The document outlines the fabrication and assembly process for prefabricated desulfurizer structures at multiple locations. It describes the building of structural components, assembly of cartridges, installation at a site, insulation, completion, and delivery for shipment. Key steps included building beams and panels, assembling cartridges, installing completed structures, leak testing, adding insulation, and loading the structures onto a ship for departure to Japan.
First Single-storey Bungalow Project after 9 years since 2008.Teow Beng Hur
ONE OF THE WAY TO IMPROVE THE OUTFLOW OF CURRENCY IS THE UTILIZATION OF INDUSTRIAL BUILDING SYSTEM ( IBS ) :
- IBS is a system which suits all architectural demands. It is neither a machine nor component,
- IBS Superstructure In Malaysia 3in1 : HC PRECAST SYSTEM
- Load Bearing + Modular Shear Keys Wet Joint + Box System
First Single-storey Bungalow Project after 9 years since 2008.Teow Beng Hur
ONE OF THE WAY TO IMPROVE THE OUTFLOW OF CURRENCY IS THE UTILIZATION OF INDUSTRIAL BUILDING SYSTEM ( IBS ) :
- IBS is a system which suits all architectural demands. It is neither a machine nor component,
- IBS Superstructure In Malaysia 3in1 : HC PRECAST SYSTEM
- Load Bearing + Modular Shear Keys Wet Joint + Box System
Presentation about Structural insulated panels sips house technical data from www.large-span.com
contact us by info@large-span.com largespangroup@gmail.com
LARGE SPAN GROUP
TEL: 0086-13333016262, 18731151165
FAX: 0086-18032909635, 18032909637
EMAIL: largespangroup@gmail.com, info@large-span.com
Large-Span group is big stated owned corporation established over 30 years and has certificated by BV, TUV, SGS inspection. As one of the most famous manufacturers in China, we have committed ourselves to developing and producing high quality products, professional suggestions and good services for customers all over the world.
Professional Presentaition on Projects and Achievements (PPPA) .pptxZawMoeMyint5
Concrete Pontoon Construction for Dalla-Yangon ferry at Dalla Dockyard. Japan and Myanmar engineers worked together to complete the pontoon project.
JICA supported materials and technology to dockyard. Dockyard engineers and labor got not only modern construction methods but also use of hand tools. During the construction Japan and Myanmar engineers solved so many problems together .JICA and Japanese people also supported to Myanmar three Cherry ferries . U Zaw Moe Myint was deputy command engineer at that time and made a power point presentation to Myanmar engineer council for the technical development. JICA also supported to dockyard welding training and transferred welding training room and welding machines.
This is a PDF copy of the Gantt chart from my Scheduling class. This was the schedule created for the construction of a Tenant Improvement in a Warehouse
English Version of Book of coasts, ports and offshore structures engineeringKabir Sadeghi
• Theory
• Design
• Calculations
• Construction and installation
• Codes’ items
• Case studies and practical examples
• Technical information and statistical information for the Persian Gulf, the Oman Sea, and the Caspian Sea
Presentation about Structural insulated panels sips house technical data from www.large-span.com
contact us by info@large-span.com largespangroup@gmail.com
LARGE SPAN GROUP
TEL: 0086-13333016262, 18731151165
FAX: 0086-18032909635, 18032909637
EMAIL: largespangroup@gmail.com, info@large-span.com
Large-Span group is big stated owned corporation established over 30 years and has certificated by BV, TUV, SGS inspection. As one of the most famous manufacturers in China, we have committed ourselves to developing and producing high quality products, professional suggestions and good services for customers all over the world.
Professional Presentaition on Projects and Achievements (PPPA) .pptxZawMoeMyint5
Concrete Pontoon Construction for Dalla-Yangon ferry at Dalla Dockyard. Japan and Myanmar engineers worked together to complete the pontoon project.
JICA supported materials and technology to dockyard. Dockyard engineers and labor got not only modern construction methods but also use of hand tools. During the construction Japan and Myanmar engineers solved so many problems together .JICA and Japanese people also supported to Myanmar three Cherry ferries . U Zaw Moe Myint was deputy command engineer at that time and made a power point presentation to Myanmar engineer council for the technical development. JICA also supported to dockyard welding training and transferred welding training room and welding machines.
This is a PDF copy of the Gantt chart from my Scheduling class. This was the schedule created for the construction of a Tenant Improvement in a Warehouse
English Version of Book of coasts, ports and offshore structures engineeringKabir Sadeghi
• Theory
• Design
• Calculations
• Construction and installation
• Codes’ items
• Case studies and practical examples
• Technical information and statistical information for the Persian Gulf, the Oman Sea, and the Caspian Sea