SlideShare a Scribd company logo
Structuring BIMs for
   IFC and COBie


     Robert A. Feldman, PhD
Gregory R. Williams, AIA, LEED AP
  Kristine Fallon Associates, Inc.
         February 23, 2012
Acknowledgements

 The research presented here was funded by:

         US Army Corps of Engineers
 Engineer Research and Development Center
Construction Engineering Research Laboratory
             Champaign, Illinois
Objectives

1. Define COBie and explain how it is used on projects.
2. Discuss the importance of information standardization.
3. Review process for extracting COBie data from a
   Building Information Model.
4. Identify limitations of current software packages used in
   this workflow.
5. Discuss how and why COBie and IFC are being utilized
   by the GSA.
What is COBie?
• Construction Operations Building Information Exchange
• COBie is based on the IFC Model View Definition for
  Facilities Management Handover
• COBie's focus is on delivering building information for
  facilities management, not geometric modeling
• In simplified terms, COBie is IFC in the form of an Excel
  spreadsheet
COBie Information Responsibility
• Phased delivery of project documentation
• Capture the information when it is created




      Source: ERDC
COBie Total Coverage




Source: ERDC
Objectives of ERDC Project
• Develop, document, and create three consistent
  baseline building information models with specific
  architectural, structural, plumbing, electrical, heating
  and ventilating information
• Document the methodology used to create these
  models and the IFC/COBie output to assist others in
  meeting contractual requirements
The ERDC Report




  http://buildingsmartalliance.org/
index.php/projects/commonbimfiles/
Successful Information Transfer
                Requires Standards
“Key to the ability to exchange intelligent building information across system
boundaries is agreement on the types, hierarchy and content of the data objects
that make up the building model.”

Source: General Buildings Information Handover Guide: Principles, Methodology, Case Studies (NISTIR 7417)
Successful Information Transfer
           Requires Standards

• Not just formats!
• Common schema
• Content to be transferred
• Properties (attributes) to be included
 –Which properties are needed
 –Naming standards for those properties
Methodology
•   Use IFC Data Model as the schema
•   Develop Common Object Library
•   Create Models
•   Export to IFC
•   Convert IFC to COBie Spreadsheet
Model Development
• Create and use a Common Object Library
• Develop models to the “Coordinated Design”
  or “60% Design” phase
 –Show details typical of ¼” = 1’ scaled drawings
 –Include the following disciplines:
  •   Architectural
  •   Structural
  •   Mechanical
  •   Plumbing
  •   Fire Protection
  •   Electrical
Project Tools
• Software
 – Autodesk Revit Architecture 2011
 – Autodesk Revit MEP 2011
 – BIMServices (AEC3 UK Ltd) v2010-12-28
       with _asCOBIE2.xml.xsl dated 2011-04-06
• Building Components (Common Object Library)
 – Use standard Revit content as much as possible
 – Add additional parameters as shared project parameters
Common Object Library
• Define consistent objects for use in multiple
  models
• Include common properties needed to
  produce IFC and COBie deliverables
 –Add properties (Shared Parameters in Revit)
 –Standardize property naming based on IFC and
  COBie terminology
Common Object Library
• 56 Revit System Families
• 103 Component Families
 –87 Standard Revit Library
 –11 Autodesk Seek
 –3 Custom
• Revit shared parameter file




        http://buildingsmartalliance.org/
      index.php/projects/commonbimfiles/
The Models

• 3 Building Models:
 –Duplex Apartment
 –Office
 –Clinic




        http://buildingsmartalliance.org/
      index.php/projects/commonbimfiles/
Getting from Model to COBie
• Each vendor creates one IFC translator that
  can serve multiple downstream programs
                   GSA
                 Validation
  Revit                            COBie

                    IFC
 Maximo                           MIMS
                  Energy
                 Analysis
Getting from Model to COBie
• Each vendor must create a separate Revit
  translator for each transfer
                  GSA
                Validation
   IFC                            COBie

                  Revit
 Maximo                          MIMS
                  Energy
                 Analysis
Revit-IFC-COBie Data Transfer
• Revit IFC export and BIMServices will populate
  these COBie tabs (8 of the 10 GSA-required tabs):
   –Facility
   –Floor
   –Space
   –Type
   –Component
   –Attribute
   –(Zone and System information export as attribute data)
Revit-COBie Data Transfer
• Revit COBie2 Add-in can populate 5 COBie tabs




• Requires manually copying information from Revit
  schedules to COBie spreadsheets
• COBie properties in Revit are not given standard
  COBie names
Limitations of the Revit-IFC Approach
• Revit export categories are broader than IFC types
• Many Revit objects did not export properly unless their
  export category was changed or specified in special
  parameters
 – IfcExportAs and IfcExportType parameters had to be added to 31 of
   the 103 component families
 – Export category names for Cable Trays and Conduits had to be
   changed to match IFC categories
 – Revit Generic Models and Specialty Equipment categories were
   changed to other categories in order to translate properly
• Non-standard component naming:
 M_Single-Flush:1250mm x 2010mm:1250mm x 2010mm:146678
BIMServices Limitations
• Duplication of some data by BIMServices
 –Values in 10 fields on 5 tabs duplicated
 –Manually edited to correct the published files
• IFC files larger than 25MB cause “Out of
  Memory” errors
 –Model must be partitioned into smaller sections,
  breaking up MEP systems, which results in the loss
  of information
• The new COBie plug-in for the open-source
  BIM Server (bimserver.org) works better
Why are Organizations Using COBie?
The General Services Administration (GSA) has incorporated
IFC and COBie requirements into their latest BIM guidelines.
 • The GSA is the largest property owner in the US – 362 million rentable
   SF

 • A study by the National Institute of Standards and Technology (NIST )
   discovered that large sums of money was being wasted looking for,
   validating, and recreating facility information that should have been
   readily available.

 • COBie provides an open standard format for capturing project data
   when its generated and minimizes information exchange loss and cost
   typically associated with physical handover of paper documentation.
GSA’s BIM Guide for Facility Management
 The GSA’s BIM Guide for Facility Management (FM)
 provides the structure to address organizing and tracking
 information through all phases of a facility’s lifecycle.

 • Identifies the work processes and information requirements.

 • Evaluates methods for capturing and recording information updates.

 • Defines the scope of information that should be included or updated
   in the record BIM

 • Defines technology requirements for accessing and updating BIMs
Summary
• Properly structured BIMs are needed to achieve usable output
• COBie is based on the IFC Model View Definition for Facilities
  Management Handover, so IFC output from BIM authoring tools
  easily converts to COBie spreadsheets
• Since IFC deliverables will be required by GSA and the IFC file
  can be used for multiple purposes, direct conversions from a
  BIM application to COBie are not a good long-term strategy
• Current state of the technology has limitations
  – Need consistently structured BIM content, including standardized
    element property sets
  – Need better IFC export
• COBie provides framework for standardizing information for the
  lifecycle of a project
Q and A

                        Thank You!
• For more information on topics discussed during this
  presentation, check out the following links:
    •Experimental BIM Report: http://buildingsmartalliance.org/
    index.php/projects/commonbimfiles/
    •COBie : http://www.wbdg.org/resources/cobie.php
    • IFC: http://buildingsmart-tech.org/specifications/ifc-
    overview/?searchterm=ifc
    •BIM Services: http://www.aec3.com/en/index.htm
    •BIM Server: http://bimserver.org/
    •BIM Server COBie Translator: http://buildingsmartalliance.org/
    index.php/projects/commonbimfiles/
    •GSA BIM Guide Series: http://www.gsa.gov/portal/category/21062

More Related Content

What's hot

BIM Strategy in practice
BIM Strategy in practiceBIM Strategy in practice
BIM Strategy in practice
Sylvain Kubicki
 
Your first steps with Visual COBOL - COBOL Developer Day
Your first steps with Visual COBOL -  COBOL Developer DayYour first steps with Visual COBOL -  COBOL Developer Day
Your first steps with Visual COBOL - COBOL Developer Day
Micro Focus
 
Define enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasadDefine enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasad
Bhawani N Prasad
 
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3b
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3bBw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3b
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3bwdalbi
 
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’ SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
Adam Levithan
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
Tero Järvinen
 
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
FITMAN FI
 

What's hot (9)

Andrew Gutteridge
Andrew GutteridgeAndrew Gutteridge
Andrew Gutteridge
 
BIM Strategy in practice
BIM Strategy in practiceBIM Strategy in practice
BIM Strategy in practice
 
Your first steps with Visual COBOL - COBOL Developer Day
Your first steps with Visual COBOL -  COBOL Developer DayYour first steps with Visual COBOL -  COBOL Developer Day
Your first steps with Visual COBOL - COBOL Developer Day
 
Define enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasadDefine enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasad
 
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3b
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3bBw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3b
Bw migration strategy 6a19f233 0e01-0010-6593-c47af5a8df3b
 
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’ SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
SharePoint Migration - To Be Or Not To Be ‘In The Cloud’
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
 
Software architecture
Software architectureSoftware architecture
Software architecture
 
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
Fitman webinar 2015 06 Collaborative Business Process Management (CBPM)
 

Similar to Pr kfa structuring_bi_msforifcandcobie_20120223

Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)
AEC Digital Solutions LLC
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014Graham H Stewart
 
Enabling BIM workflow for informed and collaborative projects | Empowering yo...
Enabling BIM workflow for informed and collaborative projects | Empowering yo...Enabling BIM workflow for informed and collaborative projects | Empowering yo...
Enabling BIM workflow for informed and collaborative projects | Empowering yo...
The NBS
 
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
The NBS
 
BIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspectiveBIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspective
BuiltEnvironmentUBM
 
Building Information Modeling
Building Information ModelingBuilding Information Modeling
Building Information Modeling
Arslan Usmani CPPD MEnPracM
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
ryanabarton
 
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
The NBS
 
The RIBA Enterprises BIM programme
The RIBA Enterprises BIM programmeThe RIBA Enterprises BIM programme
The RIBA Enterprises BIM programme
Ruggero Lancia
 
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
Ali Ismail
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
RavenousSolos
 
XWBI_Migrating to BusinessObjects 4.2
XWBI_Migrating to BusinessObjects 4.2XWBI_Migrating to BusinessObjects 4.2
XWBI_Migrating to BusinessObjects 4.2Nicolas Henry
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
BIM User Day
 
Xbim flex webinar 20 Jan 2021
Xbim flex webinar 20 Jan 2021Xbim flex webinar 20 Jan 2021
Xbim flex webinar 20 Jan 2021
Andy Ward
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
Lancashire Construction Best Practice
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
The NBS
 
Component based software engineering
Component based software engineeringComponent based software engineering
Component based software engineering
Charotar University Of Science And Technology,Gujrat
 
BIM Workflows: How to Build from CAD & GIS for Infrastructure
BIM Workflows: How to Build from CAD & GIS for InfrastructureBIM Workflows: How to Build from CAD & GIS for Infrastructure
BIM Workflows: How to Build from CAD & GIS for Infrastructure
Safe Software
 

Similar to Pr kfa structuring_bi_msforifcandcobie_20120223 (20)

Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Enabling BIM workflow for informed and collaborative projects | Empowering yo...
Enabling BIM workflow for informed and collaborative projects | Empowering yo...Enabling BIM workflow for informed and collaborative projects | Empowering yo...
Enabling BIM workflow for informed and collaborative projects | Empowering yo...
 
Paul Nunn
Paul NunnPaul Nunn
Paul Nunn
 
Paul Nunn v2
Paul Nunn v2Paul Nunn v2
Paul Nunn v2
 
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
Enabling BIM Workflow for Informed and Collaborative Projects | Empowering yo...
 
BIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspectiveBIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspective
 
Building Information Modeling
Building Information ModelingBuilding Information Modeling
Building Information Modeling
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
Intro to buildingsmart and COBie - Nick Tune at Ecobuild 2015
 
The RIBA Enterprises BIM programme
The RIBA Enterprises BIM programmeThe RIBA Enterprises BIM programme
The RIBA Enterprises BIM programme
 
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
AEC Hackathon -London (06-08/10/2017) Team Conenctivity- BIM and smart city c...
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
 
XWBI_Migrating to BusinessObjects 4.2
XWBI_Migrating to BusinessObjects 4.2XWBI_Migrating to BusinessObjects 4.2
XWBI_Migrating to BusinessObjects 4.2
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
Xbim flex webinar 20 Jan 2021
Xbim flex webinar 20 Jan 2021Xbim flex webinar 20 Jan 2021
Xbim flex webinar 20 Jan 2021
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
 
Component based software engineering
Component based software engineeringComponent based software engineering
Component based software engineering
 
BIM Workflows: How to Build from CAD & GIS for Infrastructure
BIM Workflows: How to Build from CAD & GIS for InfrastructureBIM Workflows: How to Build from CAD & GIS for Infrastructure
BIM Workflows: How to Build from CAD & GIS for Infrastructure
 

Recently uploaded

GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 

Recently uploaded (20)

GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 

Pr kfa structuring_bi_msforifcandcobie_20120223

  • 1. Structuring BIMs for IFC and COBie Robert A. Feldman, PhD Gregory R. Williams, AIA, LEED AP Kristine Fallon Associates, Inc. February 23, 2012
  • 2. Acknowledgements The research presented here was funded by: US Army Corps of Engineers Engineer Research and Development Center Construction Engineering Research Laboratory Champaign, Illinois
  • 3. Objectives 1. Define COBie and explain how it is used on projects. 2. Discuss the importance of information standardization. 3. Review process for extracting COBie data from a Building Information Model. 4. Identify limitations of current software packages used in this workflow. 5. Discuss how and why COBie and IFC are being utilized by the GSA.
  • 4. What is COBie? • Construction Operations Building Information Exchange • COBie is based on the IFC Model View Definition for Facilities Management Handover • COBie's focus is on delivering building information for facilities management, not geometric modeling • In simplified terms, COBie is IFC in the form of an Excel spreadsheet
  • 5. COBie Information Responsibility • Phased delivery of project documentation • Capture the information when it is created Source: ERDC
  • 7. Objectives of ERDC Project • Develop, document, and create three consistent baseline building information models with specific architectural, structural, plumbing, electrical, heating and ventilating information • Document the methodology used to create these models and the IFC/COBie output to assist others in meeting contractual requirements
  • 8. The ERDC Report http://buildingsmartalliance.org/ index.php/projects/commonbimfiles/
  • 9. Successful Information Transfer Requires Standards “Key to the ability to exchange intelligent building information across system boundaries is agreement on the types, hierarchy and content of the data objects that make up the building model.” Source: General Buildings Information Handover Guide: Principles, Methodology, Case Studies (NISTIR 7417)
  • 10. Successful Information Transfer Requires Standards • Not just formats! • Common schema • Content to be transferred • Properties (attributes) to be included –Which properties are needed –Naming standards for those properties
  • 11. Methodology • Use IFC Data Model as the schema • Develop Common Object Library • Create Models • Export to IFC • Convert IFC to COBie Spreadsheet
  • 12. Model Development • Create and use a Common Object Library • Develop models to the “Coordinated Design” or “60% Design” phase –Show details typical of ¼” = 1’ scaled drawings –Include the following disciplines: • Architectural • Structural • Mechanical • Plumbing • Fire Protection • Electrical
  • 13. Project Tools • Software – Autodesk Revit Architecture 2011 – Autodesk Revit MEP 2011 – BIMServices (AEC3 UK Ltd) v2010-12-28 with _asCOBIE2.xml.xsl dated 2011-04-06 • Building Components (Common Object Library) – Use standard Revit content as much as possible – Add additional parameters as shared project parameters
  • 14. Common Object Library • Define consistent objects for use in multiple models • Include common properties needed to produce IFC and COBie deliverables –Add properties (Shared Parameters in Revit) –Standardize property naming based on IFC and COBie terminology
  • 15. Common Object Library • 56 Revit System Families • 103 Component Families –87 Standard Revit Library –11 Autodesk Seek –3 Custom • Revit shared parameter file http://buildingsmartalliance.org/ index.php/projects/commonbimfiles/
  • 16. The Models • 3 Building Models: –Duplex Apartment –Office –Clinic http://buildingsmartalliance.org/ index.php/projects/commonbimfiles/
  • 17. Getting from Model to COBie • Each vendor creates one IFC translator that can serve multiple downstream programs GSA Validation Revit COBie IFC Maximo MIMS Energy Analysis
  • 18. Getting from Model to COBie • Each vendor must create a separate Revit translator for each transfer GSA Validation IFC COBie Revit Maximo MIMS Energy Analysis
  • 19. Revit-IFC-COBie Data Transfer • Revit IFC export and BIMServices will populate these COBie tabs (8 of the 10 GSA-required tabs): –Facility –Floor –Space –Type –Component –Attribute –(Zone and System information export as attribute data)
  • 20. Revit-COBie Data Transfer • Revit COBie2 Add-in can populate 5 COBie tabs • Requires manually copying information from Revit schedules to COBie spreadsheets • COBie properties in Revit are not given standard COBie names
  • 21. Limitations of the Revit-IFC Approach • Revit export categories are broader than IFC types • Many Revit objects did not export properly unless their export category was changed or specified in special parameters – IfcExportAs and IfcExportType parameters had to be added to 31 of the 103 component families – Export category names for Cable Trays and Conduits had to be changed to match IFC categories – Revit Generic Models and Specialty Equipment categories were changed to other categories in order to translate properly • Non-standard component naming: M_Single-Flush:1250mm x 2010mm:1250mm x 2010mm:146678
  • 22. BIMServices Limitations • Duplication of some data by BIMServices –Values in 10 fields on 5 tabs duplicated –Manually edited to correct the published files • IFC files larger than 25MB cause “Out of Memory” errors –Model must be partitioned into smaller sections, breaking up MEP systems, which results in the loss of information • The new COBie plug-in for the open-source BIM Server (bimserver.org) works better
  • 23. Why are Organizations Using COBie? The General Services Administration (GSA) has incorporated IFC and COBie requirements into their latest BIM guidelines. • The GSA is the largest property owner in the US – 362 million rentable SF • A study by the National Institute of Standards and Technology (NIST ) discovered that large sums of money was being wasted looking for, validating, and recreating facility information that should have been readily available. • COBie provides an open standard format for capturing project data when its generated and minimizes information exchange loss and cost typically associated with physical handover of paper documentation.
  • 24. GSA’s BIM Guide for Facility Management The GSA’s BIM Guide for Facility Management (FM) provides the structure to address organizing and tracking information through all phases of a facility’s lifecycle. • Identifies the work processes and information requirements. • Evaluates methods for capturing and recording information updates. • Defines the scope of information that should be included or updated in the record BIM • Defines technology requirements for accessing and updating BIMs
  • 25. Summary • Properly structured BIMs are needed to achieve usable output • COBie is based on the IFC Model View Definition for Facilities Management Handover, so IFC output from BIM authoring tools easily converts to COBie spreadsheets • Since IFC deliverables will be required by GSA and the IFC file can be used for multiple purposes, direct conversions from a BIM application to COBie are not a good long-term strategy • Current state of the technology has limitations – Need consistently structured BIM content, including standardized element property sets – Need better IFC export • COBie provides framework for standardizing information for the lifecycle of a project
  • 26. Q and A Thank You! • For more information on topics discussed during this presentation, check out the following links: •Experimental BIM Report: http://buildingsmartalliance.org/ index.php/projects/commonbimfiles/ •COBie : http://www.wbdg.org/resources/cobie.php • IFC: http://buildingsmart-tech.org/specifications/ifc- overview/?searchterm=ifc •BIM Services: http://www.aec3.com/en/index.htm •BIM Server: http://bimserver.org/ •BIM Server COBie Translator: http://buildingsmartalliance.org/ index.php/projects/commonbimfiles/ •GSA BIM Guide Series: http://www.gsa.gov/portal/category/21062