PROJECT MANAGEMENT
PROFESSIONAL
DCOLEARNING – ACCOLADIA GROUP
Specialist in Project Management Training
Registered Education Provider (R.E.P.) of Project Management Institute, USA.
PMI, PMP, CAPM, Project Management Professional (PMP), Certified Associate in Project Management (CAPM)
and PMBOK are registered marks of Project Management Institute, Inc.
Project Management For Everyone. From Every Business.
R.E.P. No. 4469
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
2
2017
Professional Project Management
Project Management For Everyone. From Every Business.
PROGRAM E-BROCHURE
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
3
Stay
Relevant.
Our team has worked with countless corporate partners and build
connections with many professionals over these past 8 years. We cherish
and appreciate their trust and their willingness to engage with our team to
create meaningful and joyful programs.
Whether it is organization’s or individual’s initiative, we believe and hope
that there is no other better investment than the investment on people’s
competency and skills. It is where everyone gains. The organization and
the professional.
Keep improving. Stay relevant.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
4
vv
The growing acceptance from companies and organizations to good project
management knowledge, skills, and practices nowadays has been very
encouraging for any professionals who understood the value of project
management. Many companies and organizations, over these years, have
acknowledged how professionals with project management skills and
capabilities can positively contribute to their success.
DCOLearning team has long experiences in Indonesia project management
areas and in witnessing such growth coming from various businesses and
sectors. Those who have not embraced project management skills as part of
their professional development plan can miss out an interesting journey
ahead of them.
Program Description
Professional Project Management (3 Days)
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
5
Project management skills and credentials have become more common
than before. Many national and multi-national companies are demanding
these qualities as part of their recruitment policy and part of their
development strategy.
Professional Project Management workshop program is uniquely
designed to assist professionals or practitioners (both with and without
project experiences or background) to identify project management
environment and managing project in line with the latest 5th Edition of
Project Management Body of Knowledge (PMBOK® Guide) issued by
Project Management Institute (PMI)®, USA.
We will go through project management body of knowledge concept
step-by-step. And the course will discuss an integrated approach that
balances the theories, methods and practices in managing project.
Other than the benefits of learning the project management knowledge
and practices, with our approach, participants will have common project
management language with other PM professionals from all around the
world.
Program Description
Professional Project Management (3 Days)
This workshop offers a new reliable approach in managing projects by
combining the practical with the theoretical approaches of up-to-date
project management knowledge and skills
After this workshop, the participants will:
• Understand the project management framework.
• Understand the PMBOK® Guide standards and processes in managing
project.
• Be able to apply the tools and techniques of managing project.
• Use PMBOK® Guide to help their actual projects.
• Be able to use knowledge from this workshop to pursue project
management certification issued by PMI® such as CAPM® or PMP®
All in all, participants will be able to manage their project(s) and achieve
the objectives well whilst doing it in a professional-and-structured way.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
6
Program Outline
Professional Project Management (3 Days)
Day 1
• Introduction to PM
• Org. Influences
• Project Life Cycle
• PM Processes & Knowledge Areas
• Project Initiating
• Project Planning I
Integration – Stakeholder - Scope
Day 1 – 7 contact hours Day 2 – 7 contact hours Day 3 – 7 contact hours Post Training - 1 Year
Day 3
• Project Planning III
Risk – Procurement
• Project Executing
• Project Monitoring & Controlling
• Project Closing
• DCOValley Introduction
Day 2
• Project Planning II
• Time
• Cost
• HR
• Communication
Post Training
• 1 Year access to DCOValley
system for training material
repository, test simulation,
discussions, etc.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
7
All Project
Practitioners
Project Managers, Project
Team Members, Project
Administrators, Project
Leaders, etc.
All Managers/
Professionals
All professionals who are
involved in projects. From
various backgrounds &
industries i.e.: HR, Marketing,
Sales, Finance, Procurement,
FMCG, Insurance, Telco, etc.
Who Should Join?
Professional Project Management (3 Days)
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
8
Class Gallery
Get The Feeling
It is our team’s priority to create and to provide unique learning experiences for our alumni and training partners.
We believe that a successful and fruitful training program is more than a facilitator with a plethora of materials to share.
It is deeper and more than that. As experienced T&D professionals, we also believe that every participant has different and unique style of learning, has
unique reason in joining our programs. Talk to us. Let us work together to have a meaningful and joyful experience with the entire team of DCOLearning.
Case Study
Friendly Staffs
Experienced
Facilitators
Standardized
Materials
Beyond The
Classroom
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
9
2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
January
February
March
April
May
June
July
August
September
October
November
December
2017 Public Schedule
Plan Your Training Programs With Us
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
Professional Project Management (3 Days)
PMNPM
PMNPM
PMNPM
PMNPM
PMNPM
PMNPM
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
10
Public Class
Select one of our pre-set
schedule dates. Join other
participants from other
companies at our training
venue.
In-House Training
With minimum participants
of 10 people. Set special
schedule for your program
at your venue. Customize
the program as needed.
On-Demand Class
With minimum participants
of 5 people. Set special
schedule for your program
at our venue just like the
public class option.
Our team is happy to accommodate any of development program needs that fit you and your organization objectives.
Contact our team for further discussions. We are ready to work with you.
Class OptionsChoose The One That Fits Your Needs
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
11
STANDARD
Investment
CALL US
Per Participant
The standard package for all
PPM program participants.
Training Certificate (Contact Hours)
Training Kit & Training Materials
1 Year Access to DCOValley
Class Photo Documentation
Venue, Snacks & Meals.
PLUS
Investment
CALL US
Per Participant
Standard + PMBOK® Guide
Hardcopy edition
Training Certificate (Contact Hours)
Training Kit & Training Materials
1 Year Access to DCOValley
Class Photo Documentation
Venue, Snacks & Meals.
ADVANCED
Investment
CALL US
Per Participant
Standard + PMI Membership
(1 Year)
Training Certificate (Contact Hours)
Training Kit & Training Materials
1 Year Access to DCOValley
Class Photo Documentation
Venue, Snacks & Meals.
Program Packages
Professional Project Management
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
12
Registration Form
Professional Project Management (3 Days)
ParticipantsContact Person
Name :
Position :
Email :
Mobile :
Company Name :
NPWP :
Billing Address :
Training Program Date :
Name #1 :
Mobile No. :
Email :
Position :
Name #2 :
Mobile No. :
Email :
Position :
Name #3 :
Mobile No. :
Email :
Position :
Please send the scan of the
completed form to:
lia.octovina@dcolearning.com
BANK MANDIRI
KK Jakarta - Kota Kasablanka
N o . R e k . 1 2 4 - 0 0 - 0 7 5 0 5 0 0 - 2
A.n. PT Accoladia Tri Vesta
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
13
Call or Chat With Our Team
M. +62 857 81 76 21 06 (IM3)
M. +62 878 85 33 21 32 (XL)
T. +62 21 87 15 341
Email Us
Ms. Lia Octovina lia . octovina @ dcolearning . com
Ms. Idna Narita idna . narita @ dcolearning . com
Ms. Beby Salsabila beby . salsabila @ dcolearning . com
Call Our DCOLearning Team
Our Team Is Here For You
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
14
About Us & Our ServicesDCOLearning – Accoladia Group
DCOLearning offers various project
management training programs with classroom
face-to-face methods. The programs can be in
the form of pre-scheduled public programs or
customized IHT (In-House Training) or On-
Demand Class formats
Project Management Training
Our DCOValley system can be used as
an internal certification or internal
testing tool for our clients to regularly
monitor their project team knowledge
and understanding on the accepted
project management practices.
Internal Certification
DCOLearning also offers Coaching &
Mentoring programs where our
mentoring team will advise and assist
a group of mentees coming from one
company in evaluating their project
management practices.
Coaching & Mentoring
DCOLearning team is a group of PMP-certified and T&D professionals with combined knowledge and passion in creating sustainable project management programs for
any businesses and any professionals from all walks of life. We believe project management is for everyone and for every business/organization.
With more than 8 years of experiences, starting in the last quarter of 2016 DCOLearning team is committed to provide programs that in line with Project Management
Institute (PMI)’s Talent Triangle which covers Technical Project Management, Strategic & Business Management, and Leadership program group.
DCOLearning facilitators are hands-on project management practitioners with strong passion in sharing and training.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
151515
The Talent Triangle™
Project Management Institute Inc.
The PMI Talent Triangle logo is a mark of Project Management Institute, Inc.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
161616
Leadership
It is the competency in guiding and
motivating. Applies to all certifications.
This group includes: Interpersonal Skills, Problem
Solving, Team Building, Emotional Intelligence,
Coaching & Mentoring, Conflict Management,
Influencing, Listening, Negotiation, etc.
Technical Project Management
It is the domain expertise, certification-specific
programs area.
This group includes: Lifecycle Management
(project, program, portfolio, product), Risk
Management, Schedule Management, Scope
Management, Earned Value Management,
Governance (project, program, portfolio), Agile
practices, etc.
Strategic & Business Management
It is the business-oriented-skills programs area.
Applies to all certifications.
This group includes: Operational Function
(marketing, finance, etc.), Strategic Planning,
Customer Relationships & Satisfactions, Legal &
Regulatory Compliance, Business Acumen, Market
Awareness & Conditions, etc.
The Talent Triangle™
Project Management Institute Inc.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
17
Banking &
Financial Services
National & Multinational Banks,
Insurance, etc.
Manufacturing, FMCG &
Distribution
Retail-store chains, Transportation
Companies, Manufacturers.
IT, Telecommunication &
Construction
Software Developers &
Implementers, Telco Operators, etc.
Oil & Gas, Energy,
and Mining
Explorations, Distributions,
Mining, etc.
Government Agencies &
State-Owned Company
Government Departments,
Directorate Generals, Utilities, etc.
Other Businesses
Transportation Carriers, Consulting Firms, etc.
Visit our website for a comprehensive list of our corporate clients
Non-Profit, NGO &
Education
Universities, Foundations, NGOs,
etc.
Our Experiences
Organizations & Businesses That We Have Worked With
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
18
vv
DCOValley Learning Platform
Our DCOValley is more than just a
repository system for all of our
training programs. It is more than
certification exam simulation tools.
International Training Partners
We build partnerships and join forces
with selected training partners to
provide better and more
comprehensive programs for our
individual and corporate clients.
PMBOK® Guide &
The Talent Triangle™
PMP® + Certified Facilitators
We selected our facilitating team
with high standard. They must be
PMP® certified and have more than
10 years of hands-on project
experience.
T&D Management Professionals
Our team are more than just
project practitioners, we are also
passionate T&D professionals who
strive to build sustainable and
quality training programs.
We use PMI’s standard and
guidelines for our programs.
DCOLearning Ecosystem
Our Collaborations & Service Integration For Your Learning Journey
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
19
Hands-on & Actual Case Study
Our facilitators are highly experienced with hands-on
actual project experiences as project managers.
PMI - Registered Education Provider
Our R.E.P status from Project Management Institute
shows our commitment in this field. For good.
1 Year DCOValley Access
Our DCOValley is continuously updated. 1 year
access is a game changer. And it’s free!
Premium Training Venue
Our training locations are selected to give our
participants better experience during and after the class
Affordable Premium Program
Our program investment is very competitive
considering the services & supports you get from us.
You Get What You Really Need
Our focus is on the training program only. No post-
training objectives or cross-selling services outside of it.
Comprehensive Repository System
We have managed our knowledge management
repository system very carefully for more than 8 years.
Full Service Assistance
Our team is here for you. A dedicated ones with clear
mission and objectives, to help you and your programs.
Why DCOLearning
There are many. Here are some of them.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
20
DCOLearning Program Experience
It Is More Than Your Usual Classroom Sessions
Case Studies & Discussion
We use actual project case for participants exercises35%
Simulation & Games
We learn when we enjoy the program. When we engaged.25%
Classroom Theory & Application
We use less time for theory and focus on the application30%
DCOValley System
DCOValley system is built to complement your learning
experience. Learning did not stop after the classroom sessions.
10%
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
21
We join forces to provide comprehensive
programs for both of our clients portfolio
and to create seamless client experience
through our offerings.
FOSTER & BRIDGE INDONESIA
To provide quality programs in project
management and to ensure our programs
are in line with global project management
standard and practices.
REGISTERED EDUCATION PROVIDER OF PMI
As part of Accoladia’s group, we build our
soft-skills & leadership programs to
complement our Talent Triangle program
model.
HARVEYSTERLING INDONESIA
Partnerships & Acknowledgement
We Mean What We Are Set To Do
INDONESIA
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
22
1 2 3 4 5 6
24/7
Always ready
365 Days
All year long
Web-Based
Easy to access
Any Gadgets
Conveniently yours
Free
No brainer
PMP® Simulator
One of a kind
DCOValley™ Features
DCOLearning Virtual Learning Environment for You
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
23
Training Materials
All of your training
material files are
accessible here. All year.
Tools & Templates
Download them for your
work and study purposes.
They are here.
Class Photos
Remember all the
experience you have in
our class.
PMP® Exam Simulator
Exercise and practice until
you are ready. More than
1,000 question banks.
Additional Materials
We put additional articles,
slides, and other contents
so you can learn more.
Additional Videos
We also curated
important videos that will
complement your study.
DCOValley™ Content
Learning Anytime. Anywhere. With Your Own Pace.
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
24
Address
Kota Kasablanka. Tower A. 38th Floor
Jl. Casablanca Raya Kav. 88
DKI Jakarta 12870
Direct Call
M. +62 857 81 76 21 06 (IM3)
M. +62 878 85 33 21 32 (XL)
T. +62 21 87 15 341
Emails
lia.octovina@dcolearning.com
Idna.narita@dcolearning.com
beby.salsabila@dcolearning.com
Contact Us
Let’s Discuss Your Professional Development Program
W W W . D C O L E A R N I N G . C O M
© 2017 DCOLearning – Accoladia Group. All Rights Reserved.
25
DCOLearning – Accoladia Group
Specialist in Project Management Training. Jakarta, Indonesia
PMI, PMP, CAPM, Project Management Professional (PMP), Certified Associate in Project Management (CAPM) and PMBOK are
registered marks of Project Management Institute, Inc.
DCOLearning and DCOValley are trademarks of PT Accoladia Tri Vesta
Images by 123RF Photo Stock
INDONESIA

2017 | E-Brochure | Professional Project Management - PPM (3 Days) | Project Management Training - DCOLearning | Jakarta, Indonesia

  • 1.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 1 PROJECT MANAGEMENT PROFESSIONAL DCOLEARNING – ACCOLADIA GROUP Specialist in Project Management Training Registered Education Provider (R.E.P.) of Project Management Institute, USA. PMI, PMP, CAPM, Project Management Professional (PMP), Certified Associate in Project Management (CAPM) and PMBOK are registered marks of Project Management Institute, Inc. Project Management For Everyone. From Every Business. R.E.P. No. 4469
  • 2.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 2 2017 Professional Project Management Project Management For Everyone. From Every Business. PROGRAM E-BROCHURE
  • 3.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 3 Stay Relevant. Our team has worked with countless corporate partners and build connections with many professionals over these past 8 years. We cherish and appreciate their trust and their willingness to engage with our team to create meaningful and joyful programs. Whether it is organization’s or individual’s initiative, we believe and hope that there is no other better investment than the investment on people’s competency and skills. It is where everyone gains. The organization and the professional. Keep improving. Stay relevant.
  • 4.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 4 vv The growing acceptance from companies and organizations to good project management knowledge, skills, and practices nowadays has been very encouraging for any professionals who understood the value of project management. Many companies and organizations, over these years, have acknowledged how professionals with project management skills and capabilities can positively contribute to their success. DCOLearning team has long experiences in Indonesia project management areas and in witnessing such growth coming from various businesses and sectors. Those who have not embraced project management skills as part of their professional development plan can miss out an interesting journey ahead of them. Program Description Professional Project Management (3 Days)
  • 5.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 5 Project management skills and credentials have become more common than before. Many national and multi-national companies are demanding these qualities as part of their recruitment policy and part of their development strategy. Professional Project Management workshop program is uniquely designed to assist professionals or practitioners (both with and without project experiences or background) to identify project management environment and managing project in line with the latest 5th Edition of Project Management Body of Knowledge (PMBOK® Guide) issued by Project Management Institute (PMI)®, USA. We will go through project management body of knowledge concept step-by-step. And the course will discuss an integrated approach that balances the theories, methods and practices in managing project. Other than the benefits of learning the project management knowledge and practices, with our approach, participants will have common project management language with other PM professionals from all around the world. Program Description Professional Project Management (3 Days) This workshop offers a new reliable approach in managing projects by combining the practical with the theoretical approaches of up-to-date project management knowledge and skills After this workshop, the participants will: • Understand the project management framework. • Understand the PMBOK® Guide standards and processes in managing project. • Be able to apply the tools and techniques of managing project. • Use PMBOK® Guide to help their actual projects. • Be able to use knowledge from this workshop to pursue project management certification issued by PMI® such as CAPM® or PMP® All in all, participants will be able to manage their project(s) and achieve the objectives well whilst doing it in a professional-and-structured way.
  • 6.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 6 Program Outline Professional Project Management (3 Days) Day 1 • Introduction to PM • Org. Influences • Project Life Cycle • PM Processes & Knowledge Areas • Project Initiating • Project Planning I Integration – Stakeholder - Scope Day 1 – 7 contact hours Day 2 – 7 contact hours Day 3 – 7 contact hours Post Training - 1 Year Day 3 • Project Planning III Risk – Procurement • Project Executing • Project Monitoring & Controlling • Project Closing • DCOValley Introduction Day 2 • Project Planning II • Time • Cost • HR • Communication Post Training • 1 Year access to DCOValley system for training material repository, test simulation, discussions, etc.
  • 7.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 7 All Project Practitioners Project Managers, Project Team Members, Project Administrators, Project Leaders, etc. All Managers/ Professionals All professionals who are involved in projects. From various backgrounds & industries i.e.: HR, Marketing, Sales, Finance, Procurement, FMCG, Insurance, Telco, etc. Who Should Join? Professional Project Management (3 Days)
  • 8.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 8 Class Gallery Get The Feeling It is our team’s priority to create and to provide unique learning experiences for our alumni and training partners. We believe that a successful and fruitful training program is more than a facilitator with a plethora of materials to share. It is deeper and more than that. As experienced T&D professionals, we also believe that every participant has different and unique style of learning, has unique reason in joining our programs. Talk to us. Let us work together to have a meaningful and joyful experience with the entire team of DCOLearning. Case Study Friendly Staffs Experienced Facilitators Standardized Materials Beyond The Classroom
  • 9.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 9 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 January February March April May June July August September October November December 2017 Public Schedule Plan Your Training Programs With Us PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM Professional Project Management (3 Days) PMNPM PMNPM PMNPM PMNPM PMNPM PMNPM
  • 10.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 10 Public Class Select one of our pre-set schedule dates. Join other participants from other companies at our training venue. In-House Training With minimum participants of 10 people. Set special schedule for your program at your venue. Customize the program as needed. On-Demand Class With minimum participants of 5 people. Set special schedule for your program at our venue just like the public class option. Our team is happy to accommodate any of development program needs that fit you and your organization objectives. Contact our team for further discussions. We are ready to work with you. Class OptionsChoose The One That Fits Your Needs
  • 11.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 11 STANDARD Investment CALL US Per Participant The standard package for all PPM program participants. Training Certificate (Contact Hours) Training Kit & Training Materials 1 Year Access to DCOValley Class Photo Documentation Venue, Snacks & Meals. PLUS Investment CALL US Per Participant Standard + PMBOK® Guide Hardcopy edition Training Certificate (Contact Hours) Training Kit & Training Materials 1 Year Access to DCOValley Class Photo Documentation Venue, Snacks & Meals. ADVANCED Investment CALL US Per Participant Standard + PMI Membership (1 Year) Training Certificate (Contact Hours) Training Kit & Training Materials 1 Year Access to DCOValley Class Photo Documentation Venue, Snacks & Meals. Program Packages Professional Project Management
  • 12.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 12 Registration Form Professional Project Management (3 Days) ParticipantsContact Person Name : Position : Email : Mobile : Company Name : NPWP : Billing Address : Training Program Date : Name #1 : Mobile No. : Email : Position : Name #2 : Mobile No. : Email : Position : Name #3 : Mobile No. : Email : Position : Please send the scan of the completed form to: lia.octovina@dcolearning.com BANK MANDIRI KK Jakarta - Kota Kasablanka N o . R e k . 1 2 4 - 0 0 - 0 7 5 0 5 0 0 - 2 A.n. PT Accoladia Tri Vesta
  • 13.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 13 Call or Chat With Our Team M. +62 857 81 76 21 06 (IM3) M. +62 878 85 33 21 32 (XL) T. +62 21 87 15 341 Email Us Ms. Lia Octovina lia . octovina @ dcolearning . com Ms. Idna Narita idna . narita @ dcolearning . com Ms. Beby Salsabila beby . salsabila @ dcolearning . com Call Our DCOLearning Team Our Team Is Here For You
  • 14.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 14 About Us & Our ServicesDCOLearning – Accoladia Group DCOLearning offers various project management training programs with classroom face-to-face methods. The programs can be in the form of pre-scheduled public programs or customized IHT (In-House Training) or On- Demand Class formats Project Management Training Our DCOValley system can be used as an internal certification or internal testing tool for our clients to regularly monitor their project team knowledge and understanding on the accepted project management practices. Internal Certification DCOLearning also offers Coaching & Mentoring programs where our mentoring team will advise and assist a group of mentees coming from one company in evaluating their project management practices. Coaching & Mentoring DCOLearning team is a group of PMP-certified and T&D professionals with combined knowledge and passion in creating sustainable project management programs for any businesses and any professionals from all walks of life. We believe project management is for everyone and for every business/organization. With more than 8 years of experiences, starting in the last quarter of 2016 DCOLearning team is committed to provide programs that in line with Project Management Institute (PMI)’s Talent Triangle which covers Technical Project Management, Strategic & Business Management, and Leadership program group. DCOLearning facilitators are hands-on project management practitioners with strong passion in sharing and training.
  • 15.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 151515 The Talent Triangle™ Project Management Institute Inc. The PMI Talent Triangle logo is a mark of Project Management Institute, Inc.
  • 16.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 161616 Leadership It is the competency in guiding and motivating. Applies to all certifications. This group includes: Interpersonal Skills, Problem Solving, Team Building, Emotional Intelligence, Coaching & Mentoring, Conflict Management, Influencing, Listening, Negotiation, etc. Technical Project Management It is the domain expertise, certification-specific programs area. This group includes: Lifecycle Management (project, program, portfolio, product), Risk Management, Schedule Management, Scope Management, Earned Value Management, Governance (project, program, portfolio), Agile practices, etc. Strategic & Business Management It is the business-oriented-skills programs area. Applies to all certifications. This group includes: Operational Function (marketing, finance, etc.), Strategic Planning, Customer Relationships & Satisfactions, Legal & Regulatory Compliance, Business Acumen, Market Awareness & Conditions, etc. The Talent Triangle™ Project Management Institute Inc.
  • 17.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 17 Banking & Financial Services National & Multinational Banks, Insurance, etc. Manufacturing, FMCG & Distribution Retail-store chains, Transportation Companies, Manufacturers. IT, Telecommunication & Construction Software Developers & Implementers, Telco Operators, etc. Oil & Gas, Energy, and Mining Explorations, Distributions, Mining, etc. Government Agencies & State-Owned Company Government Departments, Directorate Generals, Utilities, etc. Other Businesses Transportation Carriers, Consulting Firms, etc. Visit our website for a comprehensive list of our corporate clients Non-Profit, NGO & Education Universities, Foundations, NGOs, etc. Our Experiences Organizations & Businesses That We Have Worked With
  • 18.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 18 vv DCOValley Learning Platform Our DCOValley is more than just a repository system for all of our training programs. It is more than certification exam simulation tools. International Training Partners We build partnerships and join forces with selected training partners to provide better and more comprehensive programs for our individual and corporate clients. PMBOK® Guide & The Talent Triangle™ PMP® + Certified Facilitators We selected our facilitating team with high standard. They must be PMP® certified and have more than 10 years of hands-on project experience. T&D Management Professionals Our team are more than just project practitioners, we are also passionate T&D professionals who strive to build sustainable and quality training programs. We use PMI’s standard and guidelines for our programs. DCOLearning Ecosystem Our Collaborations & Service Integration For Your Learning Journey
  • 19.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 19 Hands-on & Actual Case Study Our facilitators are highly experienced with hands-on actual project experiences as project managers. PMI - Registered Education Provider Our R.E.P status from Project Management Institute shows our commitment in this field. For good. 1 Year DCOValley Access Our DCOValley is continuously updated. 1 year access is a game changer. And it’s free! Premium Training Venue Our training locations are selected to give our participants better experience during and after the class Affordable Premium Program Our program investment is very competitive considering the services & supports you get from us. You Get What You Really Need Our focus is on the training program only. No post- training objectives or cross-selling services outside of it. Comprehensive Repository System We have managed our knowledge management repository system very carefully for more than 8 years. Full Service Assistance Our team is here for you. A dedicated ones with clear mission and objectives, to help you and your programs. Why DCOLearning There are many. Here are some of them.
  • 20.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 20 DCOLearning Program Experience It Is More Than Your Usual Classroom Sessions Case Studies & Discussion We use actual project case for participants exercises35% Simulation & Games We learn when we enjoy the program. When we engaged.25% Classroom Theory & Application We use less time for theory and focus on the application30% DCOValley System DCOValley system is built to complement your learning experience. Learning did not stop after the classroom sessions. 10%
  • 21.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 21 We join forces to provide comprehensive programs for both of our clients portfolio and to create seamless client experience through our offerings. FOSTER & BRIDGE INDONESIA To provide quality programs in project management and to ensure our programs are in line with global project management standard and practices. REGISTERED EDUCATION PROVIDER OF PMI As part of Accoladia’s group, we build our soft-skills & leadership programs to complement our Talent Triangle program model. HARVEYSTERLING INDONESIA Partnerships & Acknowledgement We Mean What We Are Set To Do INDONESIA
  • 22.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 22 1 2 3 4 5 6 24/7 Always ready 365 Days All year long Web-Based Easy to access Any Gadgets Conveniently yours Free No brainer PMP® Simulator One of a kind DCOValley™ Features DCOLearning Virtual Learning Environment for You
  • 23.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 23 Training Materials All of your training material files are accessible here. All year. Tools & Templates Download them for your work and study purposes. They are here. Class Photos Remember all the experience you have in our class. PMP® Exam Simulator Exercise and practice until you are ready. More than 1,000 question banks. Additional Materials We put additional articles, slides, and other contents so you can learn more. Additional Videos We also curated important videos that will complement your study. DCOValley™ Content Learning Anytime. Anywhere. With Your Own Pace.
  • 24.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 24 Address Kota Kasablanka. Tower A. 38th Floor Jl. Casablanca Raya Kav. 88 DKI Jakarta 12870 Direct Call M. +62 857 81 76 21 06 (IM3) M. +62 878 85 33 21 32 (XL) T. +62 21 87 15 341 Emails lia.octovina@dcolearning.com Idna.narita@dcolearning.com beby.salsabila@dcolearning.com Contact Us Let’s Discuss Your Professional Development Program
  • 25.
    W W W. D C O L E A R N I N G . C O M © 2017 DCOLearning – Accoladia Group. All Rights Reserved. 25 DCOLearning – Accoladia Group Specialist in Project Management Training. Jakarta, Indonesia PMI, PMP, CAPM, Project Management Professional (PMP), Certified Associate in Project Management (CAPM) and PMBOK are registered marks of Project Management Institute, Inc. DCOLearning and DCOValley are trademarks of PT Accoladia Tri Vesta Images by 123RF Photo Stock INDONESIA