The document appears to be a progress report for assembling pipe spools for a pressure equalization system. It provides details on transporting materials to the site, lifting and positioning spools, tack welding and fully welding spool joints, inspecting welds, and documenting progress. Tables show assembly plans, drawings, weights of installed components and remaining work at different elevations, with 79.6% of the work completed as of the report date.
To enroll in the best universities of the world, students need to have excellent knowledge and comprehension of English.
The major barrier between an intermediate and advanced level is a vocabulary. And there are no effective tools to enhance it as it needs to be increased by several thousands words.
The idea is to provide a really big amount of different content around the words that are learned and to get people to be active: not only reading and watching but communicating with each other.
To do this we built the platform where everyone is learning the same words simultaneously. We hope that this will help to achieve critical mass of people that will start to communicate.
Moreover, gamification on every stage will help to involve people into the next type of activity.
To enroll in the best universities of the world, students need to have excellent knowledge and comprehension of English.
The major barrier between an intermediate and advanced level is a vocabulary. And there are no effective tools to enhance it as it needs to be increased by several thousands words.
The idea is to provide a really big amount of different content around the words that are learned and to get people to be active: not only reading and watching but communicating with each other.
To do this we built the platform where everyone is learning the same words simultaneously. We hope that this will help to achieve critical mass of people that will start to communicate.
Moreover, gamification on every stage will help to involve people into the next type of activity.
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM-BF1_ 2009 (WEEK 26)
1. TRANSPORTTOSITE
LIFTINGTHEMATERIAL
POSITINEDSPOOLS
SPOOLSCONECTION
TACKWELDSPOOLJOINTS
WELDINGSPOOLJOINTS
FINALTIGHTNESS
WELDVISUALINSPECTION
(NDT)TESTS
DOCUMENTATION
%
5 5 15 20 8 30 5 5 5 2 100
14-04-2009
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0004_001 LEVEL +61955 0008A 2 704,8 585 120 X X X X X X 83,0 14-04-2009 PIPE DN500 & ELBOW 67º
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0004_001 LEVEL +61955 0008B 2 725,4 602 123 X X X X X X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0004_001 LEVEL +61955 0008C 2 792,4 658 135 X X X X X X 83,0 PIPE DN500 & ELBOW 67º
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0037_001 LEVEL +61955 Expansion Joint 1 165,0 0 165 0,0 EJ13
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0037_001 LEVEL +61955 Expansion Joint 1 165,0 0 165 0,0 EJ53
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0038_001 LEVEL +61955 Expansion Joint 1 356,0 0 356 0,0 EJ13
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0038_001 LEVEL +61955 Expansion Joint 1 356,0 0 356 0,0 EJ53
10 3264,6 1845 1420 56,5%
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0008F 2 1162,0 964 198 X X X X X X 83,0 PIPE DN500 & ELBOW 80°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0009J 2 1094,2 908 186 X X X X X x 83,0 PIPE DN500 & SUPPORT
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0009N 6 73,2 61 12 X X X X X x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0008H 2 600,6 498 102 X X X X X x 83,0 PIPE DN500 & TAKE OF
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0009A 8 2819,2 2340 479 X X X X X x 83,0 PIE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0009N 6 73,2 61 12 X X X X X x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0008G 2 600,6 498 102 X X X X X x 83,0 PIPE DN500 & TAKE OF
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0008D 2 792,0 657 135 X X X X X x 83,0 PIPE DN500 & ELBOW 86°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0008E 2 792,0 657 135 X X X X X x 83,0 PIPE DN500 & ELBOW 86°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL +68710 VM-02 2 1136,0 943 193 X X X X X X 83,0 WEDGE GATE VALVE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL +68710 VM-11 2 1136,0 943 193 X X X X X X 83,0 WEDGE GATE VALVE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL +68710 VM-14 2 1136,0 943 193 X X X X X X 83,0 GATE VALVE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL +68710 VM-21 2 1136,0 943 193 X X X X X X 83,0 GATE VALVE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0007A 4 254,8 211 43 X X X X X x 83,0 SUPPORT BASE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 0007D 16 280,0 232 48 X X X X X x 83,0 SUPPORT BLOCK
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL +68710 BALL VALVE DN25 16 32,0 0 32 0,0
82,0 14952,2 11518,9 3433,3 77,0%
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005/6/7_001 LEVEL+72010 0009C 8 2342,4 1944 398 X X X X X x 83,0 PIPE DN500 & SUPPORT
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0006_001 LEVEL+72010 0007A 8 509,6 423 87 X X X X X x 83,0 SUPPORT BASE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0006_001 LEVEL+72010 0007D 32 560,0 465 95 X X X X X x 83,0 SUPPORT BLOCK
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X X X x x 83,0 VAI - 01
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VAI - 02
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VAI - 01
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VAI - 02
TOTAL ELEVATION +68710
ERECTEDWEIGTH(Kg)
ELEVATION
OBSERVATIONS
79,6%Progress:
FINISHDATE
WEIGHT(Kg)
STARTINGDATE
TOTAL ELEVATION +61955
PROGRESS SHEET OF PRESSURE EQUALIZING SYSTEM "BF1" WEEK 26 (2009)
ASSEMBLYPLANNº
ERECTION
SPOOLSNº
Quant.Spools
RemainingWeigth(Kg)
DRAWING Nº
2. TRANSPORTTOSITE
LIFTINGTHEMATERIAL
POSITINEDSPOOLS
SPOOLSCONECTION
TACKWELDSPOOLJOINTS
WELDINGSPOOLJOINTS
FINALTIGHTNESS
WELDVISUALINSPECTION
(NDT)TESTS
DOCUMENTATION
%
5 5 15 20 8 30 5 5 5 2 100
ERECTEDWEIGTH(Kg)
ELEVATION
OBSERVATIONS
79,6%Progress:
FINISHDATE
WEIGHT(Kg)
STARTINGDATE
ASSEMBLYPLANNº
ERECTION
SPOOLSNº
Quant.Spools
RemainingWeigth(Kg)
DRAWING Nº
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X X X x x 83,0 VEQ - 01
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VEQ - 02
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VEQ - 01
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0009_001 LEVEL+72010 EQU/RELIEF VALVE 1 2865,0 2378 487 X X x x x x 83,0 VEQ - 02
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 01/EJ14
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 02/EJ21
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 01/EJ14
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 02/EJ21
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 03/EJ14
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 04/EJ21
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 03/EJ14
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0034_001 LEVEL+72010 EXPANSION JOINT 1 93,0 0 93 0,0 JEX - 04/EJ21
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+72010 0009B 8 1620,8 1345 276 X X x x x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+72010 0009N 8 97,6 81 17 X X x x x x 83,0 PLATE
80,0 28794,4 23281,8 5512,6 80,9%
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0007A 8 509,6 423 87 X X X X X X 83,0 SUPPORT BASE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0007D 32 560,0 465 95 X X X X X X 83,0 SUPPORT BLOCK
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009C 8 2342,4 1944 398 X X X X X X 83,0 PIPE DN500 & SUPPORT
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0008K 4 338,4 281 58 X X X X X X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL+76310 GATE VAVE 4 3640,0 3021 619 X X X X X X 83,0 (2-VM-05) + (2-VM08)
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0018_001 LEVEL+76310 GATE VAVE 4 3640,0 3021 619 X X X X X X 83,0 (2-VM17) + (2-VM18)
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009P 2 180,8 150 31 X X X X x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 2 24,4 20 4 X X X X x x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009E 2 636,2 528 108 x x x X x x 83,0 PIPE DN500 & ELBOW 84,5°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 2 180,8 150 31 x x x X x x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009F 1 574,5 477 98 X X X X x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009H 1 574,5 477 98 X X X X x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0010A 1 80,3 67 14 X X X X x X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0010A 1 80,3 67 14 X X X X x X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 2 180,8 150 31 X X X X x X 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0010C 1 389,7 323 66 X X X X x X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 2 180,8 150 31 X X X X x x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009L 1 57,9 48 10 x x x x x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0036_001 LEVEL+76310 EXPANSION JOINT 1 215,0 0 215 0,0 EJ91
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0008K 4 338,4 281 58 X X X X X X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_MDG_S03_0017_001 LEVEL+76310 BUTERFLY VALVE 4 860,0 714 146 X X X X X X 83,0 (2 - VBM01) & (2 - VBM02)
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0007_001 LEVEL+76310 0009A 4 254,8 211 43 X X X X X X 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 4 361,6 300 61 X X X X X x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009D 1 318,1 264 54 x x x X X x 83,0 PIPE DN500 & ELBOW 84,5°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 3 271,2 225 46 x x x X X x 83,0 PLATE
TOTAL ELEVATION +72010
3. TRANSPORTTOSITE
LIFTINGTHEMATERIAL
POSITINEDSPOOLS
SPOOLSCONECTION
TACKWELDSPOOLJOINTS
WELDINGSPOOLJOINTS
FINALTIGHTNESS
WELDVISUALINSPECTION
(NDT)TESTS
DOCUMENTATION
%
5 5 15 20 8 30 5 5 5 2 100
ERECTEDWEIGTH(Kg)
ELEVATION
OBSERVATIONS
79,6%Progress:
FINISHDATE
WEIGHT(Kg)
STARTINGDATE
ASSEMBLYPLANNº
ERECTION
SPOOLSNº
Quant.Spools
RemainingWeigth(Kg)
DRAWING Nº
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009F 1 574,5 477 98 X X X X X x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009G 1 636,5 528 108 x x x X X x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009M 1 325,5 270 55 x x x X X x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 4 361,6 300 61 x x x X X x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0010D 1 389,7 323 66 x x x X X x 83,0 PIPE DN500 & ELBOW 60º
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 0009N 4 361,6 300 61 X X X X X x 83,0 PLATE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+76310 EXPANSION JOINT 1 382,0 0 382 0,0 EJ32
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+76310 0009K 1 132,6 110 382 x x x x x x 83,0 PIPE DN500
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0005_001 LEVEL+76310 BALL VALVE DN25 12 24,0 0 24 0,0
125,0 19978,5 16066,7 4271,2 80,4%
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+80355 0009D 1 318,1 264 300 X X X x x x 83,0 PIPE DN500 & ELBOW 84,5°
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+80355 0010B 1 544,7 245 54 X X X x 45,0 PIPE DN500 & SUPPORT
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+80355 0007A 1 63,7 29 300 X X X x 45,0 SUPPORT BASE
CHP_01_Y29_PWD_S03_0001_001 CHP_01_Y29_PLD_S03_0035_001 LEVEL+80355 0007D 4 70,0 32 39 x x x x 45,0 SUPPORT BLOCK
7,0 996,5 569,3 57,1%
298 66151,8 52624 14152 79,6%
TOTAL
TOTAL ELEVATION +76310
TOTAL ELEVATION +80355