Jayanta Chaudhuri
Mobile: +91-9830439770 E-Mail: jayanta.chaudhuri@gmail.com
An experienced software professional with experience in managing projects and architecting software for
diverse domains and technologies with a passion to take up challenging assignments and deliver end to end
with an eye for perfection and looking for a carrier in software development at senior-technical or mid-
management position where my skills, competence and experience could be effectively applied and enhanced.
My aim is to make positive consequential difference to the organization I am part of.
Professional Abridgement
 Having 13 years’ 10 months of cross functional experience in the areas of:
- Program Management - Project Management (Traditional and Agile)
- Technical Project Management - Scrum Master - Solutioning
- Architecting - Stakeholder Management - Management Interaction
- Team Building - Risk Management - Mentoring - Coding
 Currently employed with Tata Consultancy Services Ltd, Kolkata, as Associate Consultant.
 Working as Project Delivery Manager in Tata Consultancy Services Ltd.
 Gained hands-on experience in the domains like e-Commerce, Online Payment Systems, Healthcare, Mobile
application development and Telecom.
 A keen planner, strategist and implementer with demonstrated success in solutioning, architecting and end-
to-end project management, ensuring effective management of various resources to meet project
specifications.
 Significant experience in working with Customers, Project Managers and Technical Teams for writing
proposals, securing and executing projects.
 An effective leader with proven abilities in leading large teams during all the program/project phases and
guiding team members, enabling knowledge sharing among the teams - for the successful delivery of the
agreed upon deliverables.
Skill Set
Managerial
Agile Project Management Experience.
 Organized and facilitated sprint planning, daily stand-up meetings, reviews, retrospectives, release
planning, demos and other Scrum-related meetings.
 Instructed and modeled core Agile principles of collaboration, prioritization, team accountability and
visibility; ensured consistent application of scrum methodologies across the enterprise.
 Worked with the engineering managers to identify cross-team dependencies and manage inter-team tasks.
 Support the Product Owner in managing customer expectations for project deliverables, managing
stakeholder communications, and helping to implement an effective system of project governance.
 Providing timely and clear reporting of the progress of feature development
 Devising clear risk mitigation strategies.
Traditional Project Management Experience.
 Conceptualisation of products and mapping them to right technology, and delivering the final product.
 Developing the project management plan and all related component plans.
 Holding review meetings to monitor progress of the projects and ensuring timely completion and delivery of
the deliverables to the clients as per schedule and budget.
 Identifying and responding to risk.
 Effectuating pre-planned strategies for accomplishment of performance milestones; handling resource
allocations and setting up communication channels across various horizons of the organisation structure.
 Providing accurate and timely reporting of project metrics.
Functional
 Preparing proposals, statement of work, business presentations to clients, resource planning, technical
direction, effort estimation, tracking, risk management, status reporting, employee appraisals and
mentoring.
 Understanding client’s needs / enhancements, customization of products accordingly, and consulting with
technical teams to provide solutions as per the delivery schedules.
 Overseeing delivery management and post implementation support.
 Domains: Retail and CPG , Ecommerce, Telecom Network Management, HealthCare
Technical
 Languages C, C++, VC++, MFC, Java , C#.Net, Objective C
 Technologies OOP/OOD, Design Patterns, Web Services, Win32, UML, SOAP, XML, HTTP,
SSL
 Operating Systems Unix, Linux, Windows XP , MAC, iOS
 Database Oracle 8i, MS SQL Server 2008
 Version Control Systems ClearCase, CM Synergy, SVN, Git, Visual source safe.
 Tools CA Clarity PPM, MS Project, MS Visio, MS Office, Waterfall, Agile techs.
Employment Scan
Tata Consultancy Services Ltd, as Associate Consultant - Project Delivery Manager : Since Apr ’11
till date.
Name of the Project: Managing Mobile Applications for Digital Enterprise Solution and Retail.
Client: Philip Morris International, Walgreen Co ,Virgin Atlantic Airways Limited,
KLM Royal Dutch Airlines
Technologies: Objective C, IOS6.0 and above.
Role: Project Delivery Manager – Agile & Scrum Master.
Details of the Project:
 Philip Morris International - Provide Territory Sales executive to collect the information about retailers in
iPad efficiencies and effectiveness.
 Walgreens - Mobile Point of Sale is an application with which Walgreens is checking out the customers using
a mobile device.
 Virgin Atlantic Airways - The VAA Tablet Check-in application is developed to help and manage the new
check-in area at the JFK terminal where there will no longer be kiosks available in the VAA check-in space.
The application is designed to avoid data redundancy, misuse of data and ensure data security.
 KLM Royal Dutch Airlines - KLM & AF's immediate objective is to have their consumer app to launch on
Windows platform. This solution will empower the consumer to easy access of the airlines sites to book
flights and check in on fly. In addition, it will meet the following additional objectives:
1. To build a new user experience of screen designs.
2. Scalability to meet future requirements.
Contributions:
 Facilitate Rituals: 1. Stand-ups / Scrums, 2. Demos, 3. Retrospectives
 Coach Agile Team in Rituals and in agile task execution.
 Preparing Burn-Down Chart for Sprint and Burn-Up Chart for tracking multiple Sprints that were needed for
a Production Release.
 Manage Project Budget.
 Communicate with Product Owner for help prioritizing, manage scope.
 Update weekly project progress to the Sr Management.
 Works with Customers and Management to identify and institute a Product Owner.
 Works with Management to form Scrum Teams
 Is the driving force behind all scrum activities and ensues that the values, practices and rules are enacted
and enforced
 Played a pivotal role in preparing proposal writing, statement of work discussions and also the finalisation of
solutions with development teams and client.
Computer Science Corporation, Chennai, as Associate Project Manager: Dec’07 – Apr’11
Name of the Project: Customer Preference Platform
Client: PayPal an EBay Company
Technologies: C++, Linux, Windows
Role: Project Manager.
Details of the Project:
 CPP is a tool which facilitates paypal merchants to create campaigns which provide incentives payout to the
customers that accomplish a marketing goal geared toward a particular product. CPP consists of three
modules: CMT (Campaign Management Tool), Message (includes dynamic button images and in-flow pieces
integrated on the merchant sites), Budget Management.
Contributions:
 Took part in technical discussions and finalizing solutions – keeping in view the success criteria of the final
product.
 Interfaced with the cross-geographical project development teams, QA team and Business Unit.
 Responsible for Project Planning, Execution, Monitoring, Tracking and control of the project and ensure
quality of delivery.
 Actively and effectively monitored the progress of the projects so these could be delivered within schedule
and budget and with the acceptable quality.
 Significantly involved in implementing good project management methodologies within the development
teams.
 Presenting to Customer on new improvement areas and Proposal making towards future strategy.
Name of the Project: Unified Checkout
Client: PayPal an EBay Company
Technologies: C++, Linux, Windows
Role: Project Manager.
Details of the Project:
 Unified Checkout Platform is an initiative to build flexible product with single customer experience for all
merchant across all PayPal user globally. The initial phase of development was started focusing germen
country.
Contributions:
 Effectively managed, planned and scheduled program delivery for multiple countries worth up to USD 10
million.
 Working on pricing, prepare & review SOW/Project agreements with Client for multiple countries and shared
on time for signatory.
 Effectively managed, planned and scheduled the delivery for multiple countries.
 Track each delivery plan across geo locations and discuss risks, issues with customers and escalate to the
concerned stakeholders during program review meetings.
 Turnaround staffing hired and molded high performing teams of over 94 members, mobilizing them to focus
on quality and the best practices.
 Involved in Project Scoping and Requirement Analysis.
Wipro Technologies Ltd., Chennai, as Technical Lead: Dec’05 – Nov’07
Name of the Project: RefMMI using Apoxi Framework.
Client: Infineon Technologies India Pvt. Ltd
Technologies: C++, Nucleus OS, APOXI (Infineon Proprietary Framework), Phone tool and Flash tool.
Role: Technical Architect.
Details of the Project:
 Unified RefMMI is a mobile application based on Nucleus OS and support Infineon’s MPE and MPEU phone.
Developed MMI features like call handling, PLMN, Call Records, Call Settings, Call forwarding, Call Deflection
etc., using APOXI framework which is Infineon's proprietary framework.
Contributions:
 Worked as a consultant to provide quick solutions to the architechtural designs and interfaces and to take
decisions on the appropriate technology selection for the software.
 Analysed all the stakeholders, documented and obtained sign offs from them with their requirements.
Implemented Change Control Board to take care of any change requests.
 Mentoring and helping team technical issue solving and providing scalable and reliable designs.
Name of the Project: Mobile Application in Linux-Java Platform.
Client: Motorola
Technologies: Linux, Java.
Role: Technical Architect.
Contributions:
 Working as a tech. lead and managing a team of 14 members (Generate pivot tables and chart to update
weekly report/Monthly report to present them to customer in well defined power point template,
arrange/participate customer meetings every month understand their requirements and plan accordingly to
achieve the goal within SLA.).
 Responsible for Project Planning, Execution, Monitoring, Tracking and control of the project and ensure all
issues in hotline are closed as per Motorola norms / goals.
 Provide technical guidance to the team and doing first level analysis on the CRs received from different
testers across globe and confirming the CR validity and providing quick solutions.
 Architectural designs and code reviews.
iSoft R&D Pvt Ltd, Chennai, as Programmer Software Development: Mar’04 – Dec’05
Name of the Project: Synergy
Client: NHS
Technologies: VC++,MFC.
Role: Programmer - Software Development.
Details of the Project:
 Synergy is a primary care system, which is running to the GPs and practices to provide the best
hospitalisation. This product is developed in VC++, .Net, VB, COM/DCOM using SQL and interbase as
backhand. Standard XML and SOAP technology is used for messaging services and to talk with Integration
Engine, which is the base for communication. The Integration engine is converting our isoft neutral XML to
HL7 messages to update the data to the data bank.NHS is having the data bank which is nothing but the
drugs and medical dictionary. This product is lying on three tire architecture. Currently this project is live in
1000 GPs in UK and many more in other countries like Germany, Holand, and Newzeland, Australia.
Contributions:
 Providing 24X7 supports to provide satisfaction to the customer.
 Currently in the stability task force to maintain the stability of the product for a very heavy real-time load of
the practitioners.
 It’s a opportunity to face the excellent challenges and providing the solution in the short duration.
Take Solutions Pvt Ltd, Chennai, as Engineer -System Software Development: Jan’02 – Mar’04
Name of the Project: TakeHub
Technologies: C,C++.
Role: Engineer - Software Development.
Details of the Project:
 Take Hub is a proprietary approach that manages and optimizes all the functions in a hub with critical
information with both real time and historical. M90 terminal Application is a user interface application that is
used to perform the data entry operations for Receipts, Issues, Stocktaking, Stock movement and Cycle
count activities of warehouse. Take Hub send data to the BC terminal using the COM port and the
application do its operations internally and send back the data to the Hub in a standard format.
Contributions:
 Design and development of Barcode Interface Application for Intermec M90 using Code-128 symbiologies.
Siemens Communication Software, Bangalore, as Engineer - Software Development: Oct’00 –
Oct’01
Name of the Project: NetM (Net Manager) - For SURPASS
Technologies: C++,VC++,MFC
Role: Engineer - Software Development.
Details of the Project:
 Net Manager Version 4N (NetM4N) is a TMN system used for Operation, Administration and Maintenance
(OA&M) of the SIEMENS switch, the EWSD. It provides a variety of applications to manage the
EWSD.SURPASS is the new SIEMENS solution for the convergence of Voice and Data Networks. The
SURPASS network consists of the TDM (traditional), IP (new concept) and ATM (new concept) transport
network with backbone capabilities.
Contributions:
 Involved in the development of Workbench, which is a user interface application to perform OA&M tasks on
the EWSD.
 Workbench provides a unified operator interface for executing MML (Siemens Proprietary protocol), Q3
(CMIP standard protocol) and SNMP command on the Network Elements.
 Involved in the stability task force to maintain the stability of the product for a very heavy real-time load of
the subscribers.
Scholastics
Graduation:
 Bachelor of Technology (Electronics and Communication Engg.) from North Eastern Regional Institute Of
Science and Technology in 2000 with 73%
 HSC from North Eastern Regional Institute Of Science and Technology, North Eastern Hill University, Shilong
in 1996 with 60%
 SSC from Netaji Subhash Vidyaniketan, TBSE Board, Tripura in 1994 with 74%
Personal Dossier
Address : Meena Residency,Flat#S4,Block#B2P,Dhalipara,Tegharia, Kolkata,India.
Date Of Birth : 11-11-1977
Passport Details : J4723905, Valid till 08-May-2021
Strength
 Self starter, Fast learner and Hard worker.
 Passionate about making quality deliverables.
 Good conceptual and analytical skills
 Ability to work under pressure
 An excellent team member
 An adaptive personality
 Enjoys life and has good sense of humor.
Declaration
I hereby declare that all the above information are true and correct to best of my knowledge.
Yours sincerely,
Place: Kolkata
Date: JAYANTA CHAUDHURI

Professional summary

  • 1.
    Jayanta Chaudhuri Mobile: +91-9830439770E-Mail: jayanta.chaudhuri@gmail.com An experienced software professional with experience in managing projects and architecting software for diverse domains and technologies with a passion to take up challenging assignments and deliver end to end with an eye for perfection and looking for a carrier in software development at senior-technical or mid- management position where my skills, competence and experience could be effectively applied and enhanced. My aim is to make positive consequential difference to the organization I am part of. Professional Abridgement  Having 13 years’ 10 months of cross functional experience in the areas of: - Program Management - Project Management (Traditional and Agile) - Technical Project Management - Scrum Master - Solutioning - Architecting - Stakeholder Management - Management Interaction - Team Building - Risk Management - Mentoring - Coding  Currently employed with Tata Consultancy Services Ltd, Kolkata, as Associate Consultant.  Working as Project Delivery Manager in Tata Consultancy Services Ltd.  Gained hands-on experience in the domains like e-Commerce, Online Payment Systems, Healthcare, Mobile application development and Telecom.  A keen planner, strategist and implementer with demonstrated success in solutioning, architecting and end- to-end project management, ensuring effective management of various resources to meet project specifications.  Significant experience in working with Customers, Project Managers and Technical Teams for writing proposals, securing and executing projects.  An effective leader with proven abilities in leading large teams during all the program/project phases and guiding team members, enabling knowledge sharing among the teams - for the successful delivery of the agreed upon deliverables. Skill Set Managerial Agile Project Management Experience.  Organized and facilitated sprint planning, daily stand-up meetings, reviews, retrospectives, release planning, demos and other Scrum-related meetings.  Instructed and modeled core Agile principles of collaboration, prioritization, team accountability and visibility; ensured consistent application of scrum methodologies across the enterprise.  Worked with the engineering managers to identify cross-team dependencies and manage inter-team tasks.  Support the Product Owner in managing customer expectations for project deliverables, managing stakeholder communications, and helping to implement an effective system of project governance.  Providing timely and clear reporting of the progress of feature development  Devising clear risk mitigation strategies. Traditional Project Management Experience.  Conceptualisation of products and mapping them to right technology, and delivering the final product.  Developing the project management plan and all related component plans.  Holding review meetings to monitor progress of the projects and ensuring timely completion and delivery of the deliverables to the clients as per schedule and budget.  Identifying and responding to risk.  Effectuating pre-planned strategies for accomplishment of performance milestones; handling resource allocations and setting up communication channels across various horizons of the organisation structure.  Providing accurate and timely reporting of project metrics.
  • 2.
    Functional  Preparing proposals,statement of work, business presentations to clients, resource planning, technical direction, effort estimation, tracking, risk management, status reporting, employee appraisals and mentoring.  Understanding client’s needs / enhancements, customization of products accordingly, and consulting with technical teams to provide solutions as per the delivery schedules.  Overseeing delivery management and post implementation support.  Domains: Retail and CPG , Ecommerce, Telecom Network Management, HealthCare Technical  Languages C, C++, VC++, MFC, Java , C#.Net, Objective C  Technologies OOP/OOD, Design Patterns, Web Services, Win32, UML, SOAP, XML, HTTP, SSL  Operating Systems Unix, Linux, Windows XP , MAC, iOS  Database Oracle 8i, MS SQL Server 2008  Version Control Systems ClearCase, CM Synergy, SVN, Git, Visual source safe.  Tools CA Clarity PPM, MS Project, MS Visio, MS Office, Waterfall, Agile techs. Employment Scan Tata Consultancy Services Ltd, as Associate Consultant - Project Delivery Manager : Since Apr ’11 till date. Name of the Project: Managing Mobile Applications for Digital Enterprise Solution and Retail. Client: Philip Morris International, Walgreen Co ,Virgin Atlantic Airways Limited, KLM Royal Dutch Airlines Technologies: Objective C, IOS6.0 and above. Role: Project Delivery Manager – Agile & Scrum Master. Details of the Project:  Philip Morris International - Provide Territory Sales executive to collect the information about retailers in iPad efficiencies and effectiveness.  Walgreens - Mobile Point of Sale is an application with which Walgreens is checking out the customers using a mobile device.  Virgin Atlantic Airways - The VAA Tablet Check-in application is developed to help and manage the new check-in area at the JFK terminal where there will no longer be kiosks available in the VAA check-in space. The application is designed to avoid data redundancy, misuse of data and ensure data security.  KLM Royal Dutch Airlines - KLM & AF's immediate objective is to have their consumer app to launch on Windows platform. This solution will empower the consumer to easy access of the airlines sites to book flights and check in on fly. In addition, it will meet the following additional objectives: 1. To build a new user experience of screen designs. 2. Scalability to meet future requirements. Contributions:  Facilitate Rituals: 1. Stand-ups / Scrums, 2. Demos, 3. Retrospectives  Coach Agile Team in Rituals and in agile task execution.  Preparing Burn-Down Chart for Sprint and Burn-Up Chart for tracking multiple Sprints that were needed for a Production Release.  Manage Project Budget.  Communicate with Product Owner for help prioritizing, manage scope.  Update weekly project progress to the Sr Management.  Works with Customers and Management to identify and institute a Product Owner.  Works with Management to form Scrum Teams  Is the driving force behind all scrum activities and ensues that the values, practices and rules are enacted and enforced  Played a pivotal role in preparing proposal writing, statement of work discussions and also the finalisation of solutions with development teams and client.
  • 3.
    Computer Science Corporation,Chennai, as Associate Project Manager: Dec’07 – Apr’11 Name of the Project: Customer Preference Platform Client: PayPal an EBay Company Technologies: C++, Linux, Windows Role: Project Manager. Details of the Project:  CPP is a tool which facilitates paypal merchants to create campaigns which provide incentives payout to the customers that accomplish a marketing goal geared toward a particular product. CPP consists of three modules: CMT (Campaign Management Tool), Message (includes dynamic button images and in-flow pieces integrated on the merchant sites), Budget Management. Contributions:  Took part in technical discussions and finalizing solutions – keeping in view the success criteria of the final product.  Interfaced with the cross-geographical project development teams, QA team and Business Unit.  Responsible for Project Planning, Execution, Monitoring, Tracking and control of the project and ensure quality of delivery.  Actively and effectively monitored the progress of the projects so these could be delivered within schedule and budget and with the acceptable quality.  Significantly involved in implementing good project management methodologies within the development teams.  Presenting to Customer on new improvement areas and Proposal making towards future strategy. Name of the Project: Unified Checkout Client: PayPal an EBay Company Technologies: C++, Linux, Windows Role: Project Manager. Details of the Project:  Unified Checkout Platform is an initiative to build flexible product with single customer experience for all merchant across all PayPal user globally. The initial phase of development was started focusing germen country. Contributions:  Effectively managed, planned and scheduled program delivery for multiple countries worth up to USD 10 million.  Working on pricing, prepare & review SOW/Project agreements with Client for multiple countries and shared on time for signatory.  Effectively managed, planned and scheduled the delivery for multiple countries.  Track each delivery plan across geo locations and discuss risks, issues with customers and escalate to the concerned stakeholders during program review meetings.  Turnaround staffing hired and molded high performing teams of over 94 members, mobilizing them to focus on quality and the best practices.  Involved in Project Scoping and Requirement Analysis. Wipro Technologies Ltd., Chennai, as Technical Lead: Dec’05 – Nov’07 Name of the Project: RefMMI using Apoxi Framework. Client: Infineon Technologies India Pvt. Ltd Technologies: C++, Nucleus OS, APOXI (Infineon Proprietary Framework), Phone tool and Flash tool. Role: Technical Architect. Details of the Project:  Unified RefMMI is a mobile application based on Nucleus OS and support Infineon’s MPE and MPEU phone. Developed MMI features like call handling, PLMN, Call Records, Call Settings, Call forwarding, Call Deflection etc., using APOXI framework which is Infineon's proprietary framework. Contributions:  Worked as a consultant to provide quick solutions to the architechtural designs and interfaces and to take decisions on the appropriate technology selection for the software.  Analysed all the stakeholders, documented and obtained sign offs from them with their requirements. Implemented Change Control Board to take care of any change requests.  Mentoring and helping team technical issue solving and providing scalable and reliable designs.
  • 4.
    Name of theProject: Mobile Application in Linux-Java Platform. Client: Motorola Technologies: Linux, Java. Role: Technical Architect. Contributions:  Working as a tech. lead and managing a team of 14 members (Generate pivot tables and chart to update weekly report/Monthly report to present them to customer in well defined power point template, arrange/participate customer meetings every month understand their requirements and plan accordingly to achieve the goal within SLA.).  Responsible for Project Planning, Execution, Monitoring, Tracking and control of the project and ensure all issues in hotline are closed as per Motorola norms / goals.  Provide technical guidance to the team and doing first level analysis on the CRs received from different testers across globe and confirming the CR validity and providing quick solutions.  Architectural designs and code reviews. iSoft R&D Pvt Ltd, Chennai, as Programmer Software Development: Mar’04 – Dec’05 Name of the Project: Synergy Client: NHS Technologies: VC++,MFC. Role: Programmer - Software Development. Details of the Project:  Synergy is a primary care system, which is running to the GPs and practices to provide the best hospitalisation. This product is developed in VC++, .Net, VB, COM/DCOM using SQL and interbase as backhand. Standard XML and SOAP technology is used for messaging services and to talk with Integration Engine, which is the base for communication. The Integration engine is converting our isoft neutral XML to HL7 messages to update the data to the data bank.NHS is having the data bank which is nothing but the drugs and medical dictionary. This product is lying on three tire architecture. Currently this project is live in 1000 GPs in UK and many more in other countries like Germany, Holand, and Newzeland, Australia. Contributions:  Providing 24X7 supports to provide satisfaction to the customer.  Currently in the stability task force to maintain the stability of the product for a very heavy real-time load of the practitioners.  It’s a opportunity to face the excellent challenges and providing the solution in the short duration. Take Solutions Pvt Ltd, Chennai, as Engineer -System Software Development: Jan’02 – Mar’04 Name of the Project: TakeHub Technologies: C,C++. Role: Engineer - Software Development. Details of the Project:  Take Hub is a proprietary approach that manages and optimizes all the functions in a hub with critical information with both real time and historical. M90 terminal Application is a user interface application that is used to perform the data entry operations for Receipts, Issues, Stocktaking, Stock movement and Cycle count activities of warehouse. Take Hub send data to the BC terminal using the COM port and the application do its operations internally and send back the data to the Hub in a standard format. Contributions:  Design and development of Barcode Interface Application for Intermec M90 using Code-128 symbiologies. Siemens Communication Software, Bangalore, as Engineer - Software Development: Oct’00 – Oct’01 Name of the Project: NetM (Net Manager) - For SURPASS Technologies: C++,VC++,MFC Role: Engineer - Software Development. Details of the Project:  Net Manager Version 4N (NetM4N) is a TMN system used for Operation, Administration and Maintenance (OA&M) of the SIEMENS switch, the EWSD. It provides a variety of applications to manage the EWSD.SURPASS is the new SIEMENS solution for the convergence of Voice and Data Networks. The SURPASS network consists of the TDM (traditional), IP (new concept) and ATM (new concept) transport network with backbone capabilities.
  • 5.
    Contributions:  Involved inthe development of Workbench, which is a user interface application to perform OA&M tasks on the EWSD.  Workbench provides a unified operator interface for executing MML (Siemens Proprietary protocol), Q3 (CMIP standard protocol) and SNMP command on the Network Elements.  Involved in the stability task force to maintain the stability of the product for a very heavy real-time load of the subscribers. Scholastics Graduation:  Bachelor of Technology (Electronics and Communication Engg.) from North Eastern Regional Institute Of Science and Technology in 2000 with 73%  HSC from North Eastern Regional Institute Of Science and Technology, North Eastern Hill University, Shilong in 1996 with 60%  SSC from Netaji Subhash Vidyaniketan, TBSE Board, Tripura in 1994 with 74% Personal Dossier Address : Meena Residency,Flat#S4,Block#B2P,Dhalipara,Tegharia, Kolkata,India. Date Of Birth : 11-11-1977 Passport Details : J4723905, Valid till 08-May-2021 Strength  Self starter, Fast learner and Hard worker.  Passionate about making quality deliverables.  Good conceptual and analytical skills  Ability to work under pressure  An excellent team member  An adaptive personality  Enjoys life and has good sense of humor. Declaration I hereby declare that all the above information are true and correct to best of my knowledge. Yours sincerely, Place: Kolkata Date: JAYANTA CHAUDHURI