PARKER SCHANKWEILER
landscape architecture portfolio
RESIDENTIAL 1-4	 PLAYGROUND INSTALL 5,6	 COMMERCIAL 7,8	 SENIOR PROJECT 9,10
1
RESIDENTIAL HOMES
JOB DESCRIPTION
• RESIDENTIAL CUSTOM-BUILD HOME
• MECHANICSBURG, PA
• ROLE: PROJECT MANAGER / INSTALLER
• TIMETABLE: FIVE WEEKS
• CREW: 6 PEOPLE,2 HARDSCAPE,4 LANDSCAPE INSTALLERS
PROJECT TASKS
• Create Excel spreadsheets to track materials, man hours, equipment use, fuel and other miscellaneous costs for later
review and comparisons.
• Meet to review project with designer, homeowner and home builder.
• Work with hardscape foreman to layout/grade back patio, front walk and timing of material delivery.
• Review plant material with designer; hand-select and transport plants from nursery to job site.
• Mark plant beds and location of plants; drill holes with skid-loader auger unit for larger trees/shrubs and ensure
proper install of plants by crew.
• Oversee and help mulch all vegetation beds.
• Assist hardscape foremen with installation/completion of patio and walkway.
• Review install with homeowner, answer questions, give suggestions, fix any issues that come up and ensure they
are happy upon completion.
SKILLS USED
• LEADERSHIP
• TEAMWORK
• ORGANIZATION
• TIME MANAGEMENT
• PROBLEM SOLVING
• PLANT IDENTIFICATION
• INTERPERSONAL COMMUNICATOIN
OVERVIEW
For being the first complete project under my leadership, I gained valuable experience. This house was still being built as my
team was installing the landscaping, so I had to work in conjunction with the home construction team and all other
companies involved in completing a house. This meant constant check-ins with the building foreman to make sure we were
not in their way or if we could work on the same portions at the same time as them to make it easier for everyone involved.
I had to communicate with my hardscape foreman, place orders for material, pick up supplies and materials, and orga-
nize them on-site to make their install easier. Doing walk arounds at the start and end of the day helped review the work
to make sure it was completed to satisfaction. Decision-making is another skill I used, whether it be at the nursery selecting
a substitute plant because the first wasn’t in stock or decisions on the fly for the daily schedule to make sure the crew had
constant work to complete. Overall, it was a fantastic project, and the homeowner and builder were ecstatic about
the landscaping results.
WHAT I LEARNED
• Plans change, so be prepared for
challenges and setbacks; try to learn 		
from them and keep pushing forward.
• Learn to speak up when I see something 	
wrong or a different way to accomplish 	 	
something.
• Always review the site at the end of the 		
day; detail is important and easy
to overlook.
• Work together with all teams working on 		
the project for new ideas and feedback.
2
RESIDENTIAL HOMES
3
RESIDENTIAL HOMES
JOB DESCRIPTION
• STREET OF DREAMS COMPETITION
• RESIDENTIAL CUSTOM-BUILD HOME
• HARRISBURG, PA
• ROLE: PROJECT MANAGER / INSTALLER
• TIMETABLE: 2 MONTH
• CREW: 10 PEOPLE
PROJECT TASKS
• Review landscape plan with designer and home builder; layout a timetable of when phases needed to be completed to 	
ensure a finished project in the allotted time.
• Create materials list with designer and hardscape foreman.
• Aid in using machines to move and place boulders for rock walls, fire pit and steppers.
• Review plant list with designer; hand-select plants from nursery and safely transport to job site; mark out landscape beds 	
and location of plants; assist and oversee plant installs; and maintain plant health.
• Oversee and aid in mulching flower beds, doing touch-ups and final adjustments.
• Order, pick up and install grass sod for front of house and keep watered.
• Be available for open houses to answer questions, explain ideas for the landscape design and represent the company.
STREET OF DREAMS
• 7 PREMIERE BUILDERS FROM CENTRAL PA
• A PROGRAM OF THE HOME BUILDERS
ASSOCIATION OF METROPOLITAN HARRISBURG
• 110-DAY PROJECT COMPLETION
• 4,000 SQUARE FEET, UNDER $900,000
SKILLS USED
• TEAMWORK
• TIME-MANAGEMENT
• ORGANIZATION
• ACTIVE LISTENING
• PROBLEM-SOLVING
• PUBLIC SPEAKING
4
OVERVIEW
Street of Dreams is an honor to be a part of and a great way to showcase our company to a several thousand people.
What they don’t get to see is how we reached our final product. On one street, seven houses are being built on both sides,
not to mention that the street is on a hill. The amount of trucks, people and equipment moving in such a small area on a
time constraint can become a headache very quickly. Balancing and managing vans moving in and out, material-drop
off and where to have people park was a daily task. Even though it is somewhat of a competition, we had to work very
closely with all other parties involved. In the end, all the hard work paid off for my company and the home builder.
RESIDENTIAL HOMES
WHAT I LEARNED
• Extra effort is the difference between good and 	
great, even if it’s after hours or on the weekend.
• Lead by example; let your actions speak for you
instead of verbal commands.
• Don’t ask someone to do something I
wouldn’t do myself.
• Stay on schedule and keep work flow consistent.
AWARDS
OVERALL: BEST OF SHOW
LANDSCAPING: 1ST PLACE
OUTDOOR LIVING: 1ST PLACE
5
PLAYGROUND INSTALLATION
JOB DESCRIPTION
• PLAYGROUND DEMOLITION AND INSTALLATION FOR
GENERAL RECREATION INC.
• GREENCASTLE, PA AND LANCASTER, PA.
• ROLE: CONSTRUCTION TEAM
• TIMETABLE: VARIED
• CREW: 3-6 PEOPLE
PROJECT TASKS
• Meet with representative from General Recreation, township or school
association leaders to review the plan and timetable for the project.
• Begin disassembly of existing playground equipment and removal from site. 	
Use machines to dig out existing concrete footers of playground equipment 	
and also remove existing wooden timber boarders. In some instances,
remove existing wood carpet and move off site.
• Be at site to receive shipment of playground equipment and packaging to
organize and set up a base location somewhere on the site.
• Stake out new playground boundary, lay out general locations of
equipment to meet regulations and ensure that the layout works.
• Begin to dig locations of concrete footers, based on plan provided by
General Recreation. Pour and set equipment footers.
• Follow guideline information booklet on constructing equipment.
• Organize all pieces of equipment, making sure of proper install and
that they’re easy to find.
• Final check with General Recreation and owner of project.
• Order and spread new wood carpet inside new containment area.
• Clean area, re-seed and do lawn touch-ups; remove trash and leftover
equipment from site.
SKILLS USED
• LASER-LEVEL SURVEYING
• PROBLEM-SOLVING
• PROJECT PARTNERSHIPS
• ORGANIZATION
• FOLLOWING DIRECTIONS
• SAFETY PRACTICES
6
PLAYGROUND INSTALLATION
Playground installation was a great change of pace from landscape install, and it provided a new learning opportunity.
Some projects involved staying out of town in hotels for a few nights, so I was exposed to travel and time with coworkers
outside of work. I gained experience in reading construction documents, following multiple step processes and paying
attention to project safety. Working with people in the community broadened my experience. One project I assisted on
was the disassembly and reassembly of a township skate park. We worked with some users of the skate park to get input
on placement of certain ramps and objects when we put the park back together. Playground installation was challenging
and enjoyable. Each project was different but had similarities, so I could use experience from a past project to help me
in the current one.
WHAT I LEARNED
• Before jumping into a project, take a look at what you 	
have and come up with a thought-out plan.
• Safety is important; be on the same page with
those around you.
• When working with multiple contractors, be sure to 	
avoid damaging other parts of the project.
• When constructing playgrounds, kids are always 		
watching; be appropriate around the work site.
OVERVIEW
7
COMMERCIAL
JOB DESCRIPTION
• COMMUNITY BUILDING/POOL, MULTI-USE COMMERCIAL 	
BUILDING, OFFICE BUILDING
• MECHANICSBURG, PA
• ROLE: PROJECT MANAGER / INSTALLER
• TIMETABLE: VARIED
• CREW: 5-8 PEOPLE
PROJECT TASKS
• Review plan with designer; speak with building owners
and other involved parties.
• Mark landscape bed locations; mark plant locations.
• Review plant list; hand-pick plants from the nursery and
transplant them to the site.
• Unload and distribute plants throughout the site; aid in
proper installation.
• Oversee mulch application, review touch-ups and
check details of site.
• Order and install grass sod where needed; keep watered 	
until healthy.
• Maintain properties throughout the year, taking care of 	
trimming plant matter, new mulch application, replacing 	
sick or dead plants and keeping in contact with building 	
owners to meet their needs.
SKILLS USED
• INTERPERSONAL COMMUNICATION
• ORGANIZATION
• PROJECT PARTNERSHIPS
• TIME MANAGEMENT
8
COMMERCIAL
Working on commercial properties has a bit of a different feel to it. Everything we do outside has to reflect what the user or
customer should expect on the inside. First impressions are important, and if the customer’s experience isn’t pleasant on the
outside of the building that could affect their feelings toward the business. I had to pay special attention to these projects
on a weekly basis, trying to keep the business owner pleased.
OVERVIEW
WHAT I LEARNED
• Keeping a clean jobsite is very important.
• Be polite and interactive with customers of the
property.
• Keep vehicles and equipment out of the way of
entrance/exits.
9
SENIOR PROJECT
PROJECT DESCRIPTOIN
• RESTORATION OF DIMINISHED SITES ALONG CREEK WATERSHED
• ROLE: IN CHARGE OF HIGHWAY CORRIDOR
• TIMETABLE: SPRING SEMESTER 2014
• TEAM: 3 CLASSMATES
PROJECT TASKS
• Partner with 1-2 classmates and select a site; create 	 	
mission statement with goals and project details to be 	
approved by class professor.
• Create booklet on project and give a final presentation 	
that must be one hour minimum, followed by questions 	
from the department and other classmates.
DECKERS CREEK, MORGANTOWN, WV
MISSION STATEMENT
Our mission is to identify and design a site-responsive master plan of diminished locations throughout the Deckers Creek wa-
tershed. The design will focus on restoring and preserving the existing wildlife, aquatic and riparian habitat along the corri-
dor. The project will achieve goals that respond to stream rehabilitation efforts and increased access to the stream corridor,
transforming sections of the landscape into an immersive educational greenway that demonstrates functional stream resto-
ration applications, green infrastructure techniques and acid mine drainage (AMD) treatment systems. It will provide a link-
age of outdoor learning environments alongside the Deckers Creek Trail, which encourages the surrounding communities to
reconnect and learn about the effects that various pollutants can have on watercourse. The extension and integration of
the Deckers Creek Outdoor Learning Park will become an all-encompassing adventure destination, a concept that can be
applied to similar tarnished watercourses.
Goal
Enhance sites along the
Deckers Creek corridor
• Incorporate green infrastructure to 	
manage stormwater runoff.
• Highlight and alleviate current
AMD sources.
• Stabilize sections of the stream’s edge.
• Rejuvenate biodiversity by providing 	
additional habitat.
Objectives:
Goal
Create interpretive trail destinations that
integrate the surrounding communities.
• Improve pedestrian circulation, stream	
and trail access.
• Incorporate parking and
informational signage.
• Design areas for community
interactions and personal leisure.
• Integrate local and recycled
building materials to link the site with
its surroundings.
• Stimulate cultural art exhibits.
Objectives:
Goal
Incorporate environmental
learning opportunities
• Create a linkage of environmental 	
learning sites along the
Deckers Creek Trail.
• Integrate interpretive areas through	
out the stream corridor.
• Provide visitors and residents with
access to the stream.
Objectives:
N
10
SENIOR PROJECTOVERVIEW
Completing my senior project gave me insight into the broad field of landscape architecture. I gained valuable
experiences and felt what it takes to be a part of a successful team to reach a final goal. From site visits, working with
community organizations, or giving a one hour presentation my group and I felt like we really accomplished our goal after
completing this project. Working on a project close to school made me feel like it more important and that I wanted to
create something special. I wouldn’t trade the late nights and countless hours at the studio with my friends for anything.
Finishing my senior project was amazing and I’m truly looking forward to being a part of more great projects down the road.
Deckers Creek
Deckers Creek
Decke
Deckers Creek
THANK YOU FOR YOUR TIME

More Related Content

Viewers also liked

S14 Dean's List Letter
S14 Dean's List LetterS14 Dean's List Letter
S14 Dean's List Letter
Kathryn Orcino
 
Deckers Creek Final
Deckers Creek FinalDeckers Creek Final
Deckers Creek Final
Parker Schankweiler
 
Advice on academic writing
Advice on academic writingAdvice on academic writing
Advice on academic writing
Verónica Bautista
 
Rocas
Rocas Rocas
Talent match
Talent matchTalent match
Talent match
The Pathway Group
 
Business environment ppt
Business environment pptBusiness environment ppt
Business environment ppt
dhrumil_soni2
 

Viewers also liked (6)

S14 Dean's List Letter
S14 Dean's List LetterS14 Dean's List Letter
S14 Dean's List Letter
 
Deckers Creek Final
Deckers Creek FinalDeckers Creek Final
Deckers Creek Final
 
Advice on academic writing
Advice on academic writingAdvice on academic writing
Advice on academic writing
 
Rocas
Rocas Rocas
Rocas
 
Talent match
Talent matchTalent match
Talent match
 
Business environment ppt
Business environment pptBusiness environment ppt
Business environment ppt
 

Similar to Portfolio Examples

How to absorb changing requirements in new product development
How to absorb changing requirements in new product developmentHow to absorb changing requirements in new product development
How to absorb changing requirements in new product development
Mark Hart
 
simon cv1 1
simon cv1 1simon cv1 1
simon cv1 1
Simon Walker
 
What Persists: People, Process, and Performance – HOW Design Live 2018
What Persists: People, Process, and Performance – HOW Design Live 2018What Persists: People, Process, and Performance – HOW Design Live 2018
What Persists: People, Process, and Performance – HOW Design Live 2018
Josh Silverman
 
Action plan for qualitative implementation
Action plan for qualitative implementationAction plan for qualitative implementation
Action plan for qualitative implementation
Rajendra kale
 
Final design project
Final design projectFinal design project
Final design project
Kasey Marshall
 
Agile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
Agile network India | Dysfunctions in a Scrum Master's Role | Soja NizamAgile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
Agile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
AgileNetwork
 
Eagle scout brochure
Eagle scout brochureEagle scout brochure
Eagle scout brochure
Philip Stanway
 
Eagle scout brochure1
Eagle scout brochure1Eagle scout brochure1
Eagle scout brochure1
Philip Stanway
 
Eagle scout brochure
Eagle scout brochureEagle scout brochure
Eagle scout brochure
Philip Stanway
 
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
David Randall
 
Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...
Triumvirate Environmental
 
Resume Carlos
Resume CarlosResume Carlos
Resume Carlos
Carlos Acevedo
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
TechGigDotCom
 
Who is this programme suitable for
Who is this programme suitable forWho is this programme suitable for
Who is this programme suitable for
RonTaiapa
 
Hannes strydom cv
Hannes strydom cvHannes strydom cv
Hannes strydom cv
Hannes Strydom
 
Take the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development processTake the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development process
Agilar
 
Take the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development processTake the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development process
Adrian Perreau de Pinninck
 
User Centered Execution for Mobile UX Designers
User Centered Execution for Mobile UX DesignersUser Centered Execution for Mobile UX Designers
User Centered Execution for Mobile UX Designers
Steven Hoober
 
Earth turf wood overview
Earth turf wood overviewEarth turf wood overview
Earth turf wood overview
Earth, Turf & Wood, Inc.
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
Nigel Vieira
 

Similar to Portfolio Examples (20)

How to absorb changing requirements in new product development
How to absorb changing requirements in new product developmentHow to absorb changing requirements in new product development
How to absorb changing requirements in new product development
 
simon cv1 1
simon cv1 1simon cv1 1
simon cv1 1
 
What Persists: People, Process, and Performance – HOW Design Live 2018
What Persists: People, Process, and Performance – HOW Design Live 2018What Persists: People, Process, and Performance – HOW Design Live 2018
What Persists: People, Process, and Performance – HOW Design Live 2018
 
Action plan for qualitative implementation
Action plan for qualitative implementationAction plan for qualitative implementation
Action plan for qualitative implementation
 
Final design project
Final design projectFinal design project
Final design project
 
Agile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
Agile network India | Dysfunctions in a Scrum Master's Role | Soja NizamAgile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
Agile network India | Dysfunctions in a Scrum Master's Role | Soja Nizam
 
Eagle scout brochure
Eagle scout brochureEagle scout brochure
Eagle scout brochure
 
Eagle scout brochure1
Eagle scout brochure1Eagle scout brochure1
Eagle scout brochure1
 
Eagle scout brochure
Eagle scout brochureEagle scout brochure
Eagle scout brochure
 
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
The Design Fortress: Boosting Design Productivity and Creativity in an Agile ...
 
Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...
 
Resume Carlos
Resume CarlosResume Carlos
Resume Carlos
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
 
Who is this programme suitable for
Who is this programme suitable forWho is this programme suitable for
Who is this programme suitable for
 
Hannes strydom cv
Hannes strydom cvHannes strydom cv
Hannes strydom cv
 
Take the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development processTake the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development process
 
Take the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development processTake the Red Pill: How Criteo revamped its software development process
Take the Red Pill: How Criteo revamped its software development process
 
User Centered Execution for Mobile UX Designers
User Centered Execution for Mobile UX DesignersUser Centered Execution for Mobile UX Designers
User Centered Execution for Mobile UX Designers
 
Earth turf wood overview
Earth turf wood overviewEarth turf wood overview
Earth turf wood overview
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
 

Recently uploaded

labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
taqyea
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
NWEXAM
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
Aditya Raghav
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
Bruce Bennett
 
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdfSwitching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
SocMediaFin - Joyce Sullivan
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
ashiquepa3
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
Alliance Jobs
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
2zjra9bn
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
FauzanHarits1
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
Bruce Bennett
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
Bruce Bennett
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
dsnow9802
 
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
GabrielleSinaga
 
IT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a RoadmapIT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a Roadmap
Base Camp
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
kakomaeric00
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
cahgading001
 

Recently uploaded (20)

labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
 
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdfSwitching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
 
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
 
IT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a RoadmapIT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a Roadmap
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
 

Portfolio Examples

  • 1. PARKER SCHANKWEILER landscape architecture portfolio RESIDENTIAL 1-4 PLAYGROUND INSTALL 5,6 COMMERCIAL 7,8 SENIOR PROJECT 9,10
  • 2. 1 RESIDENTIAL HOMES JOB DESCRIPTION • RESIDENTIAL CUSTOM-BUILD HOME • MECHANICSBURG, PA • ROLE: PROJECT MANAGER / INSTALLER • TIMETABLE: FIVE WEEKS • CREW: 6 PEOPLE,2 HARDSCAPE,4 LANDSCAPE INSTALLERS PROJECT TASKS • Create Excel spreadsheets to track materials, man hours, equipment use, fuel and other miscellaneous costs for later review and comparisons. • Meet to review project with designer, homeowner and home builder. • Work with hardscape foreman to layout/grade back patio, front walk and timing of material delivery. • Review plant material with designer; hand-select and transport plants from nursery to job site. • Mark plant beds and location of plants; drill holes with skid-loader auger unit for larger trees/shrubs and ensure proper install of plants by crew. • Oversee and help mulch all vegetation beds. • Assist hardscape foremen with installation/completion of patio and walkway. • Review install with homeowner, answer questions, give suggestions, fix any issues that come up and ensure they are happy upon completion. SKILLS USED • LEADERSHIP • TEAMWORK • ORGANIZATION • TIME MANAGEMENT • PROBLEM SOLVING • PLANT IDENTIFICATION • INTERPERSONAL COMMUNICATOIN
  • 3. OVERVIEW For being the first complete project under my leadership, I gained valuable experience. This house was still being built as my team was installing the landscaping, so I had to work in conjunction with the home construction team and all other companies involved in completing a house. This meant constant check-ins with the building foreman to make sure we were not in their way or if we could work on the same portions at the same time as them to make it easier for everyone involved. I had to communicate with my hardscape foreman, place orders for material, pick up supplies and materials, and orga- nize them on-site to make their install easier. Doing walk arounds at the start and end of the day helped review the work to make sure it was completed to satisfaction. Decision-making is another skill I used, whether it be at the nursery selecting a substitute plant because the first wasn’t in stock or decisions on the fly for the daily schedule to make sure the crew had constant work to complete. Overall, it was a fantastic project, and the homeowner and builder were ecstatic about the landscaping results. WHAT I LEARNED • Plans change, so be prepared for challenges and setbacks; try to learn from them and keep pushing forward. • Learn to speak up when I see something wrong or a different way to accomplish something. • Always review the site at the end of the day; detail is important and easy to overlook. • Work together with all teams working on the project for new ideas and feedback. 2 RESIDENTIAL HOMES
  • 4. 3 RESIDENTIAL HOMES JOB DESCRIPTION • STREET OF DREAMS COMPETITION • RESIDENTIAL CUSTOM-BUILD HOME • HARRISBURG, PA • ROLE: PROJECT MANAGER / INSTALLER • TIMETABLE: 2 MONTH • CREW: 10 PEOPLE PROJECT TASKS • Review landscape plan with designer and home builder; layout a timetable of when phases needed to be completed to ensure a finished project in the allotted time. • Create materials list with designer and hardscape foreman. • Aid in using machines to move and place boulders for rock walls, fire pit and steppers. • Review plant list with designer; hand-select plants from nursery and safely transport to job site; mark out landscape beds and location of plants; assist and oversee plant installs; and maintain plant health. • Oversee and aid in mulching flower beds, doing touch-ups and final adjustments. • Order, pick up and install grass sod for front of house and keep watered. • Be available for open houses to answer questions, explain ideas for the landscape design and represent the company. STREET OF DREAMS • 7 PREMIERE BUILDERS FROM CENTRAL PA • A PROGRAM OF THE HOME BUILDERS ASSOCIATION OF METROPOLITAN HARRISBURG • 110-DAY PROJECT COMPLETION • 4,000 SQUARE FEET, UNDER $900,000 SKILLS USED • TEAMWORK • TIME-MANAGEMENT • ORGANIZATION • ACTIVE LISTENING • PROBLEM-SOLVING • PUBLIC SPEAKING
  • 5. 4 OVERVIEW Street of Dreams is an honor to be a part of and a great way to showcase our company to a several thousand people. What they don’t get to see is how we reached our final product. On one street, seven houses are being built on both sides, not to mention that the street is on a hill. The amount of trucks, people and equipment moving in such a small area on a time constraint can become a headache very quickly. Balancing and managing vans moving in and out, material-drop off and where to have people park was a daily task. Even though it is somewhat of a competition, we had to work very closely with all other parties involved. In the end, all the hard work paid off for my company and the home builder. RESIDENTIAL HOMES WHAT I LEARNED • Extra effort is the difference between good and great, even if it’s after hours or on the weekend. • Lead by example; let your actions speak for you instead of verbal commands. • Don’t ask someone to do something I wouldn’t do myself. • Stay on schedule and keep work flow consistent. AWARDS OVERALL: BEST OF SHOW LANDSCAPING: 1ST PLACE OUTDOOR LIVING: 1ST PLACE
  • 6. 5 PLAYGROUND INSTALLATION JOB DESCRIPTION • PLAYGROUND DEMOLITION AND INSTALLATION FOR GENERAL RECREATION INC. • GREENCASTLE, PA AND LANCASTER, PA. • ROLE: CONSTRUCTION TEAM • TIMETABLE: VARIED • CREW: 3-6 PEOPLE PROJECT TASKS • Meet with representative from General Recreation, township or school association leaders to review the plan and timetable for the project. • Begin disassembly of existing playground equipment and removal from site. Use machines to dig out existing concrete footers of playground equipment and also remove existing wooden timber boarders. In some instances, remove existing wood carpet and move off site. • Be at site to receive shipment of playground equipment and packaging to organize and set up a base location somewhere on the site. • Stake out new playground boundary, lay out general locations of equipment to meet regulations and ensure that the layout works. • Begin to dig locations of concrete footers, based on plan provided by General Recreation. Pour and set equipment footers. • Follow guideline information booklet on constructing equipment. • Organize all pieces of equipment, making sure of proper install and that they’re easy to find. • Final check with General Recreation and owner of project. • Order and spread new wood carpet inside new containment area. • Clean area, re-seed and do lawn touch-ups; remove trash and leftover equipment from site. SKILLS USED • LASER-LEVEL SURVEYING • PROBLEM-SOLVING • PROJECT PARTNERSHIPS • ORGANIZATION • FOLLOWING DIRECTIONS • SAFETY PRACTICES
  • 7. 6 PLAYGROUND INSTALLATION Playground installation was a great change of pace from landscape install, and it provided a new learning opportunity. Some projects involved staying out of town in hotels for a few nights, so I was exposed to travel and time with coworkers outside of work. I gained experience in reading construction documents, following multiple step processes and paying attention to project safety. Working with people in the community broadened my experience. One project I assisted on was the disassembly and reassembly of a township skate park. We worked with some users of the skate park to get input on placement of certain ramps and objects when we put the park back together. Playground installation was challenging and enjoyable. Each project was different but had similarities, so I could use experience from a past project to help me in the current one. WHAT I LEARNED • Before jumping into a project, take a look at what you have and come up with a thought-out plan. • Safety is important; be on the same page with those around you. • When working with multiple contractors, be sure to avoid damaging other parts of the project. • When constructing playgrounds, kids are always watching; be appropriate around the work site. OVERVIEW
  • 8. 7 COMMERCIAL JOB DESCRIPTION • COMMUNITY BUILDING/POOL, MULTI-USE COMMERCIAL BUILDING, OFFICE BUILDING • MECHANICSBURG, PA • ROLE: PROJECT MANAGER / INSTALLER • TIMETABLE: VARIED • CREW: 5-8 PEOPLE PROJECT TASKS • Review plan with designer; speak with building owners and other involved parties. • Mark landscape bed locations; mark plant locations. • Review plant list; hand-pick plants from the nursery and transplant them to the site. • Unload and distribute plants throughout the site; aid in proper installation. • Oversee mulch application, review touch-ups and check details of site. • Order and install grass sod where needed; keep watered until healthy. • Maintain properties throughout the year, taking care of trimming plant matter, new mulch application, replacing sick or dead plants and keeping in contact with building owners to meet their needs. SKILLS USED • INTERPERSONAL COMMUNICATION • ORGANIZATION • PROJECT PARTNERSHIPS • TIME MANAGEMENT
  • 9. 8 COMMERCIAL Working on commercial properties has a bit of a different feel to it. Everything we do outside has to reflect what the user or customer should expect on the inside. First impressions are important, and if the customer’s experience isn’t pleasant on the outside of the building that could affect their feelings toward the business. I had to pay special attention to these projects on a weekly basis, trying to keep the business owner pleased. OVERVIEW WHAT I LEARNED • Keeping a clean jobsite is very important. • Be polite and interactive with customers of the property. • Keep vehicles and equipment out of the way of entrance/exits.
  • 10. 9 SENIOR PROJECT PROJECT DESCRIPTOIN • RESTORATION OF DIMINISHED SITES ALONG CREEK WATERSHED • ROLE: IN CHARGE OF HIGHWAY CORRIDOR • TIMETABLE: SPRING SEMESTER 2014 • TEAM: 3 CLASSMATES PROJECT TASKS • Partner with 1-2 classmates and select a site; create mission statement with goals and project details to be approved by class professor. • Create booklet on project and give a final presentation that must be one hour minimum, followed by questions from the department and other classmates. DECKERS CREEK, MORGANTOWN, WV MISSION STATEMENT Our mission is to identify and design a site-responsive master plan of diminished locations throughout the Deckers Creek wa- tershed. The design will focus on restoring and preserving the existing wildlife, aquatic and riparian habitat along the corri- dor. The project will achieve goals that respond to stream rehabilitation efforts and increased access to the stream corridor, transforming sections of the landscape into an immersive educational greenway that demonstrates functional stream resto- ration applications, green infrastructure techniques and acid mine drainage (AMD) treatment systems. It will provide a link- age of outdoor learning environments alongside the Deckers Creek Trail, which encourages the surrounding communities to reconnect and learn about the effects that various pollutants can have on watercourse. The extension and integration of the Deckers Creek Outdoor Learning Park will become an all-encompassing adventure destination, a concept that can be applied to similar tarnished watercourses. Goal Enhance sites along the Deckers Creek corridor • Incorporate green infrastructure to manage stormwater runoff. • Highlight and alleviate current AMD sources. • Stabilize sections of the stream’s edge. • Rejuvenate biodiversity by providing additional habitat. Objectives: Goal Create interpretive trail destinations that integrate the surrounding communities. • Improve pedestrian circulation, stream and trail access. • Incorporate parking and informational signage. • Design areas for community interactions and personal leisure. • Integrate local and recycled building materials to link the site with its surroundings. • Stimulate cultural art exhibits. Objectives: Goal Incorporate environmental learning opportunities • Create a linkage of environmental learning sites along the Deckers Creek Trail. • Integrate interpretive areas through out the stream corridor. • Provide visitors and residents with access to the stream. Objectives: N
  • 11. 10 SENIOR PROJECTOVERVIEW Completing my senior project gave me insight into the broad field of landscape architecture. I gained valuable experiences and felt what it takes to be a part of a successful team to reach a final goal. From site visits, working with community organizations, or giving a one hour presentation my group and I felt like we really accomplished our goal after completing this project. Working on a project close to school made me feel like it more important and that I wanted to create something special. I wouldn’t trade the late nights and countless hours at the studio with my friends for anything. Finishing my senior project was amazing and I’m truly looking forward to being a part of more great projects down the road. Deckers Creek Deckers Creek Decke
  • 12. Deckers Creek THANK YOU FOR YOUR TIME