Embed presentation
Download to read offline

This production plan schedules the filming of scenes 17 and 6 on Monday the 20th at a pub house party location, scene 3 on Tuesday the 21st at the same location, and scenes requiring Kirsty Lowe, Jordan Tombling, and extras on Saturday with costumes of party attire and dresses. Equipment needed includes cameras, tripods, props of hand bags, bottles, cans of beer, and shot glasses.
