SlideShare a Scribd company logo
TSX P I NYSE PPP I
2015 TD SECURITIES
MINING CONFERENCE
JANUARY 27, 2015
TSX P I NYSE PPP I
This presentation may contain “forward-looking” statements within the meaning of Canadian securities legislation and the
United States Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to future events or the
anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and
anticipated performance. In certain cases, forward-looking statements can be identified by the use of words such as “plans”,
“expects”, “is expected”, “budget”, “scheduled”, ”estimates”, ”forecasts”, ”intends”, ”anticipates” or “believes”, or variations of
such words and phrases or statements that certain actions, events or results “may”, ”could”, “would”, ”might”, or “will be
taken”, “occur” or “be achieved”, or the negative of these words or comparable terminology. By their very nature forward-
looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual performance
of the Company to be materially different from any anticipated performance expressed or implied by the forward-looking
statements. Such factors include various risks related to the Company’s operations, including, without limitation, fluctuations in
spot and forward markets for gold, silver and other metals, fluctuations in currency markets, changes in national and local
governments in Mexico and the speculative nature of mineral exploration and development, risks associated with obtaining
necessary exploitation and environmental licenses and permits, and the presence of laws that may impose restrictions on
mining. A complete list of risk factors are described in the Company’s annual information form and will be detailed from time to
time in the Company’s continuous disclosure, all of which are, or will be available, for review on SEDAR at www.sedar.com.
This presentation uses the terms “measured resources”, “indicated resources” and “inferred resources”. The Company advises
readers that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101
Standards of Disclosure for Mineral Projects (“NI 43-101”), the United States Securities and Exchange Commission does not
recognize them. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be
converted in to reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and
economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to
a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-
feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI43-101. Investors are cautioned
not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
Although the Company has attempted to identify important factors that could cause actual performance to differ materially
from that described in forward-looking statements, there may be other factors that cause its performance not to be as
anticipated. The Company neither intends nor assumes any obligation to update these forward-looking statements or
information to reflect changes in assumptions or circumstances other than required by applicable law. There can be no
assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially
from those currently anticipated. Accordingly, readers should not place undue reliance on forward-looking statements.
Unless otherwise indicated, all dollar values herein are in US$.
Cautionary Statement
2
TSX P I NYSE PPP I 3
Stable Platform for Growth
OUR KEY FOCUS
Producing in America’s Top Mining Jurisdictions
Established Growth Profile from Assets in Production
Disciplined Cost Management
Experienced Board and Management
Strong Financial Position
Track Record of Delivering on Stakeholder Commitments
Corporate Office
(Toronto)
Producing Mine
Development Project
Exploration Property
Black Fox
Grey Fox
San Dimas
Cerro Del Gallo
Ventanas
TSX P I NYSE PPP I
111
143
161
180
190
215
64
80
100
100
2012 2013 2014 2015E 2016E 2017E
Black Fox San Dimas
300-350
250-270
280-300
Targeted Production Growth Profile (AuEq koz)
1,2
4
Strategic Approach:
1. Strong balance sheet
2. Measured approach to growth
3. Disciplined cost management
4. Low-risk jurisdictions
5. Responsible mining practices
Operating in attractive mining jurisdictions with:
 Long mining history
 Stable Government
 Established permitting process
Located in areas with:
 Existing infrastructure
 Skilled local workforce
 Suppliers
 Community support
Established Organic Growth Profile
FROM ASSETS IN PRODUCTION
225
*See final slide for footnotes.
TSX P I NYSE PPP I
Increased Production by 57% in 2014
2013 2014
Gold equivalent production
1
(gold equivalent ounces)
143,114 225,100
Gold production
(ounces)
111,983 190,000
Silver production
1
(million ounces)
6.05 6.15
All-in Sustaining Costs
3
($ per gold ounce)
$1,077 $1,217
Cash cost
3
($ per AuEq ounce)
$599 $687
5
WITH DISCIPLINED COST MANAGEMENT
*See final slide for footnotes.
0
50,000
100,000
150,000
200,000
250,000
2013 2014
+57%
Production
(AuEq ounces)
TSX P I NYSE PPP I 6
A Further 20% Production Growth in 2015
2014 Black Fox San Dimas Outlook 2015
Attributable gold equivalent
production1
(gold equivalent ounces)
225,100 75,000-85,000 175,000-185,000 250,000-270,000
Gold Production
(ounces)
190,000 75,000-85,000 145,000-155,000 220,000-240,000
Silver Production1
(million ounces)
6.15 6.5-7.5 6.5-7.5
Total cash costs3
(per gold equivalent ounce)
$687 $820-$870 $590-$640 $650-$700
All-in Sustaining Costs3
(per gold ounce)
$1,217 $1,075-$1,125 $840-$890 $1,000-$1,100
Capital Expenditures
($ millions)
$80.0 $22.6 $41.4 $66.7
Exploration
($ millions)
$35.0 $6.4 $12.3 $19.1
*Includes Cerro del Gallo.
See final slide for footnotes.
AT LOWER COSTS
TSX P I NYSE PPP I
2014A Operating
Efficiencies
Lower
Sustaining
Capital
Decreased
G&A
2015E
$1,217
$1,050
$500
$600
$700
$800
$900
Disciplined Cost Management
7
POSITIONED TO OUTPERFORM
2015 Cash Costs Guidance Range (US$/oz Au)*
*Cash costs are net of by-product credits. Based on available company disclosure and data
from SNL Metals & Mining. See final slide for footnotes.
San Dimas:
o Expansion to 2,500 TPD increased efficiencies of
scale
o Increased long-hole mining reduced dilution by
30%
o Expansion to 3,000 TPD expected to reduce costs
by a further ~$50/oz
Black Fox:
o Mining optimization program commenced in 2014
o Contractors reduced
o Initiated 24-hour open-pit mining
o Training improves productivity and quality control
Corporate:
o Rationalizing offices (closing Vancouver and
Mexico City offices)
o Focused on reducing G&A
Primero 2015 AISC Guidance vs. 2014 Results (US$/oz Au)
3
TSX P I NYSE PPP I
Strong Financial Position
Exchanges
TSX: P
NYSE: PPP
Balance Sheet (September 30, 2014)
Cash
Line of Credit5
Total Liquidity
Convertible Debenture
(6.5%, due March 2016, $14 conversion)
Line of Credit Draw Down5
(Due May 2017)
Total Debt4
$22 million
$45 million
~$67 million
$48 million
$30 million
$78 million
Capital Structure
Common Shares Outstanding 6
Fully Diluted 7
Market Cap. At Jan 19, 2015
160 million
190 million
C$895 million
POSITIONED FOR GROWTH
Source: 2014E-2016E Operating Cash Flow – Capital IQ consensus CFPS multiplied by
current 160 million shares outstanding.
$67MSTRONG Liquidity
$78M4
PRUDENT Debt Level
September 30, 2014
Consensus Estimated Operating Cash Flow ($ millions)
8
$72 $79
$115
$155
$0
$50
$100
$150
$200
2013 2014E 2015E 2016E
*See final slide for footnotes.
TSX P I NYSE PPP I
Experienced Board and Management
9
Joseph Conway | President & CEO
30 Years of Experience
► Appointed CEO in June 2010
► Former CEO, President and Director of
IAMGOLD and Repadre Capital
Wendy Kaufman | CFO
20 Years of Experience
► Appointed CFO in September 2014
► Former VP, Finance and Treasury of
Inmet Mining Corp.
Wade Nesmith | Chairman
► Founder of Primero
► Founding and current director of Silver
Wheaton
200+ Years of
Combined Industry
Experience
Entrepreneurs
BOARD OF DIRECTORS
MANAGEMENT
David Demers | Director 2,3,4,5
► Founder, CEO and Director Westport
Innovations
► Director of Cummins Westport and
Juniper Engines
Grant Edey | Director 3,5
► President & CEO, Khan Resources
► Former Director of Breakwater Resources,
Queenstake Resources, Santa Cruz Gold,
CFO, IAMGOLD
Rohan Hazelton | Director 1
► VP, Strategy, Goldcorp
► Formerly with Wheaton River and
Deloitte & Touche LLP
Proven Track Record of
Asset Turnaround
Capital Markets
Expertise
Disciplined Approach to
Business Development
Eduardo Luna | Director 1
► Former Chairman and CEO of Silver
Wheaton, Executive VP of Goldcorp and
Luismin (San Dimas)
► Former President of Mexican Mining
Chamber
Brad Marchant | Director 1
► Co-founder of Triton Mining Corporation
► Founder of BioteQ Environmental
Technologies Inc.
Robert Quartermain | Director 2,3
► Founder and President & CEO, Pretium
Resources
► Former President of Silver Standard
Resources
Michael Riley | Director 2,5
► Chartered accountant with more than 26
years of accounting experience
► Chair of Primero Audit Committee
Board Committees: 1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit
TSX P I NYSE PPP I
1.9
1.5
1.1
0
0.5
1
1.5
2
2011 2012 2013
Track Record of Delivering on Stakeholder Commitments
Primero All Injury Frequency RateSHAREHOLDERS
Superior Value Creation
ENVIRONMENT
Certified “Clean Industry”
COMMUNITY
Awarded “Socially Responsible Company”
SAFETY
Lowering All Injury Frequency Rate
10
(100%)
(40%)
20%
80%
140%
Primero Mining Corp. S&P/TSX Global Gold Index(Source Thomson One)
Delivering Superior Returns to Primero Shareholders
January 2012 to Present
TSX P I NYSE PPP I
o Commence expansion to 3,000 TPD
o Increase access to high-grade
Victoria vein
o Implement 7 day, 12-hour shifts to
optimize mine throughput
o Complete tunnels connecting
Central Block to Sinaloa Graben,
increasing efficiency and reducing
costs
Location
Mine Type
Ownership
Durango, Mexico
Underground, Gold & Silver
100% (silver stream)
1
Proven & Probable Gold Reserves (koz)
(4.9M tonnes at 5.5 g/t)
870
Measured & Indicated Gold Resources
(koz)
(Inclusive of Reserves) (4.3M tonnes at 7.2 g/t)
997
Inferred Gold Resources (koz)
(7.3M tonnes at 4.2 g/t)
998
2015E Production
1
(AuEq koz) 175-185
2015E Cash Costs
3
($/AuEq oz) $590-$640
2014 2015 2016
o 23% increase in gold reserve grade
o Mill expansion to 2,500 TPD
completed in Q1
o Expanded top producing veins
through successful exploration
o Discovered new high-grade veins
o Achieved record production of
161,000 AuEq oz
o Complete expansion to 3,000 TPD
o Increase mined grade to current gold
reserve grade of 5.5 g/t
World Class Platform Asset
11
SAN DIMAS
*See final slide for footnotes.
TSX P I NYSE PPP I
-
500
1,000
1,500
2,000
2,500
3,000
3,500
Q3 2010 Q3 2012 Q3 2014 Q3 2016E
*See final slide for footnotes.
Expansion to 3,000 TPD
SAN DIMAS
Construction Mill expansion to 3,000 TPD began in Q1 2015 and is expected to be completed by Q2 2016
Capital Cost Currently estimated at $26 million, including a 30% contingency
After-tax IRR8 is expected to be 78% with a 12 month payback period9
Production An estimated increase by more than 30% over 2014 to approximately 215,000 gold
equivalent ounces
Cash Cost Expected to drop by ~$50 per ounce from current levels
89%
GROWTH
San Dimas Mill Throughput (TPD)
12
TSX P I NYSE PPP I
2015 Mine Expansion Plan
13
SAN DIMAS
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
tonnesperday
Actual
Forecast



Mill Expansion
Base Production
Mine Production
to 2,150 tpd
Mine Production
to 2,500 tpd
Mill Expansion
Mine Production
to 2,900 tpd
2011 2012 2013 2014 2015 2016
Current Nameplate Capacity
Expanded 3,000 TPD Capacity
TSX P I NYSE PPP I
Proven History of Reserve & Resource Growth
505
660
870
577
780
997
704
762
998
2011 2012 2013
P&P Reserves ( Au Koz)
M&I Resources (Au Koz)
Inferred Resources (Au Koz)
(M&I Resources Include Mineral Reserves)
See slides 27, 28, 29, & 30
Significant Exploration Upside with Low Finding Costs
o Completed 80,000 metres of drilling 2014, 2014 reserves and
resources to be released in Q1 2015
o 2015: $6.4 million, 25,000 metres of drilling
SAN DIMAS
Low Finding Cost Per Ounce
247 311
$53.0
$34.7
2012 2013
P&P Reserves Discoverd (Koz Au)
P&P Discovery Cost(US$/oz Au)
14
TSX P I NYSE PPP I
Note: Based on public data, average depth of listed mines is 1,633 metres.
Established Jurisdiction with Proven Depth Potential
Over 200 Million Ounces of Historical Production
BLACK FOX
15
TSX P I NYSE PPP I
o Continue building underground long-
hole stope inventory
o Finalize mill and tailings optimization
o Continue in-fill drilling of central
zone
o Goal of identifying resources to
depth of 1,000 metres
2014 2015 2016
o Completed acquisition and
integration of Black Fox Complex
o Commenced optimization program,
focused on cost reduction
o Increased efforts on underground
exploration and development
o Discovered high-grade intercepts at
depths up to 800 metres
o Review the concept of sinking a shaft
to access deep mineralization
o Complete detailed economic
analysis to potentially include Grey
Fox as part of long term
development at the Black Fox
Complex
Turnaround Opportunity to Create Value
BLACK FOX
Location
Mine Type
Ownership
Timmins, Ontario
Open-Pit & Underground, Gold
100% (8% gold stream)
1
Proven & Probable Gold Reserves (koz)
(3.8M tonnes at 4.3 g/t)
538
Measured & Indicated Gold Resources
(koz)
(Inclusive of Reserves) (4.0M tonnes at 5.1 g/t)
653
Inferred Gold Resources (koz)
(0.7M tonnes at 7.6 g/t)
168
2015E Production
1
(AuEq koz) 75-85
2015E Cash Costs
3
($/AuEq oz) $820-$870
16
*See final slide for footnotes.
TSX P I NYSE PPP I
Focused on Reserve & Resource Development
Lateral & Depth Expansion
BLACK FOX
17
TSX P I NYSE PPP I
Grey Fox
Promising Exploration Project
GREY FOX
o Completed 76,000 metres of drilling
in 2014.
o Planned another 50,000 metres in
2015.
o Positive exploration results
announced to date from underground
and open pit targets.
o Further results pending.
Location
Ownership
4 km from Black Fox, Ontario
100% (no stream)
Measured & Indicated Gold Resources (koz)
(5.3M tonnes at 3.3 g/t)
558
Inferred Gold Resources (koz)
(1.6M tonnes at 4.4 g/t)
219
TSX P I NYSE PPP I
Catalysts and News Flow
Q3 2014
San Dimas Operating at
2,500 TPD
Increases annual
production rate to
165,000AuEq oz
Q1 2015
Reserve and Resource
Update
Including 226,000
metres of 2014 drilling
Q1 2015
Black Fox Complex
Exploration Update
Drilling from 500 metre level
exploration drift at depth
Q3 2014
San Dimas 3,000 TPD
Decision
Expansion decision
announced
Q4 2015
Grey Fox Scoping
Study
Q4 2014
San Dimas
Exploration Update
Extended top
producing veins



19
2014 Q1 2015 2015
TSX P I NYSE PPP I
$650-700/oz
TOTAL CASH COST3,10
Low Cost Production
250–270koz
MEXICO & CANADA1,10
Producing in America’s
Top Mining Jurisdictions
20
Positioned to Outperform
DELIVERING SUPERIOR RETURNS
14quarters
CONSECUTIVE
History of Positive Cash
Flow From Operations
9%
DEBT / TOTAL CAP.5
Strong
Financial Position
+200years
INDUSTRY EXPERIENCE
Experienced
Board and Management
+53%
VS. TSX GLOBAL GOLD
Consistent
Outperformer
(100%)
(40%)
20%
80%
140%
Primero Mining Corp. S&P/TSX Global Gold Index
Delivering Superior Returns to Primero Shareholders
Source: Thomson One
January 2012 to Present
*See final slide for footnotes.
APPENDICES
TSX P I NYSE PPP I
Stock Performance & Significant Events
22
0
10
20
30
-80%
-60%
-40%
-20%
0%
20%
40%
60%
80%
8/13/2010 2/13/2011 8/13/2011 2/13/2012 8/13/2012 2/13/2013 8/13/2013 2/13/2014 8/13/2014
Volume(Millions)
P-T Volume
Primero Mining Corp.
S&P/TSX Global Gold
Index
Primero IPO,
Begins Trading
on the TSX, and
Finalizes San
Dimas
Acquisition
Primero
Announces
Brigus Gold
Acquisition
Primero Added
to S&P/TSX
Composite Index
Primero
Announces San
Dimas Expansion
Plan Phase 1
Primero
Begins
Trading on
the NYSE Primero Announces
Acquisition of Cerro
Del Gallo
Primero
Announce
s APA
Ruling
Spot Gold
Hits 4-
Year Low
TSX P I NYSE PPP I 23
Lower 2015 Capital Expenditures
Capital Expenditures Estimated 2015 Costs
San Dimas Underground Development $15.2 million
San Dimas Sustaining Capital $10.8 million
San Dimas Projects $15.4 million
San Dimas Sub Total $41.4 million
Black Fox Underground Development $13.4 million
Black Fox Sustaining Capital $4.5 million
Black Fox Projects $3.4 million
Grey Fox Development Studies $1.3 million
Black Fox Sub Total $22.6 million
Cerro del Gallo Development $2.7 million
Total $66.7 million
2014 Capital Expenditure $80 million
Note: Figures may not add due to rounding.
2015 GUIDANCE
TSX P I NYSE PPP I 24
Continuing to Invest in Exploration
2015 GUIDANCE
Capitalized Exploration Expenditures Estimated 2015 Costs
San Dimas Diamond Drilling $3.1 million
San Dimas Drifting $1.9 million
San Dimas Regional Diamond Drilling $0.9 million
Ventanas Regional Diamond Drilling $0.5 million
San Dimas Sub Total $6.4 million
Black Fox Diamond Drilling $5.0 million
Grey Fox & Regional Exploration $7.3 million
Black Fox Complex Sub Total $12.3 million
Cerro del Gallo Geology Mapping $0.4 million
Total $19.1 million
2014 Exploration $35 million
TSX P I NYSE PPP I 25
Summary of Debt & Tradable Securities
Convertible
Debentures
TSX: P.DB.U
Revolving Line
of Credit Facility
Primero Warrants
TSX: P.WT
Face Value $48.1 million Q3/14 draw: $30.0 million n/a
Maturity / Expiry March 31, 2016 May 23, 2017 July 20, 2015
Interest Rate 6.5% Floating Rate (see below) n/a
Payable Semi-Annually Revolving Credit n/a
Conversion / Strike C$14.00 n/a C$8.00
Additional Notes  Provision for forced
conversion if the market
price of the Primero’s
shares is at least 125%
of the conversion price
 CUSIP: 74164WAA4
 The floating interest rate
was approximately 5%
per annum during the
nine months ended
September 30, 2014
 CUSIP: 74164W114
TSX P I NYSE PPP I
Silver Purchase Agreement
Primero sells 50% of annual silver
production above 6.0 million ounces at spot
o Remainder sold at ~$4 per ounce under silver
purchase agreement
o Threshold commences August 6 to following
August 5
o Expansion anticipated to generate meaningful
silver spot sales post August 6, 2014
Primero sells 8% of annual gold production
at Black Fox at ~$509 per ounce
o Primero streams 6.3% from the Black Fox
Extension which includes the Pike River Property
o Gold is sold at $500 per ounce subject to
inflationary adjustment beginning in 2013, not to
exceed 2% per annum
o The Grey Fox exploration property is not subject
to any gold streaming agreements
SAN DIMAS BLACK FOX
Gold Streaming Agreement
25%
75%
Silver Gold
Silver as Percentage of
2013E Revenue
26
TSX P I NYSE PPP I
Focus on Responsible Mining
HEALTH AND SAFETY
o We understand that our most important assets
are our people and their safety is our number
one priority
o We maintain world-class health and safety
policies
ENVIRONMENT
o San Dimas is certified as “Clean Industry” by
PROFEPA (Mexican EPA)
o We utilize sustainable green technologies where
possible - Primero’s own hydroelectric dam
supplies the majority of San Dimas Mine’s power
COMMUNITY
o We treat our local communities as our partners
o We focus on understanding our local
communities goals and providing local
opportunities
o We promote local education with awards for the
local technical college in San Dimas
27
TSX P I NYSE PPP I
Classification
Tonnage
(Million Tonnes)
Gold Grade (G/T)
Silver Grade
(G/T)
Contained Gold
(000 Ounces)
Contained Silver
(000 Ounces)
Mineral Reserves
Proven &
Probable
4.893 5.5 315 870 49,479
Mineral Resources
Measured &
Indicated
4.282 7.2 419 997 57,713
Inferred 7,333 4.2 310 998 72,647
Notes to Mineral Reserve Statement:
Cutoff grade of 2.7 grams per tonne (”g/t”) gold equivalent (“AuEq”) based on total operating cost of US$104.97/t. Metal prices assumed are gold US$1,250 per
troy ounce and silver US$20 per troy ounce. Silver supply contract obligations have been referenced in determining overall vein reserve estimate viability.
Processing recovery factors for gold and silver of 97% and 94% assumed.
Exchange rate assumed is 13 pesos/US$1.00.
The Mineral Reserve estimates were prepared under the supervision of Mr. Gabriel Voicu P.Geo., Vice President, Geology and Exploration, Primero and a QP for
the purposes of National Instrument 43-101 (“NI 43-101”).
Notes to Mineral Resource Statement:
Mineral Resources are total and include those resources converted to Mineral Reserves.
A 2.0g/t AuEq cutoff grade is applied and the gold equivalent is calculated at a gold price of US$1,300 per troy ounce and a silver price of US$20 per troy ounce.
A constant bulk density of 2.7 tonnes/m3 has been used.
The Mineral Resource estimates were prepared by Mr. Rodney Webster MAusIMM, MAIG and Mr. J. Morton Shannon P.Geo., both of AMC Mining Consultants
(Canada) Ltd. and a QP for the purposes of NI 43-101.
Additional exploration potential was estimated at 6-10 million tonnes at grade ranges of 3-5 grams per tonne of gold and 200-400 grams per tonne of silver as of
December 31, 2011. It should be noted that these targets are conceptual in nature. There has been insufficient exploration to define an associated Mineral Resource
and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource.
Mineral Resources and Mineral Reserves
(December 31, 2013, Mineral Resources include Mineral Reserves)
SAN DIMAS
28
TSX P I NYSE PPP I
Notes to Black Fox Mineral Reserve estimate:
1. Mineral Reserves stated as at December 31, 2013.
2. Open pit cut-off grade of 1.0 g/t Au and underground cut-off grade of 3.4 g/t.
3. Gold price assumed is US$1,250 per troy ounce.
4. Processing gold recovery factor 94% assumed.
5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates.
Notes to Black Fox Mineral Resource estimate:
1. Mineral Reserves stated as at December 31, 2013.
2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t.
3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations.
4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR
THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com.
Classification
Tonnage
(Tonnes)
Gold Grade
(G/T)
Cont. Gold
(Ounces)
Proven & Probable Reserves
Open Pit 1,468,500 3.7 173,900
Underground 1,663,900 6.3 339,100
Stockpile 716,200 1.1 24,700
Total 3,848,700 4.3 537,700
Measured & Indicated Resources, Including Reserves
Open Pit 1,423,900 4.0 182,518
Underground 1,852,800 7.5 445,336
Stockpile 716,200 1.1 24,706
Total 3,992,800 5.1 652,560
Inferred Resources
Open Pit 364,100 5.8 67,897
Underground 326,300 9.5 99,889
Total 690,400 7.6 167,786
Mineral Resources and Mineral Reserves
(December 31, 2013, Mineral Resources include Mineral Reserves)
BLACK FOX
29
TSX P I NYSE PPP I
Classification
Cut-off
Grade
(G/T Au)
Potential Material
Tonnes
(Million
Tonnes)
CAPPED Au
(G/T)
Contained Gold
(Ounces)
Indicated Resources
>3.0 Underground 1.394 5.4 243,041
>0.9 Open Pit 3.882 2.5 314,615
Total Indicated Resources 5.276 3.3 557,655
Inferred Resources
>3.0 Underground 1.065 5.1 175,511
>0.9 Open Pit 0.486 2.8 43,309
Total Inferred Resources 1.552 4.4 218,820
Notes to Grey Fox Mineral Resource estimate:
1. Mineral Reserves stated as at 31 December 2013.
2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t
3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations.
4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR
THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com.
5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates.
Mineral Resources
(December 31, 2013)
GREY FOX
30
TSX P I NYSE PPP I
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
AuEq
(g/t)
AuEq
(M oz)
Proven 28.2 0.71 0.64 15.1 13.7 0.08 50.2 1.15 1.05
Probable 4.0 0.54 0.07 13.2 1.7 0.07 6.2 0.93 0.12
Proven & Probable 32.2 0.69 0.71 14.8 15.3 0.08 56.4 1.14 1.18
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
AuEq
(g/t)
AuEq
(M oz)
Measured 39.9 0.61 0.78 13.8 17.71 0.10 88.8 1.07 1.37
Indicated 8.0 0.55 0.14 11.0 2.83 0.08 14.6 0.92 0.24
Measured & Indicated 47.9 0.60 0.92 13.3 20.55 0.1 103.4 1.06 1.64
Total Resources Within the Gold Domain2
Phase I Heap Leach In-Pit Proven and Probable Reserves3
In-Pit Resources (excluding Proven and Probable Reserves)4,5
Category M Tonnes
Au
(g/t)
Au
(M ozs)
Ag
(g/t)
Ag
(M ozs)
Cu
(%)
Cu
(M lbs)
AuEq
(g/t)
AuEq
(M oz)
Measured 129 0.54 2.24 12.0 49.8 0.09 256.0 0.94 3.91
Indicated 80 0.38 0.98 8.0 20.6 0.08 141.1 0.69 1.77
Measured & Indicated 209 0.48 3.22 11.0 70.3 0.08 396.9 0.83 5.58
Inferred 20 0.3 0.19 7.0 4.5 0.09 39.7 0.59 0.38
1. “Technical Report First Stage Heap Leach Feasibility Study, Cerro del Gallo Gold Silver Project, Guanajuato, Mexico” June 2012 (“Feasibility Study”). Gold equivalent
ounces calculated by Cerro Resources using gold, silver and copper prices of US$1,341/oz, US$25.58/oz and US$7,582/t respectively.
2. These resources are reported using internal cut-off grade of 0.2 g/tAu as per Feasibility Study, 2012 and Golder Associates Technical Report, 2008.
3. These reserves are reported using internal cut-off grades of 0.24 and 0.29 gAuEq/t for weathered and partially oxidized, respectively.
4. These resources are reported using internal cut-off grades of 0.24, 0.29, and 0.34 gAuEq/t for weathered, partially oxidized, and fresh material resp.
5. See note 7 in January 23, 2013 News Release “Primero achieves 2012 Guidance and Provides 2013 Outlook”.
CERRO DEL GALLO
Reserves and In-Pit Resources1
31
TSX P I NYSE PPP I
Tamara Brown | VP, Investor Relations
 Former Director Investor Relations for IAMGOLD
 Former partner of a Toronto based, boutique
investment bank and professional engineer in mining
industry
H. Maura Lendon | VP, Chief General Counsel and
Corporate Secretary
 Former Senior Vice President, Chief Legal Officer
and Corporate Secretary of HudBay Minerals Inc.;
Chief Counsel Canada, Chief Privacy Officer -
Canada of AT&T
David Sandison | VP, Corporate Development
 Former VP, Corporate Development of
Clarity Capital ; Director, Corporate Development
Xstrata Zinc Canada ; Director Business
Development, Noranda/Falconbridge; Former EVP,
Noranda Chile
Louis Toner | VP, Project Development &
Construction
 Over 30 Years of Engineering and Construction
experience, formerly held Senior Project
Management roles with BBA Inc. and Lafarge
Canada Inc.
Gabriel Voicu | VP, Geology and Exploration
 25 Years of mining experience, formerly held senior
technical and exploration positions with Cambior
and IAMGOLD
James Mallory | VP, Corporate Responsibility
 Over 35 Years of mining experience
 Former VP, Vice-President, Operations & Social
Responsibility at South American Silver
 13 Years of experience in Latin America
Joseph Conway | President & CEO
 30 Years of experience
 Appointed President and CEO in June 2010
 Former CEO, President & Director of IAMGOLD and
Repadre Capital
Wendy Kaufman | Chief Financial Officer
 20 Years of experience
 Appointed CFO in September 2014
 Former VP, Finance and Treasure of Inmet Mining
Corporation
Executive Management
32
TSX P I NYSE PPP I
Robert Quartermain | Director 2,3
 Founder and President & CEO, Pretivm Resources
 Former President and CEO of Silver Standard
Brad Marchant | Director 1
 Co-founder of Triton Mining Corporation
 Founder of BioteQ Environmental Technologies Inc.
Michael Riley | Director 2,5
 Chartered accountant with more than 26 years of
accounting experience
 Chair of Primero Audit Committee
Eduardo Luna | Director 1
 Former EVP & President, Mexico. Former Chairman
and CEO of Silver Wheaton, Executive VP of
Goldcorp and Luismin S.A. de C.V. (San Dimas) and
President of Mexican Mining Chamber and the Silver
Institute
Rohan Hazelton | Director 1
 VP, Strategy, Goldcorp
 Formerly with Wheaton River and Deloitte & Touche
LLP
Grant Edey | Director 3,4,5
 President & CEO, Khan Resources Inc.
 Former Director of Breakwater Resources, former
director of Queenstake Resources, Santa Cruz Gold
 Former CFO, IAMGOLD
David Demers | Director 2,3,4,5
 Founder, CEO and Director Westport Innovations
 Director of Cummins Westport and
Juniper Engines
Wade Nesmith | Chairman
 Founder of Primero
 Founding and current director of Silver Wheaton
Board of Directors
33Board Committees:
1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit
Joseph Conway | Director
see Executive Management
TSX P I NYSE PPP I
This presentation has been prepared in accordance with the requirements of Canadian provincial securities laws which differ from the requirements of
U.S. securities laws. Unless otherwise indicated, all mineral reserve and resource estimates included in this presentation have been prepared in
accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining,
Metallurgy and Petroleum classification systems. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for
all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the
requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource estimates disclosed in this presentation
may not be comparable to similar information disclosed by U.S. companies.
The mineral reserve estimates in this presentation have been calculated in accordance with NI 43-101, as required by Canadian securities regulatory
authorities. For United States reporting purposes, SEC Industry Guide 7 under the United States Securities Exchange Act of 1934, as amended, as
interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. As a result, the definition of “probable
reserves” used in NI 43-101 differs from the definition in the SEC Industry Guide 7. Under SEC standards, mineralization may not be classified as a
“reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the
reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify
mineralized material as reserves under the SEC standards. Accordingly, mineral reserve estimates contained in this presentation may not qualify as
“reserves” under SEC standards.
In addition, this presentation uses the terms “indicated resources” and “inferred resources” to comply with the reporting standards in Canada. The
Company advises United States investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them.
United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral
reserves. Further, “inferred resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or
economically. Therefore, United States investors are also cautioned not to assume that all or any part of the “inferred resources” exist. In accordance
with Canadian securities laws, estimates of “inferred resources” cannot form the basis of feasibility or other economic studies. It cannot be assumed
that all or any part of “indicated resources” or “inferred resources” will ever be upgraded to a higher category or are economically or legally mineable. In
addition, disclosure of “contained ounces” is permitted disclosure under Canadian securities laws; however, the SEC only permits issuers to report
mineralization as in place tonnage and grade without reference to unit measures.
NI 43-101 also permits the inclusion of disclosure regarding the potential quantity and grade, expressed as ranges, of a target for further exploration
provided that the disclosure (i) states with equal prominence that the potential quantity and grade is conceptual in nature, that there has been
insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral
resources, and (ii) states the basis on which the disclosed potential quantity and grade has been determined. Disclosure regarding exploration potential
has been included in this presentation. United States investors are cautioned that disclosure of such exploration potential is conceptual in nature by
definition and there is no assurance that exploration will result in any category of NI 43-101 mineral resources being identified.
Notes to Investors Regarding the Use of Resources
34
TSX P I NYSE PPP I
1. “Gold equivalent ounces” include silver production converted to a gold equivalent based on consensus estimated commodity prices;
accounts for the San Dimas silver purchase agreement. Silver production is subject to a silver purchase agreement. The silver
purchase agreement dictates that until August 6, 2014 Primero will deliver to Silver Wheaton a per annum amount equal to the first 3.5
million ounces of silver produced at San Dimas and 50% of any excess at $4.16 per ounce (increasing by 1% per year). Thereafter
Primero will deliver to Silver Wheaton a per annum amount equal to the first 6.0 million ounces of silver produced at San Dimas and
50% of any excess at $4.20 per ounce (increasing by 1% per year). The Company will receive silver spot prices only after the annual
threshold amount has been delivered. Black Fox is subject to a gold purchase agreement under which Sandstorm is entitled to 8% of
production at the Black Fox mine and 6.3% at the Black Fox Extension.
2. Assumes San Dimas operates at least at 3,000 TPD from end of Q2 2016; and Primero management estimates for Black Fox
production, based on 2,200-2,300 TPD operation and underground throughput increasing to 1,000 TPD by the end of 2015.
3. Cash costs and All-in Sustaining Costs are non-GAAP measures. Refer to the Company’s third quarter 2014 MD&A for a reconciliation
to operating expenses. Note the calculation of all-in sustaining costs at San Dimas changed with the acquisition of a second producing
asset and subsequently do not include corporate G&A. 2014 Cash costs and All-in Sustaining Costs are preliminary and may differ
from the final results included in the Company’s 2014 audited annual financial statements and MD&A.
4. $48.1 million senior unsecured convertible debenture (acquired from Brigus, with a 6.5% coupon an effective conversion price of
$14.00 and an expiry of March 2016); and $30 million draw down from line of credit. Excludes capital leases and pending US$75
million convertible, unsecured, subordinated debentures expected to close on or about February 9, 2015.
5. The Company closed a $75 million line of credit on May 23, 2014 and has drawn down $30 million as of September 30, 2014.
6. During the nine months ended September 30 2014, the Company issued 41,340,347 common shares as consideration for the
acquisition of Brigus, 1,919,744 common shares upon the exercise of stock options; and 1,000,000 common shares pursuant to a flow
through agreement.
7. Fully diluted shares include 20.8 million warrants with an exercise price of Cdn$8.00 per share, expiring on July 20, 2015; and 9.5
million options with an average exercise price of Cdn$6.26.
8. Major assumptions include a flat gold price per ounce of $1,300, a flat silver price per ounce of $22.
9. The Company currently estimates that expanding the San Dimas mill to 3,000 TPD will require approximately $26.4 million of capital
investment, with approximately $6 million expenditure expected in 2014 and the remainder spread over the following eighteen
months. As a result of the preliminary nature of the capital assessment a contingency factor of 30% has been included in the capital
estimate.
10. Based on 2015 Guidance.
Footnotes
35
TSX P I NYSE PPP I
PRIMERO MINING CORP.
79 Wellington St. West, Suite 2100
Toronto, ON M5K 1H1
T 416 814 3160 TF 877 619 3160
www.primeromining.com
Tamara Brown
Vice President, Investor Relations
T 416 814 3168
info@primeromining.com
2015 TD SECURITIES
MINING CONFERENCE
JANUARY 27, 2015

More Related Content

What's hot

Primero corporate presentation january 2014
Primero corporate presentation january 2014Primero corporate presentation january 2014
Primero corporate presentation january 2014
primero_mining
 
Primero november corporate presentation v2
Primero november corporate presentation v2Primero november corporate presentation v2
Primero november corporate presentation v2
primero_mining
 

What's hot (17)

2019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 92019.03.28 probe metals presentation reformatted 16 9
2019.03.28 probe metals presentation reformatted 16 9
 
2019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 92019.02.12 probe metals presentation reformatted 16 9
2019.02.12 probe metals presentation reformatted 16 9
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
Probe Metals
Probe MetalsProbe Metals
Probe Metals
 
2019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 92019.02.20 probe metals presentation reformatted 16 9
2019.02.20 probe metals presentation reformatted 16 9
 
2019.06.05 probe metals presentation
2019.06.05 probe metals presentation 2019.06.05 probe metals presentation
2019.06.05 probe metals presentation
 
2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final2019.03.28 probe metals presentation final
2019.03.28 probe metals presentation final
 
2019.05.07 probe metals presentation
2019.05.07 probe metals presentation 2019.05.07 probe metals presentation
2019.05.07 probe metals presentation
 
Ami corporate update november 2017
Ami corporate update   november 2017Ami corporate update   november 2017
Ami corporate update november 2017
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation
 
Kemess Site Visit Presentation
Kemess Site Visit PresentationKemess Site Visit Presentation
Kemess Site Visit Presentation
 
Osisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold ForumOsisko Gold Royalties - 2017 Denver Gold Forum
Osisko Gold Royalties - 2017 Denver Gold Forum
 
2019.04.23 probe metals presentation
2019.04.23 probe metals presentation 2019.04.23 probe metals presentation
2019.04.23 probe metals presentation
 
Primero corporate presentation january 2014
Primero corporate presentation january 2014Primero corporate presentation january 2014
Primero corporate presentation january 2014
 
Corporate Presentation - October 2017
Corporate Presentation - October 2017Corporate Presentation - October 2017
Corporate Presentation - October 2017
 
Primero november corporate presentation v2
Primero november corporate presentation v2Primero november corporate presentation v2
Primero november corporate presentation v2
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 

Viewers also liked (20)

Bullying
BullyingBullying
Bullying
 
בנות כיתה ו' מתכוננות למסיבת בת המצווה
בנות כיתה ו' מתכוננות למסיבת בת המצווהבנות כיתה ו' מתכוננות למסיבת בת המצווה
בנות כיתה ו' מתכוננות למסיבת בת המצווה
 
Fifa
FifaFifa
Fifa
 
Azzano power point energy
Azzano   power point energyAzzano   power point energy
Azzano power point energy
 
Blc hyperlink
Blc hyperlinkBlc hyperlink
Blc hyperlink
 
Pašv sad saldus_101111
Pašv sad saldus_101111Pašv sad saldus_101111
Pašv sad saldus_101111
 
Australia
AustraliaAustralia
Australia
 
Primero mining interim q3 2011 report
Primero mining interim q3 2011 reportPrimero mining interim q3 2011 report
Primero mining interim q3 2011 report
 
3INVESTONLINE.COM
3INVESTONLINE.COM3INVESTONLINE.COM
3INVESTONLINE.COM
 
Ce este agenţia de ştiri
Ce este agenţia de ştiriCe este agenţia de ştiri
Ce este agenţia de ştiri
 
Tárki: Kik azok a Jobbikosok?
Tárki: Kik azok a Jobbikosok?Tárki: Kik azok a Jobbikosok?
Tárki: Kik azok a Jobbikosok?
 
World label awards 2012
World label awards 2012World label awards 2012
World label awards 2012
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
 
Varam klapenkovs jauns
Varam klapenkovs jaunsVaram klapenkovs jauns
Varam klapenkovs jauns
 
FATCA - Foreign Accounts Tax Compliance Acts - bachir el nakib-
FATCA - Foreign Accounts Tax Compliance Acts -  bachir el nakib-FATCA - Foreign Accounts Tax Compliance Acts -  bachir el nakib-
FATCA - Foreign Accounts Tax Compliance Acts - bachir el nakib-
 
Status update 1
Status update 1Status update 1
Status update 1
 
Double roll crusher
Double roll crusherDouble roll crusher
Double roll crusher
 
Hypertext system
Hypertext systemHypertext system
Hypertext system
 
Eidn 4-historico mobilizacao
Eidn 4-historico mobilizacaoEidn 4-historico mobilizacao
Eidn 4-historico mobilizacao
 
Plan
PlanPlan
Plan
 

Similar to Primero td presentation january 2015 final

Primero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 finalPrimero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 final
primero_mining
 
Primero scotia presentation final
Primero scotia presentation finalPrimero scotia presentation final
Primero scotia presentation final
primero_mining
 
Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2
primero_mining
 
Primero 2014 bmo conference final
Primero 2014 bmo conference finalPrimero 2014 bmo conference final
Primero 2014 bmo conference final
primero_mining
 
Primero Corporate Presentation October 18 2010
Primero Corporate Presentation October 18 2010Primero Corporate Presentation October 18 2010
Primero Corporate Presentation October 18 2010
Primero Mining Corp.
 
Primero Corporate Presentation November 2010
Primero Corporate Presentation November 2010Primero Corporate Presentation November 2010
Primero Corporate Presentation November 2010
Primero Mining Corp.
 
Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2
primero_mining
 

Similar to Primero td presentation january 2015 final (19)

Primero Dundee Presentation
Primero Dundee PresentationPrimero Dundee Presentation
Primero Dundee Presentation
 
Corporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining ConferenceCorporate Presentation - BMO 2015 Global Metals & Mining Conference
Corporate Presentation - BMO 2015 Global Metals & Mining Conference
 
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
24. Conferencia Mundial sobre Metales y Mineria de BMO Capital Markets
 
Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015Corporate Presentation - PDAC 2015
Corporate Presentation - PDAC 2015
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
Primero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 finalPrimero q4 2014 presentation 2015 final
Primero q4 2014 presentation 2015 final
 
Primero scotia presentation final
Primero scotia presentation finalPrimero scotia presentation final
Primero scotia presentation final
 
Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2Primero corporate presentation march 2014 v2
Primero corporate presentation march 2014 v2
 
Primero 2014 bmo conference final
Primero 2014 bmo conference finalPrimero 2014 bmo conference final
Primero 2014 bmo conference final
 
Primero Corporate Presentation October 18 2010
Primero Corporate Presentation October 18 2010Primero Corporate Presentation October 18 2010
Primero Corporate Presentation October 18 2010
 
Primero Corporate Presentation November 2010
Primero Corporate Presentation November 2010Primero Corporate Presentation November 2010
Primero Corporate Presentation November 2010
 
Primero q1 2015 presentation final
Primero q1 2015 presentation finalPrimero q1 2015 presentation final
Primero q1 2015 presentation final
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk Presentation
 
RBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials ConferenceRBC Capital Markets 2015 Global Mining & Materials Conference
RBC Capital Markets 2015 Global Mining & Materials Conference
 
Primero Second Quarter 2015 Results
Primero Second Quarter 2015 ResultsPrimero Second Quarter 2015 Results
Primero Second Quarter 2015 Results
 
The BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining ExpoThe BIG Event - Canadian Mining Expo
The BIG Event - Canadian Mining Expo
 
Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2Primero bmo conference presentation 2015 final v2
Primero bmo conference presentation 2015 final v2
 

More from primero_mining (11)

Primero 2014-csr-web
Primero 2014-csr-webPrimero 2014-csr-web
Primero 2014-csr-web
 
Primero Q3 2014 Presentation
Primero Q3 2014 PresentationPrimero Q3 2014 Presentation
Primero Q3 2014 Presentation
 
Primero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rlyPrimero san-dimas-site-visit-sept v001-o70rly
Primero san-dimas-site-visit-sept v001-o70rly
 
Primero denver presentation
Primero denver presentationPrimero denver presentation
Primero denver presentation
 
Primero baml presentation sept 2014
Primero baml presentation sept 2014Primero baml presentation sept 2014
Primero baml presentation sept 2014
 
Primero q2 2014 presentation
Primero q2 2014 presentationPrimero q2 2014 presentation
Primero q2 2014 presentation
 
Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014Primero Corporate Presentation - July 2014
Primero Corporate Presentation - July 2014
 
Black fox site visit june 19
Black fox site visit june 19Black fox site visit june 19
Black fox site visit june 19
 
Black fox site visit june 5
Black fox site visit june 5Black fox site visit june 5
Black fox site visit june 5
 
Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2Primero corporate presentation may 2014 v2
Primero corporate presentation may 2014 v2
 
Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2Primero corporate presentation may 2014 merrill lynch conferencev2
Primero corporate presentation may 2014 merrill lynch conferencev2
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...
BOHR International Journal of Business Ethics and Corporate Governance
 

Recently uploaded (20)

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
G-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table DesignG-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table Design
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 

Primero td presentation january 2015 final

  • 1. TSX P I NYSE PPP I 2015 TD SECURITIES MINING CONFERENCE JANUARY 27, 2015
  • 2. TSX P I NYSE PPP I This presentation may contain “forward-looking” statements within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, ”estimates”, ”forecasts”, ”intends”, ”anticipates” or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, ”could”, “would”, ”might”, or “will be taken”, “occur” or “be achieved”, or the negative of these words or comparable terminology. By their very nature forward- looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual performance of the Company to be materially different from any anticipated performance expressed or implied by the forward-looking statements. Such factors include various risks related to the Company’s operations, including, without limitation, fluctuations in spot and forward markets for gold, silver and other metals, fluctuations in currency markets, changes in national and local governments in Mexico and the speculative nature of mineral exploration and development, risks associated with obtaining necessary exploitation and environmental licenses and permits, and the presence of laws that may impose restrictions on mining. A complete list of risk factors are described in the Company’s annual information form and will be detailed from time to time in the Company’s continuous disclosure, all of which are, or will be available, for review on SEDAR at www.sedar.com. This presentation uses the terms “measured resources”, “indicated resources” and “inferred resources”. The Company advises readers that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), the United States Securities and Exchange Commission does not recognize them. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted in to reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre- feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Although the Company has attempted to identify important factors that could cause actual performance to differ materially from that described in forward-looking statements, there may be other factors that cause its performance not to be as anticipated. The Company neither intends nor assumes any obligation to update these forward-looking statements or information to reflect changes in assumptions or circumstances other than required by applicable law. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those currently anticipated. Accordingly, readers should not place undue reliance on forward-looking statements. Unless otherwise indicated, all dollar values herein are in US$. Cautionary Statement 2
  • 3. TSX P I NYSE PPP I 3 Stable Platform for Growth OUR KEY FOCUS Producing in America’s Top Mining Jurisdictions Established Growth Profile from Assets in Production Disciplined Cost Management Experienced Board and Management Strong Financial Position Track Record of Delivering on Stakeholder Commitments Corporate Office (Toronto) Producing Mine Development Project Exploration Property Black Fox Grey Fox San Dimas Cerro Del Gallo Ventanas
  • 4. TSX P I NYSE PPP I 111 143 161 180 190 215 64 80 100 100 2012 2013 2014 2015E 2016E 2017E Black Fox San Dimas 300-350 250-270 280-300 Targeted Production Growth Profile (AuEq koz) 1,2 4 Strategic Approach: 1. Strong balance sheet 2. Measured approach to growth 3. Disciplined cost management 4. Low-risk jurisdictions 5. Responsible mining practices Operating in attractive mining jurisdictions with:  Long mining history  Stable Government  Established permitting process Located in areas with:  Existing infrastructure  Skilled local workforce  Suppliers  Community support Established Organic Growth Profile FROM ASSETS IN PRODUCTION 225 *See final slide for footnotes.
  • 5. TSX P I NYSE PPP I Increased Production by 57% in 2014 2013 2014 Gold equivalent production 1 (gold equivalent ounces) 143,114 225,100 Gold production (ounces) 111,983 190,000 Silver production 1 (million ounces) 6.05 6.15 All-in Sustaining Costs 3 ($ per gold ounce) $1,077 $1,217 Cash cost 3 ($ per AuEq ounce) $599 $687 5 WITH DISCIPLINED COST MANAGEMENT *See final slide for footnotes. 0 50,000 100,000 150,000 200,000 250,000 2013 2014 +57% Production (AuEq ounces)
  • 6. TSX P I NYSE PPP I 6 A Further 20% Production Growth in 2015 2014 Black Fox San Dimas Outlook 2015 Attributable gold equivalent production1 (gold equivalent ounces) 225,100 75,000-85,000 175,000-185,000 250,000-270,000 Gold Production (ounces) 190,000 75,000-85,000 145,000-155,000 220,000-240,000 Silver Production1 (million ounces) 6.15 6.5-7.5 6.5-7.5 Total cash costs3 (per gold equivalent ounce) $687 $820-$870 $590-$640 $650-$700 All-in Sustaining Costs3 (per gold ounce) $1,217 $1,075-$1,125 $840-$890 $1,000-$1,100 Capital Expenditures ($ millions) $80.0 $22.6 $41.4 $66.7 Exploration ($ millions) $35.0 $6.4 $12.3 $19.1 *Includes Cerro del Gallo. See final slide for footnotes. AT LOWER COSTS
  • 7. TSX P I NYSE PPP I 2014A Operating Efficiencies Lower Sustaining Capital Decreased G&A 2015E $1,217 $1,050 $500 $600 $700 $800 $900 Disciplined Cost Management 7 POSITIONED TO OUTPERFORM 2015 Cash Costs Guidance Range (US$/oz Au)* *Cash costs are net of by-product credits. Based on available company disclosure and data from SNL Metals & Mining. See final slide for footnotes. San Dimas: o Expansion to 2,500 TPD increased efficiencies of scale o Increased long-hole mining reduced dilution by 30% o Expansion to 3,000 TPD expected to reduce costs by a further ~$50/oz Black Fox: o Mining optimization program commenced in 2014 o Contractors reduced o Initiated 24-hour open-pit mining o Training improves productivity and quality control Corporate: o Rationalizing offices (closing Vancouver and Mexico City offices) o Focused on reducing G&A Primero 2015 AISC Guidance vs. 2014 Results (US$/oz Au) 3
  • 8. TSX P I NYSE PPP I Strong Financial Position Exchanges TSX: P NYSE: PPP Balance Sheet (September 30, 2014) Cash Line of Credit5 Total Liquidity Convertible Debenture (6.5%, due March 2016, $14 conversion) Line of Credit Draw Down5 (Due May 2017) Total Debt4 $22 million $45 million ~$67 million $48 million $30 million $78 million Capital Structure Common Shares Outstanding 6 Fully Diluted 7 Market Cap. At Jan 19, 2015 160 million 190 million C$895 million POSITIONED FOR GROWTH Source: 2014E-2016E Operating Cash Flow – Capital IQ consensus CFPS multiplied by current 160 million shares outstanding. $67MSTRONG Liquidity $78M4 PRUDENT Debt Level September 30, 2014 Consensus Estimated Operating Cash Flow ($ millions) 8 $72 $79 $115 $155 $0 $50 $100 $150 $200 2013 2014E 2015E 2016E *See final slide for footnotes.
  • 9. TSX P I NYSE PPP I Experienced Board and Management 9 Joseph Conway | President & CEO 30 Years of Experience ► Appointed CEO in June 2010 ► Former CEO, President and Director of IAMGOLD and Repadre Capital Wendy Kaufman | CFO 20 Years of Experience ► Appointed CFO in September 2014 ► Former VP, Finance and Treasury of Inmet Mining Corp. Wade Nesmith | Chairman ► Founder of Primero ► Founding and current director of Silver Wheaton 200+ Years of Combined Industry Experience Entrepreneurs BOARD OF DIRECTORS MANAGEMENT David Demers | Director 2,3,4,5 ► Founder, CEO and Director Westport Innovations ► Director of Cummins Westport and Juniper Engines Grant Edey | Director 3,5 ► President & CEO, Khan Resources ► Former Director of Breakwater Resources, Queenstake Resources, Santa Cruz Gold, CFO, IAMGOLD Rohan Hazelton | Director 1 ► VP, Strategy, Goldcorp ► Formerly with Wheaton River and Deloitte & Touche LLP Proven Track Record of Asset Turnaround Capital Markets Expertise Disciplined Approach to Business Development Eduardo Luna | Director 1 ► Former Chairman and CEO of Silver Wheaton, Executive VP of Goldcorp and Luismin (San Dimas) ► Former President of Mexican Mining Chamber Brad Marchant | Director 1 ► Co-founder of Triton Mining Corporation ► Founder of BioteQ Environmental Technologies Inc. Robert Quartermain | Director 2,3 ► Founder and President & CEO, Pretium Resources ► Former President of Silver Standard Resources Michael Riley | Director 2,5 ► Chartered accountant with more than 26 years of accounting experience ► Chair of Primero Audit Committee Board Committees: 1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit
  • 10. TSX P I NYSE PPP I 1.9 1.5 1.1 0 0.5 1 1.5 2 2011 2012 2013 Track Record of Delivering on Stakeholder Commitments Primero All Injury Frequency RateSHAREHOLDERS Superior Value Creation ENVIRONMENT Certified “Clean Industry” COMMUNITY Awarded “Socially Responsible Company” SAFETY Lowering All Injury Frequency Rate 10 (100%) (40%) 20% 80% 140% Primero Mining Corp. S&P/TSX Global Gold Index(Source Thomson One) Delivering Superior Returns to Primero Shareholders January 2012 to Present
  • 11. TSX P I NYSE PPP I o Commence expansion to 3,000 TPD o Increase access to high-grade Victoria vein o Implement 7 day, 12-hour shifts to optimize mine throughput o Complete tunnels connecting Central Block to Sinaloa Graben, increasing efficiency and reducing costs Location Mine Type Ownership Durango, Mexico Underground, Gold & Silver 100% (silver stream) 1 Proven & Probable Gold Reserves (koz) (4.9M tonnes at 5.5 g/t) 870 Measured & Indicated Gold Resources (koz) (Inclusive of Reserves) (4.3M tonnes at 7.2 g/t) 997 Inferred Gold Resources (koz) (7.3M tonnes at 4.2 g/t) 998 2015E Production 1 (AuEq koz) 175-185 2015E Cash Costs 3 ($/AuEq oz) $590-$640 2014 2015 2016 o 23% increase in gold reserve grade o Mill expansion to 2,500 TPD completed in Q1 o Expanded top producing veins through successful exploration o Discovered new high-grade veins o Achieved record production of 161,000 AuEq oz o Complete expansion to 3,000 TPD o Increase mined grade to current gold reserve grade of 5.5 g/t World Class Platform Asset 11 SAN DIMAS *See final slide for footnotes.
  • 12. TSX P I NYSE PPP I - 500 1,000 1,500 2,000 2,500 3,000 3,500 Q3 2010 Q3 2012 Q3 2014 Q3 2016E *See final slide for footnotes. Expansion to 3,000 TPD SAN DIMAS Construction Mill expansion to 3,000 TPD began in Q1 2015 and is expected to be completed by Q2 2016 Capital Cost Currently estimated at $26 million, including a 30% contingency After-tax IRR8 is expected to be 78% with a 12 month payback period9 Production An estimated increase by more than 30% over 2014 to approximately 215,000 gold equivalent ounces Cash Cost Expected to drop by ~$50 per ounce from current levels 89% GROWTH San Dimas Mill Throughput (TPD) 12
  • 13. TSX P I NYSE PPP I 2015 Mine Expansion Plan 13 SAN DIMAS 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 tonnesperday Actual Forecast    Mill Expansion Base Production Mine Production to 2,150 tpd Mine Production to 2,500 tpd Mill Expansion Mine Production to 2,900 tpd 2011 2012 2013 2014 2015 2016 Current Nameplate Capacity Expanded 3,000 TPD Capacity
  • 14. TSX P I NYSE PPP I Proven History of Reserve & Resource Growth 505 660 870 577 780 997 704 762 998 2011 2012 2013 P&P Reserves ( Au Koz) M&I Resources (Au Koz) Inferred Resources (Au Koz) (M&I Resources Include Mineral Reserves) See slides 27, 28, 29, & 30 Significant Exploration Upside with Low Finding Costs o Completed 80,000 metres of drilling 2014, 2014 reserves and resources to be released in Q1 2015 o 2015: $6.4 million, 25,000 metres of drilling SAN DIMAS Low Finding Cost Per Ounce 247 311 $53.0 $34.7 2012 2013 P&P Reserves Discoverd (Koz Au) P&P Discovery Cost(US$/oz Au) 14
  • 15. TSX P I NYSE PPP I Note: Based on public data, average depth of listed mines is 1,633 metres. Established Jurisdiction with Proven Depth Potential Over 200 Million Ounces of Historical Production BLACK FOX 15
  • 16. TSX P I NYSE PPP I o Continue building underground long- hole stope inventory o Finalize mill and tailings optimization o Continue in-fill drilling of central zone o Goal of identifying resources to depth of 1,000 metres 2014 2015 2016 o Completed acquisition and integration of Black Fox Complex o Commenced optimization program, focused on cost reduction o Increased efforts on underground exploration and development o Discovered high-grade intercepts at depths up to 800 metres o Review the concept of sinking a shaft to access deep mineralization o Complete detailed economic analysis to potentially include Grey Fox as part of long term development at the Black Fox Complex Turnaround Opportunity to Create Value BLACK FOX Location Mine Type Ownership Timmins, Ontario Open-Pit & Underground, Gold 100% (8% gold stream) 1 Proven & Probable Gold Reserves (koz) (3.8M tonnes at 4.3 g/t) 538 Measured & Indicated Gold Resources (koz) (Inclusive of Reserves) (4.0M tonnes at 5.1 g/t) 653 Inferred Gold Resources (koz) (0.7M tonnes at 7.6 g/t) 168 2015E Production 1 (AuEq koz) 75-85 2015E Cash Costs 3 ($/AuEq oz) $820-$870 16 *See final slide for footnotes.
  • 17. TSX P I NYSE PPP I Focused on Reserve & Resource Development Lateral & Depth Expansion BLACK FOX 17
  • 18. TSX P I NYSE PPP I Grey Fox Promising Exploration Project GREY FOX o Completed 76,000 metres of drilling in 2014. o Planned another 50,000 metres in 2015. o Positive exploration results announced to date from underground and open pit targets. o Further results pending. Location Ownership 4 km from Black Fox, Ontario 100% (no stream) Measured & Indicated Gold Resources (koz) (5.3M tonnes at 3.3 g/t) 558 Inferred Gold Resources (koz) (1.6M tonnes at 4.4 g/t) 219
  • 19. TSX P I NYSE PPP I Catalysts and News Flow Q3 2014 San Dimas Operating at 2,500 TPD Increases annual production rate to 165,000AuEq oz Q1 2015 Reserve and Resource Update Including 226,000 metres of 2014 drilling Q1 2015 Black Fox Complex Exploration Update Drilling from 500 metre level exploration drift at depth Q3 2014 San Dimas 3,000 TPD Decision Expansion decision announced Q4 2015 Grey Fox Scoping Study Q4 2014 San Dimas Exploration Update Extended top producing veins    19 2014 Q1 2015 2015
  • 20. TSX P I NYSE PPP I $650-700/oz TOTAL CASH COST3,10 Low Cost Production 250–270koz MEXICO & CANADA1,10 Producing in America’s Top Mining Jurisdictions 20 Positioned to Outperform DELIVERING SUPERIOR RETURNS 14quarters CONSECUTIVE History of Positive Cash Flow From Operations 9% DEBT / TOTAL CAP.5 Strong Financial Position +200years INDUSTRY EXPERIENCE Experienced Board and Management +53% VS. TSX GLOBAL GOLD Consistent Outperformer (100%) (40%) 20% 80% 140% Primero Mining Corp. S&P/TSX Global Gold Index Delivering Superior Returns to Primero Shareholders Source: Thomson One January 2012 to Present *See final slide for footnotes.
  • 22. TSX P I NYSE PPP I Stock Performance & Significant Events 22 0 10 20 30 -80% -60% -40% -20% 0% 20% 40% 60% 80% 8/13/2010 2/13/2011 8/13/2011 2/13/2012 8/13/2012 2/13/2013 8/13/2013 2/13/2014 8/13/2014 Volume(Millions) P-T Volume Primero Mining Corp. S&P/TSX Global Gold Index Primero IPO, Begins Trading on the TSX, and Finalizes San Dimas Acquisition Primero Announces Brigus Gold Acquisition Primero Added to S&P/TSX Composite Index Primero Announces San Dimas Expansion Plan Phase 1 Primero Begins Trading on the NYSE Primero Announces Acquisition of Cerro Del Gallo Primero Announce s APA Ruling Spot Gold Hits 4- Year Low
  • 23. TSX P I NYSE PPP I 23 Lower 2015 Capital Expenditures Capital Expenditures Estimated 2015 Costs San Dimas Underground Development $15.2 million San Dimas Sustaining Capital $10.8 million San Dimas Projects $15.4 million San Dimas Sub Total $41.4 million Black Fox Underground Development $13.4 million Black Fox Sustaining Capital $4.5 million Black Fox Projects $3.4 million Grey Fox Development Studies $1.3 million Black Fox Sub Total $22.6 million Cerro del Gallo Development $2.7 million Total $66.7 million 2014 Capital Expenditure $80 million Note: Figures may not add due to rounding. 2015 GUIDANCE
  • 24. TSX P I NYSE PPP I 24 Continuing to Invest in Exploration 2015 GUIDANCE Capitalized Exploration Expenditures Estimated 2015 Costs San Dimas Diamond Drilling $3.1 million San Dimas Drifting $1.9 million San Dimas Regional Diamond Drilling $0.9 million Ventanas Regional Diamond Drilling $0.5 million San Dimas Sub Total $6.4 million Black Fox Diamond Drilling $5.0 million Grey Fox & Regional Exploration $7.3 million Black Fox Complex Sub Total $12.3 million Cerro del Gallo Geology Mapping $0.4 million Total $19.1 million 2014 Exploration $35 million
  • 25. TSX P I NYSE PPP I 25 Summary of Debt & Tradable Securities Convertible Debentures TSX: P.DB.U Revolving Line of Credit Facility Primero Warrants TSX: P.WT Face Value $48.1 million Q3/14 draw: $30.0 million n/a Maturity / Expiry March 31, 2016 May 23, 2017 July 20, 2015 Interest Rate 6.5% Floating Rate (see below) n/a Payable Semi-Annually Revolving Credit n/a Conversion / Strike C$14.00 n/a C$8.00 Additional Notes  Provision for forced conversion if the market price of the Primero’s shares is at least 125% of the conversion price  CUSIP: 74164WAA4  The floating interest rate was approximately 5% per annum during the nine months ended September 30, 2014  CUSIP: 74164W114
  • 26. TSX P I NYSE PPP I Silver Purchase Agreement Primero sells 50% of annual silver production above 6.0 million ounces at spot o Remainder sold at ~$4 per ounce under silver purchase agreement o Threshold commences August 6 to following August 5 o Expansion anticipated to generate meaningful silver spot sales post August 6, 2014 Primero sells 8% of annual gold production at Black Fox at ~$509 per ounce o Primero streams 6.3% from the Black Fox Extension which includes the Pike River Property o Gold is sold at $500 per ounce subject to inflationary adjustment beginning in 2013, not to exceed 2% per annum o The Grey Fox exploration property is not subject to any gold streaming agreements SAN DIMAS BLACK FOX Gold Streaming Agreement 25% 75% Silver Gold Silver as Percentage of 2013E Revenue 26
  • 27. TSX P I NYSE PPP I Focus on Responsible Mining HEALTH AND SAFETY o We understand that our most important assets are our people and their safety is our number one priority o We maintain world-class health and safety policies ENVIRONMENT o San Dimas is certified as “Clean Industry” by PROFEPA (Mexican EPA) o We utilize sustainable green technologies where possible - Primero’s own hydroelectric dam supplies the majority of San Dimas Mine’s power COMMUNITY o We treat our local communities as our partners o We focus on understanding our local communities goals and providing local opportunities o We promote local education with awards for the local technical college in San Dimas 27
  • 28. TSX P I NYSE PPP I Classification Tonnage (Million Tonnes) Gold Grade (G/T) Silver Grade (G/T) Contained Gold (000 Ounces) Contained Silver (000 Ounces) Mineral Reserves Proven & Probable 4.893 5.5 315 870 49,479 Mineral Resources Measured & Indicated 4.282 7.2 419 997 57,713 Inferred 7,333 4.2 310 998 72,647 Notes to Mineral Reserve Statement: Cutoff grade of 2.7 grams per tonne (”g/t”) gold equivalent (“AuEq”) based on total operating cost of US$104.97/t. Metal prices assumed are gold US$1,250 per troy ounce and silver US$20 per troy ounce. Silver supply contract obligations have been referenced in determining overall vein reserve estimate viability. Processing recovery factors for gold and silver of 97% and 94% assumed. Exchange rate assumed is 13 pesos/US$1.00. The Mineral Reserve estimates were prepared under the supervision of Mr. Gabriel Voicu P.Geo., Vice President, Geology and Exploration, Primero and a QP for the purposes of National Instrument 43-101 (“NI 43-101”). Notes to Mineral Resource Statement: Mineral Resources are total and include those resources converted to Mineral Reserves. A 2.0g/t AuEq cutoff grade is applied and the gold equivalent is calculated at a gold price of US$1,300 per troy ounce and a silver price of US$20 per troy ounce. A constant bulk density of 2.7 tonnes/m3 has been used. The Mineral Resource estimates were prepared by Mr. Rodney Webster MAusIMM, MAIG and Mr. J. Morton Shannon P.Geo., both of AMC Mining Consultants (Canada) Ltd. and a QP for the purposes of NI 43-101. Additional exploration potential was estimated at 6-10 million tonnes at grade ranges of 3-5 grams per tonne of gold and 200-400 grams per tonne of silver as of December 31, 2011. It should be noted that these targets are conceptual in nature. There has been insufficient exploration to define an associated Mineral Resource and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource. Mineral Resources and Mineral Reserves (December 31, 2013, Mineral Resources include Mineral Reserves) SAN DIMAS 28
  • 29. TSX P I NYSE PPP I Notes to Black Fox Mineral Reserve estimate: 1. Mineral Reserves stated as at December 31, 2013. 2. Open pit cut-off grade of 1.0 g/t Au and underground cut-off grade of 3.4 g/t. 3. Gold price assumed is US$1,250 per troy ounce. 4. Processing gold recovery factor 94% assumed. 5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates. Notes to Black Fox Mineral Resource estimate: 1. Mineral Reserves stated as at December 31, 2013. 2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t. 3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations. 4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com. Classification Tonnage (Tonnes) Gold Grade (G/T) Cont. Gold (Ounces) Proven & Probable Reserves Open Pit 1,468,500 3.7 173,900 Underground 1,663,900 6.3 339,100 Stockpile 716,200 1.1 24,700 Total 3,848,700 4.3 537,700 Measured & Indicated Resources, Including Reserves Open Pit 1,423,900 4.0 182,518 Underground 1,852,800 7.5 445,336 Stockpile 716,200 1.1 24,706 Total 3,992,800 5.1 652,560 Inferred Resources Open Pit 364,100 5.8 67,897 Underground 326,300 9.5 99,889 Total 690,400 7.6 167,786 Mineral Resources and Mineral Reserves (December 31, 2013, Mineral Resources include Mineral Reserves) BLACK FOX 29
  • 30. TSX P I NYSE PPP I Classification Cut-off Grade (G/T Au) Potential Material Tonnes (Million Tonnes) CAPPED Au (G/T) Contained Gold (Ounces) Indicated Resources >3.0 Underground 1.394 5.4 243,041 >0.9 Open Pit 3.882 2.5 314,615 Total Indicated Resources 5.276 3.3 557,655 Inferred Resources >3.0 Underground 1.065 5.1 175,511 >0.9 Open Pit 0.486 2.8 43,309 Total Inferred Resources 1.552 4.4 218,820 Notes to Grey Fox Mineral Resource estimate: 1. Mineral Reserves stated as at 31 December 2013. 2. Open pit cut-off grade of 0.9 g/t Au and underground cut-off grade of 3.0 g/t 3. Gold price assumed is US$1,300 per troy ounce and exchange rate of US$1.00=C$1.10 was used in the gold cut-off grade calculations. 4. Detailed footnotes can be found in the NI 43-101 Technical Report titled “TECHNICAL REPORT ON THE MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES FOR THE BLACK FOX COMPLEX”, dated June 30, 2014 and filed on www.sedar.com. 5. Harold Brisson, PhD, Eng. is the Qualified Person for the Black Fox Complex Mineral Resource estimates. Mineral Resources (December 31, 2013) GREY FOX 30
  • 31. TSX P I NYSE PPP I Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) AuEq (g/t) AuEq (M oz) Proven 28.2 0.71 0.64 15.1 13.7 0.08 50.2 1.15 1.05 Probable 4.0 0.54 0.07 13.2 1.7 0.07 6.2 0.93 0.12 Proven & Probable 32.2 0.69 0.71 14.8 15.3 0.08 56.4 1.14 1.18 Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) AuEq (g/t) AuEq (M oz) Measured 39.9 0.61 0.78 13.8 17.71 0.10 88.8 1.07 1.37 Indicated 8.0 0.55 0.14 11.0 2.83 0.08 14.6 0.92 0.24 Measured & Indicated 47.9 0.60 0.92 13.3 20.55 0.1 103.4 1.06 1.64 Total Resources Within the Gold Domain2 Phase I Heap Leach In-Pit Proven and Probable Reserves3 In-Pit Resources (excluding Proven and Probable Reserves)4,5 Category M Tonnes Au (g/t) Au (M ozs) Ag (g/t) Ag (M ozs) Cu (%) Cu (M lbs) AuEq (g/t) AuEq (M oz) Measured 129 0.54 2.24 12.0 49.8 0.09 256.0 0.94 3.91 Indicated 80 0.38 0.98 8.0 20.6 0.08 141.1 0.69 1.77 Measured & Indicated 209 0.48 3.22 11.0 70.3 0.08 396.9 0.83 5.58 Inferred 20 0.3 0.19 7.0 4.5 0.09 39.7 0.59 0.38 1. “Technical Report First Stage Heap Leach Feasibility Study, Cerro del Gallo Gold Silver Project, Guanajuato, Mexico” June 2012 (“Feasibility Study”). Gold equivalent ounces calculated by Cerro Resources using gold, silver and copper prices of US$1,341/oz, US$25.58/oz and US$7,582/t respectively. 2. These resources are reported using internal cut-off grade of 0.2 g/tAu as per Feasibility Study, 2012 and Golder Associates Technical Report, 2008. 3. These reserves are reported using internal cut-off grades of 0.24 and 0.29 gAuEq/t for weathered and partially oxidized, respectively. 4. These resources are reported using internal cut-off grades of 0.24, 0.29, and 0.34 gAuEq/t for weathered, partially oxidized, and fresh material resp. 5. See note 7 in January 23, 2013 News Release “Primero achieves 2012 Guidance and Provides 2013 Outlook”. CERRO DEL GALLO Reserves and In-Pit Resources1 31
  • 32. TSX P I NYSE PPP I Tamara Brown | VP, Investor Relations  Former Director Investor Relations for IAMGOLD  Former partner of a Toronto based, boutique investment bank and professional engineer in mining industry H. Maura Lendon | VP, Chief General Counsel and Corporate Secretary  Former Senior Vice President, Chief Legal Officer and Corporate Secretary of HudBay Minerals Inc.; Chief Counsel Canada, Chief Privacy Officer - Canada of AT&T David Sandison | VP, Corporate Development  Former VP, Corporate Development of Clarity Capital ; Director, Corporate Development Xstrata Zinc Canada ; Director Business Development, Noranda/Falconbridge; Former EVP, Noranda Chile Louis Toner | VP, Project Development & Construction  Over 30 Years of Engineering and Construction experience, formerly held Senior Project Management roles with BBA Inc. and Lafarge Canada Inc. Gabriel Voicu | VP, Geology and Exploration  25 Years of mining experience, formerly held senior technical and exploration positions with Cambior and IAMGOLD James Mallory | VP, Corporate Responsibility  Over 35 Years of mining experience  Former VP, Vice-President, Operations & Social Responsibility at South American Silver  13 Years of experience in Latin America Joseph Conway | President & CEO  30 Years of experience  Appointed President and CEO in June 2010  Former CEO, President & Director of IAMGOLD and Repadre Capital Wendy Kaufman | Chief Financial Officer  20 Years of experience  Appointed CFO in September 2014  Former VP, Finance and Treasure of Inmet Mining Corporation Executive Management 32
  • 33. TSX P I NYSE PPP I Robert Quartermain | Director 2,3  Founder and President & CEO, Pretivm Resources  Former President and CEO of Silver Standard Brad Marchant | Director 1  Co-founder of Triton Mining Corporation  Founder of BioteQ Environmental Technologies Inc. Michael Riley | Director 2,5  Chartered accountant with more than 26 years of accounting experience  Chair of Primero Audit Committee Eduardo Luna | Director 1  Former EVP & President, Mexico. Former Chairman and CEO of Silver Wheaton, Executive VP of Goldcorp and Luismin S.A. de C.V. (San Dimas) and President of Mexican Mining Chamber and the Silver Institute Rohan Hazelton | Director 1  VP, Strategy, Goldcorp  Formerly with Wheaton River and Deloitte & Touche LLP Grant Edey | Director 3,4,5  President & CEO, Khan Resources Inc.  Former Director of Breakwater Resources, former director of Queenstake Resources, Santa Cruz Gold  Former CFO, IAMGOLD David Demers | Director 2,3,4,5  Founder, CEO and Director Westport Innovations  Director of Cummins Westport and Juniper Engines Wade Nesmith | Chairman  Founder of Primero  Founding and current director of Silver Wheaton Board of Directors 33Board Committees: 1. Health, Safety and Environment 2. Human Resources 3. Governance and Nominating 4. Lead Director 5. Audit Joseph Conway | Director see Executive Management
  • 34. TSX P I NYSE PPP I This presentation has been prepared in accordance with the requirements of Canadian provincial securities laws which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all mineral reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum classification systems. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource estimates disclosed in this presentation may not be comparable to similar information disclosed by U.S. companies. The mineral reserve estimates in this presentation have been calculated in accordance with NI 43-101, as required by Canadian securities regulatory authorities. For United States reporting purposes, SEC Industry Guide 7 under the United States Securities Exchange Act of 1934, as amended, as interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. As a result, the definition of “probable reserves” used in NI 43-101 differs from the definition in the SEC Industry Guide 7. Under SEC standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Accordingly, mineral reserve estimates contained in this presentation may not qualify as “reserves” under SEC standards. In addition, this presentation uses the terms “indicated resources” and “inferred resources” to comply with the reporting standards in Canada. The Company advises United States investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. Further, “inferred resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, United States investors are also cautioned not to assume that all or any part of the “inferred resources” exist. In accordance with Canadian securities laws, estimates of “inferred resources” cannot form the basis of feasibility or other economic studies. It cannot be assumed that all or any part of “indicated resources” or “inferred resources” will ever be upgraded to a higher category or are economically or legally mineable. In addition, disclosure of “contained ounces” is permitted disclosure under Canadian securities laws; however, the SEC only permits issuers to report mineralization as in place tonnage and grade without reference to unit measures. NI 43-101 also permits the inclusion of disclosure regarding the potential quantity and grade, expressed as ranges, of a target for further exploration provided that the disclosure (i) states with equal prominence that the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resources, and (ii) states the basis on which the disclosed potential quantity and grade has been determined. Disclosure regarding exploration potential has been included in this presentation. United States investors are cautioned that disclosure of such exploration potential is conceptual in nature by definition and there is no assurance that exploration will result in any category of NI 43-101 mineral resources being identified. Notes to Investors Regarding the Use of Resources 34
  • 35. TSX P I NYSE PPP I 1. “Gold equivalent ounces” include silver production converted to a gold equivalent based on consensus estimated commodity prices; accounts for the San Dimas silver purchase agreement. Silver production is subject to a silver purchase agreement. The silver purchase agreement dictates that until August 6, 2014 Primero will deliver to Silver Wheaton a per annum amount equal to the first 3.5 million ounces of silver produced at San Dimas and 50% of any excess at $4.16 per ounce (increasing by 1% per year). Thereafter Primero will deliver to Silver Wheaton a per annum amount equal to the first 6.0 million ounces of silver produced at San Dimas and 50% of any excess at $4.20 per ounce (increasing by 1% per year). The Company will receive silver spot prices only after the annual threshold amount has been delivered. Black Fox is subject to a gold purchase agreement under which Sandstorm is entitled to 8% of production at the Black Fox mine and 6.3% at the Black Fox Extension. 2. Assumes San Dimas operates at least at 3,000 TPD from end of Q2 2016; and Primero management estimates for Black Fox production, based on 2,200-2,300 TPD operation and underground throughput increasing to 1,000 TPD by the end of 2015. 3. Cash costs and All-in Sustaining Costs are non-GAAP measures. Refer to the Company’s third quarter 2014 MD&A for a reconciliation to operating expenses. Note the calculation of all-in sustaining costs at San Dimas changed with the acquisition of a second producing asset and subsequently do not include corporate G&A. 2014 Cash costs and All-in Sustaining Costs are preliminary and may differ from the final results included in the Company’s 2014 audited annual financial statements and MD&A. 4. $48.1 million senior unsecured convertible debenture (acquired from Brigus, with a 6.5% coupon an effective conversion price of $14.00 and an expiry of March 2016); and $30 million draw down from line of credit. Excludes capital leases and pending US$75 million convertible, unsecured, subordinated debentures expected to close on or about February 9, 2015. 5. The Company closed a $75 million line of credit on May 23, 2014 and has drawn down $30 million as of September 30, 2014. 6. During the nine months ended September 30 2014, the Company issued 41,340,347 common shares as consideration for the acquisition of Brigus, 1,919,744 common shares upon the exercise of stock options; and 1,000,000 common shares pursuant to a flow through agreement. 7. Fully diluted shares include 20.8 million warrants with an exercise price of Cdn$8.00 per share, expiring on July 20, 2015; and 9.5 million options with an average exercise price of Cdn$6.26. 8. Major assumptions include a flat gold price per ounce of $1,300, a flat silver price per ounce of $22. 9. The Company currently estimates that expanding the San Dimas mill to 3,000 TPD will require approximately $26.4 million of capital investment, with approximately $6 million expenditure expected in 2014 and the remainder spread over the following eighteen months. As a result of the preliminary nature of the capital assessment a contingency factor of 30% has been included in the capital estimate. 10. Based on 2015 Guidance. Footnotes 35
  • 36. TSX P I NYSE PPP I PRIMERO MINING CORP. 79 Wellington St. West, Suite 2100 Toronto, ON M5K 1H1 T 416 814 3160 TF 877 619 3160 www.primeromining.com Tamara Brown Vice President, Investor Relations T 416 814 3168 info@primeromining.com 2015 TD SECURITIES MINING CONFERENCE JANUARY 27, 2015