the ShelterBubble. Risk Potential Impact Remedy/Mitigation/Approach The product isn’tsafe Setsback productiondate and release date Create multiple blueprint variationsaheadof time The product istoo heavyto move fromone place to another Decrease salesvolume Use lightmaterialsinsteadinboth interiorandexteriordesign The product doesn’thave a place to store Lowerspotential sales volume due tolackof storage space Designthe productto be able to fitinside asingle cargarage Potential Dependencies Thisdependonour ownarchitectural engineers,electricians,accountants,andmarketresearcher.The external dependenciesincludeLine XSpray,a companywe are goingto collaborate upwith.Theycurrently manufacture a sprayfor truck bedsthatcan transformweakersubstancesintosomethingthatisvirtually indestructible.We will be dependentontheirproduct. Internal Dependencies External Dependencies Architectural Engineers Line X Spray Electricians Accountant
  • 6. Page 6 of 6 Market researcher Acceptance Criteria The ShelterBubble issupposedtoprovide protectionemotionallyandphysically.Itshouldbe as affordable asa car so that more people have accesstoit and itisn’tjustusedas a toy. Thiscouldsave livesina newand unique way.The factthat itwill appeal more tothose whocrave preparedness,itwill alsoappealto those whohave beenaffectedbynatural disasterssothattheyare preparedinthe future.Non-profit’scanalso buythese as theywill wanttoassistpeople innatural disasters. Acceptance criteriainclude: ● Safety ● Affordability ● Unique Signatures/Approvals The signaturesbelowformallyapprove the projectcharterandempowerthe projectmanagertoproceedwith the projectas outlinedinthischart. ClientName andSignature:_____________Shawn Alborz_______________ Date:___9/11/2017_____ ProjectSponsorName andSignature:_______Shawn Alborz_____________ Date: ___9/11/2017____ ProjectManager Name andSignature:___________Sivan Lubinin__________ Date: ___9/11/2017___