Name: Hishmat Rai
Roll no: 16PG46
Topic :Demostration on
Pressure Drawdown Test
1
Presure Drawdown test
• The measurement and analysis of pressure
data taken after a well is put on production ,
either initially or after shut in period.
• A pressure drawdown test is simply series of
of bottom hole pressure measurements made
during a period of flow at constant production
rate
2
Objective of pressure Drawdown test
• Average permeability within drainage arera of
the well
• Skin fector(damage or Improve)
• It determine the pore volume
• Rerservoir homogeneities within drainage
area of the reservoir
3
Procedure of Pressure Drawdown test
• Step1: Shut the well for the period of time to
equalize the pressure throughout the reservoir
• step 2: Pressure equimpent (Electronic Guage
) is lowerd into the well to measure pressure
from bottom to top of well
• Step 3: when flow begun at constant rate and
the bottom hole pressure measured
continuesly 4
Advantage of Draw Down Test
• No loss of cash flow due to shut in of the well
during test time , It means producing while
testing
• It determines the boundries of the reservoir.
• It is particularly applicable for new well or
wells that have been closed for long time
5
Disadvantage of Drawdown test
• It is difficult to flow the well at constant rate .
• It doesnt determine the average reservoir
pressure.
• In order to get accurate analysis of drawdon,
its critical that no choke change during the
test.
• Pressure drawn down test is noisy test
6
Equation use in this test to measure parameter
7
• pwf =Pi+162.6qBµ/kh[log(1,688صctr2
w /kt)-0.869s]
k=162.6qBµ/mh,
m=162.6qBµ/kh
• S=1.151[ { (pi-pwf)/m} - log { k/ q µ ct r2 w }+3.23]
ct=co So +cw Sw +cgSg +cr
m is calculate from semilog graph.
Noi=Ø(av)So (av) VB / Bo(av)
Vp =ØVB
t
2
inv
c
kt
10434.2r



Conclusion
• We conduct the test for measurement with
out production loss.
• Form pressure drawdown test, we determine
the average permeablity , skin factor ,pore
voume
8

Pressure draw down test .

  • 1.
    Name: Hishmat Rai Rollno: 16PG46 Topic :Demostration on Pressure Drawdown Test 1
  • 2.
    Presure Drawdown test •The measurement and analysis of pressure data taken after a well is put on production , either initially or after shut in period. • A pressure drawdown test is simply series of of bottom hole pressure measurements made during a period of flow at constant production rate 2
  • 3.
    Objective of pressureDrawdown test • Average permeability within drainage arera of the well • Skin fector(damage or Improve) • It determine the pore volume • Rerservoir homogeneities within drainage area of the reservoir 3
  • 4.
    Procedure of PressureDrawdown test • Step1: Shut the well for the period of time to equalize the pressure throughout the reservoir • step 2: Pressure equimpent (Electronic Guage ) is lowerd into the well to measure pressure from bottom to top of well • Step 3: when flow begun at constant rate and the bottom hole pressure measured continuesly 4
  • 5.
    Advantage of DrawDown Test • No loss of cash flow due to shut in of the well during test time , It means producing while testing • It determines the boundries of the reservoir. • It is particularly applicable for new well or wells that have been closed for long time 5
  • 6.
    Disadvantage of Drawdowntest • It is difficult to flow the well at constant rate . • It doesnt determine the average reservoir pressure. • In order to get accurate analysis of drawdon, its critical that no choke change during the test. • Pressure drawn down test is noisy test 6
  • 7.
    Equation use inthis test to measure parameter 7 • pwf =Pi+162.6qBµ/kh[log(1,688صctr2 w /kt)-0.869s] k=162.6qBµ/mh, m=162.6qBµ/kh • S=1.151[ { (pi-pwf)/m} - log { k/ q µ ct r2 w }+3.23] ct=co So +cw Sw +cgSg +cr m is calculate from semilog graph. Noi=Ø(av)So (av) VB / Bo(av) Vp =ØVB t 2 inv c kt 10434.2r   
  • 8.
    Conclusion • We conductthe test for measurement with out production loss. • Form pressure drawdown test, we determine the average permeablity , skin factor ,pore voume 8