ArchiCo Inspection
Services
Brief Information
ArchiCO Inspection Services is part of ArchiCo Engineering
Company which was founded in 2010. ArchiCo LLC is one of the
biggest local engineering Companies in Azerbaijan. Service
portfolio of our Company include full package of design works,
project localization, building and structures assessment, project
and quality control inspection, testing and Technical Staff Supply
services.
Total quantity of staff – about 70 engineers, inspectors and
technicians
Brief Information
ArchiCo Inspection Services are providing by professional team with
experience in well known international Companies. Our inspection team
trained and certified by different proper institutes and this process in a
continuous development.
Our crew equipped with modern inspection and testing devices from the
best worldwide suppliers. We are always trying to improve and maintain
our technical resourses.
The main slogan of our company -
Be honest, be professional, be needful!
is the main criterion for the activities of all employees from the first day
Inspection Services
Our capabilities include but not limited with:
 Independent Construction Supervision
 Construction Management/ Project Monitoring
 Buildings and Structures Assessment Services
 Engineering Consultancy Services
 Project Localisation Services
 Construction Materials Control and Testing
 Non Destructive Testing of welding seams
 Bolt Connections Inspections and Testing
 Painting/coating Inspections
What we are doing?
Construction Supervision Services include:
 Earth works supervision
 Topography survey
 Soil investigation – execution and verification
 Concrete works control
 Reinforcing works control
 Form works control
 Concrete input control – in situ slab test
 Concrete compressive tests/verification
 Non destructive test of reinforced - concrete elements
 Finishing works control
What we are doing?
Construction Supervision Services include:
 HVAC systems installation control
 Equipment installation supervision
 Steel structure assembling and installation control
 Welding seams testing by: MPI, DP, UT and RT methods
 Electrical systems installation control
 Engineering systems functional tests verification
 Input material control – control of material certificates
 Site documentation control as per local legislation
 Commissioning process control and verification
What we are doing?
Construction Management services include:
ArchiCo offers a proactive approach to construction management (CM). This lowers
cost, improves quality and minimizes construction claims. Our vast experience as
engineer-constructors, in addition to our strong startup and commissioning abilities,
makes us uniquely qualified to manage complex projects for clients globally.
Our CM services include:
 Cost control and schedule
 Quality management
 Safety
 Constructability
 Startup and commissioning
What we are doing?
 Construction coordination
 Field engineering
 Contract management
 Materials management
 Labor relations
Inspection & Testing Services:
Inspection of welding seams
 PQR and WPS preparation
 MPI, UT, DPI testing
Paint inspection
 Preparation of painting procedures
 Paint thickness checking
 Adhesions test
Pile testing
 Pile integrity testing
 Static load testing
Bolt Connection testing
 Integrity checking
 Torque Testing
What we are doing?
Anchorage systems testing
 Pull out tests
 Reinforcing Tests
Concrete Testing
 NDT of concrete structures
 Diamond drilling and core sampling
 Concrete samples testing
 Rebars determination inside of
concrete structures
 Protection layer control
Earthworks testing
 Proctor sampling and compaction test
 In situ tests
Why you need inspection?
 Quality of performed works accepts
by independent professional
engineers
 In time information of project
activities, difficulties and problems
 Professional consulting for
forthcoming activities
 Effective planning of costs for project
quality assurance and control
 Continuous control of projects costs,
material deliveries, time schedule
Client Benefits
Why ArchiCo?
 We are providing professional
services with most competitive prices
in the market
 ArchiCo Structural Engineering and
design Group always supports
inspection team on sites
 Our specialists have trained and
certified in accordance to international
standards.
 We organized high level of quality
management system and always in
direct Contact with Clients
 We are flexible in time and open to
response and working by schedule
24/7
Equipments and Testing Devices
Licenses, Accreditations, Certificates
Our Clients
Remarkable Projects
Remarkable Projects
Remarkable Projects
Engineering Company of 2016

Presentation 2016

  • 1.
  • 2.
    Brief Information ArchiCO InspectionServices is part of ArchiCo Engineering Company which was founded in 2010. ArchiCo LLC is one of the biggest local engineering Companies in Azerbaijan. Service portfolio of our Company include full package of design works, project localization, building and structures assessment, project and quality control inspection, testing and Technical Staff Supply services. Total quantity of staff – about 70 engineers, inspectors and technicians Brief Information
  • 3.
    ArchiCo Inspection Servicesare providing by professional team with experience in well known international Companies. Our inspection team trained and certified by different proper institutes and this process in a continuous development. Our crew equipped with modern inspection and testing devices from the best worldwide suppliers. We are always trying to improve and maintain our technical resourses. The main slogan of our company - Be honest, be professional, be needful! is the main criterion for the activities of all employees from the first day Inspection Services
  • 4.
    Our capabilities includebut not limited with:  Independent Construction Supervision  Construction Management/ Project Monitoring  Buildings and Structures Assessment Services  Engineering Consultancy Services  Project Localisation Services  Construction Materials Control and Testing  Non Destructive Testing of welding seams  Bolt Connections Inspections and Testing  Painting/coating Inspections What we are doing?
  • 5.
    Construction Supervision Servicesinclude:  Earth works supervision  Topography survey  Soil investigation – execution and verification  Concrete works control  Reinforcing works control  Form works control  Concrete input control – in situ slab test  Concrete compressive tests/verification  Non destructive test of reinforced - concrete elements  Finishing works control What we are doing?
  • 6.
    Construction Supervision Servicesinclude:  HVAC systems installation control  Equipment installation supervision  Steel structure assembling and installation control  Welding seams testing by: MPI, DP, UT and RT methods  Electrical systems installation control  Engineering systems functional tests verification  Input material control – control of material certificates  Site documentation control as per local legislation  Commissioning process control and verification What we are doing?
  • 7.
    Construction Management servicesinclude: ArchiCo offers a proactive approach to construction management (CM). This lowers cost, improves quality and minimizes construction claims. Our vast experience as engineer-constructors, in addition to our strong startup and commissioning abilities, makes us uniquely qualified to manage complex projects for clients globally. Our CM services include:  Cost control and schedule  Quality management  Safety  Constructability  Startup and commissioning What we are doing?  Construction coordination  Field engineering  Contract management  Materials management  Labor relations
  • 8.
    Inspection & TestingServices: Inspection of welding seams  PQR and WPS preparation  MPI, UT, DPI testing Paint inspection  Preparation of painting procedures  Paint thickness checking  Adhesions test Pile testing  Pile integrity testing  Static load testing Bolt Connection testing  Integrity checking  Torque Testing What we are doing? Anchorage systems testing  Pull out tests  Reinforcing Tests Concrete Testing  NDT of concrete structures  Diamond drilling and core sampling  Concrete samples testing  Rebars determination inside of concrete structures  Protection layer control Earthworks testing  Proctor sampling and compaction test  In situ tests
  • 9.
    Why you needinspection?  Quality of performed works accepts by independent professional engineers  In time information of project activities, difficulties and problems  Professional consulting for forthcoming activities  Effective planning of costs for project quality assurance and control  Continuous control of projects costs, material deliveries, time schedule Client Benefits Why ArchiCo?  We are providing professional services with most competitive prices in the market  ArchiCo Structural Engineering and design Group always supports inspection team on sites  Our specialists have trained and certified in accordance to international standards.  We organized high level of quality management system and always in direct Contact with Clients  We are flexible in time and open to response and working by schedule 24/7