Powersines Systems develops and markets energy efficiency solutions for lighting and electric motors. Their patented voltage control technologies help stabilize voltage and reduce it by up to 35%, saving 15-35% in energy costs. Their compact lighting energy controllers can be easily installed on existing infrastructure and provide verified savings and a return on investment of 1.5-2.5 years. Over 23,000 of their systems have been installed globally in various applications such as street lighting, retail stores, and industrial facilities.