Bangladesh Army University of Engineering & Technology
Department of Electrical and Electronic Engineering
Title of Project
Final Defense of IDP-I/II
Presented By
1. (ID:XXXXXXXXXXXXXXXXX)
2. (ID: XXXXXXXXXXXXXXXXX)
3. (ID:XXXXXXXXXXXXXXXXX)
Supervised By
Mr. X,
Designation
Date: 4th
June, 2024 Venue : Simulation Lab (Room No : 512P)
Department of EEE, BAUET 2
Outline
11/25/2024
EEE 3100: Title of the Presentation
Review & Problem Statement
Objectives
Methodology
Project Design & Development
Noble Features of This Project
Milestone and Gantt Chart
2
3
4
5
6
7
Conclusion
Budget
8
9
Introduction/Background
1
Department of EEE, BAUET 3
11/25/2024
Introduction
 Give short introduction about your
project.
 Use font 32 or greater so that audience
can easily read the text of your slide from
far distance.
 Use same type font Like Times New
Roman/ Arial for whole slide.
Department of EEE, BAUET 4
11/25/2024
Review of Existing Project
 Write about the existing project related to
your project.
 Give proper citation of image/text that
you have reviewed
 Compare their features/nobility
Department of EEE, BAUET 5
11/25/2024
Problem Statement
.
 Write about the problem that you want to
solve in your IDP project which has not
been solved properly in existing project.
Department of EEE, BAUET 6
11/25/2024
Objectives
.
 Write clear and concise objective(s) of
your project.
Department of EEE, BAUET 7
11/25/2024
Methodology
.
 In this section you can write description
with proper model no of the modern/
tools/software/modules that you have
used for project.
 Explain different methods to develop the
project
Department of EEE, BAUET 8
11/25/2024
Project Design & Development
.
 Give the hardware constructed
model/simulation diagram
 Explain process with flow chart/ bullet
points
 Give figure no and title properly
Department of EEE, BAUET 9
11/25/2024
Noble Features of this Project
.
 Write the key findings of your IDP
project
 If you give any data give it in tabular
form
Department of EEE, BAUET 10
11/25/2024
Milestone & Gantt Chart
.
 Give your project milestone and Gantt
Chart in Tabular form
Department of EEE, BAUET 11
11/25/2024
Budget
.
Department of EEE, BAUET 12
11/25/2024
Conclusion
.
Department of EEE, BAUET 13
11/25/2024
References
.
Thank you

Presentation-Template-for-IDP-or-any-project-work-EEE-BAUET.pptx

  • 1.
    Bangladesh Army Universityof Engineering & Technology Department of Electrical and Electronic Engineering Title of Project Final Defense of IDP-I/II Presented By 1. (ID:XXXXXXXXXXXXXXXXX) 2. (ID: XXXXXXXXXXXXXXXXX) 3. (ID:XXXXXXXXXXXXXXXXX) Supervised By Mr. X, Designation Date: 4th June, 2024 Venue : Simulation Lab (Room No : 512P)
  • 2.
    Department of EEE,BAUET 2 Outline 11/25/2024 EEE 3100: Title of the Presentation Review & Problem Statement Objectives Methodology Project Design & Development Noble Features of This Project Milestone and Gantt Chart 2 3 4 5 6 7 Conclusion Budget 8 9 Introduction/Background 1
  • 3.
    Department of EEE,BAUET 3 11/25/2024 Introduction  Give short introduction about your project.  Use font 32 or greater so that audience can easily read the text of your slide from far distance.  Use same type font Like Times New Roman/ Arial for whole slide.
  • 4.
    Department of EEE,BAUET 4 11/25/2024 Review of Existing Project  Write about the existing project related to your project.  Give proper citation of image/text that you have reviewed  Compare their features/nobility
  • 5.
    Department of EEE,BAUET 5 11/25/2024 Problem Statement .  Write about the problem that you want to solve in your IDP project which has not been solved properly in existing project.
  • 6.
    Department of EEE,BAUET 6 11/25/2024 Objectives .  Write clear and concise objective(s) of your project.
  • 7.
    Department of EEE,BAUET 7 11/25/2024 Methodology .  In this section you can write description with proper model no of the modern/ tools/software/modules that you have used for project.  Explain different methods to develop the project
  • 8.
    Department of EEE,BAUET 8 11/25/2024 Project Design & Development .  Give the hardware constructed model/simulation diagram  Explain process with flow chart/ bullet points  Give figure no and title properly
  • 9.
    Department of EEE,BAUET 9 11/25/2024 Noble Features of this Project .  Write the key findings of your IDP project  If you give any data give it in tabular form
  • 10.
    Department of EEE,BAUET 10 11/25/2024 Milestone & Gantt Chart .  Give your project milestone and Gantt Chart in Tabular form
  • 11.
    Department of EEE,BAUET 11 11/25/2024 Budget .
  • 12.
    Department of EEE,BAUET 12 11/25/2024 Conclusion .
  • 13.
    Department of EEE,BAUET 13 11/25/2024 References .
  • 14.