PEMBAIKAN KECEMASAN 6 MEN CHAMBER KD DUYONG (5 YEARLY REFIT) - DSA01/12
Job ID: #12390 - Pangkalan TLDM Lumut: Jan 2012
Scope of Work:
• Third party decompression chamber recertification: Germanischer Lloyds
• Containers’ replacement & refitting works
• Environmental Control Unit (ECU) refurbishment
• Air supply high flow regulator replacement & hydrostatic testing
• BIBS replacements
• Viewports replacement & leak testing
• Oxygen/Carbon Dioxide analyzer replacement & calibration
• Chamber control panel re-design & testing. Gauges calibration
• Doors re-alignment & seal replacement
• Medical lock door re-alignment & seal replacement
• HP compressor overhaul & air purity test
• Communication system repair & testing
• Air storage bank refurbishment & hydrostatic testing
For more information, kindly contact:
HEALING CHAMBERS OF ASIA SDN BHD
(Co. Reg. No.: 642186-T)
No. 3, Persiaran Titiwangsa 3,
Taman Tasik Titiwangsa, Setapak
53200 Kuala Lumpur, MALAYSIA.
Tel: +603.4023.3333 Fax: +603.4023.3030
Web: www.healingchambers.com.my
E-mail: info@healingchambers.com.my

More Related Content

Similar to Portfolio 1 - KD Duyong small

production operator
production operatorproduction operator
production operatorGURU JOY
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseComit Projects Ltd
 
PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World
 
Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Lalit Patnaik
 
B597-EN-D_Gas_Cooling_Primary_Metals.pdf
B597-EN-D_Gas_Cooling_Primary_Metals.pdfB597-EN-D_Gas_Cooling_Primary_Metals.pdf
B597-EN-D_Gas_Cooling_Primary_Metals.pdfssusercf6d0e
 
Dave Harrison CV December 2016
Dave Harrison CV December 2016Dave Harrison CV December 2016
Dave Harrison CV December 2016David Harrison
 
Pipeline Operator Proposal PowerPoint Presentation Slides
Pipeline Operator Proposal PowerPoint Presentation SlidesPipeline Operator Proposal PowerPoint Presentation Slides
Pipeline Operator Proposal PowerPoint Presentation SlidesSlideTeam
 
last updat C.V SAYED
last updat C.V SAYEDlast updat C.V SAYED
last updat C.V SAYEDSayed Rewesh
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetSean Street
 
2016 Sales Brochure
2016 Sales Brochure2016 Sales Brochure
2016 Sales BrochureRocky Buras
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor NewJoseph Jaiwin Das
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsSociety of Petroleum Engineers
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerKamran Saeed
 

Similar to Portfolio 1 - KD Duyong small (20)

production operator
production operatorproduction operator
production operator
 
remesh new
remesh newremesh new
remesh new
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...
 
Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)
 
Kbl 2014 corporate presentation final
Kbl 2014 corporate presentation finalKbl 2014 corporate presentation final
Kbl 2014 corporate presentation final
 
B597-EN-D_Gas_Cooling_Primary_Metals.pdf
B597-EN-D_Gas_Cooling_Primary_Metals.pdfB597-EN-D_Gas_Cooling_Primary_Metals.pdf
B597-EN-D_Gas_Cooling_Primary_Metals.pdf
 
Grey water treatment & reuse
Grey water treatment & reuseGrey water treatment & reuse
Grey water treatment & reuse
 
Dave Harrison CV December 2016
Dave Harrison CV December 2016Dave Harrison CV December 2016
Dave Harrison CV December 2016
 
Pipeline Operator Proposal PowerPoint Presentation Slides
Pipeline Operator Proposal PowerPoint Presentation SlidesPipeline Operator Proposal PowerPoint Presentation Slides
Pipeline Operator Proposal PowerPoint Presentation Slides
 
Oral Presentation
Oral PresentationOral Presentation
Oral Presentation
 
last updat C.V SAYED
last updat C.V SAYEDlast updat C.V SAYED
last updat C.V SAYED
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean Street
 
2016 Sales Brochure
2016 Sales Brochure2016 Sales Brochure
2016 Sales Brochure
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
 
Resume-me
Resume-meResume-me
Resume-me
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
OMV Muzaffar CV
OMV Muzaffar CVOMV Muzaffar CV
OMV Muzaffar CV
 
GNwafor WellBond Cement System Design
GNwafor WellBond Cement System DesignGNwafor WellBond Cement System Design
GNwafor WellBond Cement System Design
 

Portfolio 1 - KD Duyong small

  • 1. ! ! ! PEMBAIKAN KECEMASAN 6 MEN CHAMBER KD DUYONG (5 YEARLY REFIT) - DSA01/12 Job ID: #12390 - Pangkalan TLDM Lumut: Jan 2012 Scope of Work: • Third party decompression chamber recertification: Germanischer Lloyds • Containers’ replacement & refitting works • Environmental Control Unit (ECU) refurbishment • Air supply high flow regulator replacement & hydrostatic testing • BIBS replacements • Viewports replacement & leak testing • Oxygen/Carbon Dioxide analyzer replacement & calibration • Chamber control panel re-design & testing. Gauges calibration • Doors re-alignment & seal replacement • Medical lock door re-alignment & seal replacement • HP compressor overhaul & air purity test • Communication system repair & testing • Air storage bank refurbishment & hydrostatic testing For more information, kindly contact: HEALING CHAMBERS OF ASIA SDN BHD (Co. Reg. No.: 642186-T) No. 3, Persiaran Titiwangsa 3, Taman Tasik Titiwangsa, Setapak 53200 Kuala Lumpur, MALAYSIA. Tel: +603.4023.3333 Fax: +603.4023.3030 Web: www.healingchambers.com.my E-mail: info@healingchambers.com.my