SlideShare a Scribd company logo
1 of 3
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
Introduction to Drawing (ARC 30103)
Prerequisite: None
Lecturers: Ida Mazlan, Normah Sulaiman (ITD)
Ann See Peng / Hasmanira (ICI)
_____________________________________________________________________
Project 1: Understanding Different types of Professions and Drawings in the Built Environment
20% Group Presentation
Presentation: 7th
May & 8th
May 2015 / CD submission: 15th
May 2015
Introduction
“I prefer drawing to talking. Drawings are faster and leave less room for lies. “
Le Corbusier
Objectives of Project
• To introduce drawing as a communication tool in the construction industry.
Learning Outcomes
• Interpret the type of drawing representation used in the construction industry
Tasks
This is an integrated project between Introduction to Drawing(ITD) ,Introduction to Construction
Industry (ICI)
In a group of five or six people, you are required to investigate type of drawings from ONE of the
profession below:
No Profession (ICI) Types of Drawing (ITD)
1 Architect Architectural Drawings
2 Interior Architect/Interior Designer Interior Architecture Drawings
3 Town Planner/Master Planner Planners Drawings
4 Product Designer (Furniture) Product Design Drawings
5 Quantity Surveyor Quantity Surveying Drawings –what do they refer to
6 Landscape Architect Landscape Architecture Drawings
7 Structural Engineer Structural Engineering Drawing
8 Electrical Engineer Electricals Drawings
(1)Introduction to Drawing (ITD) Task (20%)-GROUP
You are to research and investigate the use of the drawings as a means of communication. The data
gathered should include types and function of drawings, stages and examples of drawings used to
communicate ideas and presentations.
(2)Introduction to Construction Industry (ICI) Task (10%)-GROUP
You are to research and investigate the scope of work handled by them, their responsibilities and
tasks at different stages of construction.
Submission Requirement
Using the data gathered, you are to discuss and work as a team to generate a presentation slide which
includes item 1 and 2 listed in the TASKS section.
One or two of your team members will be communicating and presenting their findings to the class on
Presentation Day. You are advice to keep the presentation short (5 minutes per task) and simple using any
creative medium that best suits the content and findings for your audience.
Presentation Day
Date : 7th
May 2015 & 8th
May 2015
Time : TBC
Dress Code : Smart Casual
Presentation Flow: TBC
To ensure the span of presentation is used wisely, please follow these guidelines on presentation day to avoid
interruptions and delay of time.
1. The whole class presentation will be using ONE laptop throughout all presentation.
2. You are advice to transfer all softcopies of presentation materials into the laptop prior to class time.
3. Each group need to setup and record presentation using their OWN CAMERA or ONE camera using
different MEMORY CARD- for E-portfolio and CD submission
4. Please print the assessment sheet for each lecturer BEFORE the presentation
Post Presentation:
As a team, you are required to compile the following components in a CD:
1-Presentation slide
2-Video of your presentation
3-References (Optional)
All items above will be compiled by group leader in the CD with proper CD Casing with proper information such
as the title, module name, group members name and ID, and the name of your respective tutor. CDs must
reach module coordinator by the next class session. (15th
May 2015).
Assessment criteria
The assessment for this assignment will be based on:
• demonstrated understanding of brief
• content
• creativity and clarity
Marking criteria
Marks shall be distributed as follows:
Work will be assessed based on (Introduction to Drawing):
TGC
Acquired
Assessment Criteria Marks %
Group Component
Demonstrated understanding of brief
5%
Content
10%
Creativity and clarity of presentation
5%
(Refer assessment sheet for detail breakdown)TOTAL 20%
NOTE: PLEASE BE INFORMED THAT INVIDUAL COMPONENTS IN GROUP WORKS IS EVALUATED BASED
ON PEER EVALUATION AND INSTRUCTUR’S EVALUATION ON INDIVIDUAL PERFORMANCE OF A GROUP
MEMBER.
Suggested References

More Related Content

Viewers also liked

شقق للبيع 2016
شقق للبيع 2016شقق للبيع 2016
شقق للبيع 2016Ramy Hamdy
 
STATS415-Final_report
STATS415-Final_reportSTATS415-Final_report
STATS415-Final_reportYilei Zhang
 
Mechanical Engineer C.V
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.VAslam Mohammed
 
Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Pui Chun Shian
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Joeylau97
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Yip Xiaojung
 
Project presentation 1
Project presentation 1Project presentation 1
Project presentation 1brandonliaw97
 
اداب البحث و المناظره القسم الاول و الثانى محمد الامين الشنقيطي
اداب البحث و المناظره   القسم الاول و الثانى محمد الامين الشنقيطياداب البحث و المناظره   القسم الاول و الثانى محمد الامين الشنقيطي
اداب البحث و المناظره القسم الاول و الثانى محمد الامين الشنقيطيosama mostafa
 
Kat van Duinen Classics Garment Catalogue
Kat van Duinen Classics Garment CatalogueKat van Duinen Classics Garment Catalogue
Kat van Duinen Classics Garment CatalogueSarah Browning
 
Moduleoutlineclmac2015 150809031543-lva1-app6892
Moduleoutlineclmac2015 150809031543-lva1-app6892Moduleoutlineclmac2015 150809031543-lva1-app6892
Moduleoutlineclmac2015 150809031543-lva1-app6892teohziwei12
 
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25Ibrahimia Church Ftriends
 
CL Module outline
CL Module outline CL Module outline
CL Module outline Sheng Zhe
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Joeylau97
 
Constructedlandscape2a
Constructedlandscape2aConstructedlandscape2a
Constructedlandscape2aDana Kan
 
人們都愛聽故事
人們都愛聽故事人們都愛聽故事
人們都愛聽故事Peggy 蔡
 

Viewers also liked (20)

CV
CVCV
CV
 
شقق للبيع 2016
شقق للبيع 2016شقق للبيع 2016
شقق للبيع 2016
 
STATS415-Final_report
STATS415-Final_reportSTATS415-Final_report
STATS415-Final_report
 
Mechanical Engineer C.V
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.V
 
Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892Iciitd2 150816125948-lva1-app6892
Iciitd2 150816125948-lva1-app6892
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
carl2
carl2carl2
carl2
 
التكوين1
التكوين1التكوين1
التكوين1
 
Project presentation 1
Project presentation 1Project presentation 1
Project presentation 1
 
Urban park
Urban parkUrban park
Urban park
 
اداب البحث و المناظره القسم الاول و الثانى محمد الامين الشنقيطي
اداب البحث و المناظره   القسم الاول و الثانى محمد الامين الشنقيطياداب البحث و المناظره   القسم الاول و الثانى محمد الامين الشنقيطي
اداب البحث و المناظره القسم الاول و الثانى محمد الامين الشنقيطي
 
Kat van Duinen Classics Garment Catalogue
Kat van Duinen Classics Garment CatalogueKat van Duinen Classics Garment Catalogue
Kat van Duinen Classics Garment Catalogue
 
Moduleoutlineclmac2015 150809031543-lva1-app6892
Moduleoutlineclmac2015 150809031543-lva1-app6892Moduleoutlineclmac2015 150809031543-lva1-app6892
Moduleoutlineclmac2015 150809031543-lva1-app6892
 
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25
063 9 aug. 2015 am خطايا بين الماضي و الحاضر . عد19.14 ــ 25
 
CL Module outline
CL Module outline CL Module outline
CL Module outline
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015
 
Constructedlandscape2a
Constructedlandscape2aConstructedlandscape2a
Constructedlandscape2a
 
人們都愛聽故事
人們都愛聽故事人們都愛聽故事
人們都愛聽故事
 
carl2
carl2carl2
carl2
 

Similar to Project 1_Integration_March 2015.doc

Integrated Project Brief
Integrated Project BriefIntegrated Project Brief
Integrated Project BriefTamZhaoWei
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revisedchristinelee1996
 
FNBE0115 - ITD PROJECT 1
FNBE0115 - ITD PROJECT 1FNBE0115 - ITD PROJECT 1
FNBE0115 - ITD PROJECT 1barbaraxchang
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revisedAmelisa Collins
 
8bb42b 98c095d8507342e0b25f19c802c0ebb7
8bb42b 98c095d8507342e0b25f19c802c0ebb78bb42b 98c095d8507342e0b25f19c802c0ebb7
8bb42b 98c095d8507342e0b25f19c802c0ebb7yongzsoh
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revisedchloeesim
 
Project 1 integration January 2015 (ICI, ITD, ENG1)
Project 1 integration January 2015 (ICI, ITD, ENG1)Project 1 integration January 2015 (ICI, ITD, ENG1)
Project 1 integration January 2015 (ICI, ITD, ENG1)Zheng Chee Cham
 
Integration Project 1 - Quantity Surveyor
Integration Project 1 - Quantity SurveyorIntegration Project 1 - Quantity Surveyor
Integration Project 1 - Quantity SurveyorNatalie Yunxian
 
Project Brief
Project BriefProject Brief
Project BriefJJeanius
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revisedJunXiang97
 
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdf
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdfproject1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdf
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdfKY Quah
 
Integrated Project Brief
Integrated Project BriefIntegrated Project Brief
Integrated Project BriefJunXiang97
 
Project 1 integration2015 brief
Project 1 integration2015 briefProject 1 integration2015 brief
Project 1 integration2015 briefLeon Lim
 

Similar to Project 1_Integration_March 2015.doc (13)

Integrated Project Brief
Integrated Project BriefIntegrated Project Brief
Integrated Project Brief
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
FNBE0115 - ITD PROJECT 1
FNBE0115 - ITD PROJECT 1FNBE0115 - ITD PROJECT 1
FNBE0115 - ITD PROJECT 1
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
8bb42b 98c095d8507342e0b25f19c802c0ebb7
8bb42b 98c095d8507342e0b25f19c802c0ebb78bb42b 98c095d8507342e0b25f19c802c0ebb7
8bb42b 98c095d8507342e0b25f19c802c0ebb7
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
Project 1 integration January 2015 (ICI, ITD, ENG1)
Project 1 integration January 2015 (ICI, ITD, ENG1)Project 1 integration January 2015 (ICI, ITD, ENG1)
Project 1 integration January 2015 (ICI, ITD, ENG1)
 
Integration Project 1 - Quantity Surveyor
Integration Project 1 - Quantity SurveyorIntegration Project 1 - Quantity Surveyor
Integration Project 1 - Quantity Surveyor
 
Project Brief
Project BriefProject Brief
Project Brief
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdf
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdfproject1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdf
project1integrationjanuary2015revised-150621093635-lva1-app6891 (1).pdf
 
Integrated Project Brief
Integrated Project BriefIntegrated Project Brief
Integrated Project Brief
 
Project 1 integration2015 brief
Project 1 integration2015 briefProject 1 integration2015 brief
Project 1 integration2015 brief
 

More from Dana Kan

SEKINCHAN Final final fainal super final.compressed
SEKINCHAN Final final fainal super final.compressedSEKINCHAN Final final fainal super final.compressed
SEKINCHAN Final final fainal super final.compressedDana Kan
 
Psyvideoreport
PsyvideoreportPsyvideoreport
PsyvideoreportDana Kan
 
BusinessPLANpresentation
BusinessPLANpresentationBusinessPLANpresentation
BusinessPLANpresentationDana Kan
 
Bus30104introtobizfinalprojectsept2015
Bus30104introtobizfinalprojectsept2015Bus30104introtobizfinalprojectsept2015
Bus30104introtobizfinalprojectsept2015Dana Kan
 
Businesscharitydrivereportfinal
BusinesscharitydrivereportfinalBusinesscharitydrivereportfinal
BusinesscharitydrivereportfinalDana Kan
 
Eng group-assignment
Eng group-assignmentEng group-assignment
Eng group-assignmentDana Kan
 
eng2research analysis
eng2research analysiseng2research analysis
eng2research analysisDana Kan
 
Eng2 assignment1 0323648
Eng2 assignment1 0323648Eng2 assignment1 0323648
Eng2 assignment1 0323648Dana Kan
 
Ici+itdproject1
Ici+itdproject1Ici+itdproject1
Ici+itdproject1Dana Kan
 
Enbeeportfolio
EnbeeportfolioEnbeeportfolio
EnbeeportfolioDana Kan
 
enbethejournalbrief
enbethejournalbriefenbethejournalbrief
enbethejournalbriefDana Kan
 
enbefinalprojectbrief
enbefinalprojectbriefenbefinalprojectbrief
enbefinalprojectbriefDana Kan
 
enbeproject1brief
enbeproject1briefenbeproject1brief
enbeproject1briefDana Kan
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Dana Kan
 
Project 2 itd
Project 2 itdProject 2 itd
Project 2 itdDana Kan
 
Process of-making-game-board
Process of-making-game-boardProcess of-making-game-board
Process of-making-game-boardDana Kan
 

More from Dana Kan (20)

SEKINCHAN Final final fainal super final.compressed
SEKINCHAN Final final fainal super final.compressedSEKINCHAN Final final fainal super final.compressed
SEKINCHAN Final final fainal super final.compressed
 
PSYVIDEO
PSYVIDEOPSYVIDEO
PSYVIDEO
 
Psyvideoreport
PsyvideoreportPsyvideoreport
Psyvideoreport
 
Psycjournal
PsycjournalPsycjournal
Psycjournal
 
Psycomic
PsycomicPsycomic
Psycomic
 
BusinessPLANpresentation
BusinessPLANpresentationBusinessPLANpresentation
BusinessPLANpresentation
 
Bus30104introtobizfinalprojectsept2015
Bus30104introtobizfinalprojectsept2015Bus30104introtobizfinalprojectsept2015
Bus30104introtobizfinalprojectsept2015
 
Businesscharitydrivereportfinal
BusinesscharitydrivereportfinalBusinesscharitydrivereportfinal
Businesscharitydrivereportfinal
 
Eng group-assignment
Eng group-assignmentEng group-assignment
Eng group-assignment
 
eng2research analysis
eng2research analysiseng2research analysis
eng2research analysis
 
Eng2 assignment1 0323648
Eng2 assignment1 0323648Eng2 assignment1 0323648
Eng2 assignment1 0323648
 
CLproject1
CLproject1CLproject1
CLproject1
 
Ici+itdproject1
Ici+itdproject1Ici+itdproject1
Ici+itdproject1
 
Enbeeportfolio
EnbeeportfolioEnbeeportfolio
Enbeeportfolio
 
enbethejournalbrief
enbethejournalbriefenbethejournalbrief
enbethejournalbrief
 
enbefinalprojectbrief
enbefinalprojectbriefenbefinalprojectbrief
enbefinalprojectbrief
 
enbeproject1brief
enbeproject1briefenbeproject1brief
enbeproject1brief
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Project 2 itd
Project 2 itdProject 2 itd
Project 2 itd
 
Process of-making-game-board
Process of-making-game-boardProcess of-making-game-board
Process of-making-game-board
 

Project 1_Integration_March 2015.doc

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments Introduction to Drawing (ARC 30103) Prerequisite: None Lecturers: Ida Mazlan, Normah Sulaiman (ITD) Ann See Peng / Hasmanira (ICI) _____________________________________________________________________ Project 1: Understanding Different types of Professions and Drawings in the Built Environment 20% Group Presentation Presentation: 7th May & 8th May 2015 / CD submission: 15th May 2015 Introduction “I prefer drawing to talking. Drawings are faster and leave less room for lies. “ Le Corbusier Objectives of Project • To introduce drawing as a communication tool in the construction industry. Learning Outcomes • Interpret the type of drawing representation used in the construction industry Tasks This is an integrated project between Introduction to Drawing(ITD) ,Introduction to Construction Industry (ICI) In a group of five or six people, you are required to investigate type of drawings from ONE of the profession below: No Profession (ICI) Types of Drawing (ITD) 1 Architect Architectural Drawings 2 Interior Architect/Interior Designer Interior Architecture Drawings 3 Town Planner/Master Planner Planners Drawings 4 Product Designer (Furniture) Product Design Drawings 5 Quantity Surveyor Quantity Surveying Drawings –what do they refer to 6 Landscape Architect Landscape Architecture Drawings 7 Structural Engineer Structural Engineering Drawing 8 Electrical Engineer Electricals Drawings
  • 2. (1)Introduction to Drawing (ITD) Task (20%)-GROUP You are to research and investigate the use of the drawings as a means of communication. The data gathered should include types and function of drawings, stages and examples of drawings used to communicate ideas and presentations. (2)Introduction to Construction Industry (ICI) Task (10%)-GROUP You are to research and investigate the scope of work handled by them, their responsibilities and tasks at different stages of construction. Submission Requirement Using the data gathered, you are to discuss and work as a team to generate a presentation slide which includes item 1 and 2 listed in the TASKS section. One or two of your team members will be communicating and presenting their findings to the class on Presentation Day. You are advice to keep the presentation short (5 minutes per task) and simple using any creative medium that best suits the content and findings for your audience. Presentation Day Date : 7th May 2015 & 8th May 2015 Time : TBC Dress Code : Smart Casual Presentation Flow: TBC To ensure the span of presentation is used wisely, please follow these guidelines on presentation day to avoid interruptions and delay of time. 1. The whole class presentation will be using ONE laptop throughout all presentation. 2. You are advice to transfer all softcopies of presentation materials into the laptop prior to class time. 3. Each group need to setup and record presentation using their OWN CAMERA or ONE camera using different MEMORY CARD- for E-portfolio and CD submission 4. Please print the assessment sheet for each lecturer BEFORE the presentation Post Presentation: As a team, you are required to compile the following components in a CD: 1-Presentation slide 2-Video of your presentation 3-References (Optional) All items above will be compiled by group leader in the CD with proper CD Casing with proper information such as the title, module name, group members name and ID, and the name of your respective tutor. CDs must reach module coordinator by the next class session. (15th May 2015).
  • 3. Assessment criteria The assessment for this assignment will be based on: • demonstrated understanding of brief • content • creativity and clarity Marking criteria Marks shall be distributed as follows: Work will be assessed based on (Introduction to Drawing): TGC Acquired Assessment Criteria Marks % Group Component Demonstrated understanding of brief 5% Content 10% Creativity and clarity of presentation 5% (Refer assessment sheet for detail breakdown)TOTAL 20% NOTE: PLEASE BE INFORMED THAT INVIDUAL COMPONENTS IN GROUP WORKS IS EVALUATED BASED ON PEER EVALUATION AND INSTRUCTUR’S EVALUATION ON INDIVIDUAL PERFORMANCE OF A GROUP MEMBER. Suggested References