SlideShare a Scribd company logo
SURVEY FIELD REPORT
(PID0085 FROM AMRP02– AMDP12)
iSURVEY AS
Billingstadsletta 25
P.O.Box 300
N-1377 Billingstad, Norway
Telephone (24hrs): (+47) 45 41 41 00
Telefax : (+47) 66 98 22 71
e-mail : mail@isurvey-group.com
internet : www.isurvey-group.com
iSURVEY Project No 10933
iSURVEY Document 10933 – ISFE – FR – 16
Company
BIBBY OFFSHORE
Project Number: AP13070
Document No
BSP PIPELINE AND RISER INSPECTION
M/V BIBBY SPRING
Revision Description
Rev. Date Description
Internal External
Originator Checked Accepted Checked Approved
B2 07.09.2013 Issued for Client Review NCS PM AK GA / SAY
A1 07.09.2013 IDC NCS PM
Signature Legend
Initials / Signature Name Position
GA / SAY George Anggat / SyamsulAmriYaacob BSP Representative
PM Paul Morgan Party Chief
NCS Naresh Chandra Sarkar Inspector 3.4U
AK Andre Kotze BOS OPM
Date of issue Page
07 Sept 2013 2 of
Doc. No Rev.
10933 – ISFE – FR - 16 01
Subject:
PID 0085 (150mm Ø) from AMRP02
Summary:
Description
Riser Inspection survey(AMRP02
Pipeline Inspection survey(PID
Riser Inspection survey(AMDP12
Finding:
Anomaly Description List
1 Small dia pipe debris lying on top of pip
contact area.
2
PID0085 crosses over the PID0322. Both pipelines are
support present between pipelines. No visual damage observed in contact
areas.
3 Loss of field joint coating circumferentially approx 1 mtrs long.
4 Loss of field joint coating circumferentially approx 1 mtrs long.
5 Cable crossing over & in contact with the pipeline. No visual damage
observed on the pipeline.
6 Fish net debris on the pipeline. No visual damage observed on the pipeline.
Anomaly on Riser at AMDP12
7
Wire rope debris on sea bed touching Riser Tube turn. No visual damage
observed to the riser tube turn.
General Statement
Differences in position of the as
pipelines against the as-supplied position of the pipelines from the current Shell database
have been observed.
It is advised that positional data from the 2013 ROV pipeline survey is used to update the
database.
Please refer to the following pages
field report purposes, according to scope of work.
Page Document Title
of 5
SURVEY FIELD REPORT
(PID0085 FROM AMRP02 – AMDP12)
Rev.
1
AMRP02 – AMDP12 Platform (2 x risers, 1 x pipeline)
KP Time
AMRP02) 0.000 -
urvey(PID0085) 0.000 – 4.354 -
AMDP12) 4.354 -
Small dia pipe debris lying on top of pipeline. No visual damage to the
PID0085 crosses over the PID0322. Both pipelines are In contact. No
support present between pipelines. No visual damage observed in contact
field joint coating circumferentially approx 1 mtrs long.
field joint coating circumferentially approx 1 mtrs long.
Cable crossing over & in contact with the pipeline. No visual damage
Fish net debris on the pipeline. No visual damage observed on the pipeline.
Wire rope debris on sea bed touching Riser Tube turn. No visual damage
observed to the riser tube turn.
Differences in position of the as-found position during the 2013 survey of
supplied position of the pipelines from the current Shell database
It is advised that positional data from the 2013 ROV pipeline survey is used to update the
the following pages for anomaly findings. All data summary is submitted as
field report purposes, according to scope of work.
SURVEY FIELD REPORT
(2 x risers, 1 x pipeline)
Date
02nd
Sept. 2013
02nd
Sept. 2013
02nd
Sept. 2013
Class KP
No visual damage to the 2 0.010
2
0.045
2
0.161
2 0.191
Cable crossing over & in contact with the pipeline. No visual damage 2 3.031
2 3.755
2 -
found position during the 2013 survey of some of the
supplied position of the pipelines from the current Shell database
It is advised that positional data from the 2013 ROV pipeline survey is used to update the
All data summary is submitted as
Date of issue Page
07 Sept 2013 3 of
Doc. No Rev.
10933 – ISFE – FR - 16 01
Page Document Title
of 5
SURVEY FIELD REPORT
(PID0085 FROM AMRP02 – AMDP12)
Rev.
1
1. Class: 2
Small dia pipe debris lying on top of
pipeline. No visual damage to the contact
area.
KP=0.010
Easting=496548.82
Northing=520625.52
2. Class: 2
Description:
PID0085 crosses over the PID0322. Both
pipelines are in contact. No support
present between pipelines. No visual
damage observed in contact areas.
KP=0.045
Easting=496564.7
Northing=520656 .2
3. Class: 2
Loss of field joint coating circumferentially
approx 1 mtrs long.
KP=0.161
Easting=496597.60
Northing=52754.32
SURVEY FIELD REPORT
Small dia pipe debris lying on top of
No visual damage to the contact
PID0085 crosses over the PID0322. Both
contact. No support
present between pipelines. No visual
damage observed in contact areas.
field joint coating circumferentially
Date of issue Page
07 Sept 2013 4 of
Doc. No Rev.
10933 – ISFE – FR - 16 01
Page Document Title
of 5
SURVEY FIELD REPORT
(PID0085 FROM AMRP02 – AMDP12)
Rev.
1
4. Class: 2
Loss of field joint coating circumferentially
approx 1 mtrs long.
KP=0.191
Easting=496600.56
Northing=520778.33
5. Class: 2
Cable crossing over & in contact with the
pipeline. No visual damage observed on
the pipeline.
KP=3.031
Easting=497907.34
Northing=523270.79
6. Class: 2
Description:
Fish net debris on the pipeline. No visual
damage observed on the pipeline.
KP=3.755
Easting=498228.82
Northing=523912.44
SURVEY FIELD REPORT
field joint coating circumferentially
crossing over & in contact with the
pipeline. No visual damage observed on
Fish net debris on the pipeline. No visual
damage observed on the pipeline.
Date of issue Page
07 Sept 2013 5 of
Doc. No Rev.
10933 – ISFE – FR - 16 01
Anomaly on Riser at AMDP12
Page Document Title
of 5
SURVEY FIELD REPORT
(PID0085 FROM AMRP02 – AMDP12)
Rev.
1
Anomaly on Riser at AMDP12
7. Class: 2
Description:
Wire rope debris on sea bed touching
Riser Tube turn. No visual damage
observed to the riser tube turn.
Easting=498732.16
Northing=524029.86
SURVEY FIELD REPORT
Wire rope debris on sea bed touching
o visual damage
to the riser tube turn.

More Related Content

Viewers also liked

taming the transfer monster power point
taming the transfer monster power pointtaming the transfer monster power point
taming the transfer monster power point
Sarah Rach
 
NOAA Wespac Monument
NOAA Wespac Monument NOAA Wespac Monument
NOAA Wespac Monument
Honolulu Civil Beat
 
#capcom15 - Clôture : Communiquer autour des enjeux climatiques
#capcom15 - Clôture :  Communiquer autour des enjeux climatiques #capcom15 - Clôture :  Communiquer autour des enjeux climatiques
#capcom15 - Clôture : Communiquer autour des enjeux climatiques
Cap'Com
 
La obediencia exacta. Leccion 2 de Inteligencia Conductual
La obediencia exacta. Leccion 2 de Inteligencia Conductual La obediencia exacta. Leccion 2 de Inteligencia Conductual
La obediencia exacta. Leccion 2 de Inteligencia Conductual
Dr.Jose A Santos. +4500 contactos
 
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACIONVENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
somol
 
differential diagnosis of appendicitis vs haematocolpos
differential diagnosis of appendicitis vs haematocolposdifferential diagnosis of appendicitis vs haematocolpos
differential diagnosis of appendicitis vs haematocolpos
ALAUF JALALUDEEN
 
Evaluation Lesson #1 (Event Evaluation) Group 2
Evaluation Lesson #1 (Event Evaluation) Group 2Evaluation Lesson #1 (Event Evaluation) Group 2
Evaluation Lesson #1 (Event Evaluation) Group 2
Ryan Veitch
 
INCIDENCIA DEL GERENTE MEDIO DE ENFERMERIA EN EL DESEMPEÑO LABORAL DE LAS E...
INCIDENCIA  DEL GERENTE MEDIO DE ENFERMERIA EN  EL DESEMPEÑO LABORAL DE LAS E...INCIDENCIA  DEL GERENTE MEDIO DE ENFERMERIA EN  EL DESEMPEÑO LABORAL DE LAS E...
INCIDENCIA DEL GERENTE MEDIO DE ENFERMERIA EN EL DESEMPEÑO LABORAL DE LAS E...
12283656
 

Viewers also liked (8)

taming the transfer monster power point
taming the transfer monster power pointtaming the transfer monster power point
taming the transfer monster power point
 
NOAA Wespac Monument
NOAA Wespac Monument NOAA Wespac Monument
NOAA Wespac Monument
 
#capcom15 - Clôture : Communiquer autour des enjeux climatiques
#capcom15 - Clôture :  Communiquer autour des enjeux climatiques #capcom15 - Clôture :  Communiquer autour des enjeux climatiques
#capcom15 - Clôture : Communiquer autour des enjeux climatiques
 
La obediencia exacta. Leccion 2 de Inteligencia Conductual
La obediencia exacta. Leccion 2 de Inteligencia Conductual La obediencia exacta. Leccion 2 de Inteligencia Conductual
La obediencia exacta. Leccion 2 de Inteligencia Conductual
 
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACIONVENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
VENTAJASY DESVENTAJAS DE LA TECNOLOGIA EN LA CONTAMINACION
 
differential diagnosis of appendicitis vs haematocolpos
differential diagnosis of appendicitis vs haematocolposdifferential diagnosis of appendicitis vs haematocolpos
differential diagnosis of appendicitis vs haematocolpos
 
Evaluation Lesson #1 (Event Evaluation) Group 2
Evaluation Lesson #1 (Event Evaluation) Group 2Evaluation Lesson #1 (Event Evaluation) Group 2
Evaluation Lesson #1 (Event Evaluation) Group 2
 
INCIDENCIA DEL GERENTE MEDIO DE ENFERMERIA EN EL DESEMPEÑO LABORAL DE LAS E...
INCIDENCIA  DEL GERENTE MEDIO DE ENFERMERIA EN  EL DESEMPEÑO LABORAL DE LAS E...INCIDENCIA  DEL GERENTE MEDIO DE ENFERMERIA EN  EL DESEMPEÑO LABORAL DE LAS E...
INCIDENCIA DEL GERENTE MEDIO DE ENFERMERIA EN EL DESEMPEÑO LABORAL DE LAS E...
 

Similar to P.Line survey @Brunei by ROV 2013.

Piping sample report
Piping sample reportPiping sample report
Piping sample report
ram111eg
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
Mary Calkins
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
DeelipZope
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 
Notam
NotamNotam
MC _ CP Rev.0.pdf
MC _ CP Rev.0.pdfMC _ CP Rev.0.pdf
MC _ CP Rev.0.pdf
Pedro Marquez
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
Clyde Porter
 
Document for Linkedin
Document for LinkedinDocument for Linkedin
Document for Linkedin
Anil Dhanania
 
MNRE Certificate Of PV Module.PDF
MNRE Certificate Of PV Module.PDFMNRE Certificate Of PV Module.PDF
MNRE Certificate Of PV Module.PDF
Highflow Industries Pvt. Ltd.
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
abhishek357916
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
EngrMuhammadArslan4
 
Icl wo. 74
Icl wo. 74Icl wo. 74
Icl wo. 74
PrathameshMohite4
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
PPEJ.090.2010 rev2
PPEJ.090.2010 rev2PPEJ.090.2010 rev2
PPEJ.090.2010 rev2
Rahmat Riski
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Gary Hayes
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
bibimisael
 
01 01-2015
01 01-201501 01-2015
01 01-2015
Carlos Carvalho
 
Smart Pigging
Smart PiggingSmart Pigging
Smart Pigging
shadek khal khali
 
ARL-TR-6593
ARL-TR-6593ARL-TR-6593
ARL-TR-6593
Hans Guo
 

Similar to P.Line survey @Brunei by ROV 2013. (20)

Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Notam
NotamNotam
Notam
 
MC _ CP Rev.0.pdf
MC _ CP Rev.0.pdfMC _ CP Rev.0.pdf
MC _ CP Rev.0.pdf
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Document for Linkedin
Document for LinkedinDocument for Linkedin
Document for Linkedin
 
MNRE Certificate Of PV Module.PDF
MNRE Certificate Of PV Module.PDFMNRE Certificate Of PV Module.PDF
MNRE Certificate Of PV Module.PDF
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
 
Icl wo. 74
Icl wo. 74Icl wo. 74
Icl wo. 74
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
PPEJ.090.2010 rev2
PPEJ.090.2010 rev2PPEJ.090.2010 rev2
PPEJ.090.2010 rev2
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
01 01-2015
01 01-201501 01-2015
01 01-2015
 
Smart Pigging
Smart PiggingSmart Pigging
Smart Pigging
 
ARL-TR-6593
ARL-TR-6593ARL-TR-6593
ARL-TR-6593
 

P.Line survey @Brunei by ROV 2013.

  • 1. SURVEY FIELD REPORT (PID0085 FROM AMRP02– AMDP12) iSURVEY AS Billingstadsletta 25 P.O.Box 300 N-1377 Billingstad, Norway Telephone (24hrs): (+47) 45 41 41 00 Telefax : (+47) 66 98 22 71 e-mail : mail@isurvey-group.com internet : www.isurvey-group.com iSURVEY Project No 10933 iSURVEY Document 10933 – ISFE – FR – 16 Company BIBBY OFFSHORE Project Number: AP13070 Document No BSP PIPELINE AND RISER INSPECTION M/V BIBBY SPRING Revision Description Rev. Date Description Internal External Originator Checked Accepted Checked Approved B2 07.09.2013 Issued for Client Review NCS PM AK GA / SAY A1 07.09.2013 IDC NCS PM Signature Legend Initials / Signature Name Position GA / SAY George Anggat / SyamsulAmriYaacob BSP Representative PM Paul Morgan Party Chief NCS Naresh Chandra Sarkar Inspector 3.4U AK Andre Kotze BOS OPM
  • 2. Date of issue Page 07 Sept 2013 2 of Doc. No Rev. 10933 – ISFE – FR - 16 01 Subject: PID 0085 (150mm Ø) from AMRP02 Summary: Description Riser Inspection survey(AMRP02 Pipeline Inspection survey(PID Riser Inspection survey(AMDP12 Finding: Anomaly Description List 1 Small dia pipe debris lying on top of pip contact area. 2 PID0085 crosses over the PID0322. Both pipelines are support present between pipelines. No visual damage observed in contact areas. 3 Loss of field joint coating circumferentially approx 1 mtrs long. 4 Loss of field joint coating circumferentially approx 1 mtrs long. 5 Cable crossing over & in contact with the pipeline. No visual damage observed on the pipeline. 6 Fish net debris on the pipeline. No visual damage observed on the pipeline. Anomaly on Riser at AMDP12 7 Wire rope debris on sea bed touching Riser Tube turn. No visual damage observed to the riser tube turn. General Statement Differences in position of the as pipelines against the as-supplied position of the pipelines from the current Shell database have been observed. It is advised that positional data from the 2013 ROV pipeline survey is used to update the database. Please refer to the following pages field report purposes, according to scope of work. Page Document Title of 5 SURVEY FIELD REPORT (PID0085 FROM AMRP02 – AMDP12) Rev. 1 AMRP02 – AMDP12 Platform (2 x risers, 1 x pipeline) KP Time AMRP02) 0.000 - urvey(PID0085) 0.000 – 4.354 - AMDP12) 4.354 - Small dia pipe debris lying on top of pipeline. No visual damage to the PID0085 crosses over the PID0322. Both pipelines are In contact. No support present between pipelines. No visual damage observed in contact field joint coating circumferentially approx 1 mtrs long. field joint coating circumferentially approx 1 mtrs long. Cable crossing over & in contact with the pipeline. No visual damage Fish net debris on the pipeline. No visual damage observed on the pipeline. Wire rope debris on sea bed touching Riser Tube turn. No visual damage observed to the riser tube turn. Differences in position of the as-found position during the 2013 survey of supplied position of the pipelines from the current Shell database It is advised that positional data from the 2013 ROV pipeline survey is used to update the the following pages for anomaly findings. All data summary is submitted as field report purposes, according to scope of work. SURVEY FIELD REPORT (2 x risers, 1 x pipeline) Date 02nd Sept. 2013 02nd Sept. 2013 02nd Sept. 2013 Class KP No visual damage to the 2 0.010 2 0.045 2 0.161 2 0.191 Cable crossing over & in contact with the pipeline. No visual damage 2 3.031 2 3.755 2 - found position during the 2013 survey of some of the supplied position of the pipelines from the current Shell database It is advised that positional data from the 2013 ROV pipeline survey is used to update the All data summary is submitted as
  • 3. Date of issue Page 07 Sept 2013 3 of Doc. No Rev. 10933 – ISFE – FR - 16 01 Page Document Title of 5 SURVEY FIELD REPORT (PID0085 FROM AMRP02 – AMDP12) Rev. 1 1. Class: 2 Small dia pipe debris lying on top of pipeline. No visual damage to the contact area. KP=0.010 Easting=496548.82 Northing=520625.52 2. Class: 2 Description: PID0085 crosses over the PID0322. Both pipelines are in contact. No support present between pipelines. No visual damage observed in contact areas. KP=0.045 Easting=496564.7 Northing=520656 .2 3. Class: 2 Loss of field joint coating circumferentially approx 1 mtrs long. KP=0.161 Easting=496597.60 Northing=52754.32 SURVEY FIELD REPORT Small dia pipe debris lying on top of No visual damage to the contact PID0085 crosses over the PID0322. Both contact. No support present between pipelines. No visual damage observed in contact areas. field joint coating circumferentially
  • 4. Date of issue Page 07 Sept 2013 4 of Doc. No Rev. 10933 – ISFE – FR - 16 01 Page Document Title of 5 SURVEY FIELD REPORT (PID0085 FROM AMRP02 – AMDP12) Rev. 1 4. Class: 2 Loss of field joint coating circumferentially approx 1 mtrs long. KP=0.191 Easting=496600.56 Northing=520778.33 5. Class: 2 Cable crossing over & in contact with the pipeline. No visual damage observed on the pipeline. KP=3.031 Easting=497907.34 Northing=523270.79 6. Class: 2 Description: Fish net debris on the pipeline. No visual damage observed on the pipeline. KP=3.755 Easting=498228.82 Northing=523912.44 SURVEY FIELD REPORT field joint coating circumferentially crossing over & in contact with the pipeline. No visual damage observed on Fish net debris on the pipeline. No visual damage observed on the pipeline.
  • 5. Date of issue Page 07 Sept 2013 5 of Doc. No Rev. 10933 – ISFE – FR - 16 01 Anomaly on Riser at AMDP12 Page Document Title of 5 SURVEY FIELD REPORT (PID0085 FROM AMRP02 – AMDP12) Rev. 1 Anomaly on Riser at AMDP12 7. Class: 2 Description: Wire rope debris on sea bed touching Riser Tube turn. No visual damage observed to the riser tube turn. Easting=498732.16 Northing=524029.86 SURVEY FIELD REPORT Wire rope debris on sea bed touching o visual damage to the riser tube turn.