SlideShare a Scribd company logo
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin
Final Project (2B)
Residential Landscape Project
40% Individual
Submission: 1st June 2015 (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
Tasks - Methodology
This is a continuous assignment of Project 2A and an individual project. From the same site that you
were doing for previous Project 2A, you are required to propose a landscape design for the
residence/house. You have to imagine that you are going to present the landscape proposal to the
client (who is the house owner) by preparing ALL drawings needed for every development stages.
The development stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble
diagram is used as a means to show what spaces and activities that you want to propose.
Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a
breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is
more related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor only you can then proceed to master
plan set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
**Note:
A self-independent study is required for presentation layout. Do save images from internet or scan from
books for ideas collection and inspirations. As supportive references, do follow Instagram account;
if_nay13 for info sharing and interactive online consultation.
Submission Requirement
Each student is required to submit ALL of the following:
1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials
as long as it is pasted on the board. You are advisable to use spray mount to stick your paper
onto the board.
2. You need to provide ALL of the following;
- Project Description
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Location Plan & Key Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. The presentation boards must have title block at the bottom which contains; tittle of the project,
“Proposed Landscape For [the name of residence or owner’s name], complete address”,
student name, student ID, FNBE (write in full), Semester 1, January 2015.
*Example:
PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10,
JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN
PREPARED BY TAYLOR SWIFT (STUDENT ID),
FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015
4. You are to show your progression drawing in every tutorial session to your respective tutors.
The progression drawing must be on butter paper, signed by the tutor with date, to be
compiled in A4/A3 plastic cover and to submit together with presentation boards. It is
compulsory to ensure that you are going through the process before completing the final work.
Without that, it could be proclaimed as plagiarism.
5. All drawings need to be completed manually (hand drawn & hand written) by using a proper
architectural (landscape) graphic communication. However, images for softscape and
hardscape can be printed.
6. Drawings must be coloured. You may choose any medium of colouring techniques that you
are master in. You are given a freedom to choose whether to colour it all or a portion of the
drawing (make sure the portion coloured explains something) and have to be proper and
presentable.
7. You need to submit the completed presentation boards with a set of progression drawing on
1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic
suites, block C, level 5). Late submission after that time will be held outside of the venue.
8. You are encouraged to take photo or scan your work for e-portfolio purposes.
*Gentle reminder;
Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no
assessment will be done.
If you are sick on the submission day, you have to provide MC with an official letter signed by
parents/guardian explaining about your health condition. A formal email should be written to the module
coordinator a day before/or before submission time.
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progression Drawings 5%
GRAND TOTAL: 40%
Suggested References
Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons.
J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons.
Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada.
http://land8.com/photo/portfolio-page-3-worsley/prev?context=user

More Related Content

Viewers also liked

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
SolomonTangerine
 
Drawing project 2 january 2015
Drawing project 2 january 2015Drawing project 2 january 2015
Drawing project 2 january 2015
SolomonTangerine
 
Enbe final project
Enbe final projectEnbe final project
Enbe final project
SolomonTangerine
 
Assignment 1 compare contrast essay
Assignment 1 compare   contrast essayAssignment 1 compare   contrast essay
Assignment 1 compare contrast essay
SolomonTangerine
 
The Tudor Dynasty
The Tudor DynastyThe Tudor Dynasty
The Tudor Dynasty
SolomonTangerine
 
Project 1 musical performance january 2015
Project 1 musical performance january 2015Project 1 musical performance january 2015
Project 1 musical performance january 2015
SolomonTangerine
 
Social Psychology Fnbe course outline
Social Psychology Fnbe  course outline Social Psychology Fnbe  course outline
Social Psychology Fnbe course outline
SolomonTangerine
 
Paint the world
Paint the worldPaint the world
Paint the world
SolomonTangerine
 
Social Psychology Video Fnbe research project
Social Psychology Video Fnbe research projectSocial Psychology Video Fnbe research project
Social Psychology Video Fnbe research project
SolomonTangerine
 
Integated final report bak kut teh
Integated final report   bak kut tehIntegated final report   bak kut teh
Integated final report bak kut teh
SolomonTangerine
 
Instrument
InstrumentInstrument
Instrument
SolomonTangerine
 
Intro to Design Module outline jan2015
Intro to Design Module outline jan2015Intro to Design Module outline jan2015
Intro to Design Module outline jan2015
SolomonTangerine
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
SolomonTangerine
 
Business new course outline
Business  new course outline  Business  new course outline
Business new course outline
SolomonTangerine
 
Business Charity Drive Event 2015
Business Charity Drive Event 2015Business Charity Drive Event 2015
Business Charity Drive Event 2015
SolomonTangerine
 
EPC Course outline July
EPC Course outline JulyEPC Course outline July
EPC Course outline July
SolomonTangerine
 
Module outline july 2015 (cnc)
Module outline july 2015 (cnc)Module outline july 2015 (cnc)
Module outline july 2015 (cnc)
SolomonTangerine
 
Enbe the journal note brief
Enbe the journal note brief Enbe the journal note brief
Enbe the journal note brief
SolomonTangerine
 
English Essay Comparison Action Comedy movies
English Essay Comparison Action Comedy moviesEnglish Essay Comparison Action Comedy movies
English Essay Comparison Action Comedy movies
SolomonTangerine
 

Viewers also liked (19)

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Drawing project 2 january 2015
Drawing project 2 january 2015Drawing project 2 january 2015
Drawing project 2 january 2015
 
Enbe final project
Enbe final projectEnbe final project
Enbe final project
 
Assignment 1 compare contrast essay
Assignment 1 compare   contrast essayAssignment 1 compare   contrast essay
Assignment 1 compare contrast essay
 
The Tudor Dynasty
The Tudor DynastyThe Tudor Dynasty
The Tudor Dynasty
 
Project 1 musical performance january 2015
Project 1 musical performance january 2015Project 1 musical performance january 2015
Project 1 musical performance january 2015
 
Social Psychology Fnbe course outline
Social Psychology Fnbe  course outline Social Psychology Fnbe  course outline
Social Psychology Fnbe course outline
 
Paint the world
Paint the worldPaint the world
Paint the world
 
Social Psychology Video Fnbe research project
Social Psychology Video Fnbe research projectSocial Psychology Video Fnbe research project
Social Psychology Video Fnbe research project
 
Integated final report bak kut teh
Integated final report   bak kut tehIntegated final report   bak kut teh
Integated final report bak kut teh
 
Instrument
InstrumentInstrument
Instrument
 
Intro to Design Module outline jan2015
Intro to Design Module outline jan2015Intro to Design Module outline jan2015
Intro to Design Module outline jan2015
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
Business new course outline
Business  new course outline  Business  new course outline
Business new course outline
 
Business Charity Drive Event 2015
Business Charity Drive Event 2015Business Charity Drive Event 2015
Business Charity Drive Event 2015
 
EPC Course outline July
EPC Course outline JulyEPC Course outline July
EPC Course outline July
 
Module outline july 2015 (cnc)
Module outline july 2015 (cnc)Module outline july 2015 (cnc)
Module outline july 2015 (cnc)
 
Enbe the journal note brief
Enbe the journal note brief Enbe the journal note brief
Enbe the journal note brief
 
English Essay Comparison Action Comedy movies
English Essay Comparison Action Comedy moviesEnglish Essay Comparison Action Comedy movies
English Essay Comparison Action Comedy movies
 

Similar to Project 3 residential landscape project

Resubmission (1)
Resubmission (1)Resubmission (1)
Resubmission (1)
Hassan Azri
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
Dana Kan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
LY97
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
teohziwei12
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
apongmalik
 
CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015
Carol Tang
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
joshualimlbn
 
CL PROJECT 3 BRIEF
CL PROJECT 3 BRIEFCL PROJECT 3 BRIEF
CL PROJECT 3 BRIEF
Sheng Zhe
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)
pigxd123
 

Similar to Project 3 residential landscape project (9)

Resubmission (1)
Resubmission (1)Resubmission (1)
Resubmission (1)
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
CL PROJECT 3 BRIEF
CL PROJECT 3 BRIEFCL PROJECT 3 BRIEF
CL PROJECT 3 BRIEF
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)
 

More from SolomonTangerine

Food and Culture (Booklet)
Food and Culture (Booklet)Food and Culture (Booklet)
Food and Culture (Booklet)
SolomonTangerine
 
Research proposal
Research proposalResearch proposal
Research proposal
SolomonTangerine
 
Nawamin House
Nawamin HouseNawamin House
Nawamin House
SolomonTangerine
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final report
SolomonTangerine
 
National mosque
National mosqueNational mosque
National mosque
SolomonTangerine
 
Binder1
Binder1Binder1
ITD Design design process journal brief
ITD Design design process journal briefITD Design design process journal brief
ITD Design design process journal brief
SolomonTangerine
 
ITD Design project two brief rev b
ITD Design project two   brief rev bITD Design project two   brief rev b
ITD Design project two brief rev b
SolomonTangerine
 
ITD Design project one full brief
ITD Design project one full   briefITD Design project one full   brief
ITD Design project one full brief
SolomonTangerine
 
EPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut TehEPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut Teh
SolomonTangerine
 
EPC Mural art oral presentation
EPC Mural art oral presentationEPC Mural art oral presentation
EPC Mural art oral presentation
SolomonTangerine
 
Social Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignmentSocial Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignment
SolomonTangerine
 
Business Tutorial Questions Compilation
Business Tutorial Questions CompilationBusiness Tutorial Questions Compilation
Business Tutorial Questions Compilation
SolomonTangerine
 
Business report complete
Business report completeBusiness report complete
Business report complete
SolomonTangerine
 
English Assignment 2 (research report)
English Assignment 2 (research report) English Assignment 2 (research report)
English Assignment 2 (research report)
SolomonTangerine
 
Brief CNC message from the past
Brief CNC message from the pastBrief CNC message from the past
Brief CNC message from the past
SolomonTangerine
 

More from SolomonTangerine (16)

Food and Culture (Booklet)
Food and Culture (Booklet)Food and Culture (Booklet)
Food and Culture (Booklet)
 
Research proposal
Research proposalResearch proposal
Research proposal
 
Nawamin House
Nawamin HouseNawamin House
Nawamin House
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final report
 
National mosque
National mosqueNational mosque
National mosque
 
Binder1
Binder1Binder1
Binder1
 
ITD Design design process journal brief
ITD Design design process journal briefITD Design design process journal brief
ITD Design design process journal brief
 
ITD Design project two brief rev b
ITD Design project two   brief rev bITD Design project two   brief rev b
ITD Design project two brief rev b
 
ITD Design project one full brief
ITD Design project one full   briefITD Design project one full   brief
ITD Design project one full brief
 
EPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut TehEPC Final presentation project Bak Kut Teh
EPC Final presentation project Bak Kut Teh
 
EPC Mural art oral presentation
EPC Mural art oral presentationEPC Mural art oral presentation
EPC Mural art oral presentation
 
Social Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignmentSocial Psychology Fnbe journal assignment
Social Psychology Fnbe journal assignment
 
Business Tutorial Questions Compilation
Business Tutorial Questions CompilationBusiness Tutorial Questions Compilation
Business Tutorial Questions Compilation
 
Business report complete
Business report completeBusiness report complete
Business report complete
 
English Assignment 2 (research report)
English Assignment 2 (research report) English Assignment 2 (research report)
English Assignment 2 (research report)
 
Brief CNC message from the past
Brief CNC message from the pastBrief CNC message from the past
Brief CNC message from the past
 

Recently uploaded

原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
mkkikqvo
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
sameer shah
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
ElizabethGarrettChri
 
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
a9qfiubqu
 
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
wyddcwye1
 
Analysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performanceAnalysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performance
roli9797
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
bopyb
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
aqzctr7x
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
hyfjgavov
 
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
apvysm8
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
nyfuhyz
 
The Ipsos - AI - Monitor 2024 Report.pdf
The  Ipsos - AI - Monitor 2024 Report.pdfThe  Ipsos - AI - Monitor 2024 Report.pdf
The Ipsos - AI - Monitor 2024 Report.pdf
Social Samosa
 
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
Timothy Spann
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
taqyea
 
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
y3i0qsdzb
 
Build applications with generative AI on Google Cloud
Build applications with generative AI on Google CloudBuild applications with generative AI on Google Cloud
Build applications with generative AI on Google Cloud
Márton Kodok
 
DSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelinesDSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelines
Timothy Spann
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
Walaa Eldin Moustafa
 
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
xclpvhuk
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
vikram sood
 

Recently uploaded (20)

原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
 
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
原版一比一弗林德斯大学毕业证(Flinders毕业证书)如何办理
 
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
原版一比一利兹贝克特大学毕业证(LeedsBeckett毕业证书)如何办理
 
Analysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performanceAnalysis insight about a Flyball dog competition team's performance
Analysis insight about a Flyball dog competition team's performance
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
 
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
办(uts毕业证书)悉尼科技大学毕业证学历证书原版一模一样
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
 
The Ipsos - AI - Monitor 2024 Report.pdf
The  Ipsos - AI - Monitor 2024 Report.pdfThe  Ipsos - AI - Monitor 2024 Report.pdf
The Ipsos - AI - Monitor 2024 Report.pdf
 
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
 
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
 
Build applications with generative AI on Google Cloud
Build applications with generative AI on Google CloudBuild applications with generative AI on Google Cloud
Build applications with generative AI on Google Cloud
 
DSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelinesDSSML24_tspann_CodelessGenerativeAIPipelines
DSSML24_tspann_CodelessGenerativeAIPipelines
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
 
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
 

Project 3 residential landscape project

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin Final Project (2B) Residential Landscape Project 40% Individual Submission: 1st June 2015 (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. Tasks - Methodology This is a continuous assignment of Project 2A and an individual project. From the same site that you were doing for previous Project 2A, you are required to propose a landscape design for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is more related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor only you can then proceed to master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. **Note: A self-independent study is required for presentation layout. Do save images from internet or scan from books for ideas collection and inspirations. As supportive references, do follow Instagram account; if_nay13 for info sharing and interactive online consultation. Submission Requirement Each student is required to submit ALL of the following: 1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
  • 3. 2. You need to provide ALL of the following; - Project Description - Bubble Diagram - Conceptual Plan - Schematic Plan - Location Plan & Key Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. The presentation boards must have title block at the bottom which contains; tittle of the project, “Proposed Landscape For [the name of residence or owner’s name], complete address”, student name, student ID, FNBE (write in full), Semester 1, January 2015. *Example: PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10, JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN PREPARED BY TAYLOR SWIFT (STUDENT ID), FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015 4. You are to show your progression drawing in every tutorial session to your respective tutors. The progression drawing must be on butter paper, signed by the tutor with date, to be compiled in A4/A3 plastic cover and to submit together with presentation boards. It is compulsory to ensure that you are going through the process before completing the final work. Without that, it could be proclaimed as plagiarism. 5. All drawings need to be completed manually (hand drawn & hand written) by using a proper architectural (landscape) graphic communication. However, images for softscape and hardscape can be printed. 6. Drawings must be coloured. You may choose any medium of colouring techniques that you are master in. You are given a freedom to choose whether to colour it all or a portion of the drawing (make sure the portion coloured explains something) and have to be proper and presentable. 7. You need to submit the completed presentation boards with a set of progression drawing on 1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic suites, block C, level 5). Late submission after that time will be held outside of the venue. 8. You are encouraged to take photo or scan your work for e-portfolio purposes. *Gentle reminder; Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. If you are sick on the submission day, you have to provide MC with an official letter signed by parents/guardian explaining about your health condition. A formal email should be written to the module coordinator a day before/or before submission time.
  • 4. Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progression Drawings 5% GRAND TOTAL: 40% Suggested References Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons. J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons. Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada. http://land8.com/photo/portfolio-page-3-worsley/prev?context=user